nm3clol-public/Amys_Drop_Box/Project Reclaim II - Final Inspection/Project Reclaim Phase II - eligibility doc - signed/README.md
2024-06-24 05:11:34 -04:00

128 lines
2.9 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters

This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.

---
type: document
title: Project Reclaim Phase II - eligibility doc - signed
file: ../Project Reclaim Phase II - eligibility doc - signed.pdf
tags:
- Amys_Drop_Box
- Project Reclaim II - Final Inspection
docDate: 2019-06-05
contentType: application/pdf
contentLength: 1604887
sha256sum: 7ee557afe3fee35b321a23506b177fc7e50fdca317f2a2f08f69f61cf3948ea3
sha1sum: c5e8a1351ba0e17abfb5bd883d7982bf39c3b277
---
Divisions
ENERGY
AS AND OL
NED LAND
MINERAL MAIN
MINERAL SOURCES
vanes
ADMSTRATION
ATION
COMMONWEALTH OF VIRGINIA.
Department of Mines, Minerals and Energy
Division of Mined Land Reclamation
P.O, Drawer 900
Big Stone Gap. Virginia
(276) 523-8100" FAX
ww dm
0900
23-8148
June 05, 2019
PILOT PROJECT ELIGIBILITY DOCUMENTATION
PROJECT RECLAIM PHASE I!
FY18 AML PILOT GRANT
The Pilot FY2018 Project Reclaim Phase II is located is located off State Route 615, along Dumps
Creek, south of South Clinchfield in Russell County, Virginia. Project area mapping is comprised
of a section of the Carbo USGS 7.5 Minute Quadrangle. The project coordinates are 82° 10'
44.21"W and 36° 57' 38.77"N. The project area is contained within the South Clinchfield
Problem Area, VA-0821.
The 2018 AML Pilot guidance document states that sites eligible under AML Pilot include
"Previously reclaimed AML lands and polluted waters" and “land adjacent to unreclaimed or
previously reclaimed AML lands and polluted waters...”. Project Reclaim Phase Il will take place
on the area being remediated through the Golden Pond Gob Pile Removal Project (Project
Number 18302 FY2018).
Additionally, the proposed AML Pilot project is adjacent to the South Clinchfield Water System
project (Project Number 8613, FY86). This project installed a public water line along Gravel Lick
Rd into the community of South Clinchfield located approximately 600 feet away from the
project area. This water line passes the proposed project area within approximately 100 feet
for a distance of approximately 700 feet before diverting into the aforementioned residential
area.
There have been no permanent program activities and there is no continuing responsibility for
any individual, firm, or organization to reclaim this feature.
| have reviewed the eligibility documentation for this project and find the project meets
eligibility criteria Section Il of the Guidance for Project Eligibility under the Abandoned Mine
Land Reclamation Economic Development Pilot Program for Fiscal Year 2018.
Bul Babe Lt los [7014
Lesa Baker Date
Abandoned Mine Land Projects Coordinator
A noprove __Disapprove
Fuad, =, Cosy olshe
Randy R. Casey Date
Division Direct¢
LOCATION MAP
cerca manana cn
Gregan GOB on \
_
Project Reclaim
Phase IT
Golden Pond Gob Removal Project (Project Number 18302, FY18)
Bee as |
Donia
a RUSSELL COUNTY
RECLAMATION, LLC
South Clinchfield Water System project (Project Number 8613, FY86)
SITE PHOTOS