COMMONWEALTH OF VIRGINIA
|
||
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||
|
||
DIVISION OF MINED LAND RECLAMATION
|
||
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||
|
||
TELEPHONE: (276) 523-8198
|
||
|
||
|
||
ABANDONED MINE LAND INSPECTION
|
||
|
||
|
||
DMLR-AML-130S Printed: 02/05/19
|
||
5/06 Page 1 of 1
|
||
|
||
|
||
HNM0008488
|
||
|
||
|
||
|
||
PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER
|
||
|
||
Golden Pond Gob Removal 18302 2018 HNM0008488
|
||
|
||
|
||
|
||
CONTRACT INFORMATION
|
||
|
||
CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED
|
||
|
||
C196013 03/31/21 0
|
||
|
||
CONTRACTOR NAME ENGINEER NAME
|
||
|
||
Russell County Reclamation, LLC SCOTTY COX
|
||
|
||
SITE CONTACT PERSON: Kevin Large
|
||
|
||
|
||
|
||
INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION
|
||
|
||
01/14/19 10:00 AM 11:30 AM FROZEN
|
||
|
||
|
||
|
||
INSPECTION BY ATTACHMENTS
|
||
|
||
MCDONALD-TAYLOR, H.
|
||
|
||
|
||
|
||
COMMENTS
|
||
|
||
The following equipment was checked by DM Inspector Vernon Johnson, Jr on 12-26-18 and found to be in safe operating
|
||
condition: (1) Caterpillar excavator with flip screen bucket, (1) Caterpillar 980 G loader, (1) Caterpillar 938 H Loader, (1)
|
||
John Deere65 dozer, (1) Volvo EC250 excavator with long boom, (2) Volvo A40G off-road trucks and (1) Volvo A30G off-
|
||
road truck.
|
||
|
||
On 1-14-19, the site was reviewed by DMLR engineer Pat Leady and water quality specialist Andrew Hensley. The
|
||
primary purpose of the visit was to review the area between Golden Pond and Pond 2 to determine the best plan for
|
||
conveying water to Pond 2.
|
||
|
||
The company continues to screen refuse in anticipation of the start of the project; however, fines removal has not yet
|
||
commenced. Application 1010465 has received technical approval and is awaiting approval of the cost bond. Approval of
|
||
application 1010465 will allow the company to begin pumping water from Golden Pond in to the permitted ponds.
|
||
|
||
|
||
COMMONWEALTH OF VIRGINIA HNMo0008488
|
||
|
||
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||
Dh DIVISION OF MINED LAND RECLAMATION
|
||
|
||
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||
Virginia Depay TELEPHONE: (276) 523-8198
|
||
|
||
Mines Minerals and Energy
|
||
ABANDONED MINE LAND INSPECTION
|
||
|
||
PROJECT NAME, PROJECT NO. GRANT YEAR | REPORT NUMBER
|
||
|
||
Golden Pond Gob Removal 48302 2018 HNM0008488
|
||
|
||
CONTRACT INFORMATION
|
||
|
||
CONTRACT NUMBER EXPIRATION DATE, PERCENT OF CONTRACT COMPLETED
|
||
|
||
C196013 03/31/21 0
|
||
CONTRACTOR NAME ENGINEER NAME,
|
||
|
||
Russell County Reclamation, LLC SCOTTY COX
|
||
|
||
‘SITE CONTACT PERSON: Kevin Large
|
||
|
||
INSPECTION DATE, ARRIVAL DEPARTURE. GROUND CONDITION
|
||
01/14/19 10:00 AM 14:30 AM FROZEN
|
||
INSPECTION BY ATTACHMENTS
|
||
|
||
MCDONALD-TAYLOR, H.
|
||
|
||
COMMENTS: ]
|
||
|
||
The following equipment was checked by DM Inspector Vernon Johnson, Jr on 12-26-18 and found to be in safe operating
|
||
condition: (1) Caterpillar excavator with flip screen bucket, (1) Caterpillar 980 G loader, (1) Caterpillar 938 H Loader, (1)
|
||
John Deere65 dozer, (1) Volvo EC250 excavator with long boom, (2) Volvo A40G off-road trucks and (1) Volvo A30G off-
|
||
road truck.
|
||
|
||
On 1-14-19, the site was reviewed by DMLR engineer Pat Leady and water quality specialist Andrew Hensley. The
|
||
primary purpose of the visit was to review the area between Golden Pond and Pond 2 to determine the best plan for
|
||
‘conveying water to Pond 2.
|
||
|
||
The company continues to screen refuse in anticipation of the start of the project; however, fines removal has not yet
|
||
‘commenced. Application 1010465 has received technical approval and is awaiting approval of the cost bond. Approval of
|
||
application 1010465 will allow the company to begin pumping water from Golden Pond in to the permitted ponds.
|
||
|
||
DMLR-AML-130S Printed: 02/05/19
|
||
5/06 Page 1 of 1
|
||
|
||
|
||
|