--- type: document title: aiHNM0008488 file: ../aiHNM0008488.pdf tags: - Amys_Drop_Box - Golden Pond Gob Pile Project docDate: 2019-02-05 contentType: application/pdf contentLength: 37655 sha256sum: acb8286bd76861230fd5ec4bb2b17fdaa0db9821e1e392f3f5142c714aead482 sha1sum: bce2c3eaf6f903cc5be55aff0e9cf49cc0b02eba --- COMMONWEALTH OF VIRGINIA DEPARTMENT OF MINES, MINERALS AND ENERGY DIVISION OF MINED LAND RECLAMATION P.O. DRAWER 900, BIG STONE GAP, VA 24219 TELEPHONE: (276) 523-8198 ABANDONED MINE LAND INSPECTION DMLR-AML-130S Printed: 02/05/19 5/06 Page 1 of 1 HNM0008488 PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER Golden Pond Gob Removal 18302 2018 HNM0008488 CONTRACT INFORMATION CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED C196013 03/31/21 0 CONTRACTOR NAME ENGINEER NAME Russell County Reclamation, LLC SCOTTY COX SITE CONTACT PERSON: Kevin Large INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION 01/14/19 10:00 AM 11:30 AM FROZEN INSPECTION BY ATTACHMENTS MCDONALD-TAYLOR, H. COMMENTS The following equipment was checked by DM Inspector Vernon Johnson, Jr on 12-26-18 and found to be in safe operating condition: (1) Caterpillar excavator with flip screen bucket, (1) Caterpillar 980 G loader, (1) Caterpillar 938 H Loader, (1) John Deere65 dozer, (1) Volvo EC250 excavator with long boom, (2) Volvo A40G off-road trucks and (1) Volvo A30G off- road truck. On 1-14-19, the site was reviewed by DMLR engineer Pat Leady and water quality specialist Andrew Hensley. The primary purpose of the visit was to review the area between Golden Pond and Pond 2 to determine the best plan for conveying water to Pond 2. The company continues to screen refuse in anticipation of the start of the project; however, fines removal has not yet commenced. Application 1010465 has received technical approval and is awaiting approval of the cost bond. Approval of application 1010465 will allow the company to begin pumping water from Golden Pond in to the permitted ponds. COMMONWEALTH OF VIRGINIA HNMo0008488 DEPARTMENT OF MINES, MINERALS AND ENERGY Dh DIVISION OF MINED LAND RECLAMATION P.O. DRAWER 900, BIG STONE GAP, VA 24219 Virginia Depay TELEPHONE: (276) 523-8198 Mines Minerals and Energy ABANDONED MINE LAND INSPECTION PROJECT NAME, PROJECT NO. GRANT YEAR | REPORT NUMBER Golden Pond Gob Removal 48302 2018 HNM0008488 CONTRACT INFORMATION CONTRACT NUMBER EXPIRATION DATE, PERCENT OF CONTRACT COMPLETED C196013 03/31/21 0 CONTRACTOR NAME ENGINEER NAME, Russell County Reclamation, LLC SCOTTY COX ‘SITE CONTACT PERSON: Kevin Large INSPECTION DATE, ARRIVAL DEPARTURE. GROUND CONDITION 01/14/19 10:00 AM 14:30 AM FROZEN INSPECTION BY ATTACHMENTS MCDONALD-TAYLOR, H. COMMENTS: ] The following equipment was checked by DM Inspector Vernon Johnson, Jr on 12-26-18 and found to be in safe operating condition: (1) Caterpillar excavator with flip screen bucket, (1) Caterpillar 980 G loader, (1) Caterpillar 938 H Loader, (1) John Deere65 dozer, (1) Volvo EC250 excavator with long boom, (2) Volvo A40G off-road trucks and (1) Volvo A30G off- road truck. On 1-14-19, the site was reviewed by DMLR engineer Pat Leady and water quality specialist Andrew Hensley. The primary purpose of the visit was to review the area between Golden Pond and Pond 2 to determine the best plan for ‘conveying water to Pond 2. The company continues to screen refuse in anticipation of the start of the project; however, fines removal has not yet ‘commenced. Application 1010465 has received technical approval and is awaiting approval of the cost bond. Approval of application 1010465 will allow the company to begin pumping water from Golden Pond in to the permitted ponds. DMLR-AML-130S Printed: 02/05/19 5/06 Page 1 of 1