--- type: document title: aiHNM0009473 file: ../aiHNM0009473.pdf tags: - Amys_Drop_Box - Golden Pond Gob Pile Project docDate: 2021-02-05 contentType: application/pdf contentLength: 208322 sha256sum: 2c19fcf1e0540d57a3aceee2e22dc6845bd40263526969ffaefa27bd09d23b9b sha1sum: b1685ea2d324684f6d6c04719f0500d487031687 --- COMMONWEALTH OF VIRGINIA DEPARTMENT OF MINES, MINERALS AND ENERGY DIVISION OF MINED LAND RECLAMATION P.O. DRAWER 900, BIG STONE GAP, VA 24219 TELEPHONE: (276) 523-8198 ABANDONED MINE LAND INSPECTION DMLR-AML-130S Printed: 02/05/21 5/06 Page 1 of 1 HNM0009473 PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER Golden Pond Gob Removal 18302 2018 HNM0009473 CONTRACT INFORMATION CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED C196013 03/31/21 80 CONTRACTOR NAME ENGINEER NAME Russell County Reclamation, LLC SCOTTY COX SITE CONTACT PERSON: Kevin Large INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION 12/01/20 12/10/20 03:30 PM 03:30 PM 04:30 PM 04:30 PM WET WET INSPECTION BY ATTACHMENTS MCDONALD-TAYLOR, H. COMMENTS Material removal and backfilling is ongoing. Material is currently being stored on areas previously backfilled as well as on the permitted site. The building site has now been covered with a mix of shot rock and soil. Photos of the site are shown below. COMMONWEALTH OF VIRGINIA HNM0009473 DEPARTMENT OF MINES, MINERALS AND ENERGY Dh DIVISION OF MINED LAND RECLAMATION P.O. DRAWER 900, BIG STONE GAP, VA 24219 -ginia Depai TELEPHONE: (276) 523-8198 Mines Minerals and Energy ABANDONED MINE LAND INSPECTION PROJECT NAME, PROJECT NO. GRANT YEAR | REPORT NUMBER Golden Pond Gob Removal 48302 2018 HNM0009473 CONTRACT INFORMATION CONTRACT NUMBER EXPIRATION DATE, PERCENT OF CONTRACT COMPLETED C196013 03/31/21 80 CONTRACTOR NAME ENGINEER NAME, Russell County Reclamation, LLC SCOTTY COX ‘SITE CONTACT PERSON: Kevin Large INSPECTION DATE, ARRIVAL, DEPARTURE. GROUND CONDITION 42/01/20 03:30 PM (04:30 PM WET 42/10/20 03:30 PM 04:30 PM WET INSPECTION BY ATTACHMENTS MCDONALD-TAYLOR, H. [ ‘COMMENTS ] Material removal and backfiling is ongoing. Material is currently being stored on areas previously backfilled as well as on the permitted site. The building site has now been covered with a mix of shot rock and soil. Photos of the site are shown below. DMLR-AML-130S Printed: 02/05/21 5106 Page 1 of 1