--- type: document title: aiHNM0009664 file: ../aiHNM0009664.pdf tags: - Amys_Drop_Box - Project Reclaim II - Final Inspection docDate: 2021-06-30 contentType: application/pdf contentLength: 275973 sha256sum: a876c62dfce152bec4e57d3e3596611b3a608ab967d39b3b25bb69be685ecf83 sha1sum: eb6994b36cb19c712035f2600537d8a5201dd5b6 --- COMMONWEALTH OF VIRGINIA DEPARTMENT OF MINES, MINERALS AND ENERGY DIVISION OF MINED LAND RECLAMATION P.O. DRAWER 900, BIG STONE GAP, VA 24219 TELEPHONE: (276) 523-8198 ABANDONED MINE LAND INSPECTION DMLR-AML-130S Printed: 06/30/21 5/06 Page 1 of 2 HNM0009664 PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER Project Reclaim Phase II 91806 2018 HNM0009664 CONTRACT INFORMATION CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED 80 CONTRACTOR NAME ENGINEER NAME SITE CONTACT PERSON: Kevin Large INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION 06/08/21 06/22/21 04:00 PM 04:00 PM 04:30 PM 04:30 PM WET WET INSPECTION BY ATTACHMENTS MCDONALD-TAYLOR, H. COMMENTS The contract for Project Reclaim Phase II was signed on 12/28/21 and a Notice to Proceed was issued the same day. Work at the site was already on going from Project Reclaim Phase I. Material haulage transitioned from Phase I to Phase II on the day the contract was signed. Material haulage continues daily on the project. Removal of fines is nearly complete as well as construction of the retaining pond at the lower end of the site. Berms around the structure have been covered with a layer of topsoil. Application for Payment #5 requested payment in the amount of $199,344.48. Payment of the invoice was recommended. Photos of the site are shown below. COMMONWEALTH OF VIRGINIA HNMo009664 DEPARTMENT OF MINES, MINERALS AND ENERGY Dh DIVISION OF MINED LAND RECLAMATION P.O. DRAWER 900, BIG STONE GAP, VA 24219 -ginia Depay TELEPHONE: (276) 523-8198 Mines Minerals and Energy ABANDONED MINE LAND INSPECTION PROJECT NAME PROJECT NO. GRANT YEAR [REPORT NUMBER Project Reclaim Phase Il 91806 2018 HINM0009664 CONTRACT INFORMATION CONTRACT NUMBER EXPIRATION DATE, PERCENT OF CONTRACT COMPLETED 80 CONTRACTOR NAME ENGINEER NAME ‘SITE CONTACT PERSON: Kevin Large INSPECTION DATE ARRIVAL, DEPARTURE GROUND CONDITION 06/08/21 04:00 PM 04:30 PM ‘WET 06/22/24 04:00 PM 04:30 PM WET INSPECTION BY ATTACHMENTS MCDONALD-TAYLOR, H. ‘COMMENTS: The contract for Project Reclaim Phase Il was signed on 12/28/21 and a Notice to Proceed was issued the same day. Work at the site was already on going from Project Reclaim Phase |. Material haulage transitioned from Phase | to Phase Ion the day the contract was signed. Material haulage continues daily on the project. Removal of fines is nearly ‘complete as well as construction of the retaining pond at the lower end of the site. Berms around the structure have been covered with a layer of topsoil. Application for Payment #5 requested payment in the amount of $199,344.48. Payment of the invoice was recommended. Photos of the site are shown below. DMLR-AML-130S 5/06 Page 1 of 2 Printed: 06/30/21 COMMONWEALTH OF VIRGINIA DEPARTMENT OF MINES, MINERALS AND ENERGY DIVISION OF MINED LAND RECLAMATION P.O. DRAWER 900, BIG STONE GAP, VA 24219 TELEPHONE: (276) 523-8198 ABANDONED MINE LAND INSPECTION DMLR-AML-130S Printed: 06/30/21 5/06 Page 2 of 2 HNM0009664 COMMONWEALTH OF VIRGINIA HNM0009664 DEPARTMENT OF MINES, MINERALS AND ENERGY DIVISION OF MINED LAND RECLAMATION P.O. DRAWER 900, BIG STONE GAP, VA 24219 ‘TELEPHONE: (276) 523-8198 Mines Minerals and Energy ABANDONED MINE LAND INSPECTION Ew ae DMLR-AML-130S Printed: 06/30/21 5/06 Page 2 of 2