--- type: document title: aiHNM0009558 file: ../aiHNM0009558.pdf tags: - Amys_Drop_Box - Golden Pond Gob Pile Project docDate: 2021-04-06 contentType: application/pdf contentLength: 36956 sha256sum: 0975b2c1283fe5743afd3806bbe9a181f3abbfdbf100248826c6c73dcc59a443 sha1sum: 211daa0f92ef734105826c35c363bfeff9bb8739 --- COMMONWEALTH OF VIRGINIA DEPARTMENT OF MINES, MINERALS AND ENERGY DIVISION OF MINED LAND RECLAMATION P.O. DRAWER 900, BIG STONE GAP, VA 24219 TELEPHONE: (276) 523-8198 ABANDONED MINE LAND INSPECTION DMLR-AML-130S Printed: 04/06/21 5/06 Page 1 of 1 HNM0009558 PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER Golden Pond Gob Removal 18302 2018 HNM0009558 CONTRACT INFORMATION CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED C196013 03/31/21 80 CONTRACTOR NAME ENGINEER NAME Russell County Reclamation, LLC SCOTTY COX SITE CONTACT PERSON: Kevin Large INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION 02/03/21 02/23/21 03:00 PM 03:30 PM 04:30 PM 04:30 PM WET WET INSPECTION BY ATTACHMENTS MCDONALD-TAYLOR, H. COMMENTS Material removal and backfilling is ongoing. Material removal has progressed to the outer edge of the structure. Material is currently being stored on areas previously backfilled as well as on the permitted site. The contract expiration date is 03/31/21. With this inspection, a change order was processed extending the contract end date to 3/31/22. COMMONWEALTH OF VIRGINIA HNM0009558 DEPARTMENT OF MINES, MINERALS AND ENERGY Dh DIVISION OF MINED LAND RECLAMATION P.O. DRAWER 900, BIG STONE GAP, VA 24219 Virginia Depay TELEPHONE: (276) 523-8198 Mines Minerals and Energy ABANDONED MINE LAND INSPECTION PROJECT NAME, PROJECT NO. GRANT YEAR | REPORT NUMBER Golden Pond Gob Removal 48302 2018 HNM0009558 CONTRACT INFORMATION CONTRACT NUMBER EXPIRATION DATE, PERCENT OF CONTRACT COMPLETED C196013 03/31/21 80 CONTRACTOR NAME ENGINEER NAME, Russell County Reclamation, LLC SCOTTY COX ‘SITE CONTACT PERSON: Kevin Large INSPECTION DATE ARRIVAL DEPARTURE. GROUND CONDITION 02/03/21 03:00 PM (04:30 PM WET 02/23/21 03:30 PM 04:30 PM WET INSPECTION BY ATTACHMENTS MCDONALD-TAYLOR, H. [ COMMENTS: Material removal and backfilling is ongoing. Material removal has progressed to the outer edge of the structure. Material is currently being stored on areas previously backfilled as well as on the permitted site. The contract expiration date is, 03/31/21. With this inspection, a change order was processed extending the contract end date to 3/31/22. DMLR-AML-130S Printed: 04/06/21 5/06 Page 1 of 1