forked from nm3clol/nm3clol-public
125 lines
2.3 KiB
Markdown
125 lines
2.3 KiB
Markdown
---
|
||
type: document
|
||
title: aiHNM0009019
|
||
file: ../aiHNM0009019.pdf
|
||
tags:
|
||
- Amys_Drop_Box
|
||
- Golden Pond Gob Pile Project
|
||
docDate: 2020-02-04
|
||
contentType: application/pdf
|
||
contentLength: 36538
|
||
sha256sum: f88f5b4223d6cdfcfacd9a00964119cec5a72f03d2bb82bf8b54869cb1b5efe5
|
||
sha1sum: 94ebb9a6dd42f2a99480af5d37f91c2aa2a6bb0a
|
||
---
|
||
|
||
COMMONWEALTH OF VIRGINIA
|
||
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||
|
||
DIVISION OF MINED LAND RECLAMATION
|
||
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||
|
||
TELEPHONE: (276) 523-8198
|
||
|
||
|
||
ABANDONED MINE LAND INSPECTION
|
||
|
||
|
||
DMLR-AML-130S Printed: 02/04/20
|
||
5/06 Page 1 of 1
|
||
|
||
|
||
HNM0009019
|
||
|
||
|
||
|
||
PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER
|
||
|
||
Golden Pond Gob Removal 18302 2018 HNM0009019
|
||
|
||
|
||
|
||
CONTRACT INFORMATION
|
||
|
||
CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED
|
||
|
||
C196013 03/31/21 15
|
||
|
||
CONTRACTOR NAME ENGINEER NAME
|
||
|
||
Russell County Reclamation, LLC SCOTTY COX
|
||
|
||
SITE CONTACT PERSON: Kevin Large
|
||
|
||
|
||
|
||
INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION
|
||
|
||
01/15/20
|
||
01/23/20
|
||
|
||
03:30 PM
|
||
03:00 PM
|
||
|
||
04:30 PM
|
||
04:00 PM
|
||
|
||
WET
|
||
WET
|
||
|
||
|
||
|
||
INSPECTION BY ATTACHMENTS
|
||
|
||
MCDONALD-TAYLOR, H.
|
||
|
||
|
||
|
||
COMMENTS
|
||
|
||
Material removal continued throughout the month. Excavation has moved beyond the building site. At the time of the
|
||
inspection, excavators were working both sides of the structure.
|
||
|
||
|
||
|
||
|
||
COMMONWEALTH OF VIRGINIA HNM0009019
|
||
|
||
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||
Dh DIVISION OF MINED LAND RECLAMATION
|
||
|
||
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||
Virginia Depay TELEPHONE: (276) 523-8198
|
||
|
||
Mines Minerals and Energy
|
||
|
||
ABANDONED MINE LAND INSPECTION
|
||
|
||
PROJECT NAME, PROJECT NO. GRANT YEAR | REPORT NUMBER
|
||
|
||
Golden Pond Gob Removal 18302 2018 HNM0009019
|
||
|
||
CONTRACT INFORMATION
|
||
|
||
CONTRACT NUMBER EXPIRATION DATE, PERCENT OF CONTRACT COMPLETED
|
||
€196013 03/31/21 15
|
||
CONTRACTOR NAME ENGINEER NAME,
|
||
Russell County Reclamation, LLC ‘SCOTTY COX
|
||
‘SITE CONTACT PERSON: Kevin Large
|
||
INSPECTION DATE ARRIVAL DEPARTURE. GROUND CONDITION
|
||
01/15/20 03:30 PM 04:30 PM WET
|
||
01/23/20 03:00 PM 04:00 PM WET
|
||
INSPECTION BY ATTACHMENTS
|
||
|
||
MCDONALD-TAYLOR, H.
|
||
|
||
[ COMMENTS
|
||
|
||
Material removal continued throughout the month. Excavation has moved beyond the building site. At the time of the
|
||
inspection, excavators were working both sides of the structure.
|
||
|
||
DMLR-AML-130S Printed: 02/04/20
|
||
5/06 Page 1 of 1
|
||
|
||
|
||
|