--- type: document title: aiHNM0008430 file: ../aiHNM0008430.pdf tags: - Amys_Drop_Box - Golden Pond Gob Pile Project docDate: 2019-01-07 contentType: application/pdf contentLength: 36996 sha256sum: 490907ea0e8d82c4ad9e7ffff96aee43afed19ee75c4e211481e7ba4b79822d5 sha1sum: 2c6e1bd3be6c41821c62b675141370004142a5d9 --- COMMONWEALTH OF VIRGINIA DEPARTMENT OF MINES, MINERALS AND ENERGY DIVISION OF MINED LAND RECLAMATION P.O. DRAWER 900, BIG STONE GAP, VA 24219 TELEPHONE: (276) 523-8198 ABANDONED MINE LAND INSPECTION DMLR-AML-130S Printed: 01/07/19 5/06 Page 1 of 1 HNM0008430 PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER Golden Pond Gob Removal 18302 2018 HNM0008430 CONTRACT INFORMATION CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED C196013 03/31/21 0 CONTRACTOR NAME ENGINEER NAME Russell County Reclamation, LLC SCOTTY COX SITE CONTACT PERSON: Kevin Large INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION 12/12/18 10:00 AM 11:15 AM FROZEN INSPECTION BY ATTACHMENTS MCDONALD-TAYLOR, H. COMMENTS A meeting was held on site on 12-12-18 with Heather McDonald-Taylor, Lesa Baker and Clara Harris from DMME and William Wampler, Kevin Large and Dave Powers with the company. The site was reviewed and future plans discussed. Work has not yet begun on the site. Large scale material removal cannot begin until the material within the structure is partially dried. Pumping cannot commence until the ponds on permit 1302253 are approved to receive the drainage. That is addressed in application 1010465. That application is likely to be approved soon. Pumping will commence as soon as the application is approved. Large scale gob removal will likely not commence until spring. COMMONWEALTH OF VIRGINIA HNM0008430 DEPARTMENT OF MINES, MINERALS AND ENERGY Dh DIVISION OF MINED LAND RECLAMATION P.O. DRAWER 900, BIG STONE GAP, VA 24219 Virginia Depay TELEPHONE: (276) 523-8198 Mines Minerals and Energy ABANDONED MINE LAND INSPECTION PROJECT NAME, PROJECT NO. GRANT YEAR | REPORT NUMBER Golden Pond Gob Removal 48302 2018 HNM0008430 CONTRACT INFORMATION CONTRACT NUMBER EXPIRATION DATE, PERCENT OF CONTRACT COMPLETED C196013 03/31/21 0 CONTRACTOR NAME ENGINEER NAME, Russell County Reclamation, LLC SCOTTY COX ‘SITE CONTACT PERSON: Kevin Large INSPECTION DATE, ARRIVAL DEPARTURE. GROUND CONDITION 42/12/18 10:00 AM 14:15 AM FROZEN INSPECTION BY ATTACHMENTS MCDONALD-TAYLOR, H. [ COMMENTS: ‘A meeting was held on site on 12-12-16 with Heather McDonald-Taylor, Lesa Baker and Clara Harris from DMME and William Wampler, Kevin Large and Dave Powers with the company. The site was reviewed and future plans discussed. Work has not yet begun on the site. Large scale material removal cannot begin until the material within the structure is partially dried. Pumping cannot commence until the ponds on permit 1302253 are approved to receive the drainage. That is addressed in application 1010465. That application is likely to be approved soon. Pumping will commence as soon as the application is approved. Large scale gob removal will ikely not commence until spring DMLR-AML-130S Printed: 01/07/19 5/06 Page 1 of 1