nm3clol-public/Amys_Drop_Box/Golden Pond Gob Pile Project/aiHNM0008528/README.md
2024-06-24 05:11:34 -04:00

153 lines
3.8 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters

This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.

---
type: document
title: aiHNM0008528
file: ../aiHNM0008528.pdf
tags:
- Amys_Drop_Box
- Golden Pond Gob Pile Project
docDate: 2019-03-07
contentType: application/pdf
contentLength: 37828
sha256sum: 1d5e9fe8c316de647394da16c975e38fc10fa5e751b19379aa5c3e8685b04199
sha1sum: c003d85d9c5879b75486caae2a206c266025e583
---
COMMONWEALTH OF VIRGINIA
DEPARTMENT OF MINES, MINERALS AND ENERGY
DIVISION OF MINED LAND RECLAMATION
P.O. DRAWER 900, BIG STONE GAP, VA 24219
TELEPHONE: (276) 523-8198
ABANDONED MINE LAND INSPECTION
DMLR-AML-130S Printed: 03/07/19
5/06 Page 1 of 1
HNM0008528
PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER
Golden Pond Gob Removal 18302 2018 HNM0008528
CONTRACT INFORMATION
CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED
C196013 03/31/21 0
CONTRACTOR NAME ENGINEER NAME
Russell County Reclamation, LLC SCOTTY COX
SITE CONTACT PERSON: Kevin Large
INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION
02/05/19
02/20/19
02/21/19
02:30 PM
09:00 AM
09:00 AM
04:30 PM
10:00 AM
09:30 AM
WET
WET
WET
INSPECTION BY ATTACHMENTS
MCDONALD-TAYLOR, H.
COMMENTS
2/5/19-Upon approval of application 1010465, the permittee breached a portion of the berm around Golden Pond and
began allowing it to gravity drain into the Pond 2 series. A ditch was constructed, along with multiple small sumps to
control the drainage.
2/20/19-I checked the drainage from the Pond 2 series and Golden Pond. The drainage from Golden Pond was
discolored, but the Pond 2 series was, for the most part, handling it. The company was preparing to chemically treat the
Golden Pond discharge in preparation for heavy rain that was predicted for the next couple of days.
2/21/19- I again checked the drainage from the Pond 2 Series and Golden Pond. The company had constructed
additional sumps between Golden Pond and Pond 2 to ensure the Pond 2 discharge stayed in compliance.
Removal of material from Golden Pond has still not commenced. The company wants to allow the material to dry more,
before removal begins.
COMMONWEALTH OF VIRGINIA HNM0008528
DEPARTMENT OF MINES, MINERALS AND ENERGY
Dh DIVISION OF MINED LAND RECLAMATION
P.O. DRAWER 900, BIG STONE GAP, VA 24219
-ginia Depai TELEPHONE: (276) 523-8198
Mines Minerals and Energy
ABANDONED MINE LAND INSPECTION
PROJECT NAME, PROJECT NO. GRANT YEAR | REPORT NUMBER
Golden Pond Gob Removal 48302 2018 HNM0008528
CONTRACT INFORMATION
CONTRACT NUMBER EXPIRATION DATE, PERCENT OF CONTRACT COMPLETED
C196013 03/31/21 0
CONTRACTOR NAME ENGINEER NAME,
Russell County Reclamation, LLC SCOTTY COX
SITE CONTACT PERSON: Kevin Large
INSPECTION DATE, ARRIVAL DEPARTURE. GROUND CONDITION
02/05/19 02:30 PM 04:30 PM WET
02/20/19 09:00 AM 10:00 AM WET
02/21/19 09:00 AM 09:30 AM WET
INSPECTION BY ATTACHMENTS
MCDONALD-TAYLOR, H.
COMMENTS
215/19-Upon approval of application 1010465, the permittee breached a portion of the berm around Golden Pond and
began allowing it to gravity drain into the Pond 2 series. A ditch was constructed, along with multiple small sumps to
control the drainage.
2120/19-1 checked the drainage from the Pond 2 series and Golden Pond. The drainage from Golden Pond was
discolored, but the Pond 2 series was, for the most part, handling it. The company was preparing to chemically treat the
Golden Pond discharge in preparation for heavy rain that was predicted for the next couple of days.
2121/19- | again checked the drainage from the Pond 2 Series and Golden Pond, The company had constructed
additional sumps between Golden Pond and Pond 2 to ensure the Pond 2 discharge stayed in compliance.
Removal of material from Golden Pond has still not commenced. The company wants to allow the material to dry more,
before removal begins.
DMLR-AML-130S
5/06 Page 1 of 1
Printed: 03/07/19