COMMONWEALTH OF VIRGINIA
|
||
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||
|
||
DIVISION OF MINED LAND RECLAMATION
|
||
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||
|
||
TELEPHONE: (276) 523-8198
|
||
|
||
|
||
ABANDONED MINE LAND INSPECTION
|
||
|
||
|
||
DMLR-AML-130S Printed: 03/07/19
|
||
5/06 Page 1 of 1
|
||
|
||
|
||
HNM0008528
|
||
|
||
|
||
|
||
PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER
|
||
|
||
Golden Pond Gob Removal 18302 2018 HNM0008528
|
||
|
||
|
||
|
||
CONTRACT INFORMATION
|
||
|
||
CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED
|
||
|
||
C196013 03/31/21 0
|
||
|
||
CONTRACTOR NAME ENGINEER NAME
|
||
|
||
Russell County Reclamation, LLC SCOTTY COX
|
||
|
||
SITE CONTACT PERSON: Kevin Large
|
||
|
||
|
||
|
||
INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION
|
||
|
||
02/05/19
|
||
02/20/19
|
||
02/21/19
|
||
|
||
02:30 PM
|
||
09:00 AM
|
||
09:00 AM
|
||
|
||
04:30 PM
|
||
10:00 AM
|
||
09:30 AM
|
||
|
||
WET
|
||
WET
|
||
WET
|
||
|
||
|
||
|
||
INSPECTION BY ATTACHMENTS
|
||
|
||
MCDONALD-TAYLOR, H.
|
||
|
||
|
||
|
||
COMMENTS
|
||
|
||
2/5/19-Upon approval of application 1010465, the permittee breached a portion of the berm around Golden Pond and
|
||
began allowing it to gravity drain into the Pond 2 series. A ditch was constructed, along with multiple small sumps to
|
||
control the drainage.
|
||
|
||
|
||
2/20/19-I checked the drainage from the Pond 2 series and Golden Pond. The drainage from Golden Pond was
|
||
discolored, but the Pond 2 series was, for the most part, handling it. The company was preparing to chemically treat the
|
||
Golden Pond discharge in preparation for heavy rain that was predicted for the next couple of days.
|
||
|
||
|
||
2/21/19- I again checked the drainage from the Pond 2 Series and Golden Pond. The company had constructed
|
||
additional sumps between Golden Pond and Pond 2 to ensure the Pond 2 discharge stayed in compliance.
|
||
|
||
Removal of material from Golden Pond has still not commenced. The company wants to allow the material to dry more,
|
||
before removal begins.
|
||
|
||
|
||
|
||
|
||
COMMONWEALTH OF VIRGINIA HNM0008528
|
||
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||
Dh DIVISION OF MINED LAND RECLAMATION
|
||
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||
|
||
-ginia Depai TELEPHONE: (276) 523-8198
|
||
Mines Minerals and Energy
|
||
|
||
ABANDONED MINE LAND INSPECTION
|
||
|
||
PROJECT NAME, PROJECT NO. GRANT YEAR | REPORT NUMBER
|
||
Golden Pond Gob Removal 48302 2018 HNM0008528
|
||
CONTRACT INFORMATION
|
||
CONTRACT NUMBER EXPIRATION DATE, PERCENT OF CONTRACT COMPLETED
|
||
C196013 03/31/21 0
|
||
CONTRACTOR NAME ENGINEER NAME,
|
||
Russell County Reclamation, LLC SCOTTY COX
|
||
‘SITE CONTACT PERSON: Kevin Large
|
||
INSPECTION DATE, ARRIVAL DEPARTURE. GROUND CONDITION
|
||
02/05/19 02:30 PM 04:30 PM WET
|
||
02/20/19 09:00 AM 10:00 AM WET
|
||
02/21/19 09:00 AM 09:30 AM WET
|
||
INSPECTION BY ATTACHMENTS
|
||
MCDONALD-TAYLOR, H.
|
||
|
||
‘COMMENTS
|
||
|
||
215/19-Upon approval of application 1010465, the permittee breached a portion of the berm around Golden Pond and
|
||
began allowing it to gravity drain into the Pond 2 series. A ditch was constructed, along with multiple small sumps to
|
||
|
||
control the drainage.
|
||
|
||
2120/19-1 checked the drainage from the Pond 2 series and Golden Pond. The drainage from Golden Pond was
|
||
discolored, but the Pond 2 series was, for the most part, handling it. The company was preparing to chemically treat the
|
||
Golden Pond discharge in preparation for heavy rain that was predicted for the next couple of days.
|
||
|
||
2121/19- | again checked the drainage from the Pond 2 Series and Golden Pond, The company had constructed
|
||
additional sumps between Golden Pond and Pond 2 to ensure the Pond 2 discharge stayed in compliance.
|
||
|
||
Removal of material from Golden Pond has still not commenced. The company wants to allow the material to dry more,
|
||
|
||
before removal begins.
|
||
|
||
DMLR-AML-130S
|
||
5/06 Page 1 of 1
|
||
|
||
Printed: 03/07/19
|
||
|
||
|
||
|
||
|