document | Project Reclaim Phase II - eligibility doc - signed | ../Project Reclaim Phase II - eligibility doc - signed.pdf |
|
2019-06-05 | application/pdf | 1604887 | 7ee557afe3fee35b321a23506b177fc7e50fdca317f2a2f08f69f61cf3948ea3 | c5e8a1351ba0e17abfb5bd883d7982bf39c3b277 |
Divisions ENERGY AS AND OL NED LAND MINERAL MAIN MINERAL SOURCES vanes ADMSTRATION
ATION
COMMONWEALTH OF VIRGINIA.
Department of Mines, Minerals and Energy Division of Mined Land Reclamation P.O, Drawer 900 Big Stone Gap. Virginia (276) 523-8100" FAX ‘ww dm
0900 23-8148
June 05, 2019
PILOT PROJECT ELIGIBILITY DOCUMENTATION PROJECT RECLAIM PHASE I! FY18 AML PILOT GRANT
The Pilot FY2018 Project Reclaim Phase II is located is located off State Route 615, along Dumps Creek, south of South Clinchfield in Russell County, Virginia. Project area mapping is comprised of a section of the Carbo USGS 7.5 Minute Quadrangle. The project coordinates are 82° 10' 44.21"W and 36° 57' 38.77"N. The project area is contained within the South Clinchfield Problem Area, VA-0821.
The 2018 AML Pilot guidance document states that sites eligible under AML Pilot include "Previously reclaimed AML lands and polluted waters" and “land adjacent to unreclaimed or previously reclaimed AML lands and polluted waters...”. Project Reclaim Phase Il will take place ‘on the area being remediated through the Golden Pond Gob Pile Removal Project (Project Number 18302 FY2018).
Additionally, the proposed AML Pilot project is adjacent to the South Clinchfield Water System project (Project Number 8613, FY86). This project installed a public water line along Gravel Lick Rd into the community of South Clinchfield located approximately 600 feet away from the project area. This water line passes the proposed project area within approximately 100 feet
for a distance of approximately 700 feet before diverting into the aforementioned residential area.
There have been no permanent program activities and there is no continuing responsibility for any individual, firm, or organization to reclaim this feature.
| have reviewed the eligibility documentation for this project and find the project meets eligibility criteria Section Il of the Guidance for Project Eligibility under the Abandoned Mine Land Reclamation Economic Development Pilot Program for Fiscal Year 2018.
Bul Babe Lt los [7014
Lesa Baker Date Abandoned Mine Land Projects Coordinator
A noprove __Disapprove Fuad, =, Cosy olshe Randy R. Casey Date
Division Direct¢
LOCATION MAP
cerca manana cn
Gregan GOB on \
_
Project Reclaim
Phase IT
Golden Pond Gob Removal Project (Project Number 18302, FY18)
Bee as |
Donia
a ‘RUSSELL COUNTY RECLAMATION, LLC
South Clinchfield Water System project (Project Number 8613, FY86)
SITE PHOTOS