News Release
|
||
vdot.virginia.gov
|
||
|
||
|
||
|
||
RELEASE: IMMEDIATE
|
||
CONTACTS:
|
||
Michelle Earl, 276-696-3283
|
||
Joey Barker, 276-696-3333
|
||
|
||
|
||
|
||
April 26, 2024
|
||
BR-24036
|
||
|
||
|
||
|
||
VDOT Bristol's Weekly Traffic Alert:
|
||
April 29 - May 5, 2024
|
||
|
||
|
||
BRISTOL – In an effort to keep motorists informed, the Virginia Department of
|
||
Transportation (VDOT) provides weekly information about highway construction and
|
||
maintenance projects in southwestern Virginia. When traveling through highway work
|
||
zones, use caution and be alert to changes in traffic patterns and slow-moving or
|
||
stopped traffic.
|
||
|
||
To help motorists take the guesswork out of travel plans, call VDOT’s 511 or
|
||
visit http://www.511virginia.org for real-time traffic information.
|
||
|
||
Entries with (NEW) or (UPDATE) indicate revisions since last week’s report
|
||
|
||
|
||
INTERSTATE PROJECTS
|
||
|
||
Interstate 81 – widening (Washington County): A project to widen I-81 southbound
|
||
between exits 10 and 7 in Washington County, as well as widening approximately one
|
||
mile of northbound I-81 from exit 7 to the north, is underway. Be alert to traffic
|
||
pattern changes north and southbound. (Completion: November 2025)
|
||
|
||
Interstate 81 – truck climbing lanes (Washington County): A project is underway
|
||
to add truck climbing lanes to Interstate 81 northbound at mile marker 32.4 and
|
||
southbound at mile marker 34 in Washington County. The roadway shoulder is closed
|
||
during construction. Be alert to temporary lane closures north and southbound. Pay
|
||
close attention to work zone signs. (Completion: November 2025)
|
||
|
||
(NEW) Interstate 77 – bridge widening (Bland County): A project is underway to
|
||
widen the I-77 bridge northbound between exits 58 and 62 in Bland County. Be alert
|
||
to nighttime lane closures. Pay attention to signs and message boards.
|
||
|
||
|
||
|
||
mailto:michelle.earl@vdot.virginia.gov
|
||
mailto:joseph.barker@vdot.virginia.gov
|
||
http://www.511virginia.org/
|
||
https://rlmzszvab.cc.rs6.net/tn.jsp?f=001-Dn-KRoLdXN86TwJ0Wasa9KGg29vBRlyLVGsXXtR_8MKsGOagv6RXVB5-bPCzuX8ghKSBh84asV9bwlHNbVpxME-BzcSUwY5hL0cxWFe2oo1kleBM-YD_OxsUtbyl4st6cRwE0cLXWRnDYfJCY6_2e9mnZehbzhO&c=1_m81YY4C2ZPt_vq_ofcYfL71BiTqPMJ0DhuLm67SIj7wy--0L5zig==&ch=7kA5jfPcLIZgAojz8fJbkOV-nZUtLEi7BsGfhfnazSuXuqat2aQbuA==
|
||
Virginia Department of Transportation vdot.virginia.gov
|
||
|
||
\VDOT News Release
|
||
|
||
RELEASE: IMMEDIATE April 26, 2024
|
||
CONTACTS: BR-24036
|
||
Michell 276-696-3283
|
||
|
||
Joey Barker, 276-696-3333
|
||
|
||
VDOT Bristol's Weekly Traffic Alert:
|
||
|
||
April 29 - May 5, 2024
|
||
|
||
BRISTOL ~ In an effort to keep motorists informed, the Virginia Department of
|
||
Transportation (VDOT) provides weekly information about highway construction and
|
||
maintenance projects in southwestern Virginia. When traveling through highway work
|
||
zones, use caution and be alert to changes in traffic patterns and slow-moving or
|
||
stopped traffic.
|
||
|
||
To help motorists take the guesswork out of travel plans, call VDOT’s 511 or
|
||
visit http://vww.5 1 I virginia.org for real-time traffic information,
|
||
|
||
Entries with (NEW) or (UPDATE) indicate revisions since last week’s report
|
||
|
||
INTERSTATE PROJECTS
|
||
|
||
Interstate 81 — widening (Washington County): A project to widen I-81 southbound
|
||
between exits 10 and 7 in Washington County, as well as widening approximately one
|
||
mile of northbound I-81 from exit 7 to the north, is underway. Be alert to traffic
|
||
pattern changes north and southbound. (Completion: November 2025)
|
||
|
||
Interstate 81 — truck climbing lanes (Washington County): A project is underway
|
||
to add truck climbing lanes to Interstate 81 northbound at mile marker 32.4 and
|
||
southbound at mile marker 34 in Washington County. The roadway shoulder is closed
|
||
during construction. Be alert to temporary lane closures north and southbound. Pay
|
||
close attention to work zone signs. (Completion: November 2025)
|
||
|
||
(NEW) Interstate 77 — bridge widening (Bland County): A project is underway to
|
||
widen the I-77 bridge northbound between exits 58 and 62 in Bland County. Be alert
|
||
to nighttime lane closures. Pay attention to signs and message boards.
|
||
|
||
|
||
|
||
|
||
|
||
(UPDATE) Interstates 81 and 77 maintenance activities: Be alert to the following
|
||
lane closures due to interstate maintenance activities:
|
||
|
||
Interstate 81
|
||
- Daytime pothole patching north and southbound between exits 54 and 73 in
|
||
Smyth and Wythe counties.
|
||
- Daytime brush removal north and southbound between mile marker 55 and exit
|
||
67 in Wythe County.
|
||
- Nighttime bridge inspections north and southbound between exits 17 and 19 in
|
||
Washington County.
|
||
- Nighttime pothole patching northbound between mile markers 82 and 83 in
|
||
Wythe County.
|
||
- Nighttime bridge inspections north and southbound between exits 22 and 24 in
|
||
Washington County.
|
||
- Nighttime bridge deck repairs southbound near exit 45 and near mile marker 52
|
||
in Smyth County.
|
||
- Nighttime bridge deck repairs southbound near exit 29 in Washington County.
|
||
- Nighttime bridge deck repairs northbound near exit 35 in Washington County.
|
||
- Day and nighttime bridge repairs north and southbound between mile markers
|
||
36 and 38 near the Washington/Smyth County line April 28-May 3. No wide loads
|
||
over 14 feet.
|
||
- Day and nighttime bridge repairs north and southbound near exit 47 in Smyth
|
||
County April 29-May 3. No wide loads over 14 feet when the work zone is in place.
|
||
|
||
Interstate 77
|
||
- Daytime pothole patching north and southbound from exit 41 in Wythe County
|
||
to mile marker 67 in Bland County.
|
||
- Nighttime tunnel maintenance and inspection north and southbound at the Big
|
||
Walker Mountain Tunnel in Bland County. All wide loads over 12 feet must stop
|
||
before entering the tunnel.
|
||
|
||
|
||
PRIMARY HIGHWAYS AND HIGH TRAFFIC SECONDARY ROADS:
|
||
Buchanan County
|
||
Route 632 (Page Drive): A 1.5-mile section of Route 632 (Page Drive) has been
|
||
closed between the intersections of Route 626 (Chambers Road) and Ballenger Road
|
||
in Buchanan County. The section of roadway is being relocated by Buchanan
|
||
Materials as part of their coal preparation plant expansion. Pay close attention to
|
||
detour signs in the area. (Completion: August 2024)
|
||
|
||
Route 460/121 Poplar Creek Phase A: Construction of Route 460/121 Poplar Creek
|
||
Phase A is underway in Buchanan County. The Poplar Creek Phase A project created a
|
||
permanent change for Route 614 (Woods Fork). Access to the north and south ends of
|
||
|
||
(UPDATE) Interstates 81 and 77 maintenance activities: Be alert to the following
|
||
lane closures due to interstate maintenance activities:
|
||
|
||
Interstate 81
|
||
= Daytime pothole patching north and southbound between exits 54 and 73 in
|
||
Smyth and Wythe counties.
|
||
|
||
- Daytime brush removal north and southbound between mile marker 55 and exit
|
||
67 in Wythe County.
|
||
|
||
- Nighttime bridge inspections north and southbound between exits 17 and 19 in
|
||
Washington County.
|
||
|
||
- Nighttime pothole patching northbound between mile markers 82 and 83 in
|
||
Wythe County.
|
||
|
||
- "Nighttime bridge inspections north and southbound between exits 22 and 24 in
|
||
Washington County.
|
||
|
||
- Nighttime bridge deck repairs southbound near exit 45 and near mile marker $2
|
||
in Smyth County.
|
||
|
||
- Nighttime bridge deck repairs southbound near exit 29 in Washington County.
|
||
- Nighttime bridge deck repairs northbound near exit 35 in Washington County.
|
||
- Day and nighttime bridge repairs north and southbound between mile markers
|
||
36 and 38 near the Washington/Smyth County line April 28-May 3. No wide loads
|
||
over 14 feet.
|
||
|
||
- Day and nighttime bridge repairs north and southbound near exit 47 in Smyth
|
||
County April 29-May 3. No wide loads over 14 feet when the work zone is in place.
|
||
|
||
Interstate 77
|
||
- _ Daytime pothole patching north and southbound from exit 41 in Wythe County
|
||
to mile marker 67 in Bland County.
|
||
|
||
- Nighttime tunnel maintenance and inspection north and southbound at the Big
|
||
Walker Mountain Tunnel in Bland County. All wide loads over 12 feet must stop
|
||
before entering the tunnel.
|
||
|
||
PRIMARY HIGHWAYS AND HIGH TRAFFIC SECONDARY ROADS:
|
||
Buchanan County
|
||
|
||
Route 632 (Page Drive): A 1.5-mile section of Route 632 (Page Drive) has been
|
||
closed between the intersections of Route 626 (Chambers Road) and Ballenger Road
|
||
in Buchanan County. The section of roadway is being relocated by Buchanan
|
||
Materials as part of their coal preparation plant expansion. Pay close attention to
|
||
detour signs in the area. (Completion: August 2024)
|
||
|
||
Route 460/121 Poplar Creek Phase A: Construction of Route 460/121 Poplar Creek
|
||
Phase A is underway in Buchanan County. The Poplar Creek Phase A project created a
|
||
permanent change for Route 614 (Woods Fork). Access to the north and south ends of
|
||
|
||
|
||
|
||
|
||
|
||
Route 614 is via Routes 609 (Bulls Creek Road) and Route 604 (Polar Creek Road),
|
||
respectively, which connect to Route 460 west of Grundy.
|
||
|
||
Route 460/121 Poplar Creek Phase B: Work on Route 460/121 Poplar Creek Phase
|
||
B is underway in Buchanan County. Work is taking place from near Route 604 (Poplar
|
||
Creek Road) to current Route 460 in Grundy.
|
||
|
||
|
||
Lee County
|
||
Route 23 bridge replacement: Be alert to an altered traffic pattern at the bridges over
|
||
Norfolk Southern Railroad in the Jasper area of Lee County due to the replacement of
|
||
the bridges. Two-way traffic is currently in the northbound lanes of Route 23.
|
||
(Completion: Fall 2024)
|
||
|
||
|
||
Russell County
|
||
Route 687 bridge replacement: Replacement of the bridge on Route 687 over Route
|
||
63 in the Dante area of Russell County continues. A temporary access road is in place
|
||
through the Roanoke Hill area connecting Route 63 and Route 687. (Completion:
|
||
October 2024)
|
||
|
||
|
||
Smyth County
|
||
Route 11 roundabout: A project is underway to build a roundabout on Route 11 at
|
||
the intersection of Route 660 (Railroad Drive) in Smyth County, approximately one
|
||
mile east of Oak Point Elementary School. Be alert to workers and pay close attention
|
||
to signs and message boards. (Completion: Summer 2025)
|
||
|
||
Route 622 bridge rehab: A project to rehabilitate the Route 622 bridge over Norfolk
|
||
and Western Railway in Smyth County continues. Be alert to temporary traffic signals
|
||
at Route 11 and Route 622 (Haven Ridge Road). Motorists should use caution in the
|
||
area and pay close attention to signs and message boards. (Completion: May 2024)
|
||
|
||
|
||
Tazewell County
|
||
Route 16 (W. Riverside Drive) bridge replacement over Cavitts Creek: Work to
|
||
replace the Route 16 bridge over Cavitts Creek in Tazewell continues. Motorists
|
||
should be alert to one-lane traffic being controlled by traffic signals. The travel lane
|
||
width on Route 16 at the bridge is restricted to 10 feet. (Completion: June 2024)
|
||
|
||
|
||
Washington County
|
||
Route 58 widening near Damascus: Be alert to flaggers directing traffic at
|
||
intersections through the entire Route 58 work zone due to paving operations. While
|
||
|
||
Route 614 is via Routes 609 (Bulls Creek Road) and Route 604 (Polar Creek Road),
|
||
respectively, which connect to Route 460 west of Grundy.
|
||
|
||
Route 460/121 Poplar Creek Phase B: Work on Route 460/121 Poplar Creek Phase
|
||
B is underway in Buchanan County. Work is taking place from near Route 604 (Poplar
|
||
Creek Road) to current Route 460 in Grundy.
|
||
|
||
Lee County
|
||
|
||
Route 23 bridge replacement: Be alert to an altered traffic pattern at the bridges over
|
||
Norfolk Southern Railroad in the Jasper area of Lee County due to the replacement of
|
||
the bridges. Two-way traffic is currently in the northbound lanes of Route 23.
|
||
(Completion: Fall 2024)
|
||
|
||
Russell County
|
||
Route 687 bridge replacement: Replacement of the bridge on Route 687 over Route
|
||
63 in the Dante area of Russell County continues. A temporary access road is in place
|
||
through the Roanoke Hill area connecting Route 63 and Route 687. (Completion:
|
||
October 2024)
|
||
|
||
Smyth County
|
||
Route 11 roundabout: A project is underway to build a roundabout on Route 11 at
|
||
the intersection of Route 660 (Railroad Drive) in Smyth County, approximately one
|
||
mile east of Oak Point Elementary School. Be alert to workers and pay close attention
|
||
to signs and message boards. (Completion: Summer 2025)
|
||
|
||
Route 622 bridge rehab: A project to rehabilitate the Route 622 bridge over Norfolk
|
||
and Western Railway in Smyth County continues, Be alert to temporary traffic signals
|
||
at Route 11 and Route 622 (Haven Ridge Road). Motorists should use caution in the
|
||
area and pay close attention to signs and message boards. (Completion: May 2024)
|
||
|
||
Tazewell County
|
||
Route 16 (W. Riverside Drive) bridge replacement over Cavitts Creek: Work to
|
||
replace the Route 16 bridge over Cavitts Creek in Tazewell continues. Motorists
|
||
should be alert to one-lane traffic being controlled by traffic signals. The travel lane
|
||
width on Route 16 at the bridge is restricted to 10 feet. (Completion: June 2024)
|
||
|
||
Washington County
|
||
Route 58 widening near Damascus: Be alert to flaggers directing traffic at
|
||
intersections through the entire Route 58 work zone due to paving operations. While
|
||
|
||
|
||
|
||
|
||
|
||
Route 58 widening continues, all traffic is using the two westbound lanes through the
|
||
work zone. Pay close attention to signs, message boards and flaggers. (Completion:
|
||
May 2024)
|
||
|
||
|
||
Wise County
|
||
Alternate Route 58 median barrier construction: Work is underway to install
|
||
permanent concrete median barriers on Alternate Route 58 in the Tacoma area of Wise
|
||
County east of Stone Mountain Road. The left lane in both directions is closed. Be
|
||
alert to flaggers and message boards. (Completion: May 2024)
|
||
|
||
|
||
Wythe County
|
||
Progress Park Connector: Construction of a new 2.3-mile connector road between
|
||
Nye Road and E. Lee Trinkle Road is underway, providing a direct connection to
|
||
Wytheville’s Progress Park industrial site. A 0.3-mile portion of Lover's Lane will be
|
||
closed beginning Monday, March 18 and will remain closed for the duration of the
|
||
project. The section of Lover's Lane to be closed is located 1.6 miles from Nye Road
|
||
and 0.5 miles from Pepper's Ferry Road. Be alert to construction vehicles, work zone
|
||
signs and workers in the area. (Completion: November 2026)
|
||
|
||
Route 671 (Crigger Road) bridge: Due to an upcoming bridge replacement project,
|
||
the Route 671 (Crigger Road) bridge in Wythe County has been restricted to one 11-
|
||
foot-wide lane and a three-ton weight limit. Construction is scheduled to begin in late
|
||
2024.
|
||
|
||
|
||
(END)
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
https://rlmzszvab.cc.rs6.net/tn.jsp?f=001-Dn-KRoLdXN86TwJ0Wasa9KGg29vBRlyLVGsXXtR_8MKsGOagv6RXbYqc78FQf1ayipvfJBkyJgyWHTJwkpKtgzdwwtuuYeS4eXTTNOAPleZdpHMvKY-G2woUFX3wt15ps5yoXO_B0EteTXzdhXtTM3KxdTLAnQg759SDc-19gk=&c=1_m81YY4C2ZPt_vq_ofcYfL71BiTqPMJ0DhuLm67SIj7wy--0L5zig==&ch=7kA5jfPcLIZgAojz8fJbkOV-nZUtLEi7BsGfhfnazSuXuqat2aQbuA==
|
||
https://rlmzszvab.cc.rs6.net/tn.jsp?f=001-Dn-KRoLdXN86TwJ0Wasa9KGg29vBRlyLVGsXXtR_8MKsGOagv6RXXG3FtKGaZEcRHI5RJCZTfBJ24ngmzozoeOiJY4YyYyWD5YEJPuwRIcRuX3w6eNWtcC2NlaSyjPlg_vMkOCw4AfGblv-8b1cq7Te0qTThC6z&c=1_m81YY4C2ZPt_vq_ofcYfL71BiTqPMJ0DhuLm67SIj7wy--0L5zig==&ch=7kA5jfPcLIZgAojz8fJbkOV-nZUtLEi7BsGfhfnazSuXuqat2aQbuA==
|
||
https://rlmzszvab.cc.rs6.net/tn.jsp?f=001-Dn-KRoLdXN86TwJ0Wasa9KGg29vBRlyLVGsXXtR_8MKsGOagv6RXTvcb1Y4Wk2RbF1nIEDFcN1A-eATOcHea6rbLuXtJlUPyFdbIv_iqDgsvAJt6ESEWJbpFStmIueW-7R06hfSy2I9ZMcwDi01ijjTmKjrgiOmYQqGk-oHowM=&c=1_m81YY4C2ZPt_vq_ofcYfL71BiTqPMJ0DhuLm67SIj7wy--0L5zig==&ch=7kA5jfPcLIZgAojz8fJbkOV-nZUtLEi7BsGfhfnazSuXuqat2aQbuA==
|
||
Route 58 widening continues, all traffic is using the two westbound lanes through the
|
||
work zone. Pay close attention to signs, message boards and flaggers. (Completion:
|
||
May 2024)
|
||
|
||
Wise County
|
||
|
||
Alternate Route 58 median barrier construction: Work is underway to install
|
||
permanent concrete median barriers on Alternate Route 58 in the Tacoma area of Wise
|
||
County east of Stone Mountain Road. The left lane in both directions is closed. Be
|
||
alert to flaggers and message boards. (Completion: May 2024)
|
||
|
||
Wythe County
|
||
Progress Park Connector: Construction of a new 2.3-mile connector road between
|
||
Nye Road and E. Lee Trinkle Road is underway, providing a direct connection to
|
||
Wytheville’s Progress Park industrial site. A 0.3-mile portion of Lover’s Lane will be
|
||
closed beginning Monday, March 18 and will remain closed for the duration of the
|
||
project. The section of Lover's Lane to be closed is located 1.6 miles from Nye Road
|
||
and 0.5 miles from Pepper's Ferry Road. Be alert to construction vehicles, work zone
|
||
signs and workers in the area. (Completion: November 2026)
|
||
|
||
Route 671 (Crigger Road) bridge: Due to an upcoming bridge replacement project,
|
||
the Route 671 (Crigger Road) bridge in Wythe County has been restricted to one 11-
|
||
foot-wide lane and a three-ton weight limit, Construction is scheduled to begin in late
|
||
2024.
|
||
|
||
(END)
|
||
|
||