COMMONWEALTH OF VIRGINIA DEPARTMENT OF MINES, MINERALS AND ENERGY

DIVISION OF MINED LAND RECLAMATION P.O. DRAWER 900, BIG STONE GAP, VA 24219

TELEPHONE: (276) 523-8198

ABANDONED MINE LAND INSPECTION

DMLR-AML-130S Printed: 02/05/21 5/06 Page 1 of 1

HNM0009473

PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER

Golden Pond Gob Removal 18302 2018 HNM0009473

CONTRACT INFORMATION

CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED

C196013 03/31/21 80

CONTRACTOR NAME ENGINEER NAME

Russell County Reclamation, LLC SCOTTY COX

SITE CONTACT PERSON: Kevin Large

INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION

12/01/20 12/10/20

03:30 PM 03:30 PM

04:30 PM 04:30 PM

WET WET

INSPECTION BY ATTACHMENTS

MCDONALD-TAYLOR, H.

COMMENTS

Material removal and backfilling is ongoing. Material is currently being stored on areas previously backfilled as well as on the permitted site. The building site has now been covered with a mix of shot rock and soil. Photos of the site are shown below.

COMMONWEALTH OF VIRGINIA HNM0009473 DEPARTMENT OF MINES, MINERALS AND ENERGY Dh DIVISION OF MINED LAND RECLAMATION P.O. DRAWER 900, BIG STONE GAP, VA 24219

-ginia Depai TELEPHONE: (276) 523-8198 Mines Minerals and Energy

ABANDONED MINE LAND INSPECTION

PROJECT NAME, PROJECT NO. GRANT YEAR | REPORT NUMBER Golden Pond Gob Removal 48302 2018 HNM0009473 CONTRACT INFORMATION CONTRACT NUMBER EXPIRATION DATE, PERCENT OF CONTRACT COMPLETED C196013 03/31/21 80 CONTRACTOR NAME ENGINEER NAME, Russell County Reclamation, LLC SCOTTY COX SITE CONTACT PERSON: Kevin Large INSPECTION DATE, ARRIVAL, DEPARTURE. GROUND CONDITION 42/01/20 03:30 PM (04:30 PM WET 42/10/20 03:30 PM 04:30 PM WET INSPECTION BY ATTACHMENTS

MCDONALD-TAYLOR, H.

[ COMMENTS ] Material removal and backfiling is ongoing. Material is currently being stored on areas previously backfilled as well as on the permitted site. The building site has now been covered with a mix of shot rock and soil. Photos of the site are shown below.

DMLR-AML-130S Printed: 02/05/21 5106 Page 1 of 1