--- type: document title: aiHNM0009816 file: ../aiHNM0009816.pdf tags: - Amys_Drop_Box - Project Reclaim II - Final Inspection docDate: 2021-10-01 contentType: application/pdf contentLength: 37336 sha256sum: 60fe98a5ee35b39844ae006ed3fca2bc3f531e46970fbd2c9a89d5e6ef17f15f sha1sum: 1103c3c3326381c5cf16afbc771bc2995c9b8c09 --- COMMONWEALTH OF VIRGINIA DEPARTMENT OF MINES, MINERALS AND ENERGY DIVISION OF MINED LAND RECLAMATION P.O. DRAWER 900, BIG STONE GAP, VA 24219 TELEPHONE: (276) 523-8198 ABANDONED MINE LAND INSPECTION DMLR-AML-130S Printed: 10/01/21 5/06 Page 1 of 1 HNM0009816 PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER Project Reclaim Phase II 91806 2018 HNM0009816 CONTRACT INFORMATION CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED 90 CONTRACTOR NAME ENGINEER NAME SITE CONTACT PERSON: Kevin Large INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION 09/14/21 02:30 PM 03:30 PM DRY INSPECTION BY ATTACHMENTS MCDONALD-TAYLOR, H. COMMENTS The contract for Project Reclaim Phase II was signed on 12/28/21 and a Notice to Proceed was issued the same day. Work at the site was already on going from Project Reclaim Phase I. Material haulage transitioned from Phase I to Phase II on the day the contract was signed. Work at the site is complete. Seeding of the structure will occur under the 2021 Revegetation Project. This inspection was conducted as a bid showing for the revegetation project. COMMONWEALTH OF VIRGINIA HNM0009816 DEPARTMENT OF MINES, MINERALS AND ENERGY Dh DIVISION OF MINED LAND RECLAMATION P.O. DRAWER 900, BIG STONE GAP, VA 24219 Virginia Depay TELEPHONE: (276) 523-8198 Mines Minerals and Energy ABANDONED MINE LAND INSPECTION PROJECT NAME, PROJECT NO, GRANT YEAR | REPORT NUMBER Project Reclaim Phase Il 91806 2018 HNM0009816 CONTRACT INFORMATION CONTRACT NUMBER EXPIRATION DATE, PERCENT OF CONTRACT COMPLETED 90 CONTRACTOR NAME ENGINEER NAME, ‘SITE CONTACT PERSON: Kevin Large INSPECTION DATE, ARRIVAL DEPARTURE. GROUND CONDITION 09/14/21 (02:30 PM 03:30 PM DRY INSPECTION BY ATTACHMENTS MCDONALD-TAYLOR, H. ‘COMMENTS The contract for Project Reclaim Phase Il was signed on 12/28/21 and a Notice to Proceed was issued the same day. Work at the site was already on going from Project Reclaim Phase |. Material haulage transitioned from Phase | to Phase Ion the day the contract was signed. Work at the site is complete. Seeding of the structure will occur under the 2021 Revegetation Project. This inspection was conducted as a bid showing for the revegetation project. DMLR-AML-130S Printed: 10/01/21 5/06 Page 1 of 1