type: document
title: aiHNM0008430
file: ../aiHNM0008430.pdf
tags:
- Amys_Drop_Box
- Golden Pond Gob Pile Project
docDate: 2019-01-07
contentType: application/pdf
contentLength: 36996
sha256sum: 490907ea0e8d82c4ad9e7ffff96aee43afed19ee75c4e211481e7ba4b79822d5
sha1sum: 2c6e1bd3be6c41821c62b675141370004142a5d9
---
COMMONWEALTH OF VIRGINIA
DEPARTMENT OF MINES, MINERALS AND ENERGY
DIVISION OF MINED LAND RECLAMATION
P.O. DRAWER 900, BIG STONE GAP, VA 24219
TELEPHONE: (276) 523-8198
ABANDONED MINE LAND INSPECTION
DMLR-AML-130S Printed: 01/07/19
5/06 Page 1 of 1
HNM0008430
PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER
Golden Pond Gob Removal 18302 2018 HNM0008430
CONTRACT INFORMATION
CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED
C196013 03/31/21 0
CONTRACTOR NAME ENGINEER NAME
Russell County Reclamation, LLC SCOTTY COX
SITE CONTACT PERSON: Kevin Large
INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION
12/12/18 10:00 AM 11:15 AM FROZEN
INSPECTION BY ATTACHMENTS
MCDONALD-TAYLOR, H.
COMMENTS
A meeting was held on site on 12-12-18 with Heather McDonald-Taylor, Lesa Baker and Clara Harris from DMME and
William Wampler, Kevin Large and Dave Powers with the company. The site was reviewed and future plans discussed.
Work has not yet begun on the site. Large scale material removal cannot begin until the material within the structure is
partially dried. Pumping cannot commence until the ponds on permit 1302253 are approved to receive the drainage.
That is addressed in application 1010465. That application is likely to be approved soon. Pumping will commence as
soon as the application is approved. Large scale gob removal will likely not commence until spring.
COMMONWEALTH OF VIRGINIA HNM0008430
DEPARTMENT OF MINES, MINERALS AND ENERGY
Dh DIVISION OF MINED LAND RECLAMATION
P.O. DRAWER 900, BIG STONE GAP, VA 24219
Virginia Depay TELEPHONE: (276) 523-8198
Mines Minerals and Energy
ABANDONED MINE LAND INSPECTION
PROJECT NAME, PROJECT NO. GRANT YEAR | REPORT NUMBER
Golden Pond Gob Removal 48302 2018 HNM0008430
CONTRACT INFORMATION
CONTRACT NUMBER EXPIRATION DATE, PERCENT OF CONTRACT COMPLETED
C196013 03/31/21 0
CONTRACTOR NAME ENGINEER NAME,
Russell County Reclamation, LLC SCOTTY COX
SITE CONTACT PERSON: Kevin Large
INSPECTION DATE, ARRIVAL DEPARTURE. GROUND CONDITION
42/12/18 10:00 AM 14:15 AM FROZEN
INSPECTION BY ATTACHMENTS
MCDONALD-TAYLOR, H.
[ COMMENTS:
A meeting was held on site on 12-12-16 with Heather McDonald-Taylor, Lesa Baker and Clara Harris from DMME and
William Wampler, Kevin Large and Dave Powers with the company. The site was reviewed and future plans discussed.
Work has not yet begun on the site. Large scale material removal cannot begin until the material within the structure is
partially dried. Pumping cannot commence until the ponds on permit 1302253 are approved to receive the drainage.
That is addressed in application 1010465. That application is likely to be approved soon. Pumping will commence as
soon as the application is approved. Large scale gob removal will ikely not commence until spring
DMLR-AML-130S Printed: 01/07/19