128 lines
2.9 KiB
Markdown
128 lines
2.9 KiB
Markdown
---
|
||
type: document
|
||
title: Project Reclaim Phase II - eligibility doc - signed
|
||
file: ../Project Reclaim Phase II - eligibility doc - signed.pdf
|
||
tags:
|
||
- Amys_Drop_Box
|
||
- Project Reclaim II - Final Inspection
|
||
docDate: 2019-06-05
|
||
contentType: application/pdf
|
||
contentLength: 1604887
|
||
sha256sum: 7ee557afe3fee35b321a23506b177fc7e50fdca317f2a2f08f69f61cf3948ea3
|
||
sha1sum: c5e8a1351ba0e17abfb5bd883d7982bf39c3b277
|
||
---
|
||
|
||
Divisions
|
||
ENERGY
|
||
AS AND OL
|
||
NED LAND
|
||
MINERAL MAIN
|
||
MINERAL SOURCES
|
||
vanes
|
||
ADMSTRATION
|
||
|
||
ATION
|
||
|
||
COMMONWEALTH OF VIRGINIA.
|
||
|
||
Department of Mines, Minerals and Energy
|
||
Division of Mined Land Reclamation
|
||
P.O, Drawer 900
|
||
Big Stone Gap. Virginia
|
||
(276) 523-8100" FAX
|
||
‘ww dm
|
||
|
||
0900
|
||
23-8148
|
||
|
||
June 05, 2019
|
||
|
||
PILOT PROJECT ELIGIBILITY DOCUMENTATION
|
||
PROJECT RECLAIM PHASE I!
|
||
FY18 AML PILOT GRANT
|
||
|
||
The Pilot FY2018 Project Reclaim Phase II is located is located off State Route 615, along Dumps
|
||
Creek, south of South Clinchfield in Russell County, Virginia. Project area mapping is comprised
|
||
of a section of the Carbo USGS 7.5 Minute Quadrangle. The project coordinates are 82° 10'
|
||
44.21"W and 36° 57' 38.77"N. The project area is contained within the South Clinchfield
|
||
Problem Area, VA-0821.
|
||
|
||
The 2018 AML Pilot guidance document states that sites eligible under AML Pilot include
|
||
"Previously reclaimed AML lands and polluted waters" and “land adjacent to unreclaimed or
|
||
previously reclaimed AML lands and polluted waters...”. Project Reclaim Phase Il will take place
|
||
‘on the area being remediated through the Golden Pond Gob Pile Removal Project (Project
|
||
Number 18302 FY2018).
|
||
|
||
Additionally, the proposed AML Pilot project is adjacent to the South Clinchfield Water System
|
||
project (Project Number 8613, FY86). This project installed a public water line along Gravel Lick
|
||
Rd into the community of South Clinchfield located approximately 600 feet away from the
|
||
project area. This water line passes the proposed project area within approximately 100 feet
|
||
|
||
for a distance of approximately 700 feet before diverting into the aforementioned residential
|
||
area.
|
||
|
||
There have been no permanent program activities and there is no continuing responsibility for
|
||
any individual, firm, or organization to reclaim this feature.
|
||
|
||
| have reviewed the eligibility documentation for this project and find the project meets
|
||
eligibility criteria Section Il of the Guidance for Project Eligibility under the Abandoned Mine
|
||
Land Reclamation Economic Development Pilot Program for Fiscal Year 2018.
|
||
|
||
|
||
|
||
|
||
Bul Babe Lt los [7014
|
||
|
||
Lesa Baker Date
|
||
Abandoned Mine Land Projects Coordinator
|
||
|
||
A noprove __Disapprove
|
||
Fuad, =, Cosy olshe
|
||
Randy R. Casey Date
|
||
|
||
Division Direct¢
|
||
|
||
|
||
|
||
|
||
LOCATION MAP
|
||
|
||
cerca manana cn
|
||
|
||
Gregan GOB on \
|
||
|
||
_
|
||
|
||
Project Reclaim
|
||
|
||
Phase IT
|
||
|
||
|
||
|
||
|
||
|
||
Golden Pond Gob Removal Project (Project Number 18302, FY18)
|
||
|
||
Bee as |
|
||
|
||
Donia
|
||
|
||
a ‘RUSSELL COUNTY
|
||
RECLAMATION, LLC
|
||
|
||
|
||
|
||
|
||
|
||
South Clinchfield Water System project (Project Number 8613, FY86)
|
||
|
||
|
||
|
||
|
||
|
||
SITE PHOTOS
|
||
|
||
|
||
|
||
|