--- type: document title: aiHNM0009019 file: ../aiHNM0009019.pdf tags: - Amys_Drop_Box - Golden Pond Gob Pile Project docDate: 2020-02-04 contentType: application/pdf contentLength: 36538 sha256sum: f88f5b4223d6cdfcfacd9a00964119cec5a72f03d2bb82bf8b54869cb1b5efe5 sha1sum: 94ebb9a6dd42f2a99480af5d37f91c2aa2a6bb0a --- COMMONWEALTH OF VIRGINIA DEPARTMENT OF MINES, MINERALS AND ENERGY DIVISION OF MINED LAND RECLAMATION P.O. DRAWER 900, BIG STONE GAP, VA 24219 TELEPHONE: (276) 523-8198 ABANDONED MINE LAND INSPECTION DMLR-AML-130S Printed: 02/04/20 5/06 Page 1 of 1 HNM0009019 PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER Golden Pond Gob Removal 18302 2018 HNM0009019 CONTRACT INFORMATION CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED C196013 03/31/21 15 CONTRACTOR NAME ENGINEER NAME Russell County Reclamation, LLC SCOTTY COX SITE CONTACT PERSON: Kevin Large INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION 01/15/20 01/23/20 03:30 PM 03:00 PM 04:30 PM 04:00 PM WET WET INSPECTION BY ATTACHMENTS MCDONALD-TAYLOR, H. COMMENTS Material removal continued throughout the month. Excavation has moved beyond the building site. At the time of the inspection, excavators were working both sides of the structure. COMMONWEALTH OF VIRGINIA HNM0009019 DEPARTMENT OF MINES, MINERALS AND ENERGY Dh DIVISION OF MINED LAND RECLAMATION P.O. DRAWER 900, BIG STONE GAP, VA 24219 Virginia Depay TELEPHONE: (276) 523-8198 Mines Minerals and Energy ABANDONED MINE LAND INSPECTION PROJECT NAME, PROJECT NO. GRANT YEAR | REPORT NUMBER Golden Pond Gob Removal 18302 2018 HNM0009019 CONTRACT INFORMATION CONTRACT NUMBER EXPIRATION DATE, PERCENT OF CONTRACT COMPLETED €196013 03/31/21 15 CONTRACTOR NAME ENGINEER NAME, Russell County Reclamation, LLC ‘SCOTTY COX ‘SITE CONTACT PERSON: Kevin Large INSPECTION DATE ARRIVAL DEPARTURE. GROUND CONDITION 01/15/20 03:30 PM 04:30 PM WET 01/23/20 03:00 PM 04:00 PM WET INSPECTION BY ATTACHMENTS MCDONALD-TAYLOR, H. [ COMMENTS Material removal continued throughout the month. Excavation has moved beyond the building site. At the time of the inspection, excavators were working both sides of the structure. DMLR-AML-130S Printed: 02/04/20 5/06 Page 1 of 1