forked from nm3clol/nm3clol-public
Added markdown metadata and plaintext OCR interpretation of documents as README.md files in the folder structure next to the files.
This commit is contained in:
parent
464f5b629c
commit
37358d494c
964
2024-02-16 FOIA Response/BOS Minutes 12112023/README.md
Normal file
964
2024-02-16 FOIA Response/BOS Minutes 12112023/README.md
Normal file
|
|
@ -0,0 +1,964 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: BOS Minutes 12112023
|
||||||
|
file: ../BOS Minutes 12112023.pdf
|
||||||
|
tags:
|
||||||
|
- 2024-02-16 FOIA Response
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 195149
|
||||||
|
sha256sum: 768d0760b341babd6fa451acd65bc8d99a10279cc13e61bd92bec34d1cf5f988
|
||||||
|
sha1sum: f4fcf5038226120a73340bcc4f017f7b27d1cdf6
|
||||||
|
---
|
||||||
|
|
||||||
|
December 11, 2023
|
||||||
|
|
||||||
|
A regular monthly mee<65>ng of the Russell County Board of Supervisors was held on Monday, December
|
||||||
|
11, 2023 at 6:00 pm at the Russell County Government Center in Lebanon, Virginia.
|
||||||
|
|
||||||
|
The Clerk called the mee<65>ng to order.
|
||||||
|
|
||||||
|
Roll Call by the Clerk:
|
||||||
|
|
||||||
|
Present:
|
||||||
|
|
||||||
|
Tim Lovelace
|
||||||
|
Lou Wallace
|
||||||
|
Carl Rhea
|
||||||
|
David Eaton
|
||||||
|
Steve Breeding
|
||||||
|
Rebecca Dye
|
||||||
|
Oris Chris<69>an
|
||||||
|
|
||||||
|
|
||||||
|
Lono Lester, Clerk
|
||||||
|
Vicki Porter, Deputy Clerk
|
||||||
|
Ka<EFBFBD>e Paton, County Atorney
|
||||||
|
|
||||||
|
Absent:
|
||||||
|
|
||||||
|
None
|
||||||
|
|
||||||
|
Invoca<EFBFBD>on by Caleb Johnson, followed by the Pledge of Allegiance to the Flag.
|
||||||
|
|
||||||
|
APPROVAL OF THE AGENDA
|
||||||
|
|
||||||
|
Mo<EFBFBD>on made by Rebecca Dye, second Oris Chris<69>an and duly approved by the Board of Supervisors to
|
||||||
|
approve the agenda as amended.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: Rebecca Dye, Oris Chris<69>an, Lou Wallace, Tim Lovelace, David Eaton, Steve Breeding and Carl Rhea
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
Presenta<EFBFBD>ons
|
||||||
|
|
||||||
|
Plaques were presented to Tim Lovelace, Carl Rhea and Oris Chris<69>an in apprecia<69>on for their service as
|
||||||
|
members of the Board of Supervisors.
|
||||||
|
|
||||||
|
New Business
|
||||||
|
|
||||||
|
|
||||||
|
APPROVAL OF THE NOVEMBER 13, 2023 MINUTES
|
||||||
|
|
||||||
|
Mo<EFBFBD>on made by Carl Rhea, second Oris Chris<69>an and duly approved by the Board of Supervisors to
|
||||||
|
approve the November 13, 2023 minutes and dispense with the reading thereof.
|
||||||
|
|
||||||
|
|
||||||
|
December 11, 2023
|
||||||
|
|
||||||
|
A regular monthly meeting of the Russell County Board of Supervisors was held on Monday, December
|
||||||
|
11, 2023 at 6:00 pm at the Russell County Government Center in Lebanon, Virginia
|
||||||
|
|
||||||
|
The Clerk called the meeting to order.
|
||||||
|
Roll Call by the Clerk:
|
||||||
|
Present:
|
||||||
|
|
||||||
|
Tim Lovelace
|
||||||
|
Lou Wallace
|
||||||
|
Carl Rhea
|
||||||
|
David Eaton
|
||||||
|
Steve Breeding
|
||||||
|
Rebecca Dye
|
||||||
|
Oris Christian
|
||||||
|
|
||||||
|
Lono Lester, Clerk
|
||||||
|
Vicki Porter, Deputy Clerk
|
||||||
|
Katie Patton, County Attorney
|
||||||
|
|
||||||
|
Absent:
|
||||||
|
|
||||||
|
None
|
||||||
|
|
||||||
|
Invocation by Caleb Johnson, followed by the Pledge of Allegiance to the Flag.
|
||||||
|
APPROVAL OF THE AGENDA
|
||||||
|
|
||||||
|
Motion made by Rebecca Dye, second Oris Christian and duly approved by the Board of Supervisors to
|
||||||
|
approve the agenda as amended.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
‘Aye: Rebecca Dye, Oris Christian, Lou Wallace, Tim Lovelace, David Eaton, Steve Breeding and Carl Rhea
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
Presentations
|
||||||
|
|
||||||
|
Plaques were presented to Tim Lovelace, Carl Rhea and Oris Christian in appreciation for their service as
|
||||||
|
members of the Board of Supervisors.
|
||||||
|
|
||||||
|
New Business
|
||||||
|
|
||||||
|
APPROVAL OF THE NOVEMBER 13, 2023 MINUTES
|
||||||
|
|
||||||
|
Motion made by Carl Rhea, second Oris Christian and duly approved by the Board of Supervisors to
|
||||||
|
approve the November 13, 2023 minutes and dispense with the reading thereof.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: Carl Rhea, Oris Chris<69>an, Lou Wallace, Tim Lovelace, Rebecca Dye, Steve Breeding and David Eaton
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
|
||||||
|
APPROVAL OF GENERAL COUNTY INVOICES
|
||||||
|
|
||||||
|
Mo<EFBFBD>on made by David Eaton, second Steve Breeding and duly approved by the Board of Supervisors to
|
||||||
|
approve general county invoices in the amount of $1,294,180.74, including reoccurring and
|
||||||
|
withholdings.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: David Eaton, Steve Breeding, Tim Lovelace, Carl Rhea, Rebecca Dye, Lou Wallace and Oris Chris<69>an
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
Commitee Appointments
|
||||||
|
|
||||||
|
|
||||||
|
MOTION TO TABLE THE COMMITTEE APPOINTMENTS UNTIL JANUARY 2024
|
||||||
|
|
||||||
|
|
||||||
|
Mo<EFBFBD>on made by David Eaton, second Steve Breeding and duly approved by the Board of Supervisors to
|
||||||
|
table the commitee appointments un<75>l January 2024 board of supervisors mee<65>ng.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: David Eaton and Steve Breeding
|
||||||
|
Nay: Tim Lovelace, Lou Wallace, Oris Chris<69>an, Rebecca Dye and Carl Rhea
|
||||||
|
|
||||||
|
MOTION FAILED.
|
||||||
|
|
||||||
|
|
||||||
|
CARL RHEA WAS APPOINTED TO THE RUSSELL COUNTY HIGHWAY & SAFETY COMMITTEE
|
||||||
|
|
||||||
|
|
||||||
|
Mo<EFBFBD>on made by Rebecca Dye, second David Eaton any duly approved by the Board of Supervisors to
|
||||||
|
appoint Carl Rhea to the Russell County Highway & Safety Commission for a (2) two-year term, said term
|
||||||
|
ending December 31, 2025.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: Rebecca Dye, David Eaton, Steve Breeding, Carl Rhea, Tim Lovelace, Lou Wallace and Oris Chris<69>an
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
|
||||||
|
MAXIE SKEEN RE-APPOINTED TO THE SOUTHWEST VIRGINIA EMS COUNCIL
|
||||||
|
|
||||||
|
Mo<EFBFBD>on made by Carl Rhea, second David Eton and duly approved by the Board of Supervisors to
|
||||||
|
reappoint Maxie Skeen to the Southwest Virginia EMS Council for a (4) four-year term, said term ending
|
||||||
|
December 31, 2027.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: Carl Rhea, David Eaton, Lou Wallace, Steve Breeding, Rebecca Dye, Oris Chris<69>an and Tim Lovelace
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
‘Aye: Carl Rhea, Oris Christian, Lou Wallace, Tim Lovelace, Rebecca Dye, Steve Breeding and David Eaton
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
APPROVAL OF GENERAL COUNTY INVOICES
|
||||||
|
Motion made by David Eaton, second Steve Breeding and duly approved by the Board of Supervisors to
|
||||||
|
approve general county invoices in the amount of $1,294,180.74, including reoccurring and
|
||||||
|
withholdings.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
|
||||||
|
Aye: David Eaton, Steve Breeding, Tim Lovelace, Carl Rhea, Rebecca Dye, Lou Wallace and Oris Christian
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
Committee Appointments
|
||||||
|
|
||||||
|
MOTION TO TABLE THE COMMITTEE APPOINTMENTS UNTIL JANUARY 2024
|
||||||
|
|
||||||
|
Motion made by David Eaton, second Steve Breeding and duly approved by the Board of Supervisors to
|
||||||
|
table the committee appointments until January 2024 board of supervisors meeting.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
‘Aye: David Eaton and Steve Breeding
|
||||||
|
Nay: Tim Lovelace, Lou Wallace, Oris Christian, Rebecca Dye and Carl Rhea
|
||||||
|
|
||||||
|
MOTION FAILED.
|
||||||
|
|
||||||
|
CARL RHEA WAS APPOINTED TO THE RUSSELL COUNTY HIGHWAY & SAFETY COMMITTEE
|
||||||
|
|
||||||
|
Motion made by Rebecca Dye, second David Eaton any duly approved by the Board of Supervisors to
|
||||||
|
appoint Carl Rhea to the Russell County Highway & Safety Commission for a (2) two-year term, said term
|
||||||
|
ending December 31, 2025.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
‘Aye: Rebecca Dye, David Eaton, Steve Breeding, Carl Rhea, Tim Lovelace, Lou Wallace and Oris Christian
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
MAXIE SKEEN RE-APPOINTED TO THE SOUTHWEST VIRGINIA EMS COUNCIL
|
||||||
|
|
||||||
|
Motion made by Carl Rhea, second David Eton and duly approved by the Board of Supervisors to
|
||||||
|
reappoint Maxie Skeen to the Southwest Virginia EMS Council for a (4) four-year term, said term ending
|
||||||
|
December 31, 2027.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
‘Aye: Carl Rhea, David Eaton, Lou Wallace, Steve Breeding, Rebecca Dye, Oris Christian and Tim Lovelace
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
REBECCA DYE REAPPOINTED TO THE CPMT
|
||||||
|
|
||||||
|
|
||||||
|
Mo<EFBFBD>on made by Tim Lovelace, second Carl Rhea and duly approved by the Board of Supervisors to
|
||||||
|
reappoint Rebecca Dye to the Community Policy Management Team for a four (4) year term, said term
|
||||||
|
ending December 31, 2027.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: Lou Wallace, Rebecca Dye, Carl Rhea and Tim Lovelace
|
||||||
|
Nay: Steve Breeding and David Eaton
|
||||||
|
|
||||||
|
|
||||||
|
MOTION TO APPOINT TARA DYE TO THE CPMT
|
||||||
|
|
||||||
|
|
||||||
|
Mo<EFBFBD>on made by David Eaton, second Steve Breeding to appoint Tara Dye to the Community Policy
|
||||||
|
Management Team.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: Steve Breeding and David Eaton
|
||||||
|
Nay: Tim Lovelace, Lou Wallace, Carl Rhea and Rebecca Dye and Oris Chris<69>an
|
||||||
|
MOTION FAILED.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
REBECCA DYE RE-APPOINTED TO THE RUSSELL COUNTY DEPARTMENT OF SOCIAL SERVICES BOARD
|
||||||
|
|
||||||
|
Mo<EFBFBD>on made by Tim Lovelace, second Oris Chris<69>an and duly approved to re-appoint Rebecca Dye to
|
||||||
|
the Russell County Department of Social Services Board for a four-year term, said term ending December
|
||||||
|
31, 2027.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: Tim Lovelace, Oris Chris<69>an, Lou Wallace, Carl Rhea and Rebecca Dye
|
||||||
|
Nay: Steve Breeding and David Eaton
|
||||||
|
|
||||||
|
|
||||||
|
MOTION TO APPOINT TARA DYE TO THE RUSSELL COUNTY DSS BOARD
|
||||||
|
|
||||||
|
Mo<EFBFBD>on made by Steve Breeding, second David Eaton to appoint Tara Dye to the Russell County
|
||||||
|
Department of Social Services Board.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: Steve Breeding .and David Eaton
|
||||||
|
Nay: Tim Lovelace, Carl Rhea, Oris Chris<69>an, Lou Wallace and Rebecca Dye
|
||||||
|
MOTION FAILED.
|
||||||
|
|
||||||
|
|
||||||
|
RICHARD LOCKRIDGE RE-APPOINTED TO THE RUSSELL COUNTY IDA
|
||||||
|
|
||||||
|
Mo<EFBFBD>on made by Steve Breeding, second Oris Chris<69>an and duly approved by the Board of Supervisors to
|
||||||
|
re-appoint Richard Lockridge to the Russell County Industrial Authority for a four (4) year term,
|
||||||
|
December 31, 2027.
|
||||||
|
|
||||||
|
|
||||||
|
REBECCA DYE REAPPOINTED TO THE CPMT
|
||||||
|
|
||||||
|
Motion made by Tim Lovelace, second Carl Rhea and duly approved by the Board of Supervisors to
|
||||||
|
reappoint Rebecca Dye to the Community Policy Management Team for a four (4) year term, said term
|
||||||
|
ending December 31, 2027.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: Lou Wallace, Rebecca Dye, Carl Rhea and Tim Lovelace
|
||||||
|
Nay: Steve Breeding and David Eaton
|
||||||
|
|
||||||
|
MOTION TO APPOINT TARA DYE TO THE CPMT
|
||||||
|
|
||||||
|
Motion made by David Eaton, second Steve Breeding to appoint Tara Dye to the Community Policy
|
||||||
|
Management Team.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
|
||||||
|
‘Aye: Steve Breeding and David Eaton
|
||||||
|
|
||||||
|
Nay: Tim Lovelace, Lou Wallace, Carl Rhea and Rebecca Dye and Oris Christian
|
||||||
|
MOTION FAILED.
|
||||||
|
|
||||||
|
REBECCA DYE RE-APPOINTED TO THE RUSSELL COUNTY DEPARTMENT OF SOCIAL SERVICES BOARD
|
||||||
|
|
||||||
|
Motion made by Tim Lovelace, second Oris Christian and duly approved to re-appoint Rebecca Dye to
|
||||||
|
the Russell County Department of Social Services Board for a four-year term, said term ending December
|
||||||
|
31, 2027.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
‘Aye: Tim Lovelace, Oris Christian, Lou Wallace, Carl Rhea and Rebecca Dye
|
||||||
|
Nay: Steve Breeding and David Eaton
|
||||||
|
|
||||||
|
MOTION TO APPOINT TARA DYE TO THE RUSSELL COUNTY DSS BOARD
|
||||||
|
|
||||||
|
Motion made by Steve Breeding, second David Eaton to appoint Tara Dye to the Russell County
|
||||||
|
Department of Social Services Board.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
|
||||||
|
‘Aye: Steve Breeding .and David Eaton
|
||||||
|
|
||||||
|
Nay: Tim Lovelace, Carl Rhea, Oris Christian, Lou Wallace and Rebecca Dye
|
||||||
|
MOTION FAILED.
|
||||||
|
|
||||||
|
RICHARD LOCKRIDGE RE-APPOINTED TO THE RUSSELL COUNTY IDA.
|
||||||
|
|
||||||
|
Motion made by Steve Breeding, second Oris Christian and duly approved by the Board of Supervisors to
|
||||||
|
re-appoint Richard Lockridge to the Russell County Industrial Authority for a four (4) year term,
|
||||||
|
December 31, 2027,
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: Steve Breeding, Oris Christian, Lou Wallace, Carl Rhea, Tim Lovelace, Rebecca Dye and David Eaton
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
|
||||||
|
MOTION TO RE-APPOINT TONY DODI TO THE RUSSELL COUNTY IDA
|
||||||
|
|
||||||
|
Motion made by Steve Breeding, second David Eaton to re-appoint Tony Dodi to the Russell County
|
||||||
|
Industrial Development Authority.
|
||||||
|
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: Steve Breeding and David Eaton
|
||||||
|
Nay: Lou Wallace, Tim Lovelace, Carl Rhea, Rebecca Dye and Oris Christian
|
||||||
|
MOTION FAILED.
|
||||||
|
|
||||||
|
|
||||||
|
TOMMY SHRADER APPOINTED TO THE RUSSELL COUNTY IDA
|
||||||
|
|
||||||
|
|
||||||
|
Mo<EFBFBD>on made by Tim Lovelace, second Carl Rhea and duly approved by the Board of Supervisors to
|
||||||
|
appoint Tommy Shrader to the Russell County Industrial Authority for a (4) four-year term, said term
|
||||||
|
ending December 31, 2027.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: Tim Lovelace, Carl Rhea, Lou Wallace, Rebecca Dye and Oris Christian
|
||||||
|
Nay: Steve Breeding and David Eaton
|
||||||
|
|
||||||
|
|
||||||
|
BICK GIBSON APPOINTED TO THE RUSSELL COUNTY IDA
|
||||||
|
|
||||||
|
Motion made Carl Rhea second Tim Lovelace and duly approved by the Board of Supervisors to appoint
|
||||||
|
Bick Gibson to the Russell County Industrial Development Authority for a (4) four-year term, said term
|
||||||
|
ending December 31, 2027.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: Tim Lovelace, Carl Rhea, Lou Wallace, Rebecca Dye and Oris Christian
|
||||||
|
Nay: Steve Breeding and David Eaton
|
||||||
|
|
||||||
|
|
||||||
|
MOTION TO RE-APPOINT TONY DODI TO THE RUSSELL COUNTY IDA
|
||||||
|
|
||||||
|
|
||||||
|
Motion made by Steve Breeding second David Eaton to re-appoint Tony Dodi to the Russell County
|
||||||
|
Industrial Development Authority.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: Steve Breeding and David Eaton
|
||||||
|
Nay: Tim Lovelace, Carl Rhea, Lou Wallace, Rebecca Dye and Oris Christian
|
||||||
|
MOTION FAILED.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
‘Aye: Steve Breeding, Oris Christian, Lou Wallace, Carl Rhea, Tim Lovelace, Rebecca Dye and David Eaton
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
MOTION TO RE-APPOINT TONY DOD! TO THE RUSSELL COUNTY IDA
|
||||||
|
|
||||||
|
Motion made by Steve Breeding, second David Eaton to re-appoint Tony Dodi to the Russell County
|
||||||
|
Industrial Development Authority.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
|
||||||
|
‘Aye: Steve Breeding and David Eaton
|
||||||
|
|
||||||
|
Nay: Lou Wallace, Tim Lovelace, Carl Rhea, Rebecca Dye and Oris Christian
|
||||||
|
MOTION FAILED.
|
||||||
|
|
||||||
|
TOMMY SHRADER APPOINTED TO THE RUSSELL COUNTY IDA
|
||||||
|
Motion made by Tim Lovelace, second Carl Rhea and duly approved by the Board of Supervisors to
|
||||||
|
appoint Tommy Shrader to the Russell County Industrial Authority for a (4) four-year term, said term
|
||||||
|
ending December 31, 2027.
|
||||||
|
The vote was:
|
||||||
|
Aye: Tim Lovelace, Carl Rhea, Lou Wallace, Rebecca Dye and Oris Christian
|
||||||
|
|
||||||
|
Nay: Steve Breeding and David Eaton
|
||||||
|
|
||||||
|
BICK GIBSON APPOINTED TO THE RUSSELL COUNTY IDA
|
||||||
|
|
||||||
|
Motion made Carl Rhea second Tim Lovelace and duly approved by the Board of Supervisors to appoint
|
||||||
|
Bick Gibson to the Russell County Industrial Development Authority for a (4) four-year term, said term
|
||||||
|
ending December 31, 2027.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
‘Aye: Tim Lovelace, Carl Rhea, Lou Wallace, Rebecca Dye and Oris Christian
|
||||||
|
Nay: Steve Breeding and David Eaton,
|
||||||
|
|
||||||
|
MOTION TO RE-APPOINT TONY DOD! TO THE RUSSELL COUNTY IDA
|
||||||
|
|
||||||
|
Motion made by Steve Breeding second David Eaton to re-appoint Tony Dodi to the Russell County
|
||||||
|
Industrial Development Authority.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
|
||||||
|
‘Aye: Steve Breeding and David Eaton
|
||||||
|
|
||||||
|
Nay: Tim Lovelace, Carl Rhea, Lou Wallace, Rebecca Dye and Oris Christian
|
||||||
|
MOTION FAILED.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Citizens’ Comment
|
||||||
|
|
||||||
|
The Chair opened ci<63>zens’ comment period.
|
||||||
|
|
||||||
|
The following ci<63>zens voiced their opposi<73>on to the proposed landfill at Moss III:
|
||||||
|
|
||||||
|
Amy Branson, Castlewood.
|
||||||
|
Josh Burgess, Cleveland
|
||||||
|
Dirk Hall, Cleveland
|
||||||
|
Jarred Ring, Castlewood
|
||||||
|
Gary Hughes, Swords Creek
|
||||||
|
Tammy Garret, Lebanon
|
||||||
|
Tony Smith, Cleveland
|
||||||
|
Jennifer Chumbley, Cleveland
|
||||||
|
|
||||||
|
Svitlana Boyd, Lebanon asked if the Board could assist with the Zoning problem she has with the Town
|
||||||
|
of Lebanon.
|
||||||
|
|
||||||
|
Ka<EFBFBD>e Paton, Lebanon thanked the Board and staff for their support during her tenure as County
|
||||||
|
Atorney. She looks forward to working with everyone as Clerk of The Circuit Court.
|
||||||
|
|
||||||
|
The Chair closed public comment.
|
||||||
|
|
||||||
|
ACCEPTANCE OF THE ABSTRACT OF VOTES
|
||||||
|
|
||||||
|
Mo<EFBFBD>on made by David Eaton, second Steve Breeding and duly approved by the Board of Supervisors to
|
||||||
|
accept the Abstract of Votes as presented by the Russell County Registrar.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: David Eaton, Steve Breeding, Lou Wallace, Tim Lovelace, Carl Rhea, Rebecca Dye and Oris Christian
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
APPROVAL OF A COUNTY AND IDA TOBACCO REGION OPPORTUNITY FUND PERFORANCE AGREEMENT
|
||||||
|
|
||||||
|
|
||||||
|
Motion made by Steve Breeding, second David Eaton and duly approved by the Board of Supervisors to
|
||||||
|
approve Russell County and the Russell County IDA Tobacco Region Opportunity Fund Performance
|
||||||
|
Agreement in the amount of $146,000.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: David Eaton, Steve Breeding, Carl Rhea, Tim Lovelace, Lou Wallace, Rebecca Dye and Oris Chris<69>an
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
|
||||||
|
APPROVAL OF A DHCD COMMUNITY DEVELOPMENT BLOCK GRANT
|
||||||
|
|
||||||
|
|
||||||
|
Mo<EFBFBD>on made by Oris Chris<69>an, second Rebecca Dye and duly approved by the Board of Supervisors to
|
||||||
|
approve the DHCD Community Development Block Grant #19-14-36 (Belfast Waterline Extension, Phase
|
||||||
|
II) Administrative & Conditional Closeout.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
|
||||||
|
Citizens’ Comment
|
||||||
|
The Chair opened citizens’ comment period.
|
||||||
|
The following citizens voiced their opposition to the proposed landfill at Moss Ill:
|
||||||
|
|
||||||
|
‘Amy Branson, Castlewood.
|
||||||
|
Josh Burgess, Cleveland
|
||||||
|
|
||||||
|
Dirk Hall, Cleveland
|
||||||
|
|
||||||
|
Jarred Ring, Castlewood
|
||||||
|
Gary Hughes, Swords Creek
|
||||||
|
Tammy Garrett, Lebanon
|
||||||
|
Tony Smith, Cleveland
|
||||||
|
Jennifer Chumbley, Cleveland
|
||||||
|
|
||||||
|
Svitlana Boyd, Lebanon asked if the Board could assist with the Zoning problem she has with the Town
|
||||||
|
of Lebanon.
|
||||||
|
|
||||||
|
Katie Patton, Lebanon thanked the Board and staff for their support during her tenure as County
|
||||||
|
‘Attorney. She looks forward to working with everyone as Clerk of The Circuit Court.
|
||||||
|
|
||||||
|
The Chair closed public comment.
|
||||||
|
‘ACCEPTANCE OF THE ABSTRACT OF VOTES
|
||||||
|
|
||||||
|
Motion made by David Eaton, second Steve Breeding and duly approved by the Board of Supervisors to
|
||||||
|
accept the Abstract of Votes as presented by the Russell County Registrar.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: David Eaton, Steve Breeding, Lou Wallace, Tim Lovelace, Carl Rhea, Rebecca Dye and Oris Christian
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
APPROVAL OF A COUNTY AND IDA TOBACCO REGION OPPORTUNITY FUND PERFORANCE AGREEMENT
|
||||||
|
Motion made by Steve Breeding, second David Eaton and duly approved by the Board of Supervisors to
|
||||||
|
approve Russell County and the Russell County IDA Tobacco Region Opportunity Fund Performance
|
||||||
|
‘Agreement in the amount of $146,000.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
|
||||||
|
‘Aye: David Eaton, Steve Breeding, Carl Rhea, Tim Lovelace, Lou Wallace, Rebecca Dye and Oris Christian
|
||||||
|
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
APPROVAL OF A DHCD COMMUNITY DEVELOPMENT BLOCK GRANT
|
||||||
|
|
||||||
|
Motion made by Oris Christian, second Rebecca Dye and duly approved by the Board of Supervisors to
|
||||||
|
approve the DHCD Community Development Block Grant #19-14-36 (Belfast Waterline Extension, Phase
|
||||||
|
Il) Administrative & Conditional Closeout.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Aye: Oris Christian, Rebecca Dye, Carl Rhea, Tim Lovelace, Lou Wallace, Steve Breeding and David Eaton
|
||||||
|
None: None
|
||||||
|
|
||||||
|
|
||||||
|
APPROVAL OF A VDOT DANTE DEPOT PROJUECT CERTIFICATION OF SUBSTANTIAL COMPLETION
|
||||||
|
|
||||||
|
Motion made by Oris Christian, second Rebecca Dye and duly approved by the Board of Supervisors to
|
||||||
|
approve the VDOT Dante Depot Project Certification of Substantial Completion.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: Oris Chris<69>an, Rebecca Dye, Tim Lovelace, Lou Wallace, Carl Rhea, Steve Breeding and David Eaton
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
|
||||||
|
APPROVAL OF A VDOT NOT COST ADDITION RESOLUTION RTE. 836 EXTENSION
|
||||||
|
|
||||||
|
Mo<EFBFBD>on made by David Eaton, second Steve Breeding and duly approved by the Board of Supervisors to
|
||||||
|
approve a VDOT No-Cost Addition Resolution RTE. 836 Extension.
|
||||||
|
|
||||||
|
The vote was
|
||||||
|
Aye: Davd Eaton, Steve Breeding, Carl Rhea, Tim Lovelace, Lou Wallace, Oris Christian and Rebecca Dye
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
|
||||||
|
APPROVAL OF A RC SCHOOL BOARD REVERSION FUNDS APPROPRIATION & REALLOCATION 2%
|
||||||
|
EMPLOYEE SALARY BY THE GENERAL ASSEMBLY
|
||||||
|
|
||||||
|
|
||||||
|
Motion made by David Eaton, second Steve Breeding and duly approved by the Board of Supervisors to
|
||||||
|
approve a Russell County School Board Reversion Funds Appropriation & Reallocation concerning the 2%
|
||||||
|
employee salary increase by the General Assembly.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: David Eaton, Steve Breeding, Carl Rhea, Lou Wallace, Tim Lovelace, Rebecca Dye and Oris Christian
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
APPROVAL OF THE RC DSS BOARD APPROPRIATION OF FUNDS CONCERNING A 2% EMPLOYEE SALARY
|
||||||
|
|
||||||
|
INCREASE BY THE GENERAL ASSEMBLY
|
||||||
|
|
||||||
|
Motion made by Rebecca Dye, second Oris Christian and duly approved by the Board of Supervisors to
|
||||||
|
approve a Russell County DSS Board Appropriation of Funds concerning a 2% salary increase by the
|
||||||
|
General Assembly.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: Rebecca Dye, Oris Christian, Lou Wallace, Carl Rhea, Tim Lovelace, David Eaton and Steve Breeding
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
APPROVAL OF A DCJS LAW ENFORCEMENT EQUIPMENT GRANT IN THE AMOUNT OF $542,000
|
||||||
|
|
||||||
|
Motion made by Rebecca Dye, second Oris Christian and duly approved by the Board of Supervisors to t
|
||||||
|
approve a DCJS Law Enforcement Equipment Grant in the amount of $542,000.
|
||||||
|
|
||||||
|
|
||||||
|
Aye: Oris Christian, Rebecca Dye, Carl Rhea, Tim Lovelace, Lou Wallace, Steve Breeding and David Eaton
|
||||||
|
None: None
|
||||||
|
|
||||||
|
APPROVAL OF A VDOT DANTE DEPOT PROJUECT CERTIFICATION OF SUBSTANTIAL COMPLETION
|
||||||
|
|
||||||
|
Motion made by Oris Christian, second Rebecca Dye and duly approved by the Board of Supervisors to
|
||||||
|
approve the VDOT Dante Depot Project Certification of Substantial Compl
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
‘Aye: Oris Christian, Rebecca Dye, Tim Lovelace, Lou Wallace, Carl Rhea, Steve Breeding and David Eaton
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
APPROVAL OF A VDOT NOT COST ADDITION RESOLUTION RTE. 836 EXTENSION
|
||||||
|
|
||||||
|
Motion made by David Eaton, second Steve Breeding and duly approved by the Board of Supervisors to
|
||||||
|
approve a VDOT No-Cost Addition Resolution RTE. 836 Extension.
|
||||||
|
|
||||||
|
The vote was
|
||||||
|
‘Aye: Davd Eaton, Steve Breeding, Carl Rhea, Tim Lovelace, Lou Wallace, Oris Christian and Rebecca Dye
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
APPROVAL OF A RC SCHOOL BOARD REVERSION FUNDS APPROPRIATION & REALLOCATION 2%
|
||||||
|
EMPLOYEE SALARY BY THE GENERAL ASSEMBLY
|
||||||
|
|
||||||
|
Motion made by David Eaton, second Steve Breeding and duly approved by the Board of Supervisors to
|
||||||
|
approve a Russell County School Board Reversion Funds Appropriation & Reallocation concerning the 2%
|
||||||
|
employee salary increase by the General Assembly.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: David Eaton, Steve Breeding, Carl Rhea, Lou Wallace, Tim Lovelace, Rebecca Dye and Oris Christian
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
APPROVAL OF THE RC DSS BOARD APPROPRIATION OF FUNDS CONCERNING A 2% EMPLOYEE SALARY
|
||||||
|
INCREASE BY THE GENERAL ASSEMBLY
|
||||||
|
|
||||||
|
Motion made by Rebecca Dye, second Oris Christian and duly approved by the Board of Supervisors to
|
||||||
|
approve a Russell County DSS Board Appropriation of Funds concerning a 2% salary increase by the
|
||||||
|
General Assembly.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
‘Aye: Rebecca Dye, Oris Christian, Lou Wallace, Carl Rhea, Tim Lovelace, David Eaton and Steve Breeding
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
APPROVAL OF A DCIS LAW ENFORCEMENT EQUIPMENT GRANT IN THE AMOUNT OF $542,000
|
||||||
|
|
||||||
|
Motion made by Rebecca Dye, second Oris Christian and duly approved by the Board of Supervisors to t
|
||||||
|
approve a DCIS Law Enforcement Equipment Grant in the amount of $542,000.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: Rebecca Dye, Oris Christian, Tim Lovelace, David Eaton, Carl Rhea, Steve Breeding and Lou Wallace
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
|
||||||
|
APPROVAL OF A $3000 DONATION TO THE SHOP WITH A COP PROGRAM
|
||||||
|
|
||||||
|
Motion made by David Eaton, second Steve Breeding and duly approved by the Board of Supervisors to
|
||||||
|
donate $3000 to the Shop with a Cop Program for the Town of Honaker, Town of Lebanon and The
|
||||||
|
Russell County Sheriff’s Department.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: David Eaton, Steve Breeding, Lou Wallace, Tim Lovelace, Carl Rhea, Rebecca Dye and Oris Christian
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
|
||||||
|
APPROVAL OF A LIBRARY OF VIRGINIA REVISED STATE GRANT-IN-AID FY 2024 IN THE AMOUNT OF
|
||||||
|
$128,394
|
||||||
|
|
||||||
|
|
||||||
|
Motion made by David Eaton, second Rebecca Dye and duly approved by the Board of Supervisors to
|
||||||
|
approve a Library of Virginia Revised State Grant-In-Aid FY 2024 in the amount of $128,394.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: David Eaton, Steve Breeding, Carl Rhea, Tim Lovelace, Lou Wallace, Rebecca Dye and Oris Christian
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
|
||||||
|
APPROVAL OF A VDEM EMERGENCY PERFORMANCE GRANT IN THE AMOUNT OF $7500
|
||||||
|
|
||||||
|
|
||||||
|
Motion made by Oris Christian, second David Eaton and duly approved by the Board of Supervisors to
|
||||||
|
appropriate and accept a VDEM Emergency Management Performance Grant in the amount of $7500.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: Oris Christian, David Eaton, Tim Lovelace, Lou Wallace, Carl Rhea, Steve Breeding and Rebecca Dye
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
BURN BAN LIFTED
|
||||||
|
|
||||||
|
Motion made by Steve Breeding, second David Eaton and duly approved by the Board of Supervisors to
|
||||||
|
lift the burn ban declaration effective immediately.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: David Eaton, Steve Breeding, Carl Rhea, Tim Lovelace, Lou Wallace, Rebecca Dye and Oris Christian
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
|
||||||
|
APPROVAL OF A POTESTA MASTER AGREEMENT FOR ENGINEERS & ENVIRNMENTAL SERVICES
|
||||||
|
CONTRACT SIX-MONTH EXTENSION
|
||||||
|
|
||||||
|
|
||||||
|
Motion made by Oris Christian, second Steve Breeding and duly approved by the Board of Supervisors to
|
||||||
|
approve a Potesta Master Agreement for Engineers & Environmental Services Six Month Extension.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
|
||||||
|
Steve Breeding
|
||||||
|
Highlight
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
‘Aye: Rebecca Dye, Oris Christian, Tim Lovelace, David Eaton, Carl Rhea, Steve Breeding and Lou Wallace
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
APPROVAL OF A $3000 DONATION TO THE SHOP WITH A COP PROGRAM
|
||||||
|
|
||||||
|
Motion made by David Eaton, second Steve Breeding and duly approved by the Board of Supervisors to
|
||||||
|
donate $3000 to the Shop with a Cop Program for the Town of Honaker, Town of Lebanon and The
|
||||||
|
Russell County Sheriff's Department.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: David Eaton, Steve Breeding, Lou Wallace, Tim Lovelace, Carl Rhea, Rebecca Dye and Oris Christian
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
APPROVAL OF A LIBRARY OF VIRGINIA REVISED STATE GRANT-IN-AID FY 2024 IN THE AMOUNT OF
|
||||||
|
$128,394
|
||||||
|
|
||||||
|
Motion made by David Eaton, second Rebecca Dye and duly approved by the Board of Supervisors to
|
||||||
|
approve a Library of Virginia Revised State Grant-In-Aid FY 2024 in the amount of $128,394.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: David Eaton, Steve Breeding, Carl Rhea, Tim Lovelace, Lou Wallace, Rebecca Dye and Oris Christian
|
||||||
|
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
APPROVAL OF A VDEM EMERGENCY PERFORMANCE GRANT IN THE AMOUNT OF $7500
|
||||||
|
|
||||||
|
Motion made by Oris Christian, second David Eaton and duly approved by the Board of Supervisors to
|
||||||
|
appropriate and accept a VDEM Emergency Management Performance Grant in the amount of $7500.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
‘Aye: Oris Chri
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
ian, David Eaton, Tim Lovelace, Lou Wallace, Carl Rhea, Steve Breeding and Rebecca Dye
|
||||||
|
BURN BAN LIFTED.
|
||||||
|
|
||||||
|
Motion made by Steve Breeding, second David Eaton and duly approved by the Board of Supervisors to
|
||||||
|
lift the burn ban declaration effective immediately.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
|
||||||
|
‘Aye: David Eaton, Steve Breeding, Carl Rhea, Tim Lovelace, Lou Wallace, Rebecca Dye and Oris Christian
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
eeaeaaamem ieee i <n
|
||||||
|
Sones Pts serene renee oer es ann ean
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Aye: Oris Christian, Steve Breeding, Carl Rhea, Tim Lovelace, Lou Wallace, David Eaton and Rebecca Dye
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
|
||||||
|
APPROVAL OF A VDH & RUSSELL COUNTY SERVICE AGREEMENT
|
||||||
|
|
||||||
|
Motion made by Rebecca Dye, second Steve Breeding and duly approved by the Board of Supervisors to
|
||||||
|
approve a VDH & Russell County Service Agreement. (Russell County Health Department).
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: Rebecca Dye, Steve Breeding, Carl Rhea, Tim Lovelace, Lou Wallace, David Eaton and Oris Christian
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
APPROVAL OF A RUSSELL COUNTY OMD CONTRACT FOR SERVICES
|
||||||
|
|
||||||
|
Motion made by Rebecca Dye, second David Eaton and duly approved by the Board of Supervisors to
|
||||||
|
approve a Russell County Operational Medical Director (OMD) Contract for Services.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: Rebecca Dye, David Eaton, Lou Wallace, Carl Rhea, Steve Breeding, Tim Lovelace and Oris Christian
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
|
||||||
|
APPROVAL OF A RUSSELL COUNTY COAL HAUL ROAD PLAN RESOLUTION
|
||||||
|
|
||||||
|
Motion made by Oris Christian, second Carl Rhea and duly approved by the Board of Supervisors to
|
||||||
|
VDOT Resolution- Russell County Coal Haul Road Plan – Rte 615 Gravel Lick Road Improvements in the
|
||||||
|
amount of $100,000.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: Oris Christian, Carl Rhea, Tim Lovelace, Lou Wallace, Steve Breeding, David Eaton and Rebecca Dye
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
|
||||||
|
APPROVAL TO CHANGE A CL DALE PLAT
|
||||||
|
|
||||||
|
|
||||||
|
Motion made by David Eaton, second Steve Breeding and duly approved by the Board of Supervisors to
|
||||||
|
approve a CL Dale Construction Plat change in language as requested by the Planning Commission.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: David Eaton, Steve Breeding, Carl Rhea, Tim Lovelace, Lou Wallace, Rebecca Dye and Oris Christian
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
CANNERY CLOSING DATE TABLED
|
||||||
|
|
||||||
|
Motion made by Steve Breeding, second David Eaton and duly approved by the Board of Supervisors to
|
||||||
|
table the cannery closing date.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: David Eaton, Steve Breeding, Carl Rhea, Tim Lovelace, Lou Wallace, Rebecca Dye and Oris Christian
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Steve Breeding
|
||||||
|
Highlight
|
||||||
|
|
||||||
|
SESS aT TW
|
||||||
|
|
||||||
|
APPROVAL OF A VDH & RUSSELL COUNTY SERVICE AGREEMENT
|
||||||
|
|
||||||
|
Motion made by Rebecca Dye, second Steve Breeding and duly approved by the Board of Supervisors to
|
||||||
|
approve a VDH & Russell County Service Agreement. (Russell County Health Department)
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
‘Aye: Rebecca Dye, Steve Breeding, Carl Rhea, Tim Lovelace, Lou Wallace, David Eaton and Oris Christian
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
APPROVAL OF A RUSSELL COUNTY OMD CONTRACT FOR SERVICES
|
||||||
|
|
||||||
|
Motion made by Rebecca Dye, second David Eaton and duly approved by the Board of Supervisors to
|
||||||
|
approve a Russell County Operational Medical Director (OMD) Contract for Services.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
‘Aye: Rebecca Dye, David Eaton, Lou Wallace, Carl Rhea, Steve Breeding, Tim Lovelace and Oris Christian
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
APPROVAL OF A RUSSELL COUNTY COAL HAUL ROAD PLAN RESOLUTION
|
||||||
|
Motion made by Oris Christian, second Carl Rhea and duly approved by the Board of Supervisors to
|
||||||
|
VDOT Resolution- Russell County Coal Haul Road Plan — Rte 615 Gravel Lick Road Improvements in the
|
||||||
|
amount of $100,000.
|
||||||
|
The vote was:
|
||||||
|
‘Aye: Oris Christian, Carl Rhea, Tim Lovelace, Lou Wallace, Steve Breeding, David Eaton and Rebecca Dye
|
||||||
|
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
APPROVAL TO CHANGE A CL DALE PLAT
|
||||||
|
|
||||||
|
Motion made by David Eaton, second Steve Breeding and duly approved by the Board of Supervisors to
|
||||||
|
approve a CL Dale Construction Plat change in language as requested by the Planning Commission.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
‘Aye: David Eaton, Steve Breeding, Carl Rhea, Tim Lovelace, Lou Wallace, Rebecca Dye and Oris Christian
|
||||||
|
|
||||||
|
Nay: None
|
||||||
|
CANNERY CLOSING DATE TABLED
|
||||||
|
|
||||||
|
Motion made by Steve Breeding, second David Eaton and duly approved by the Board of Supervisors to
|
||||||
|
table the cannery closing date.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
‘Aye: David Eaton, Steve Breeding, Carl Rhea, Tim Lovelace, Lou Wallace, Rebecca Dye and Oris Christian
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
APPROVAL OF COUNTY HOLIDAY AND PAY SCHEDULE
|
||||||
|
|
||||||
|
Motion made by Steve Breeding, second Rebecca Dye and duly approved by the Board of Supervisors to
|
||||||
|
approve the county holiday and pay schedule as presented.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: Steve Breeding, Rebecca Dye, Carl Rhea, Tim Lovelace, David Eaton, Lou Wallace and Oris Christian
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
APPROVAL TO SET THE BOARD MEETING FOR JANUARY 02, 2024
|
||||||
|
|
||||||
|
|
||||||
|
Motion made by Steve Breeding, second David Eaton and duly approved by the Board of Supervisors to
|
||||||
|
set the Board of Supervisors meeting for Tuesday, January 02, 2024 at 6:00 pm.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: Steve Breeding, David Eaton, Tim Lovelace, Carl Rhea, Lou Wallace, Rebecca Dye and Oris Christian
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
|
||||||
|
APPROVAL OF A VDOT DANTE ENGINEERING STUDY
|
||||||
|
|
||||||
|
|
||||||
|
Motion made by David Eaton, second Steve Breeding and duly approved by the Board of Supervisors to
|
||||||
|
the VDOT Dante Engineering Study.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: David Eaton, Steve Breeding, Carl Rhea, Tim Lovelace, Lou Wallace, Rebecca Dye and Oris Christian
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
|
||||||
|
APPROVAL TO SEND A LETTER OPPOSING UTILITY RATE INCREASES
|
||||||
|
|
||||||
|
|
||||||
|
Motion made by David Eaton, second Carl Rhea and duly approved by the Board of Supervisors to
|
||||||
|
authorize the County Administrator to send a letter opposing the rate increase to AEP and Kentucky
|
||||||
|
Utilities.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: David Eaton, Carl Rhea, Tim Lovelace, Rebecca Dye, Lou Wallace, Steve Breeding and Oris Christian
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
_________________________ _________________________
|
||||||
|
Clerk of the Board Chairperson
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
APPROVAL OF COUNTY HOLIDAY AND PAY SCHEDULE
|
||||||
|
|
||||||
|
Motion made by Steve Breeding, second Rebecca Dye and duly approved by the Board of Supervisors to.
|
||||||
|
approve the county holiday and pay schedule as presented.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: Steve Breeding, Rebecca Dye, Carl Rhea, Tim Lovelace, David Eaton, Lou Wallace and Oris Christian
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
APPROVAL TO SET THE BOARD MEETING FOR JANUARY 02, 2024
|
||||||
|
|
||||||
|
Motion made by Steve Breeding, second David Eaton and duly approved by the Board of Supervisors to
|
||||||
|
set the Board of Supervisors meeting for Tuesday, January 02, 2024 at 6:00 pm.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
‘Aye: Steve Breeding, David Eaton, Tim Lovelace, Carl Rhea, Lou Wallace, Rebecca Dye and Oris Christian
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
APPROVAL OF A VDOT DANTE ENGINEERING STUDY
|
||||||
|
|
||||||
|
Motion made by David Eaton, second Steve Breeding and duly approved by the Board of Supervisors to
|
||||||
|
the VDOT Dante Engineering Study.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
‘Aye: David Eaton, Steve Breeding, Carl Rhea, Tim Lovelace, Lou Wallace, Rebecca Dye and Oris Christian
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
APPROVAL TO SEND A LETTER OPPOSING UTILITY RATE INCREASES
|
||||||
|
|
||||||
|
Motion made by David Eaton, second Carl Rhea and duly approved by the Board of Supervisors to
|
||||||
|
authorize the County Administrator to send a letter opposing the rate increase to AEP and Kentucky
|
||||||
|
Utilities
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
‘Aye: David Eaton, Carl Rhea, Tim Lovelace, Rebecca Dye, Lou Wallace, Steve Breeding and Oris Christian
|
||||||
|
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
Clerk of the Board Chairperson
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
308
2024-02-16 FOIA Response/FOIA-Potesta_and_Associates/README.md
Normal file
308
2024-02-16 FOIA Response/FOIA-Potesta_and_Associates/README.md
Normal file
|
|
@ -0,0 +1,308 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: FOIA-Potesta and Associates
|
||||||
|
file: ../FOIA-Potesta_and_Associates.pdf
|
||||||
|
tags:
|
||||||
|
- 2024-02-16 FOIA Response
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 2864779
|
||||||
|
sha256sum: 857f17c1f0df39fb1228325a159aa22f72f9a6ca1c193b4519951078bc42fce4
|
||||||
|
sha1sum: e1f2f74cbf5f8e8cee0ca938f28d74e8a9c3da40
|
||||||
|
---
|
||||||
|
|
||||||
|
2/16/24, 2:19 PM daball.me Mail - Freedom of Information Act Request regarding Potesta & Associates, its competitors, selection process, and legal…
|
||||||
|
|
||||||
|
https://mail.google.com/mail/u/0/?ik=c072651926&view=pt&search=all&permmsgid=msg-f:1791081891212180563&simpl=msg-f:1791081891212180… 1/2
|
||||||
|
|
||||||
|
David Ball <david@daball.me>
|
||||||
|
|
||||||
|
Freedom of Information Act Request regarding Potesta & Associates, its
|
||||||
|
competitors, selection process, and legal theories regarding landfill project
|
||||||
|
Lonzo Lester <lonzo.lester@russellcountyva.us> Fri, Feb 16, 2024 at 1:39 PM
|
||||||
|
To: David Ball <david@daball.me>
|
||||||
|
Cc: foiacouncil@dls.virginia.gov, vcog@opengovva.org, Blhurleylaw@gmail.com
|
||||||
|
|
||||||
|
Potesta Landfill Development Feasibility Study
|
||||||
|
RFQ.pdf
|
||||||
|
|
||||||
|
T&L Landfill Development Feasibility Study
|
||||||
|
RFQ.pdf
|
||||||
|
|
||||||
|
Mr. Ball,
|
||||||
|
|
||||||
|
You have requested information (attached) from the Russell County Board of Supervisors under the Virginia Freedom of
|
||||||
|
Information Act (FOIA). I have reviewed your request and provide the following information:
|
||||||
|
|
||||||
|
Request #1 - All communications, if any, including but not limited to any emails, phone call notes,
|
||||||
|
chats, instant messages, letters, or other correspondence, regarding any requests for
|
||||||
|
qualifications (RFQs) about the Russell County landfill project referenced above
|
||||||
|
including solicitations for requests for qualifications, negotiations between the
|
||||||
|
County and any prospective clients, including but not limited to Potesta & Associates
|
||||||
|
and Thomas & Litton, or any discussions about the scope, cost, or any other facts
|
||||||
|
regarding the project, between the County and any prospective clients, to include
|
||||||
|
communications not limited to the Board of Supervisors but also to include the
|
||||||
|
County Administrator, any County Attorneys, or any other parties representing the
|
||||||
|
County and any prospective clients, whether or not the Board accepted those offers by
|
||||||
|
those offerors. You should omit the communications which were already disclosed in
|
||||||
|
the agenda packet for September 12, 2022. - See attached documents.
|
||||||
|
|
||||||
|
Request #2 - All communications, if any, including but not limited to any emails, phone call notes,
|
||||||
|
chats, instant messages, letters, or other correspondence, regarding any ongoing
|
||||||
|
relationship between Russell County and Potesta & Associates regarding the landfill
|
||||||
|
project for which the Request for Qualifications (RFQ) was ultimately awarded to
|
||||||
|
Potesta & Associates during the September 12, 2022, board meeting. This request
|
||||||
|
should include communications between Board Members, County Administrator, any
|
||||||
|
County Attorneys, or any other parties representing the County and Potesta &
|
||||||
|
Associates. You should omit the communications that were already disclosed in any
|
||||||
|
other agenda packets currently available for download. - See attached documents.
|
||||||
|
|
||||||
|
Request #3 - All project deliverables, if any, including but not limited to any results, and
|
||||||
|
particularly comprehensive results, of the feasibility study work being purchased on
|
||||||
|
an ongoing basis from Potesta & Associates regarding the landfill project for which
|
||||||
|
the County’s client has done work for the County. - Gentry Locke (Special Counsel) is asserting that the information
|
||||||
|
submitted by NOV A and Potesta Engineering is CONFIDENTIAL under Va. Code Sections 2.2-3705.6.3 and 2.2-
|
||||||
|
3705.7.2 which is part of the Host Agreement.
|
||||||
|
|
||||||
|
Request #4 - All communications, if any, including but not limited to any emails, phone call notes,
|
||||||
|
chats, instant messages, letters, or other correspondence, between the County or any
|
||||||
|
of its representatives, Board Members, the County Administrator, or any other parties
|
||||||
|
representing the County, and any prospective landfill owners or their attorneys,
|
||||||
|
County attorneys, or any other attorneys, that can corroborate or otherwise reinforce
|
||||||
|
any claims, arguments, suppositions, etc., that the County might be held liable in the
|
||||||
|
event it does not resolve to sign a Host Agreement and/or if the County might choose
|
||||||
|
to modify the 2017 waste management ordinance to remove language permitting
|
||||||
|
private landfills. Especially if you have any documentation on redress rights the
|
||||||
|
|
||||||
|
https://drive.google.com/file/d/17ukVuJ18RcreL-VFuf_2Fr4ic6_OLrXt/view?usp=drive_web
|
||||||
|
https://drive.google.com/file/d/1WFX3e8dsHs2z4YBNEDyMX7udLcM3ioAE/view?usp=drive_web
|
||||||
|
2/16/24, 2:19 PM <aball.me Mail - Freedom of Information Act Request regarding Potesta & Associates, its competitors, selection process, and legal
|
||||||
|
|
||||||
|
Gmail bavi al cavidedabatime>
|
||||||
|
|
||||||
|
Freedom of Information Act Request regarding Potesta & Associates, its
|
||||||
|
competitors, selection process, and legal theories regarding landfill project
|
||||||
|
|
||||||
|
Lonzo Lester <lonzo.lester@russellcountyva.us> Fri, Feb 16, 2024 at 1:39 PM
|
||||||
|
To: David Ball <david@daball. me>
|
||||||
|
Co: foiacouncil@als. virginia. gov, veog@opengowva.org, Bihurleylaw@gmail.com
|
||||||
|
|
||||||
|
1B Potesta Landfill Development Feasibility Study
|
||||||
|
RFQ. pdf
|
||||||
|
|
||||||
|
BR Tat Landfill Development Feasibility Study
|
||||||
|
|
||||||
|
REQ.pdf
|
||||||
|
Mr. Bali,
|
||||||
|
|
||||||
|
You have requested information (attached) from the Russell County Board of Supervisors under the Virginia Freedom of
|
||||||
|
Information Act (FOIA). | have reviewed your request and provide the following information:
|
||||||
|
|
||||||
|
Request #1 - All communications, if any, including but not limited to any emails, phone call notes,
|
||||||
|
chats, instant messages, letters, or other correspondence, regarding any requests for
|
||||||
|
qualifications (RFQs) about the Russell County landfill project referenced above
|
||||||
|
including solicitations for requests for qualifications, negotiations between the
|
||||||
|
|
||||||
|
County and any prospective clients, including but not limited to Potesta & Associates
|
||||||
|
and Thomas & Litton, or any discussions about the scope, cost, or any other facts
|
||||||
|
regarding the project, between the County and any prospective clients, to include
|
||||||
|
communications not limited to the Board of Supervisors but also to include the
|
||||||
|
|
||||||
|
County Administrator, any County Attorneys, or any other parties representing the
|
||||||
|
County and any prospective clients, whether or not the Board accepted those offers by
|
||||||
|
those offerors. You should omit the communications which were already disclosed in
|
||||||
|
the agenda packet for September 12, 2022. - See attached documents.
|
||||||
|
|
||||||
|
Request #2 - All communications, if any, including but not limited to any emails, phone call notes,
|
||||||
|
chats, instant messages, letters, or other correspondence, regarding any ongoing
|
||||||
|
|
||||||
|
relationship between Russell County and Potesta & Associates regarding the landfill
|
||||||
|
|
||||||
|
project for which the Request for Qualifications (RFQ) was ultimately awarded to
|
||||||
|
|
||||||
|
Potesta & Associates during the September 12, 2022, board meeting. This request
|
||||||
|
|
||||||
|
should include communications between Board Members, County Administrator, any
|
||||||
|
|
||||||
|
County Attorneys, or any other parties representing the County and Potesta &
|
||||||
|
|
||||||
|
Associates. You should omit the communications that were already disclosed in any
|
||||||
|
|
||||||
|
other agenda packets currently available for download. - See attached documents.
|
||||||
|
|
||||||
|
Request #3 - All project deliverables, if any, including but not limited to any results, and
|
||||||
|
Particularly comprehensive results, of the feasibility study work being purchased on
|
||||||
|
|
||||||
|
an ongoing basis from Potesta & Associates regarding the landfill project for which
|
||||||
|
|
||||||
|
the County's client has done work for the County. - Gentry Locke (Special Counsel) is asserting that the information
|
||||||
|
submitted by NOV A and Potesta Engineering is CONFIDENTIAL under Va. Code Sections 2.2-3705.6.3 and 2.
|
||||||
|
3705.7.2 which is part of the Host Agreement.
|
||||||
|
|
||||||
|
Request #4 - All communications, if any, including but not limited to any emails, phone call notes,
|
||||||
|
chats, instant messages, letters, or other correspondence, between the County or any
|
||||||
|
|
||||||
|
of its representatives, Board Members, the County Administrator, or any other parties,
|
||||||
|
representing the County, and any prospective landfill owners or their attorneys,
|
||||||
|
|
||||||
|
County attomeys, or any other attorneys, that can corroborate or otherwise reinforce
|
||||||
|
|
||||||
|
any claims, arguments, suppositions, etc., that the County might be held liable in the
|
||||||
|
|
||||||
|
event it does not resolve to sign a Host Agreement andior if the County might choose
|
||||||
|
|
||||||
|
to modify the 2017 waste management ordinance to remove language permitting
|
||||||
|
|
||||||
|
private landfills. Especially if you have any documentation on redress rights the
|
||||||
|
|
||||||
|
hitps//mail. google.com/mailu/0/2Ik=c0726519268.view=pt&search=all&permmsgid=msq-£17910818912121 80563&simp!=msq-1791081891212180... 1/2
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
2/16/24, 2:19 PM daball.me Mail - Freedom of Information Act Request regarding Potesta & Associates, its competitors, selection process, and legal…
|
||||||
|
|
||||||
|
https://mail.google.com/mail/u/0/?ik=c072651926&view=pt&search=all&permmsgid=msg-f:1791081891212180563&simpl=msg-f:1791081891212180… 2/2
|
||||||
|
|
||||||
|
landfill owner might have, do include that in the request. - No communications of any type addresses or exist
|
||||||
|
concerning corroborate or otherwise reinforce
|
||||||
|
any claims, arguments, suppositions, etc., that the County might be held liable in the
|
||||||
|
event it does not resolve to sign a Host Agreement and/or if the County might choose
|
||||||
|
to modify the 2017 waste management ordinance to remove language permitting
|
||||||
|
private landfills. Especially if you have any documentation on redress rights the
|
||||||
|
landfill owner might have, do include that in the request.
|
||||||
|
|
||||||
|
If you have any questions, please contact me.
|
||||||
|
|
||||||
|
Sincerely,
|
||||||
|
|
||||||
|
Lonzo Lester, MBA, VCO, CPC
|
||||||
|
County Administrator
|
||||||
|
Russell County Board of Supervisors
|
||||||
|
137 Highland Drive, Suite A
|
||||||
|
Lebanon, VA 24266
|
||||||
|
Office: 276.889.8000
|
||||||
|
Cell: 276.880.4396
|
||||||
|
lonzo.lester@russellcountyva.us
|
||||||
|
|
||||||
|
|
||||||
|
www.russellcounty.us
|
||||||
|
|
||||||
|
[Quoted text hidden]
|
||||||
|
|
||||||
|
7 attachments
|
||||||
|
|
||||||
|
Potesta Master Ageement Final - 09302022.pdf
|
||||||
|
2601K
|
||||||
|
|
||||||
|
Proposal for Consulting Services - Potesta & Assoc..pdf
|
||||||
|
611K
|
||||||
|
|
||||||
|
Potesta contract adjustment.pdf
|
||||||
|
114K
|
||||||
|
|
||||||
|
BOS Minutes 12112023.pdf
|
||||||
|
191K
|
||||||
|
|
||||||
|
RC BOS Minutes 09122022.pdf
|
||||||
|
129K
|
||||||
|
|
||||||
|
Landfill Feasibility RFQ.pdf
|
||||||
|
146K
|
||||||
|
|
||||||
|
RussellCountyLandfillFeasibilityStudyProposal (1).pdf
|
||||||
|
648K
|
||||||
|
|
||||||
|
mailto:lonzo.lester@russellcountyva.us
|
||||||
|
mailto:lonzo.lester@russellcountyva.us
|
||||||
|
http://www.russellcounty.us/
|
||||||
|
https://mail.google.com/mail/u/0/?ui=2&ik=c072651926&view=att&th=18db337d91563c53&attid=0.1&disp=attd&realattid=f_lsoxndk70&safe=1&zw
|
||||||
|
https://mail.google.com/mail/u/0/?ui=2&ik=c072651926&view=att&th=18db337d91563c53&attid=0.1&disp=attd&realattid=f_lsoxndk70&safe=1&zw
|
||||||
|
https://mail.google.com/mail/u/0/?ui=2&ik=c072651926&view=att&th=18db337d91563c53&attid=0.2&disp=attd&realattid=f_lsoxnlx91&safe=1&zw
|
||||||
|
https://mail.google.com/mail/u/0/?ui=2&ik=c072651926&view=att&th=18db337d91563c53&attid=0.2&disp=attd&realattid=f_lsoxnlx91&safe=1&zw
|
||||||
|
https://mail.google.com/mail/u/0/?ui=2&ik=c072651926&view=att&th=18db337d91563c53&attid=0.3&disp=attd&realattid=f_lsoxnoz92&safe=1&zw
|
||||||
|
https://mail.google.com/mail/u/0/?ui=2&ik=c072651926&view=att&th=18db337d91563c53&attid=0.3&disp=attd&realattid=f_lsoxnoz92&safe=1&zw
|
||||||
|
https://mail.google.com/mail/u/0/?ui=2&ik=c072651926&view=att&th=18db337d91563c53&attid=0.4&disp=attd&realattid=f_lsoxnrej3&safe=1&zw
|
||||||
|
https://mail.google.com/mail/u/0/?ui=2&ik=c072651926&view=att&th=18db337d91563c53&attid=0.4&disp=attd&realattid=f_lsoxnrej3&safe=1&zw
|
||||||
|
https://mail.google.com/mail/u/0/?ui=2&ik=c072651926&view=att&th=18db337d91563c53&attid=0.5&disp=attd&realattid=f_lsoxntet4&safe=1&zw
|
||||||
|
https://mail.google.com/mail/u/0/?ui=2&ik=c072651926&view=att&th=18db337d91563c53&attid=0.5&disp=attd&realattid=f_lsoxntet4&safe=1&zw
|
||||||
|
https://mail.google.com/mail/u/0/?ui=2&ik=c072651926&view=att&th=18db337d91563c53&attid=0.6&disp=attd&realattid=f_lsozk7d25&safe=1&zw
|
||||||
|
https://mail.google.com/mail/u/0/?ui=2&ik=c072651926&view=att&th=18db337d91563c53&attid=0.6&disp=attd&realattid=f_lsozk7d25&safe=1&zw
|
||||||
|
https://mail.google.com/mail/u/0/?ui=2&ik=c072651926&view=att&th=18db337d91563c53&attid=0.7&disp=attd&realattid=f_lsozkvfk6&safe=1&zw
|
||||||
|
https://mail.google.com/mail/u/0/?ui=2&ik=c072651926&view=att&th=18db337d91563c53&attid=0.7&disp=attd&realattid=f_lsozkvfk6&safe=1&zw
|
||||||
|
2/16/24, 2:19 PM <aball.me Mail - Freedom of Information Act Request regarding Potesta & Associates, its competitors, selection process, and legal
|
||||||
|
|
||||||
|
landfill owner might have, do include that in the request. - No communications of any type addresses or exist
|
||||||
|
|
||||||
|
concerning corroborate or otherwise reinforce
|
||||||
|
any claims, arguments, suppositions, etc., that the County mi
|
||||||
|
|
||||||
|
ight be held liable in the
|
||||||
|
|
||||||
|
event it does not resolve to sign a Host Agreement and/or if the County might choose
|
||||||
|
to modify the 2017 waste management ordinance to remove language permitting
|
||||||
|
|
||||||
|
private lan
|
||||||
|
landfill owner might have, do include that in the request.
|
||||||
|
|
||||||
|
If you have any questions, please contact me.
|
||||||
|
|
||||||
|
Sincerely,
|
||||||
|
|
||||||
|
Lonzo Lester, MBA, VCO, CPC
|
||||||
|
County Administrator
|
||||||
|
|
||||||
|
Russell County Board of Supervisors
|
||||||
|
137 Highland Drive, Suite A
|
||||||
|
|
||||||
|
Lebanon, VA 24266
|
||||||
|
|
||||||
|
Office: 276.889.8000
|
||||||
|
|
||||||
|
Cell: 276.880.4396
|
||||||
|
lonzo.lester@russellcountyva.us
|
||||||
|
|
||||||
|
www.russellcounty.us
|
||||||
|
|
||||||
|
[Quoted text hidden}
|
||||||
|
|
||||||
|
7 attachments
|
||||||
|
|
||||||
|
‘23 Potesta Master Ageement Final - 09302022.pdf
|
||||||
|
2601K
|
||||||
|
|
||||||
|
‘Bj Proposal for Consulting Services - Potesta & Assoc..pdf
|
||||||
|
611k
|
||||||
|
|
||||||
|
Potesta contract adjustment.pdf
|
||||||
|
a i pe
|
||||||
|
14K
|
||||||
|
|
||||||
|
BOS Minutes 12112023.pdf
|
||||||
|
191K
|
||||||
|
|
||||||
|
RC BOS Minutes 09122022.pdf
|
||||||
|
129K
|
||||||
|
|
||||||
|
Landfill Feasi
|
||||||
|
146K
|
||||||
|
|
||||||
|
RussellCountyLandfillFea:
|
||||||
|
648K
|
||||||
|
|
||||||
|
ity RFQ.pdf
|
||||||
|
|
||||||
|
ityStudyProposal (1).pdf
|
||||||
|
|
||||||
|
ooo o
|
||||||
|
|
||||||
|
hittps://mall google. com/mailu/0/2Ik=c0726519268 view=pt&search=all&permmsgi
|
||||||
|
|
||||||
|
lls. Especially if you have any documentation on redress rights the
|
||||||
|
|
||||||
|
msq-417910818912121805638simpl=msq-f1781081891212180,
|
||||||
|
|
||||||
|
22
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
155
2024-02-16 FOIA Response/Landfill Feasibility RFQ/README.md
Normal file
155
2024-02-16 FOIA Response/Landfill Feasibility RFQ/README.md
Normal file
|
|
@ -0,0 +1,155 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: Landfill Feasibility RFQ
|
||||||
|
file: ../Landfill Feasibility RFQ.pdf
|
||||||
|
tags:
|
||||||
|
- 2024-02-16 FOIA Response
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 148535
|
||||||
|
sha256sum: 4ce7d9380f8a3e96249b527554834baceb6c0f82833703c621592f4f17eda7e6
|
||||||
|
sha1sum: a9298f20fcab625fc4040dab0aca1a04ecfdb845
|
||||||
|
---
|
||||||
|
|
||||||
|
PUBLIC NOTICE
|
||||||
|
|
||||||
|
|
||||||
|
REQUEST FOR QUALIFICATIONS (RFQ)
|
||||||
|
|
||||||
|
Landfill Development Feasibility
|
||||||
|
|
||||||
|
Technical and Environmental Consulting Services
|
||||||
|
The County of Russell is currently seeking Landfill Feasibility Technical and
|
||||||
|
Environmental Consulting Services with capabilities and experience in landfill
|
||||||
|
development from a qualified and experienced firms/consultants to provide support for
|
||||||
|
the Russell County’s Landfill Feasibility Project. The Board of Supervisors of Russell
|
||||||
|
County, Virginia, hereinafter referred to as “The Board,” hereby issues to qualified firms
|
||||||
|
and individuals, a Request for Qualifications (hereinafter referred to as “RFQ”). The
|
||||||
|
Board proposes to award a contract for landfill technical and environmental consulting
|
||||||
|
services to assist the Board in determining the feasibility of a substantial landfill project.
|
||||||
|
|
||||||
|
|
||||||
|
Statements of Qualification will be evaluated based on the following information:
|
||||||
|
|
||||||
|
|
||||||
|
1. Experience and qualifications of firms or individuals.
|
||||||
|
2. Offeror’s past work experience with feasibility of substantial landfill projects.
|
||||||
|
3. Relevant experience in providing similar consulting services.
|
||||||
|
4. Capability to meet landfill technical and environmental consulting services
|
||||||
|
|
||||||
|
requirements.
|
||||||
|
5. Experience in landfill technical and environmental consulting services in the following
|
||||||
|
|
||||||
|
environmental areas but not limited to:.
|
||||||
|
• Groundwater Monitoring
|
||||||
|
• Wetlands
|
||||||
|
• Water Quality
|
||||||
|
• Gas Monitoring
|
||||||
|
• Storm Water
|
||||||
|
• Environmental Assessments
|
||||||
|
• Ecological Studies
|
||||||
|
• Hazardous Waste
|
||||||
|
• Landfill Federal, State, and County Regulatory Compliance
|
||||||
|
|
||||||
|
|
||||||
|
Firms/consultants meeting the requirements of this RFQ are invited to submit their
|
||||||
|
proposal. Request for Qualifications (RFQ) are available on the County’s Website Bid
|
||||||
|
Postings • Russell County, VA • CivicEngage (russellcountyva.us) or email
|
||||||
|
lonzo.lester@russellcountyva.us to request the RFQ.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Proposals are due no later than 3:00 p.m., Monday, June 6, 2022. Any proposals received
|
||||||
|
after this deadline will be returned to the offeror unopened. The County reserves the right
|
||||||
|
to reject any and all proposals.
|
||||||
|
|
||||||
|
|
||||||
|
Disadvantaged Business Enterprises (small or minority and/or women owned firms) are
|
||||||
|
encouraged to submit proposals. MBE/WBE firms are encouraged to submit proposals.
|
||||||
|
|
||||||
|
|
||||||
|
The County is an equal opportunity/affirmative action employer and will not discriminate
|
||||||
|
based on race, creed, color, national origin, age, or handicap.
|
||||||
|
|
||||||
|
|
||||||
|
BY ORDER OF THE
|
||||||
|
|
||||||
|
RUSSELL COUNTY BOARD OF SUPERVISORS
|
||||||
|
|
||||||
|
https://www.russellcountyva.us/Bids.aspx
|
||||||
|
https://www.russellcountyva.us/Bids.aspx
|
||||||
|
mailto:lonzo.lester@russellcountyva.us
|
||||||
|
PUBLIC NOTICE
|
||||||
|
|
||||||
|
REQUEST FOR QUALIFICATIONS (RFQ)
|
||||||
|
Landfill Development Feasibility
|
||||||
|
|
||||||
|
Technical and Environmental Consulting Services
|
||||||
|
|
||||||
|
The County of Russell is currently seeking Landfill Feasibility Technical and
|
||||||
|
Environmental Consulting Services with capabilities and experience in landfill
|
||||||
|
development from a qualified and experienced firms/consultants to provide support for
|
||||||
|
the Russell County's Landfill Feasibility Project. The Board of Supervisors of Russell
|
||||||
|
County, Virginia, hereinafter referred to as “The Board,” hereby issues to qualified firms
|
||||||
|
and individuals, a Request for Qualifications (hereinafter referred to as “RFQ"). The
|
||||||
|
Board proposes to award a contract for landfill technical and environmental consulting
|
||||||
|
services to assist the Board in determining the feasibility of a substantial landfill project.
|
||||||
|
|
||||||
|
Statements of Qualification will be evaluated based on the following information:
|
||||||
|
|
||||||
|
Experience and qualifications of firms or individuals.
|
||||||
|
|
||||||
|
Offeror’s past work experience with feasibilty of substantial landfill projects.
|
||||||
|
Relevant experience in providing similar consulting services.
|
||||||
|
|
||||||
|
Capability to meet landill technical and environmental consulting services
|
||||||
|
requirements.
|
||||||
|
|
||||||
|
Experience in landfill technical and environmental consulting services in the following
|
||||||
|
environmental areas but not limited to:
|
||||||
|
|
||||||
|
+ Groundwater Monitoring
|
||||||
|
|
||||||
|
* Wetlands
|
||||||
|
|
||||||
|
+ Water Quality
|
||||||
|
|
||||||
|
‘* Gas Monitoring
|
||||||
|
|
||||||
|
* Storm Water
|
||||||
|
|
||||||
|
+ Environmental Assessments
|
||||||
|
|
||||||
|
+ Ecological Studies
|
||||||
|
|
||||||
|
+ Hazardous Waste
|
||||||
|
|
||||||
|
+ Landfill Federal, State, and County Regulatory Compliance
|
||||||
|
|
||||||
|
RONA
|
||||||
|
|
||||||
|
a
|
||||||
|
|
||||||
|
Firms/consultants meeting the requirements of this RFQ are invited to submit their
|
||||||
|
proposal. Request for Qualifications (RFQ) are available on the County's Website Bid
|
||||||
|
Postings + Russell County, VA + CivicEngage (russellcountyva.us) or email
|
||||||
|
ionzo.lester@russelicountyva.us to request the RFQ.
|
||||||
|
|
||||||
|
Proposals are due no later than 3:00 p.m., Monday, June 6, 2022. Any proposals received
|
||||||
|
after this deadline will be returned to the offeror unopened. The County reserves the right
|
||||||
|
to reject any and all proposals.
|
||||||
|
|
||||||
|
Disadvantaged Business Enterprises (small or minority and/or women owned firms) are
|
||||||
|
‘encouraged to submit proposals. MBE/WBE firms are encouraged to submit proposals.
|
||||||
|
|
||||||
|
The County is an equal opportunity/affirmative action employer and will not discriminate
|
||||||
|
based on race, creed, color, national origin, age, or handicap.
|
||||||
|
|
||||||
|
BY ORDER OF THE
|
||||||
|
RUSSELL COUNTY BOARD OF SUPERVISORS
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Landfill Development Feasibility
|
||||||
|
Technical and Environmental Consulting Services
|
||||||
|
|
||||||
665
2024-02-16 FOIA Response/RC BOS Minutes 09122022/README.md
Normal file
665
2024-02-16 FOIA Response/RC BOS Minutes 09122022/README.md
Normal file
|
|
@ -0,0 +1,665 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: RC BOS Minutes 09122022
|
||||||
|
file: ../RC BOS Minutes 09122022.pdf
|
||||||
|
tags:
|
||||||
|
- 2024-02-16 FOIA Response
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 131564
|
||||||
|
sha256sum: 1f2bc746d4f9c58229c9be43f22f570f63cec15aac1a03ccd7ed2f2fc6876dd6
|
||||||
|
sha1sum: f3d60c11b7a51a959fe018610b3b672128d6d0d7
|
||||||
|
---
|
||||||
|
|
||||||
|
September 12, 2022
|
||||||
|
|
||||||
|
A regular monthly meeting of the Russell County Board of Supervisors was held on Monday, September
|
||||||
|
12, 2022 at 6:00 pm at the Russell County Government Center in Lebanon, Virginia.
|
||||||
|
|
||||||
|
The Clerk called the meeting to order.
|
||||||
|
|
||||||
|
Roll Call by the Clerk:
|
||||||
|
|
||||||
|
Present:
|
||||||
|
Tim Lovelace
|
||||||
|
Lou Wallace
|
||||||
|
David Eaton
|
||||||
|
Steve Breeding
|
||||||
|
Rebecca Dye
|
||||||
|
Oris Christian
|
||||||
|
|
||||||
|
Absent:
|
||||||
|
Carl Rhea
|
||||||
|
|
||||||
|
Invocation by Caleb Johnson followed by the Pledge of Allegiance to the Flag.
|
||||||
|
|
||||||
|
Presentations
|
||||||
|
|
||||||
|
Linda Skeens was recognized as the “Viral County Fair Queen” by the Board of Supervisors and was
|
||||||
|
presented a resolution in her honor.
|
||||||
|
|
||||||
|
The Board presented Russell County Country music band 49 Winchester with a resolution proclaiming
|
||||||
|
April 09 as the Annual “49 Winchester Day” in Russell County.
|
||||||
|
|
||||||
|
Dora Martin, representing Vet Fest gave the Board an overview of the Vet Fest event to be held on
|
||||||
|
September 24, 2022.
|
||||||
|
|
||||||
|
Cuba Porter, Chairman of The Russell County Public Service Authority gave an update on the fire
|
||||||
|
hydrants and PSA projects.
|
||||||
|
|
||||||
|
New Business
|
||||||
|
|
||||||
|
APPROVAL OF THE AUGUST 01, 2022 MINUTES
|
||||||
|
|
||||||
|
Motion made by David Eaton, second Steve Breeding as duly approved by the Board of Supervisors to
|
||||||
|
approve the August 01, 2022 minutes and dispense with the reading thereof.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: David Eaton, Steve Breeding, Tim Lovelace, Lou Wallace, Rebecca Dye and Oris Christian
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
APPROVAL OF GENERAL COUNTY INVOICES
|
||||||
|
|
||||||
|
September 12, 2022
|
||||||
|
|
||||||
|
A regular monthly meeting of the Russell County Board of Supervisors was held on Monday, September
|
||||||
|
12, 2022 at 6:00 pm at the Russell County Government Center in Lebanon, Virginia.
|
||||||
|
|
||||||
|
The Clerk called the meeting to order.
|
||||||
|
Roll Call by the Clerk:
|
||||||
|
|
||||||
|
Present:
|
||||||
|
|
||||||
|
Tim Lovelace
|
||||||
|
|
||||||
|
Lou Wallace
|
||||||
|
|
||||||
|
David Eaton
|
||||||
|
|
||||||
|
Steve Breeding
|
||||||
|
|
||||||
|
Rebecca Dye
|
||||||
|
|
||||||
|
Oris Christian
|
||||||
|
|
||||||
|
Absent:
|
||||||
|
Carl Rhea
|
||||||
|
|
||||||
|
Invocation by Caleb Johnson followed by the Pledge of Allegiance to the Flag.
|
||||||
|
Presentations
|
||||||
|
|
||||||
|
Linda Skeens was recognized as the “Viral County Fair Queen” by the Board of Supervisors and was
|
||||||
|
presented a resolution in her honor.
|
||||||
|
|
||||||
|
‘The Board presented Russell County Country music band 49 Winchester with a resolution proclaiming
|
||||||
|
April 09 as the Annual “49 Winchester Day” in Russell County.
|
||||||
|
|
||||||
|
Dora Martin, representing Vet Fest gave the Board an overview of the Vet Fest event to be held on
|
||||||
|
September 24, 2022.
|
||||||
|
|
||||||
|
Cuba Porter, Chairman of The Russell County Public Service Authority gave an update on the fire
|
||||||
|
hydrants and PSA projects.
|
||||||
|
|
||||||
|
New Business
|
||||||
|
APPROVAL OF THE AUGUST 01, 2022 MINUTES
|
||||||
|
|
||||||
|
Motion made by David Eaton, second Steve Breeding as duly approved by the Board of Supervisors to
|
||||||
|
approve the August 01, 2022 minutes and dispense with the reading thereof.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
‘Aye: David Eaton, Steve Breeding, Tim Lovelace, Lou Wallace, Rebecca Dye and Oris Christian
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
APPROVAL OF GENERAL COUNTY INVOICES
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Motion made by Steve Breeding, second Oris Christian as duly approved by the Board of Supervisors to
|
||||||
|
approve of general county invoices in the amount of $ , including reoccurring and
|
||||||
|
withholdings.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: Steve Breeding, Oris Christian, Tim Lovelace, Lou Wallace, Rebecca Dye and David Eaton
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
Committee Appointments
|
||||||
|
|
||||||
|
LISA HUBBARD APPOINTED TO THE TOURISM ADVISORY COMMITTEE
|
||||||
|
|
||||||
|
Motion made by David Eaton, second Tim Lovelace and duly approved by the Board of Supervisors to
|
||||||
|
appoint Lisa Hubbard to the Tourism Advisory Committee for a (2) two-year term, said term ending
|
||||||
|
August 01, 2024.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: David Eaton, Tim Lovelace, Steve Breeding, Lou Wallace, Rebecca Dye and Oris Christian
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
HARRY FERGUSON APPOINTED TO THE RUSSELL COUNTY PSA
|
||||||
|
|
||||||
|
Motion made by Rebecca Dye, second Tim Lovelace and duly approved by the Board of Supervisors to
|
||||||
|
appoint Harry Ferguson to The Russell County Public Service Authority to fill the unexpired term of
|
||||||
|
Phillip Campbell, said term ending August 01, 2026.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: Rebecca Dye, Tim Lovelace, Lou Wallace, David Eaton, Steve Breeding and Oris Christian
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
KAREN DAVIS, SHARON SARGENT, SHARON VANDYKE AND JUDY ASHBROOK APPOINTED TO THE
|
||||||
|
LIBRARY BOARD OF TRUSTEES
|
||||||
|
|
||||||
|
Motion made Steve Breeding, second David Eaton to re-appoint Karen Davis, Sharon Sargent, and
|
||||||
|
Sharon VanDyke and to appoint Judy Ashbrook to the Russell County Library Board of Trustees for (4)
|
||||||
|
four-year terms, said terms ending September 20, 2026.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: Steve Breeding, David Eaton, Tim Lovelace, Lou Wallace, Rebecca Dye and Oris Christian
|
||||||
|
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
MADDIE GORDON APPOINTED TO THE UPPER TENNESSEE RIVER ROUNDTABLE
|
||||||
|
|
||||||
|
Motion made by Rebecca Dye, second Tim Lovelace to appoint Maddie Gordon to the Upper Tennessee
|
||||||
|
River Roundtable to fill the unexpired term of Nathaniel Rasnake, said term ending December 31, 2024.
|
||||||
|
|
||||||
|
Motion made by Steve Breeding, second Oris Christian as duly approved by the Board of Supervisors to
|
||||||
|
approve of general county invoices in the amount of $ , including reoccurring and
|
||||||
|
withholdings.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
|
||||||
|
Aye: Steve Breeding, Oris Christian, Tim Lovelace, Lou Wallace, Rebecca Dye and David Eaton
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
Committee Appointments
|
||||||
|
|
||||||
|
LISA HUBBARD APPOINTED TO THE TOURISM ADVISORY COMMITTEE
|
||||||
|
|
||||||
|
Motion made by David Eaton, second Tim Lovelace and duly approved by the Board of Supervisors to.
|
||||||
|
appoint Lisa Hubbard to the Tourism Advisory Committee for a (2) two-year term, said term ending
|
||||||
|
‘August 01, 2024.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: David Eaton, Tim Lovelace, Steve Breeding, Lou Wallace, Rebecca Dye and Oris Christian
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
HARRY FERGUSON APPOINTED TO THE RUSSELL COUNTY PSA
|
||||||
|
|
||||||
|
Motion made by Rebecca Dye, second Tim Lovelace and duly approved by the Board of Supervisors to
|
||||||
|
appoint Harry Ferguson to The Russell County Public Service Authority to fill the unexpired term of
|
||||||
|
Phillip Campbell, said term ending August 01, 2026.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
‘Aye: Rebecca Dye, Tim Lovelace, Lou Wallace, David Eaton, Steve Breeding and Oris Christian
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
KAREN DAVIS, SHARON SARGENT, SHARON VANDYKE AND JUDY ASHBROOK APPOINTED TO THE
|
||||||
|
LIBRARY BOARD OF TRUSTEES
|
||||||
|
|
||||||
|
Motion made Steve Breeding, second David Eaton to re-appoint Karen Davis, Sharon Sargent, and
|
||||||
|
‘Sharon VanDyke and to appoint Judy Ashbrook to the Russell County Library Board of Trustees for (4)
|
||||||
|
four-year terms, said terms ending September 20, 2026.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
‘Aye: Steve Breeding, David Eaton, Tim Lovelace, Lou Wallace, Rebecca Dye and Oris Christian
|
||||||
|
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
MADDIE GORDON APPOINTED TO THE UPPER TENNESSEE RIVER ROUNDTABLE
|
||||||
|
|
||||||
|
Motion made by Rebecca Dye, second Tim Lovelace to appoint Maddie Gordon to the Upper Tennessee
|
||||||
|
River Roundtable to fill the unexpired term of Nathaniel Rasnake, said term ending December 31, 2024.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: Rebecca Dye, Tim Lovelace, Lou Wallace, Steve Breeding, David Eaton and Oris Christian
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
Citizens Comment
|
||||||
|
|
||||||
|
Brandon Moore, Moccasin stated that the Moccasin solid waste site has been closing early.
|
||||||
|
|
||||||
|
Victor Hall, Castlewood commented that a water main leak flooded his garage, and the PSA was at fault.
|
||||||
|
|
||||||
|
Annie Stevens, New Garden Rescue Squad requested ARPA funds to help with the expenses of the all
|
||||||
|
the fire and rescue departments.
|
||||||
|
|
||||||
|
The following citizens spoke in favor of making Russell County a Pro-Life sanctuary:
|
||||||
|
|
||||||
|
Sandy Hess
|
||||||
|
Michelle Vance
|
||||||
|
Arnold King
|
||||||
|
Dr. Don Zampogna
|
||||||
|
Larry Hughes
|
||||||
|
Adam Hess
|
||||||
|
Stephen Damron
|
||||||
|
Scotty Perkins
|
||||||
|
Tim Whited
|
||||||
|
Cody Jackson
|
||||||
|
Michael Sautters
|
||||||
|
Gordon Colob
|
||||||
|
Kenny Bolling
|
||||||
|
Mike Dye
|
||||||
|
Jony Baker
|
||||||
|
Jonathan Edwards
|
||||||
|
Lynn Hess
|
||||||
|
Shelly Reynolds
|
||||||
|
Sue Hubbard
|
||||||
|
Jody Shelton
|
||||||
|
Kirby Meadows
|
||||||
|
Ericia Hubbard
|
||||||
|
Wayne Hubbard
|
||||||
|
Delana Bodmer
|
||||||
|
Nate Kiser
|
||||||
|
Paul Herndon
|
||||||
|
Darrell Fletcher
|
||||||
|
|
||||||
|
The Chair closed citizens’ comment.
|
||||||
|
|
||||||
|
APPROVAL OF A RESOLUTION PROCLAIMING RUSSELL COUNTY AS A PRO-LIFE SANCTUARY
|
||||||
|
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: Rebecca Dye, Tim Lovelace, Lou Wallace, Steve Breeding, David Eaton and Oris Christian
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
Citizens Comment
|
||||||
|
Brandon Moore, Moccasin stated that the Moccasin solid waste site has been closing early.
|
||||||
|
Victor Hall, Castlewood commented that a water main leak flooded his garage, and the PSA was at fault.
|
||||||
|
|
||||||
|
Annie Stevens, New Garden Rescue Squad requested ARPA funds to help with the expenses of the all
|
||||||
|
the fire and rescue departments.
|
||||||
|
|
||||||
|
The following citizens spoke in favor of making Russell County a Pro-Life sanctuary:
|
||||||
|
|
||||||
|
‘Sandy Hess
|
||||||
|
Michelle Vance
|
||||||
|
Arnold King
|
||||||
|
|
||||||
|
Dr. Don Zampogna
|
||||||
|
Larry Hughes
|
||||||
|
‘Adam Hess
|
||||||
|
‘Stephen Damron
|
||||||
|
Scotty Perkins
|
||||||
|
Tim Whited
|
||||||
|
Cody Jackson
|
||||||
|
Michael Sautters
|
||||||
|
Gordon Colob
|
||||||
|
Kenny Bolling
|
||||||
|
Mike Dye
|
||||||
|
|
||||||
|
Jony Baker
|
||||||
|
Jonathan Edwards
|
||||||
|
Lynn Hess
|
||||||
|
|
||||||
|
Shelly Reynolds
|
||||||
|
‘Sue Hubbard
|
||||||
|
Jody Shelton
|
||||||
|
Kirby Meadows,
|
||||||
|
Ericia Hubbard
|
||||||
|
Wayne Hubbard
|
||||||
|
Delana Bodmer
|
||||||
|
Nate Kiser
|
||||||
|
|
||||||
|
Paul Herndon
|
||||||
|
Darrell Fletcher
|
||||||
|
|
||||||
|
The Chair closed citizens’ comment,
|
||||||
|
|
||||||
|
APPROVAL OF A RESOLUTION PROCLAIMING RUSSELL COUNTY AS A PRO-LIFE SANCTUARY
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Motion made by Steve Breeding, second David Eaton and duly approved by the Board of Supervisors to
|
||||||
|
pass the original resolution (as written by Steve Breeding) proclaiming Russell County as a Pro-Life
|
||||||
|
Sanctuary.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: David Eaton, Steve Breeding, Tim Lovelace, Lou Wallace, Rebecca Dye and Oris Christian
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
The Chair declared a 5- minute break.
|
||||||
|
|
||||||
|
The Chair reconvened the meeting.
|
||||||
|
|
||||||
|
APPROVAL OF THE AGENDA
|
||||||
|
|
||||||
|
Motion made by Oris Christian, second Rebecca Dye and duly approved by the Board of Supervisors to
|
||||||
|
approve the agenda as presented.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: Oris Christian, Rebecca Dye, Tim Lovelace, Steve Breeding, David Eaton, and Lou Wallace
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
Constitutional Office Reports and Requests
|
||||||
|
|
||||||
|
Treasurer Alicia McGlothlin commented that tax tickets were ready to go out and due to increased
|
||||||
|
values, taxes would increase around 20%. She also discussed the school reversion funds.
|
||||||
|
|
||||||
|
County Attorney Reports and Requests
|
||||||
|
|
||||||
|
COUNTY PERSONNEL POLICY INSURANCE INCENTIVE TO INCLUDE EMPLOYEES OF CONSTITUTIONAL
|
||||||
|
OFFICES
|
||||||
|
|
||||||
|
Motion made by David Eaton, second Steve Breeding and duly approved by the Board of Supervisors
|
||||||
|
amend the Russell County Personnel Policy to include employees of constitutional offices in the
|
||||||
|
insurance retirement incentive.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: David Eaton, Steve Breeding, Rebecca Dye, Tim Lovelace, Oris Christian and Lou Wallace
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
APPROVAL OF A LANDFILL CONTRACT WITH POTESTA AND ASSOCIATES
|
||||||
|
|
||||||
|
Motion made by Rebecca Dye, second Tim Lovelace and duly approved by the Board of Supervisors to
|
||||||
|
approve the Russell County Landfill Consultant Contract with Potesta and Associates with modifications
|
||||||
|
to the contract as made by the County Attorney.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: Rebecca Dye, Tim Lovelace, Tim Lovelace, David Eaton, Steve Breeding, Oris Christian, Lou Ann
|
||||||
|
Wallance
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
Steve Breeding
|
||||||
|
Highlight
|
||||||
|
|
||||||
|
Motion made by Steve Breeding, second David Eaton and duly approved by the Board of Supervisors to
|
||||||
|
pass the original resolution (as written by Steve Breeding) proclaiming Russell County as a Pro-Life
|
||||||
|
Sanctuary.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
‘Aye: David Eaton, Steve Breeding, Tim Lovelace, Lou Wallace, Rebecca Dye and Oris Christian
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
‘The Chair declared a 5- minute break.
|
||||||
|
|
||||||
|
The Chair reconvened the meeting.
|
||||||
|
‘APPROVAL OF THE AGENDA
|
||||||
|
|
||||||
|
Motion made by Oris Christian, second Rebecca Dye and duly approved by the Board of Supervisors to
|
||||||
|
approve the agenda as presented.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: Oris Christian, Rebecca Dye, Tim Lovelace, Steve Breeding, David Eaton, and Lou Wallace
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
Constitutional Office Reports and Requests
|
||||||
|
|
||||||
|
Treasurer Alicia McGlothlin commented that tax tickets were ready to go out and due to increased
|
||||||
|
values, taxes would increase around 20%. She also discussed the school reversion funds.
|
||||||
|
|
||||||
|
County Attorney Reports and Requests
|
||||||
|
|
||||||
|
COUNTY PERSONNEL POLICY INSURANCE INCENTIVE TO INCLUDE EMPLOYEES OF CONSTITUTIONAL
|
||||||
|
OFFICES
|
||||||
|
|
||||||
|
Motion made by David Eaton, second Steve Breeding and duly approved by the Board of Supervisors
|
||||||
|
‘amend the Russell County Personnel Policy to include employees of constitutional offices in the
|
||||||
|
insurance retirement incentive.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
|
||||||
|
‘Aye: David Eaton, Steve Breeding, Rebecca Dye, Tim Lovelace, Oris Christian and Lou Wallace
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
APPROVAL OF $1000 PER MONTH IN ARPA FUNDS FOR FIRE AND RESCUE AGENCIES
|
||||||
|
|
||||||
|
Motion made by Rebecca Dye, second David Eaton and duly approved by the Board of Supervisors to
|
||||||
|
allocate $1000 per month for 12 months to county fire and rescue agencies from ARPA funds.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: Rebecca Dye, David Eaton, Steve Breeding, Tim Lovelace, Oris Christian and Lou Wallace
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
APPROVAL OF A VDOT DANTE DEPOT RENOVATION CONTRACT
|
||||||
|
|
||||||
|
Motion made by David Eaton, second Rebecca Dye and duly approved by the Board of Supervisors to
|
||||||
|
approve a VDOT Dante Depot Renovation Contract.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: David Eaton, Rebecca Dye, Steve Breeding, Tim Lovelace, Oris Christian and Lou Wallace
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
APPROVAL OF THE DHCD DANTE SEWER LINE EXTENSION AGREEMENT
|
||||||
|
|
||||||
|
Motion made by Rebecca Dye, second David Eaton and duly approved by the Board of Supervisors to
|
||||||
|
approve the DHCD Sewer Line Extension Agreement.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: Rebecca Dye, David Eaton, Tim Lovelace, Steve Breeding, Oris Christian and Lou Wallace
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
APPROVAL OF A DCJS VICTIM WITNESS GRANT IN THE AMOUNT OF $70,000
|
||||||
|
|
||||||
|
Motion made by David Eaton, second Rebecca Dye and duly approved by the Board of Supervisors to
|
||||||
|
accept and appropriate a DCJS Victim Witness Grant in the amount of $70,000.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: David Eaton, Rebecca Dye, Steve Breeding, Tim Lovelace, Oris Christian and Lou Wallace
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
APPROVAL TO PURCHASE AN ICE TABULATOR FOR VOTER REGISTRATION
|
||||||
|
|
||||||
|
Motion made by Steve Breeding, second David Eaton and duly approved by the Board of Supervisors to
|
||||||
|
approve the purchase of an ICE Tabulator as requested by the Voter Registration office in the amount of
|
||||||
|
$8625.00.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: David Eaton, Steve Breeding, Tim Lovelace, Lou Wallace, Rebecca Dye and Oris Christian
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
APPROVAL OF A VDOT RESOLUTION -PROJECT 7058-097-105, G302, G303
|
||||||
|
|
||||||
|
APPROVAL OF $1000 PER MONTH IN ARPA FUNDS FOR FIRE AND RESCUE AGENCIES
|
||||||
|
|
||||||
|
Motion made by Rebecca Dye, second David Eaton and duly approved by the Board of Supervisors to
|
||||||
|
allocate $1000 per month for 12 months to county fire and rescue agencies from ARPA funds.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
‘Aye: Rebecca Dye, David Eaton, Steve Breeding, Tim Lovelace, Oris Christian and Lou Wallace
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
APPROVAL OF A VDOT DANTE DEPOT RENOVATION CONTRACT
|
||||||
|
|
||||||
|
Motion made by David Eaton, second Rebecca Dye and duly approved by the Board of Supervisors to
|
||||||
|
approve a VDOT Dante Depot Renovation Contract.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
‘Aye: David Eaton, Rebecca Dye, Steve Breeding, Tim Lovelace, Oris Christian and Lou Wallace
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
APPROVAL OF THE DHCD DANTE SEWER LINE EXTENSION AGREEMENT
|
||||||
|
|
||||||
|
Motion made by Rebecca Dye, second David Eaton and duly approved by the Board of Supervisors to
|
||||||
|
approve the DHCD Sewer Line Extension Agreement.
|
||||||
|
|
||||||
|
The vote was
|
||||||
|
‘Aye: Rebecca Dye, Da
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
Eaton, Tim Lovelace, Steve Breeding, Oris Christian and Lou Wallace
|
||||||
|
|
||||||
|
APPROVAL OF A DCIS VICTIM WITNESS GRANT IN THE AMOUNT OF $70,000
|
||||||
|
|
||||||
|
Motion made by David Eaton, second Rebecca Dye and duly approved by the Board of Supervisors to
|
||||||
|
accept and appropriate a DCIS Victim Witness Grant in the amount of $70,000.
|
||||||
|
|
||||||
|
The vote was
|
||||||
|
‘Aye: David Eaton, Rebecca Dye, Steve Breeding, Tim Lovelace, Oris Christian and Lou Wallace
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
APPROVAL TO PURCHASE AN ICE TABULATOR FOR VOTER REGISTRATION
|
||||||
|
|
||||||
|
Motion made by Steve Breeding, second David Eaton and duly approved by the Board of Supervisors to
|
||||||
|
approve the purchase of an ICE Tabulator as requested by the Voter Registration office in the amount of
|
||||||
|
$8625.00,
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
‘Aye: David Eaton, Steve Breeding, Tim Lovelace, Lou Wallace, Rebecca Dye and Oris Christian
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
APPROVAL OF A VDOT RESOLUTION -PROJECT 7058-097-105, G302, G303
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Motion made by Rebecca Dye, second Tim Lovelace and duly approved by the Board of Supervisors to
|
||||||
|
approve a VDOT Resolution for Highway System – Project 7058-097-105, G302 and G303.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: Rebecca Dye, Tim Lovelace, Steve Breeding, David Eaton, Oris Christian and Lou Wallace
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
APPROVAL OF A CSA SUPPLEMENT REQUEST IN THE AMOUNT OF $11,141.09
|
||||||
|
|
||||||
|
Motion made by David Eaton, second Rebecca Dye and duly approved by the Board of Supervisors to
|
||||||
|
approve a CSA Supplement request in the amount of $11,141.09.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: David Eaton, Rebecca Dye, Steve Breeding, Tim Lovelace, Oris Christian and Lou Wallace
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
APPROVAL OF $356,522.13 RUSSELL COUNTY SCHOOL BOARD REVERSION FUNDS CORRECTION
|
||||||
|
|
||||||
|
Motion made by David Eaton, second Steve Breeding and duly approved by the Board of Supervisors to
|
||||||
|
accept the correction of Russell County Schools reversion funds in the amount of $356,522.13.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: David Eaton, Steve Breeding, Tim Lovelace, Lou Wallace, Rebecca Dye and Oris Christian
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
ACCEPTANCE OF A $43,265.96 NATIONAL OPIOIDS SETTLEMENT PAYMENT
|
||||||
|
|
||||||
|
Motion made by David Eaton, second Steve Breeding and duly approved by the Board of Supervisors to
|
||||||
|
accept and appropriate a National Opioids settlement payment in the amount of $43,265.96.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: David Eaton, Steve Breeding, Tim Lovelace, Lou Wallace, Rebecca Dye and Oris Christian
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
APPROVAL TO ADVERTISE FOR A TOURISM COORDINATOR
|
||||||
|
|
||||||
|
Motion made by David Eaton, second Steve Breeding and duly approved by the Board of Supervisors to
|
||||||
|
advertise for a Russell County Tourism Coordinator.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: David Eaton, Steve Breeding, Tim Lovelace, Lou Wallace, Rebecca Dye and Oris Christian
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
APPROVAL OF RC PLANNING COMMISSION PLAT FOR GREGORY & AUDREY TILLER
|
||||||
|
|
||||||
|
Motion made by Rebecca Dye, second David Eaton and duly approved by the Board of Supervisors to
|
||||||
|
approve a plat for Gregory and Audrey Tiller as requested by the Russell County Planning Commission.
|
||||||
|
|
||||||
|
Motion made by Rebecca Dye, second Tim Lovelace and duly approved by the Board of Supervisors to
|
||||||
|
approve a VDOT Resolution for Highway System — Project 7058-097-105, G302 and G303.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
‘Aye: Rebecca Dye, Tim Lovelace, Steve Breeding, David Eaton, Oris Christian and Lou Wallace
|
||||||
|
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
APPROVAL OF A CSA SUPPLEMENT REQUEST IN THE AMOUNT OF $11,141.09
|
||||||
|
|
||||||
|
Motion made by David Eaton, second Rebecca Dye and duly approved by the Board of Supervisors to
|
||||||
|
approve a CSA Supplement request in the amount of $11,141.09.
|
||||||
|
|
||||||
|
The vote was
|
||||||
|
‘Aye: David Eaton, Rebecca Dye, Steve Breeding, Tim Lovelace, Oris Christian and Lou Wallace
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
APPROVAL OF $356,522.13 RUSSELL COUNTY SCHOOL BOARD REVERSION FUNDS CORRECTION
|
||||||
|
|
||||||
|
Motion made by David Eaton, second Steve Breeding and duly approved by the Board of Supervisors to
|
||||||
|
accept the correction of Russell County Schools reversion funds in the amount of $356,522.13.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
‘Aye: David Eaton, Steve Breeding, Tim Lovelace, Lou Wallace, Rebecca Dye and Oris Christian
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
ACCEPTANCE OF A $43,265.96 NATIONAL OPIOIDS SETTLEMENT PAYMENT
|
||||||
|
|
||||||
|
Motion made by David Eaton, second Steve Breeding and duly approved by the Board of Supervisors to
|
||||||
|
accept and appropriate a National Opioids settlement payment in the amount of $43,265.96.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: David Eaton, Steve Breeding, Tim Lovelace, Lou Wallace, Rebecca Dye and Oris Christian
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
APPROVAL TO ADVERTISE FOR A TOURISM COORDINATOR
|
||||||
|
|
||||||
|
Motion made by David Eaton, second Steve Breeding and duly approved by the Board of Supervisors to
|
||||||
|
advertise for a Russell County Tourism Coordinator.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
‘Aye: David Eaton, Steve Breeding, Tim Lovelace, Lou Wallace, Rebecca Dye and Oris Christian
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
APPROVAL OF RC PLANNING COMMISSION PLAT FOR GREGORY & AUDREY TILLER
|
||||||
|
|
||||||
|
Motion made by Rebecca Dye, second David Eaton and duly approved by the Board of Supervisors to
|
||||||
|
approve a plat for Gregory and Audrey Tiller as requested by the Russell County Planning Commission.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: David Eaton, Rebecca Dye, Steve Breeding, Tim Lovelace, Oris Christian and Lou Wallace
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
APPROVAL OF A TRAVEL REQUEST FOR THE RC PUBLIC LIBRARY
|
||||||
|
|
||||||
|
Motion made by Steve Breeding, second David Eaton and duly approved by the Board of Supervisors to
|
||||||
|
approve a travel request from the Russell County Public Library.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: David Eaton, Steve Breeding, Tim Lovelace, Lou Wallace, Rebecca Dye and Oris Christian
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
OCTOBER BOARD MEETING TO HELD ON OCTOBER 06, 2022
|
||||||
|
|
||||||
|
Motion made by Oris Christian, second Rebecca Dye and duly approved by the Board of Supervisors to
|
||||||
|
move the October 03, 2022 Board of Supervisors meeting to Thursday, October 06, 2022.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
Aye: Oris Christian, Rebecca Dye, David Eaton, Steve Breeding, Tim Lovelace and Lou Wallace
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
______________________ ____________________
|
||||||
|
Clerk of the Board Chairperson
|
||||||
|
|
||||||
|
The vote was
|
||||||
|
‘Aye: David Eaton, Rebecca Dye, Steve Breeding, Tim Lovelace, Oris Christian and Lou Wallace
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
APPROVAL OF A TRAVEL REQUEST FOR THE RC PUBLIC LIBRARY
|
||||||
|
|
||||||
|
Motion made by Steve Breeding, second David Eaton and duly approved by the Board of Supervisors to
|
||||||
|
approve a travel request from the Russell County Public Library.
|
||||||
|
|
||||||
|
The vote was
|
||||||
|
‘Aye: David Eaton, Steve Breeding, Tim Lovelace, Lou Wallace, Rebecca Dye and Oris Christian
|
||||||
|
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
OCTOBER BOARD MEETING TO HELD ON OCTOBER 06, 2022
|
||||||
|
|
||||||
|
Motion made by Oris Christian, second Rebecca Dye and duly approved by the Board of Supervisors to
|
||||||
|
move the October 03, 2022 Board of Supervisors meeting to Thursday, October 06, 2022.
|
||||||
|
|
||||||
|
The vote was:
|
||||||
|
‘Aye: Oris Christian, Rebecca Dye, David Eaton, Steve Breeding, Tim Lovelace and Lou Wallace
|
||||||
|
Nay: None
|
||||||
|
|
||||||
|
Clerk of the Board Chairperson,
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,217 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: RussellCountyLandfillFeasibilityStudyProposal (1)
|
||||||
|
file: ../RussellCountyLandfillFeasibilityStudyProposal (1).pdf
|
||||||
|
tags:
|
||||||
|
- 2024-02-16 FOIA Response
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 663123
|
||||||
|
sha256sum: 89ac0e295eba00727272b8b8b9748eb75efd8e1e56dc406bfd094a7ea459997c
|
||||||
|
sha1sum: e0e5895f793c8c68acc1f0bb31ff23836ff607c0
|
||||||
|
---
|
||||||
|
|
||||||
|
THOMPSON
|
||||||
|
& LITTON See
|
||||||
|
|
||||||
|
ENGINEERS ARCHITECTS SURVEYORS
|
||||||
|
|
||||||
|
August 2, 2022
|
||||||
|
|
||||||
|
Mr. Lonzo Lester, County Administrator
|
||||||
|
Russell County Board of Supervisors
|
||||||
|
137 Highland Drive
|
||||||
|
|
||||||
|
PO Box 1208
|
||||||
|
|
||||||
|
Lebanon, VA 24266
|
||||||
|
|
||||||
|
Re: Landfill Feasibility Study
|
||||||
|
‘T&L Project No. 716831
|
||||||
|
|
||||||
|
Dear Mr. Lester:
|
||||||
|
|
||||||
|
Thompson & Litton, Inc. (Thompson & Litton) is pleased to provide this proposal for consulting services
|
||||||
|
for the above referenced project for a fee based on time and expenses, not-to-exceed $35,000.00.
|
||||||
|
Thompson & Litton understands thata developer andits engineer are developing private landfil in the
|
||||||
|
Carbo area of Russell County. Russell County will be reviewing and considering documentation provided
|
||||||
|
by the developer and engineer.
|
||||||
|
|
||||||
|
Scope of Services
|
||||||
|
|
||||||
|
‘Thompson & Litton will provide the following services associated with the Landfill Feasibility Study:
|
||||||
|
|
||||||
|
Conducta site visit/tour and meet with Owner/Developer/Engineer.
|
||||||
|
Performa technical review of a Part A permit application for a new landfill.
|
||||||
|
Review/evaluate the following (to be provided by developer)
|
||||||
|
|
||||||
|
Initial Total Project Costs including Phase landfill iner and fixed infrastructure including
|
||||||
|
road, scales, leachate treatment system, gas handling system, landfill operational
|
||||||
|
equipment, buildings for administration and maintenance, stormwater management
|
||||||
|
system, water and sewer service, electrical service, establishment of longterm borrow
|
||||||
|
area for cover, and related costs such as administration, legal, engineering, interest,
|
||||||
|
contingency.
|
||||||
|
Projected future project costs for additional landfill liner expansions and other capital
|
||||||
|
cost projects.
|
||||||
|
|
||||||
|
Operations budget including labor, maintenance/repairs, fuel, leachate disposal, gas
|
||||||
|
‘management, groundwater/surface water/gas monitoring and testing, annual
|
||||||
|
groundwater report, borrow area operation.
|
||||||
|
|
||||||
|
Funded depreciation schedule (sinking fund for equipmentreplacement, future capital
|
||||||
|
construction, closure of landfill segments reaching final contour during operation,
|
||||||
|
closure of landfill at end of landfil ife, 30-year postclosure period)
|
||||||
|
|
||||||
|
TEL 103 East MainStreet. P.O, Box1307 Wise, Virginia 24293 tel: 276.328.2161 fax:276.328.1738 wonw.T-Lcom
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Mr. LonzoLester
|
||||||
|
Lanafil Feasibility Study
|
||||||
|
‘August 2, 2022
|
||||||
|
|
||||||
|
Page2
|
||||||
|
|
||||||
|
+ Project proforma or financial forecast/outlook of the project once development
|
||||||
|
construction is completed; required revenue; guaranteed waste streams, fee structure,
|
||||||
|
terms, etc.
|
||||||
|
|
||||||
|
+ Assesshost fee, compared to comparable localities with private landfills.
|
||||||
|
|
||||||
|
+ Assess initial and projected solid waste disposal rates and any costs for out of state
|
||||||
|
waste.
|
||||||
|
|
||||||
|
Project schedule
|
||||||
|
Thompson & Litton will complete the proposed Landfill Feasibility Study for submittal to the Owner within
|
||||||
|
ninety (90) days of the Owner entering into a written agreement and issuing a notice-to-proceed. Once
|
||||||
|
this proposalis accepted, Thompson & Litton can prepare an agreement for Russell County's consideration
|
||||||
|
|
||||||
|
and approval.
|
||||||
|
|
||||||
|
Thank you for allowing us to propose on this project. We look forward to working with you on this and
|
||||||
|
future projects.
|
||||||
|
|
||||||
|
Should you have any questions, please feel free to give us a call.
|
||||||
|
Sincerely,
|
||||||
|
Res {beater
|
||||||
|
|
||||||
|
Rita H. Baker,
|
||||||
|
Project Manager
|
||||||
|
|
||||||
|
Enclosure: Schedule of Hourly Rates
|
||||||
|
|
||||||
|
TAL worw.T.com
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
EFFECTIVE: Through June 30, 2023
|
||||||
|
|
||||||
|
THOMPSON & LITTON
|
||||||
|
SCHEDULE OF HOURLY RATES
|
||||||
|
|
||||||
|
TYPICAL HOURLY RATES
|
||||||
|
INDIVIDUAL CLASSIFICATIONS (Current Rates)
|
||||||
|
Officer-in-Charge $ 275.00
|
||||||
|
Associate $ 210.00
|
||||||
|
Senior Project Manager $ 190.00
|
||||||
|
Project Manager $ 150.00
|
||||||
|
Senior Engineer $ 180.00
|
||||||
|
Project Engineer $ 143.00
|
||||||
|
Design Engineer $ 108.00
|
||||||
|
Senior Technician $ 100.00
|
||||||
|
Technician $ 70.00
|
||||||
|
Senior Architect $ 176.00
|
||||||
|
Project Architect $ 125.00
|
||||||
|
Intern Architect $ 88.00
|
||||||
|
Senior Surveyor $ 165.00
|
||||||
|
Surveyor $ 100.00
|
||||||
|
Senior Survey Technician $ 74.00
|
||||||
|
Survey Technician $ 65.00
|
||||||
|
3-Person Survey Party $ 215.00
|
||||||
|
2-Person Survey Party $ 150.00
|
||||||
|
Senior Construction Contract Administrator $ 155.00
|
||||||
|
Construction Contract Administrator $ 105.00
|
||||||
|
Senior Construction Representative $ 103.00
|
||||||
|
Construction Representative $ 75.00
|
||||||
|
Specifications and Technical Composer $ 75.00
|
||||||
|
Administrative Assistant $ 85.00
|
||||||
|
Clerical $ 58.00
|
||||||
|
REIMBURSABLE EXPENSES
|
||||||
|
Consultants and subcontractors will be billed at Direct Cost times 1.20.
|
||||||
|
Transportation and out-of-town subsistence will be billed at Direct Cost times 1.15.
|
||||||
|
|
||||||
|
Mileage for use of personal or company vehicles – Effective IRS mileage rate.
|
||||||
|
|
||||||
|
Long distance telephone calls, facsimiles, printing or items not customarily provided by the
|
||||||
|
Consultant shall be charged at Direct Cost times 1.15.
|
||||||
|
|
||||||
|
REPRODUCTION: A) 8 1/2 x 11 page, per copy (black/white) ........................................ $0.20
|
||||||
|
|
||||||
|
B) 8 1/2 x 11 page, per copy (color) ................................................... $0.60
|
||||||
|
C) 11 x 17 page, per copy (black/white) ............................................ $0.50
|
||||||
|
D) 11 x 17 page, per copy (color) ....................................................... $0.85
|
||||||
|
|
||||||
|
E) Large Drawings, per square foot ................................................... $0.65
|
||||||
|
F) Large Drawings, per square foot (color) ........................................ $1.25
|
||||||
|
|
||||||
|
FINANCIAL: Invoices are payable within thirty days. Interest is, therefore, charged in the event of
|
||||||
|
non-payment within sixty days. An interest rate 1% per month will be charged and applied to the
|
||||||
|
unpaid balance monthly.
|
||||||
|
|
||||||
|
EFFECTIVE: Through June 30, 2023
|
||||||
|
|
||||||
|
THOMPSON & LITTON
|
||||||
|
SCHEDULE OF HOURLY RATES
|
||||||
|
TYPICAL HOURLY RATES
|
||||||
|
|
||||||
|
INDIVIDUAL CLASSIFICATIONS (Current Rates)
|
||||||
|
Officer-in-Charge $ 275.00
|
||||||
|
Associate $ 210.00
|
||||||
|
Senior Project Manager $ 190.00
|
||||||
|
Project Manager $ 150.00
|
||||||
|
Senior Engineer $ 180.00
|
||||||
|
Project Engineer $ 143.00
|
||||||
|
Design Engineer $ 108.00
|
||||||
|
Senior Technician $ 100.00
|
||||||
|
Technician $ 70.00
|
||||||
|
Senior Architect $ 176.00
|
||||||
|
Project Architect $ 125.00
|
||||||
|
Intern Architect, $ 88,00
|
||||||
|
Senior Surveyor $ 165.00
|
||||||
|
Surveyor $ 100.00
|
||||||
|
Senior Survey Technician $ 74.00
|
||||||
|
Survey Technician $ 65.00
|
||||||
|
3-Person Survey Party $ 215.00
|
||||||
|
2-Person Survey Party $ 150.00
|
||||||
|
Senior Construction Contract Administrator $ 155.00
|
||||||
|
Construction Contract Administrator $ 105.00
|
||||||
|
Senior Construction Representative $ 103.00
|
||||||
|
Construction Representative $ 75.00
|
||||||
|
Specifications and Technical Composer $ 75.00
|
||||||
|
Administrative Assistant $ 85.00
|
||||||
|
Clerical $58.00
|
||||||
|
|
||||||
|
REIMBURSABLE EXPENSES
|
||||||
|
Consultants and subcontractors will be billed at Direct Cost times 1.20.
|
||||||
|
Transportation and out-of-town subsistence will be billed at Direct Cost times 1.15.
|
||||||
|
|
||||||
|
Mileage for use of personal or company vehicles — Effective IRS mileage rate.
|
||||||
|
|
||||||
|
Long distance telephone calls, facsimiles, printing or items not customarily provided by the
|
||||||
|
Consultant shall be charged at Direct Cost times 1.15.
|
||||||
|
|
||||||
|
REPRODUCTION: ‘A) 8 1/2 x 11 page, per copy (black/white)
|
||||||
|
B) 8 1/2 x 11 page, per copy (color).
|
||||||
|
C) 11x 17 page, per copy (black/white) .
|
||||||
|
D) 11x 17 page, per copy (color).
|
||||||
|
E) Large Drawings, per square foot
|
||||||
|
F) Large Drawings, per square foot (color)
|
||||||
|
|
||||||
|
FINANCIAL: Invoices are payable within thirty days. Interest is, therefore, charged in the event of
|
||||||
|
non-payment within sixty days. An interest rate 1% per month will be charged and applied to the
|
||||||
|
unpaid balance monthly.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
File diff suppressed because it is too large
Load Diff
2711
Amys_Drop_Box/Coal Waste Study/README.md
Normal file
2711
Amys_Drop_Box/Coal Waste Study/README.md
Normal file
File diff suppressed because it is too large
Load Diff
File diff suppressed because it is too large
Load Diff
File diff suppressed because it is too large
Load Diff
File diff suppressed because it is too large
Load Diff
|
|
@ -0,0 +1,517 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: 2013 Disposal contract
|
||||||
|
file: ../2013 Disposal contract.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Cumberland_Waste_FOIA_May_2024
|
||||||
|
- Disposal Contracts
|
||||||
|
- '2013'
|
||||||
|
docDate: '2013'
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 465612
|
||||||
|
sha256sum: fd052532797dd4cedc8e994a77273b71e4f4a74b82a53132c5ffda8d2112c009
|
||||||
|
sha1sum: c4622163f4dbbfd789bfa31795da12fdc8050299
|
||||||
|
---
|
||||||
|
|
||||||
|
Disposal Contract
|
||||||
|
|
||||||
|
‘THIS CONTRACT, made and entered into this 99. day of _August___, 2013_, by and between the
|
||||||
|
CUMBERLAND PLATEAU REGIONAL WASTE MANAGEMENT AUTHORITY, an authority
|
||||||
|
created under the provisions of the Virginia Water and Sewer Authorities Act, (hereinafter called the
|
||||||
|
“Authority”) represented herewith by its duly appointed Chairman of the Board of Directors, Frank Horton, and
|
||||||
|
Eco Safe Systems, LLC., a Tennessee limited liability company qualified to do and actually doing business in
|
||||||
|
the State of Tennessee (hereinafter called “Contractor”),
|
||||||
|
|
||||||
|
WITNESSED, THAT in consideration of the covenants and agreements herein contained, to be performed by
|
||||||
|
the parties hereto and of the payments hereinafter agreed to be made, it is mutually agreed as follows:
|
||||||
|
|
||||||
|
1. The Contractor is hereby granted the sole and exclusive rights for the disposal of solid waste generated
|
||||||
|
in the Authority's three (3) transfer stations - Buchanan, Dickenson, and Russell, in accordance
|
||||||
|
with all applicable Federal, State, and local laws and regulations during term of this Contract.
|
||||||
|
|
||||||
|
2. The Contract Documents shall include the following documents, and this Contract does hereby
|
||||||
|
expressly incorporate same herein as fully as if set forth verbatim in this Contract:
|
||||||
|
|
||||||
|
Exhibit A - General Specifications
|
||||||
|
|
||||||
|
Exhibit B - Insurance Requirements
|
||||||
|
|
||||||
|
Exhibit C - Contractor's Proposal/Pricing
|
||||||
|
|
||||||
|
Exhibit D - Contractor’s Letter of Credit
|
||||||
|
|
||||||
|
This Instrument
|
||||||
|
|
||||||
|
Any addenda or changes to the foregoing documents agreed to by the parties hereto.
|
||||||
|
|
||||||
|
mepese
|
||||||
|
|
||||||
|
3. All provisions of the Contract Documents shall be strictly complied with and conformed to by the
|
||||||
|
Contractor, and no amendment to this Contract shall be made except upon written consent of the parties.
|
||||||
|
No amendment shall be construed to release either party from any obligation of the Contract Documents
|
||||||
|
‘except as specifically provided for in such amendment.
|
||||||
|
|
||||||
|
4, The initial term if this Contract shall be from October 27, 2013 (the “Effective Date”) until October 27,
|
||||||
|
2018. Upon mutual agreement between the parties the Contract may be extended in additional five (5)
|
||||||
|
year extensions under the same terms and conditions. It is understood that both parties must agree, with
|
||||||
|
Written notification, of this extension at least sixty (60) days prior to the expiration date as defined
|
||||||
|
herein. Disposal rates for all extensions must be agreed upon by Authority and Contractor.
|
||||||
|
|
||||||
|
IN WITNESS HEREOF, the Authority and Contractor have executed this Contractor as of the date first
|
||||||
|
written above. Frank Horton, Chairman, is the Authorized Agent of the Cumberland Plateau Regional Waste
|
||||||
|
Management Authority and authorized to sign this Contract on behalf of the Cumberland Plateau Regional
|
||||||
|
‘Waste Management Authority. Walter H. Hall, Jr. COO ,is the Authorized Agent of Eco Safe Systems, LLC and
|
||||||
|
is i i i behalf of 7
|
||||||
|
|
||||||
|
WITNESSES: ‘Cumberland Plateau Regio:
|
||||||
|
|
||||||
|
be
|
||||||
|
|
||||||
|
Frank Horton, CPRWMA Chairman
|
||||||
|
|
||||||
|
a on: 22 Alugect 20)3
|
||||||
|
|
||||||
|
faste Management Authority
|
||||||
|
|
||||||
|
Walter H. Hall, Ir. COO.
|
||||||
|
|
||||||
|
ane t f— aii on: _AuguSt 20. 2013
|
||||||
|
4
|
||||||
|
|
||||||
|
THUS DONE AND SIGNED in the presences of witnesses whose names are inscribed opposite each respective
|
||||||
|
signature on and as of the ZO __day of August » 20(3.
|
||||||
|
|
||||||
|
WITNESS MY HAND AND SEAL OF OFFICE
|
||||||
|
id Jarry
|
||||||
|
‘NOTARY PUBLIC
|
||||||
|
‘Cumberland Plateau Regional SWA Disposal Contract 2) JAIME S MARINI Page 1of9
|
||||||
|
My COMMISSION #FFO24868
|
||||||
|
|
||||||
|
EXPIRES June 6, 2017
|
||||||
|
Won 3680159 __FondaNotarySeric.com,
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
EXHIBIT A
|
||||||
|
GENERAL SPECIFICA’
|
||||||
|
|
||||||
|
INDEX
|
||||||
|
|
||||||
|
1.0 DEFINITIONS OF ITEMS INCLUDED IN THIS CONTRACT
|
||||||
|
1.01 Authority
|
||||||
|
|
||||||
|
1.02 Disposal Site
|
||||||
|
1.03 Solid Waste
|
||||||
|
|
||||||
|
2.0. DEFINITIONS OF ITEMS EXCLUDED FROM THIS CONTRACT
|
||||||
|
2.01 Hazardous Waste
|
||||||
|
2.02 Offal Waste
|
||||||
|
|
||||||
|
2.03 Special Waste
|
||||||
|
3.0 SCOPE OF WORK
|
||||||
|
3.01 General
|
||||||
|
3.02 Work Not Covered By Contract
|
||||||
|
4.0 GENERAL PROVISIONS
|
||||||
|
4.01 Hours of Operation
|
||||||
|
4.02 Holidays
|
||||||
|
4.03 Office
|
||||||
|
4.04 Disposal
|
||||||
|
4.05 Delivery
|
||||||
|
4.06 Point of Contact
|
||||||
|
5.0 BASIS OF PRICES AND METHOD OF PAYMENT
|
||||||
|
5.01 Disposal Rates (Exhibits C)
|
||||||
|
5.02 Additional Costs and Charges
|
||||||
|
5.03 Modification to Rates
|
||||||
|
5.04 Contractor Billings to Authority
|
||||||
|
6.0 COMPLIANCE WITH LAWS
|
||||||
|
7.0 RISK ALLOCATION AND INDEMNITY
|
||||||
|
8.0 LICENSES AND TAXES
|
||||||
|
9.0 FORCE MAJEURE,
|
||||||
|
10.0 ASSIGNMENT OF CONTRACT
|
||||||
|
11.0 EXCLUSIVE CONTRACT
|
||||||
|
12.0 TITLE TO WASTE
|
||||||
|
13.0 TERMINATION OF CONTRACT
|
||||||
|
|
||||||
|
14.0 MISCELLANEOUS TERMS
|
||||||
|
|
||||||
|
‘Cumberland Plateau Regional SWA Disposal Contract (2)
|
||||||
|
|
||||||
|
Page 2 of 9
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
EXHIBIT A
|
||||||
|
GENERAL SPECIFICATIONS
|
||||||
|
|
||||||
|
1.0 DEFINITIONS OF ITEMS INCLUDED IN THIS CONTRACT
|
||||||
|
|
||||||
|
1.02
|
||||||
|
|
||||||
|
1.03
|
||||||
|
|
||||||
|
is a Member of the Authority - Buchanan, Dickenson, and Russell Counties and
|
||||||
|
any County within the State of Virginia adjacent to (having a common boundary with) any Member
|
||||||
|
that may enter into an agreement with the Authority after the date hereof relating to such adjacent
|
||||||
|
County's use of the Authority's Transfer Stations.
|
||||||
|
|
||||||
|
Disposal Site ~The municipal solid waste landfill owned and operated by Eco Safe Systems, LLC
|
||||||
|
located in Blountville, Tennessee in Sullivan County, Tennessee, permitted or approved by all
|
||||||
|
governmental bodies and agencies having jurisdiction and requiring such licenses, permits or
|
||||||
|
approvals to receive for processing or final disposal of Waste Material and Small Dead Animals.
|
||||||
|
|
||||||
|
Solid Waste ~ useless, unwanted or discarded materials with insufficient liquid content to be free-
|
||||||
|
flowing, that result from domestic, industrial, commercial, agricultural, governmental and community
|
||||||
|
operations which require proper storage, collection, transportation and disposal to prevent
|
||||||
|
environmental pollution inimical to public health, safety and welfare. Solid Waste does not include
|
||||||
|
sewage, earth or material used to fill land in accordance with construction codes, mining residues,
|
||||||
|
slag, dissolved or suspended solids in industrial waste water effluents which are not acceptable for
|
||||||
|
disposal in sanitary sewage treatment system or any material included in the definition of Excluded
|
||||||
|
Waste which is defined to include all of the materials set forth in Section 2.0 below.
|
||||||
|
|
||||||
|
2.0 DEFINITIONS OF ITEMS EXCLUDED FROM THIS CONTRACT.
|
||||||
|
|
||||||
|
2.01
|
||||||
|
|
||||||
|
2.02
|
||||||
|
|
||||||
|
2.03
|
||||||
|
|
||||||
|
Hazardous Waste (excluded from this Contract) Hazardous Waste is a form of Excluded Waste and
|
||||||
|
defined as any radioactive, volatile, corrosive, highly flammable, explosive, biomedical, infectious,
|
||||||
|
biohazardous, toxic or listed or characteristic Hazardous Waste as defined by federal, state, provincial
|
||||||
|
or local law or any otherwise regulated waste. Hazardous Waste shall include, but not be limited to,
|
||||||
|
any amount of waste listed or characterized as hazardous by the United States Environmental
|
||||||
|
Protection Agency or any state agency pursuant to the Resource Conservation and Recovery Act of
|
||||||
|
1976, as amended, and including future amendments thereto, and any other applicable federal, state
|
||||||
|
or local laws or regulations.
|
||||||
|
|
||||||
|
Offal Waste (excluded from this Contract) Waste animal (land or marine) matter from
|
||||||
|
establishments such as butcher shops, slaughterhouses, food processing and packing plants, rendering
|
||||||
|
plants and fertilizer plants.
|
||||||
|
|
||||||
|
Special Waste (excluded from this Contract)- Special Waste is a form of Excluded Waste and is
|
||||||
|
defined as nonhazardous, solid waste that is subject to additional govemmental regulations or special
|
||||||
|
handling requirements in collection, transportation, processing or disposal as a result of the
|
||||||
|
characteristics of, or processes which generate, such waste. Special Waste includes, but is not li
|
||||||
|
to:
|
||||||
|
(a) waste iron from a commercial or industrial activity;
|
||||||
|
(b) waste generated by an industrial process or a pollution control process;
|
||||||
|
(©) waste which may contain free liquids;
|
||||||
|
(@) waste which may contain residue and debris from the cleanup of a spill of petroleum, chemical
|
||||||
|
or commercial products or wastes, or contaminated residuals;
|
||||||
|
(©) articles from the cleanup of a facility which generates, stores, treats, recycles or disposes of
|
||||||
|
chemical substances, commercial products or wastes;
|
||||||
|
(® wastes which are nonhazardous as a result of proper treatment pursuant to Subtitle C of the
|
||||||
|
Resource Conservation and Recovery Act of 1976 (“RCRA”);
|
||||||
|
(g) asbestos containing or asbestos bearing material that has been properly secured under existing
|
||||||
|
federal, state, provincial and local laws, rules and regulations;
|
||||||
|
(h) containers that once contained hazardous substances, chemicals, or insecticides so long as such
|
||||||
|
containers are “empty” as defined by RCRA;
|
||||||
|
(@ municipal or commercial solid waste that may have come into contact with any of the
|
||||||
|
foregoing;
|
||||||
|
() filter cake sludge wastes from waste water treatment processes;
|
||||||
|
(&) wastes containing any regulated polychlorinated biphenyls; and,
|
||||||
|
() ash, sludge, whole tires and powders.
|
||||||
|
|
||||||
|
ited
|
||||||
|
|
||||||
|
‘Cumberland Plateau Regional SWA Disposal Contract (2) Poge 3 of 9
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
3.0 SCOPE OF WORK
|
||||||
|
|
||||||
|
3.01 General. The work under this Contract shall consist of disposing of all Solid Waste transported by
|
||||||
|
the Authority’s agent to the Disposal Site defined above in accordance with and subject to the terms
|
||||||
|
and conditions of this Contract.
|
||||||
|
|
||||||
|
3.02 Work Not Covered By Contract. The work under this Contract does not include transportation from
|
||||||
|
the Authority's Transfer Stations and disposal of Excluded Waste materials.
|
||||||
|
|
||||||
|
4.0 GENERAL PROVISIONS
|
||||||
|
|
||||||
|
4.01 Hours of Operation
|
||||||
|
Disposal of Waste Material shall not start before 6:00 A.M. or continue after 4:00 P.M. on the same
|
||||||
|
day. Exceptions to operation hours shall be effected only upon the mutual agreement of the
|
||||||
|
Authority and Contractor, or when Contractor reasonably determines that an exception is necessary in
|
||||||
|
order to complete disposal due to unusual circumstances.
|
||||||
|
|
||||||
|
4.02. 4.02. Holidays ~ The following shall be holidays for purposes of this Contract:
|
||||||
|
New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day
|
||||||
|
|
||||||
|
Contractor or the Authority may decide to observe any or all of the above mentioned holidays by
|
||||||
|
suspension of disposal service on the holiday.
|
||||||
|
|
||||||
|
4,03 Office ‘The Contractor shall maintain an office or such other facilities through which it can be
|
||||||
|
contacted by direct visit or by local (toll free) call from anywhere in the Authority's area. It shall be
|
||||||
|
equipped with sufficient telephones and shall have a responsible person in charge from 8:00 A.M. to
|
||||||
|
5:00 P.M on regular days of operation.
|
||||||
|
|
||||||
|
4.04. Disposal - The Authority will use the Disposal Site, directly or via Cumberland Plateau Transfer
|
||||||
|
Stations, for the disposal of all Cumberland Plateau solid waste and such approved special waste
|
||||||
|
delivered to the Authority’s Transfer Stations in accordance with the terms and provisions of this
|
||||||
|
Contract. During the Term hereof, the Authority shall take all action necessary, whether or not
|
||||||
|
by legislative means or otherwise, to direct the flow of solid waste to the Disposal Site and
|
||||||
|
otherwise require the use of the Disposal Site by its Affiliates, members, employees, franc!
|
||||||
|
haulers and constituents and their Affiliates. The Authority shall not take any action by contract
|
||||||
|
or otherwise to direct solid waste away from the Disposal Site or to another location. The
|
||||||
|
Authority irrevocably covenants and agrees to deliver and hereby guarantees that, commer
|
||||||
|
as of the Effectvie Date it shall deliver to the Disposal Site all Acceptable Solid Waste whic!
|
||||||
|
collected or controlled by the Authority. The Disposal Site shall be the exclusive disposal
|
||||||
|
facility used by the Authority and its Affiliates, its members, employees, franchised haulers,
|
||||||
|
and constituents and their Affiliates, and any other entity owned, controlled, managed or
|
||||||
|
financed (directly or indirectly) by the Authority with respect to Acceptable Solid Waste
|
||||||
|
collected or controlled by Authority in the Service Area during the Term. The exclusivity
|
||||||
|
provisions of this Agreement shall apply to and are binding on the Authority and its Affiliates,
|
||||||
|
its employees, franchised haulers and their Affiliates, and any other entity, agency, division, or
|
||||||
|
department of the County and their respective successors and assigns.
|
||||||
|
|
||||||
|
4.05 Delivery ~ All solid waste will be delivered by an agent of the Authority.
|
||||||
|
4,06 Point of Contact — All dealing, contacts, etc., between the Contractor and the Authority shall be
|
||||||
|
|
||||||
|
directed by the Contractor to the Authority’s point of contact specified in the applicable Exhibit, and,
|
||||||
|
by the Authority to the Contractor's General Manager or Operations Manager.
|
||||||
|
|
||||||
|
5.0 BASIS OF PRICES AND METHOD OF PAYMENT
|
||||||
|
5.01 Disposal Rates (Exhibits C) - The prices to be paid by the Authority for the disposal of Waste
|
||||||
|
Material from all Cumberland Plateau Transfer Stations shall be as shown on Exhibit C, as adjusted
|
||||||
|
in accordance with Section 5.04 herein. The Authority shall also pay Contractor the other costs and
|
||||||
|
charges as specified in Section 5.03 herein.
|
||||||
|
|
||||||
|
5.02 Additional Costs and Charges
|
||||||
|
|
||||||
|
Cumberland Plateau Regional SWA Disposal Contract (2) Page 4 of 9
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
6.0
|
||||||
|
|
||||||
|
70
|
||||||
|
|
||||||
|
8.0
|
||||||
|
|
||||||
|
9.0
|
||||||
|
|
||||||
|
5.02.1 Cost Recovery Fees - Environmental Recovery Fee. In addition to the rates set forth in other
|
||||||
|
sections of this Contract, Contractor will charge an Environmental Recovery Fee (the “ERF”),
|
||||||
|
which is a set amount per disposal load. The ERF is assessed to meet environmental
|
||||||
|
compliance requirements at landfills and transfer stations, such as closure and post-closure
|
||||||
|
costs, leachate management, landfill cell construction costs, landfill gas management,
|
||||||
|
permitting costs, etc.
|
||||||
|
|
||||||
|
5.02.2 Pass Through Tax/Cost Increases. Contractor may pass through certain cost increases directly to
|
||||||
|
the Authority to adjust for increases in cost to Contractor due to the changes in taxes, fees, change
|
||||||
|
in law or other governmental charges (other than income or real property taxes).
|
||||||
|
|
||||||
|
5.02.3 Except as provided expressly herein, the charges for Contractor's service with respect to this
|
||||||
|
work shall include all taxes and disposal fees.
|
||||||
|
|
||||||
|
5.03 Modification to Rates - The fees in Exhibit C which may be charged by the Contractor for the first
|
||||||
|
and subsequent years of the term hereof shall be effective October 27 annually.
|
||||||
|
|
||||||
|
5.04__Contractor Billings to Authority ~ The Contractor shall bill the Authority for Waste Material
|
||||||
|
disposal services rendered to Cumberland Plateau Regional Waste once a month and will be issued
|
||||||
|
within ten (10) days following the end of the month and the Authority shall pay the Contractor
|
||||||
|
within 60 days of invoice date. Such billing and payment shall be based on the price rates and
|
||||||
|
schedules set forth in the Contract Documents. Payments not made by the Authority on or before
|
||||||
|
their due date shall be subject to late fees of: a) the greater of five dollars ($5) or one and one-half
|
||||||
|
percent (1.5%) per month or portion thereof; or, b) the maximum allowed by law, if less than a). In
|
||||||
|
the event the Authority withholds payment of a portion or whole of an invoice and itis later
|
||||||
|
determined that a portion or all of such withheld amount is owed to Contractor, such amount shall
|
||||||
|
be subject to the late fees provided herein from the original due date until paid by Authority.
|
||||||
|
|
||||||
|
COMPLIANCE WITH LAWS
|
||||||
|
|
||||||
|
‘The Contractor shall conduct operations under this Contract in compliance with all applicable laws;
|
||||||
|
provided, however, that the Contract shall govern the obligations of the Contractor where there exist
|
||||||
|
conflicting ordinances of the Authority on the subject.
|
||||||
|
|
||||||
|
RISK ALLOCATION AND INDEMNITY
|
||||||
|
|
||||||
|
7.01 Authority shall be responsible for any and all claims for personal injuries or death, or the loss of life
|
||||||
|
or damage to property to the extent caused by the Authority’s negligence or acts of willful misconduct
|
||||||
|
or those of its contractors or agents.
|
||||||
|
|
||||||
|
7.02 In the event any Excluded Waste is not discovered by Contractor before it is disposed of in the
|
||||||
|
Advance Disposal landfill, Contractor may, in its sole discretion, remove, transport and dispose of
|
||||||
|
such Excluded Waste at a location authorized to accept such Excluded Waste in accordance with all
|
||||||
|
applicable laws and charge the depositor or generator of such Excluded Waste all direct and indirect
|
||||||
|
costs incurred due to removal, remediation, handling, transportation, delivery and disposal of such
|
||||||
|
Excluded Waste. The Authority shall provide all reasonable assistance to Contractor to conduct an
|
||||||
|
investigation to determine the identity of the depositor or generator of the Excluded Waste and to
|
||||||
|
collect the costs incurred by Contractor in connection with such Excluded Waste. Subject to the
|
||||||
|
Authority’s providing all such reasonable assistance to Contractor, Contractor shall release Authority
|
||||||
|
from any liability for any such costs incurred by Contractor in connection with such Excluded Waste,
|
||||||
|
except to the extent that such Excluded Waste is determined to be attributed to the Authority.
|
||||||
|
|
||||||
|
LICENSES AND TAXES
|
||||||
|
|
||||||
|
‘The Contractor shall obtain all licenses and permits (other than the license and permit granted by this
|
||||||
|
Contract) and promptly pay all taxes required by the State.
|
||||||
|
|
||||||
|
FORCE MAJEURE
|
||||||
|
|
||||||
|
Except for Authority’s obligation to pay amounts due to Contractor, any failure or delay in performance
|
||||||
|
under this Contract due to contingencies beyond a party’s reasonable control, including, but not limited to,
|
||||||
|
strikes, riots, terrorist acts, compliance with applicable laws or governmental orders, fires, bad weather and
|
||||||
|
acts of God, shall not constitute a breach of this Contract, but shall entitle the affected party to be relieved
|
||||||
|
of performance under this Contract during the term of such event and for a reasonable time thereafter.
|
||||||
|
|
||||||
|
10.0 ASSIGNMENT OF CONTRACT
|
||||||
|
|
||||||
|
‘Cumberland Plateau Regional SWA Disposal Contract (2) Page 5 of 9
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Neither party shall assign this Contract in its entirety without the other party’s prior written consent, which
|
||||||
|
‘consent shall not be unreasonably withheld. Notwithstanding the foregoing, Contractor may assign this
|
||||||
|
Contract without the Authority's consent to its parent companies or any of their subsidiaries, to any person
|
||||||
|
or entity who purchases any operations from Contractor or as a collateral assignment to any lender to
|
||||||
|
Contractor.
|
||||||
|
|
||||||
|
11.0 EXCLU:
|
||||||
|
|
||||||
|
E CONTRACT
|
||||||
|
|
||||||
|
‘The Contractor shall have an exclusive privilege to provide Waste Material disposal services within the
|
||||||
|
Authority’s area as defined in section 1.01 of this Contract.
|
||||||
|
|
||||||
|
12.0 TITLE TO WASTE
|
||||||
|
|
||||||
|
Title to Waste Materials delivered by the Authority shall pass to the Contractor when accepted by
|
||||||
|
Contractor's landfill. Title to and liability for any Excluded Waste shall remain with the generator or
|
||||||
|
depositor of such waste and shall at no time pass to Contractor.
|
||||||
|
|
||||||
|
13.0 TERMINATION OF CONTRACT
|
||||||
|
|
||||||
|
13.01 Inthe event of a failure by Contractor to perform any material provision of this Contract, the
|
||||||
|
Authority shall give written notice of such breach to the Contractor along with at least thirty (30)
|
||||||
|
days (the “cure period”) to correct such breach. Authority may terminate this Contract after such
|
||||||
|
‘cure period if Contractor has not adequately corrected such breach in accordance with this Contract,
|
||||||
|
and Authority so notifies Contractor in writing of such termination action. At such time, Authority
|
||||||
|
shall pay Contractor only all charges and fees for the services performed on or before such
|
||||||
|
termination date. Thereafter, in the event such termination occurs during the initial term of this
|
||||||
|
Contract, Authority, as its sole and exclusive remedy may exercise its rights under Contractor's
|
||||||
|
performance bond, and procure the services of another waste services provider to complete the work
|
||||||
|
covered under this Contract for the remainder of the time period covered by the initial term of this
|
||||||
|
Contract. Except for such right during the initial term of this Contract, following any such
|
||||||
|
termination and the final payment from the Authority to the Contractor, neither party shall have any
|
||||||
|
further obligation under this Contract other than for claims for personal injuries or property damage
|
||||||
|
as expressly provided in this Contract and arising prior to such termination date.
|
||||||
|
|
||||||
|
13,02 In the event of a failure by Authority to perform any material provision of this Contract, the
|
||||||
|
Contractor shall give written notice of such breach to the Authority along with at least thirty (30)
|
||||||
|
days (the “cure period”) to correct such breach. Contractor may terminate this Contract after such
|
||||||
|
cure period if Authority has not adequately corrected such breach in accordance with this Contract
|
||||||
|
and Contractor so notifies Authority in writing of such termination action. At such time, Authority
|
||||||
|
shall pay Contractor for all charges and fees for the services performed on or before such
|
||||||
|
termination date, Thereafter, following any such termination and the final payment from the
|
||||||
|
Authority to the Contractor, neither party shall have any further obligation under this Contract other
|
||||||
|
than for claims for personal injuries or property damage as expressly provided in these terms and
|
||||||
|
arising prior to such termination date.
|
||||||
|
|
||||||
|
14.0 MISCELLANEOUS TERMS
|
||||||
|
14.01 No liquidated damages or penalties may be assessed against Contractor by Authority.
|
||||||
|
|
||||||
|
14.02 No intellectual property (IP) rights in any of Contractor’s IP are granted to Authority under this
|
||||||
|
Contract.
|
||||||
|
|
||||||
|
14.03. This Contract shall be binding upon and inure solely to the benefit of the parties and their permitted
|
||||||
|
assigns.
|
||||||
|
|
||||||
|
14.04 Ifany provision of this Contract shall be invalid, illegal or unenforceable, it shall be modified so as
|
||||||
|
to be valid, legal and enforceable but so as most nearly to retain the intent of the parties. If such
|
||||||
|
modification is not possible, such provision shall be severed from this Contract. In either case, the
|
||||||
|
validity, legality and enforceability of the remaining provisions of this Contract shall not in any way
|
||||||
|
be affected thereby.
|
||||||
|
|
||||||
|
14.05 The failure or delay on the part of either party to exercise any right, power, privilege or remedy
|
||||||
|
under this Contract shall not constitute a waiver thereof. No modification or waiver by either party
|
||||||
|
of any provision shall be deemed to have been made unless made in writing. Any waiver by a party
|
||||||
|
for one or more similar events shall not be construed to apply to any other events whether similar or
|
||||||
|
not.
|
||||||
|
|
||||||
|
‘Cumberland Plateau Regional SWA Disposal Contract (2) Page 6 of 9
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
14.06 This Contract shall be interpreted and governed by the law of the Commonwealth of Virginia and
|
||||||
|
jurisdiction and venue for any litigation commenced under this contract shall lie in the
|
||||||
|
Commonwealth of Virginia.
|
||||||
|
|
||||||
|
14.07 This Contract sets forth the entire agreement of the parties and supersedes all prior agreements,
|
||||||
|
whether written or oral, that exist between the parties regarding the subject matter of this Contract.
|
||||||
|
|
||||||
|
Workers’ Compensation
|
||||||
|
|
||||||
|
Coverage A Statutory
|
||||||
|
|
||||||
|
Coverage B- Employers Liability $1,000,000 each Bodily Injury by Accident
|
||||||
|
$1,000,000 policy limit Bodily Injury by Disease
|
||||||
|
$1,000,000 each occurrence Bodily Injury by Disease
|
||||||
|
|
||||||
|
Automobile Liability
|
||||||
|
Bodily Injury/Property Damage $3,000,000
|
||||||
|
Combined — Single Limit Coverage is to apply to all owned, non-owned, hired and
|
||||||
|
leased vehicles (including trailers).
|
||||||
|
Pollution Liability Endorsement MCS-90 endorsement for pollution liability coverage
|
||||||
|
‘Commercial General Liability
|
||||||
|
Bodily Injury/Property Damage $2,500,000 each occurrence
|
||||||
|
Combined ~ Single Limit ‘$5,000,000 general aggregate
|
||||||
|
|
||||||
|
All such insurance policies will be primary without the right of contribution from any other insurance coverage
|
||||||
|
‘maintained by Authority. All policies required herein shall be written by insurance carriers with a rating of
|
||||||
|
AM. Bests of at least “A-” and a financial size category of at least VII. Upon Authority’s request, Contractor
|
||||||
|
shall furnish Authority with a certificate of insurance, evidencing that such coverages are in effect. Such
|
||||||
|
certificate: (i) will also provide for 30 days prior written notice of cancellation to the Authority; (ii) shall show
|
||||||
|
Authority as an additional insured under the Automobile and General Liability policies; and, (ii) shall contain
|
||||||
|
waivers of subrogation in favor of Authority (excluding Worker's Compensation policy) except with respect to
|
||||||
|
the sole negligence or willful misconduct of Authority. In addition, the following requirements apply:
|
||||||
|
|
||||||
|
* The Commercial General Liability policy must include Contractual Liability coverage specifically
|
||||||
|
covering Contractor’s Indemnification of Authority herein.
|
||||||
|
Coverage must be provided for Products/Completed Operations.
|
||||||
|
The policy shall also contain a cross Liability/Severability of Interests provision assuring that the acts of
|
||||||
|
one insured do not affect the applicability of coverage to another insured.
|
||||||
|
|
||||||
|
‘Cumberland Plateau Regional SWA Disposal Contract (2) Page 7 of 9
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
EXHIBIT C
|
||||||
|
CONTRACTOR'S PR ICING
|
||||||
|
|
||||||
|
Disposal Rates (all Transfer Stations) includes annual price increase
|
||||||
|
|
||||||
|
Year 1 (October 27, 2013-October 27, 2014) $16.07 / Ton
|
||||||
|
Year 2 (October 27, 2014-October 27, 2015) $16.47/Ton
|
||||||
|
Year 3 (October 27, 2015-October 27, 2016) $16.88 / Ton
|
||||||
|
‘Year 4 (October 27, 2016-October 27, 2017) $17.30/ Ton
|
||||||
|
Year 5 (October 27, 2017-October 27, 2018) $17.74/ Ton
|
||||||
|
|
||||||
|
‘Cumberland Plateau Regional SWA Disposal Contract (2)
|
||||||
|
|
||||||
|
Poge 8 of 9
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
EXHIBIT D
|
||||||
|
|
||||||
|
CONTRACTOR'S LETTER OF CREDIT
|
||||||
|
|
||||||
|
‘To be provided by Contractor.
|
||||||
|
|
||||||
|
‘Cumberland Plateau Regional SWA Disposal Contract (2) Page 9 of 9
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,115 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: 2017 disposal extention
|
||||||
|
file: ../2017 disposal extention.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Cumberland_Waste_FOIA_May_2024
|
||||||
|
- Disposal Contracts
|
||||||
|
- '2017'
|
||||||
|
docDate: '2017'
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 68074
|
||||||
|
sha256sum: b4dc4ee9bca71014ac34ce3ce13db8849ff63f983b277639499c1a964ed2d5e5
|
||||||
|
sha1sum: 08b61fdf26dbdc2fe0da3bb8127cb84cef832810
|
||||||
|
---
|
||||||
|
|
||||||
|
AMENDMENT TO
|
||||||
|
DISPOSAL CONTRACT
|
||||||
|
|
||||||
|
This Amendment to that certain Disposal Contract (this “Amendment”) is made as of this 14 day
|
||||||
|
of December 2017 (“Effective Date”) by and between Eco-Safe Systems, LLC, a Tennessee limited
|
||||||
|
liability company (the “Contractor”), and Cumberland Plateau Regional Waste Management Authority,
|
||||||
|
an authority created under the provisions of the Virginia Water and Sewer Authorities Act (hereinafter
|
||||||
|
called the “Authority”)..
|
||||||
|
|
||||||
|
WITNESSETH:
|
||||||
|
|
||||||
|
WHEREAS, the parties entered into that certain Disposal Contract dated August 22, 2013 (the
|
||||||
|
“Contract”);
|
||||||
|
|
||||||
|
WHEREAS, the parties have agreed to renew the Contract and execute and deliver this
|
||||||
|
Amendment;
|
||||||
|
|
||||||
|
WHEREAS, in connection with such renewal of the term of the Contract, the parties wish to
|
||||||
|
amend the Contract on the terms and conditions as hereinafter set forth.
|
||||||
|
|
||||||
|
NOW, THEREFORE, in consideration of the mutual grants and covenants contained herein, and
|
||||||
|
for other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged,
|
||||||
|
the parties hereto agree as follows:
|
||||||
|
|
||||||
|
Section 1. Defined Terms. All capitalized terms used herein and not otherwise defined herein
|
||||||
|
shall have the respective meanings ascribed thereto in the Contract,
|
||||||
|
|
||||||
|
Section 2. Amendments. This Amendment shall be deemed to be an amendment to the Contract
|
||||||
|
and shall not be construed in any way as a replacement or substitution therefor. All of the terms and
|
||||||
|
provisions of this Amendment are hereby incorporated into the Contract as if such terms and provisions
|
||||||
|
were set forth therein in full. Subject to the foregoing and to the terms hereof, Contractor and Authority
|
||||||
|
hereby agree that the Contract is hereby amended as follows:
|
||||||
|
|
||||||
|
(a) The term of the Contract shall be renewed as of October 27,
|
||||||
|
2018 for an additional term of five years (the “Renewal Term”).
|
||||||
|
|
||||||
|
(b) The rates charged by Contractor and paid by the Authority
|
||||||
|
during the Renewal Term are as set forth below:
|
||||||
|
|
||||||
|
October 27, 2018 ~ October 26, 2019: $17.50 per ton
|
||||||
|
October 27, 2019 — October 26, 2020: $18.03 per ton
|
||||||
|
October 27, 2020 - October 26, 2021: $18.57 per ton
|
||||||
|
October 27, 2021 — October 26, 2022: $19.12 per ton
|
||||||
|
October 27, 2022 - October 26, 2023: $19.70 per ton
|
||||||
|
|
||||||
|
Section 3. Reference to and Effect upon the Existing Contract.
|
||||||
|
|
||||||
|
(i) Effectiveness; Recitals. This Amendment shall be effective as of the date set
|
||||||
|
forth above. Upon the effectiveness of this Amendment, each reference in the Contract to “this
|
||||||
|
Agreement”, this “Contract”, “hereunder”, “hereof”, “herein”, or words of like import, and each reference
|
||||||
|
to the Contract in any other related document shall mean and be a reference to the Contract as amended
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
hereby. The parties agree that the “whereas” recitals set forth above are true and correct and are hereby
|
||||||
|
incorporated into this Amendment by reference.
|
||||||
|
|
||||||
|
(ii) Authority. Each party represents and warrants to the other party that (i) this
|
||||||
|
‘Amendment has been duly and validly authorized, executed and delivered by it, and is a valid and binding
|
||||||
|
‘agreement enforceable against it accordance with its terms; (ji) the persons executing this Amendment on
|
||||||
|
behalf of the applicable party has been authorized and empowered to do so; (iii) each party has full power
|
||||||
|
and authority to enter into and perform this Amendment in accordance with its terms. The parties
|
||||||
|
acknowledge and agree that this Amendment shall inure to the benefit of and be enforceable by the parties
|
||||||
|
hereto.
|
||||||
|
|
||||||
|
(iii) Ratification and Confirmation Generally. Except as specifically amended above,
|
||||||
|
the Contract shall remain in full force and effect and all of its respective terms and conditions are hereby
|
||||||
|
ratified and confirmed.
|
||||||
|
|
||||||
|
Section 4. Governing Law. This Amendment shall be governed by and construed in
|
||||||
|
‘accordance with the laws of the Commonwealth of Virginia.
|
||||||
|
|
||||||
|
Section S. Counterparts. This Amendment may be executed in any number of separate
|
||||||
|
counterparts, each of which when so executed and delivered shall be deemed to be an original and all of
|
||||||
|
which taken together shall constitute one and the same instrument.
|
||||||
|
|
||||||
|
Section 6. Headings. Section headings in this Amendment are included herein for
|
||||||
|
convenience of reference only and shall not constitute a part of this Amendment for any other purpose.
|
||||||
|
|
||||||
|
Section 7. Successors and Assigns. This Amendment shall be binding upon the Contractor
|
||||||
|
and the Authority and their respective successors and assigns.
|
||||||
|
|
||||||
|
IN WITNESS WHEREOF, the parties hereto have caused this Amendment to be executed by
|
||||||
|
their duly authorized representatives as of the date first above written,
|
||||||
|
|
||||||
|
ECO-SAFE SYSTEMS, LLC
|
||||||
|
ZaA
|
||||||
|
By:
|
||||||
|
|
||||||
|
CUMBERLAND PLATEAU REGIONAL WASTE
|
||||||
|
MANAGEMENT AUTHORITY
|
||||||
|
|
||||||
|
Its,
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,642 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: 2023 Disposal contract
|
||||||
|
file: ../2023 Disposal contract.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Cumberland_Waste_FOIA_May_2024
|
||||||
|
- Disposal Contracts
|
||||||
|
- '2023'
|
||||||
|
docDate: '2023'
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 434721
|
||||||
|
sha256sum: 0f366fc161774b947e6c6821fcceaaf7718ca0175b42d13927690b94346585b9
|
||||||
|
sha1sum: d5e3d0ba2a984bd5cf3dea8979c1bee76c2c0bd8
|
||||||
|
---
|
||||||
|
|
||||||
|
Disposal Contract
|
||||||
|
|
||||||
|
‘THIS DISPOSAL CONTRACT (the “Contract”), made and entered into this 17* day of August, 2023, by and
|
||||||
|
between the CUMBERLAND PLATEAU REGIONAL WASTE MANAGEMENT AUTHORITY, an
|
||||||
|
authority created under the provisions of the Virginia Water and Sewer Authorities Act, (hereinafter
|
||||||
|
|
||||||
|
as called the “Authority”) represented herewith by its duly appointed Chairman of the Board of Directors, Ronald
|
||||||
|
Peters, and ECO-SAFE SYSTEMS, LLC, a Tennessce limited liability company and subsidiary of WASTE
|
||||||
|
MANAGEMENT INC, a Delaware Corporation, duly authorized to conduct business in the Commonwealth of
|
||||||
|
Virginia and the State of Tennessee (hereinafter called “Contractor”), herein represented by William Edward
|
||||||
|
‘McManus, Area Vice President, Waste Management, its duly qualified and acting Agent.
|
||||||
|
|
||||||
|
WITNESSED, THAT in consideration ofthe covenants and agreements herein contained, to be performed by
|
||||||
|
‘he parties hereto and ofthe payments hereinaferagrecd tobe made, i is mutually agreed as follows:
|
||||||
|
|
||||||
|
1 ‘The Contractor i hereby granted exclusive rights for the disposal of solid waste generated within the
|
||||||
|
‘Authority's three (3) transfer stations ~ Buchanan, Dickenson, and Russell, in accordance with all
|
||||||
|
‘applicable Federal, State, and local laws and regulations during term of this Contract,
|
||||||
|
|
||||||
|
2. The Contract Documents shall include the Following documents, incorporated and referenced herein as
|
||||||
|
follows:
|
||||||
|
|
||||||
|
Exhibit A - General Specifications
|
||||||
|
|
||||||
|
ExhibicB - Insurance Requirements
|
||||||
|
|
||||||
|
Exhibit C - Contractor's Proposal/Pricing.
|
||||||
|
|
||||||
|
Exhibit D - Contractor's Lette of Credit.
|
||||||
|
|
||||||
|
Exhibit E - Contact Information
|
||||||
|
|
||||||
|
This Instrument
|
||||||
|
|
||||||
|
‘Any addenda or changes tothe foregoing documents agreed to by the parties hereto
|
||||||
|
|
||||||
|
mneeese
|
||||||
|
|
||||||
|
3. All provisions ofthe Contract Documents shal be strictly complied with and conformed to by the
|
||||||
|
Contractor, and no amendment to this Contract shall be made except upon written consent of the panies.
|
||||||
|
‘No amendment shall be construed to release either party from any obligation of the Contract Documents
|
||||||
|
except as specifically provided for in such amendment.
|
||||||
|
|
||||||
|
4. ‘The inital term if this Contract shall be from October 27, 2023 (the “Effective Date”) until October 27,
|
||||||
|
2026. Upon mutual agreement between the partes the Contract may be extended an additional two (2)
|
||||||
|
Van ‘years under the same terms and conditions. I is understood that both partes must agree, with written
|
||||||
|
‘notification, ofthis extension atleast sixty (60) days prior to the expiration date as defined herein.
|
||||||
|
Disposal rates for the two-year extension shall be as detailed in Exhibit C for years 4 and 5.
|
||||||
|
|
||||||
|
IN WITNESS WHEREOF, the parties have duly exccuted this Disposal Contract.
|
||||||
|
‘Cumberland Plateau Regional Waste Management Authority
|
||||||
|
|
||||||
|
Toby Franklin Edwards
|
||||||
|
wy. LOL — ccontVTARY PUBLIC
|
||||||
|
Ronald Peters, CPRWMA Chairman mmonwesith of Virginia
|
||||||
|
|
||||||
|
s }. #7342893
|
||||||
|
eHub
|
||||||
|
prism tycoon ts ra
|
||||||
|
|
||||||
|
wes sa
|
||||||
|
(7 iat cf
|
||||||
|
veces
|
||||||
|
|
||||||
|
Waste Management, Ine.
|
||||||
|
|
||||||
|
eile
|
||||||
|
COMMONWEALTH OF VIRGINIA,
|
||||||
|
|
||||||
|
COUNT OF OF ROI
|
||||||
|
|
||||||
|
“The fagin ed wage, sworn and acknowledged before by LAA & he {Nays on nis ZAK,
|
||||||
|
|
||||||
|
My commission expires:
|
||||||
|
|
||||||
|
(>) My Commission Expires CP Des Whey
|
||||||
|
Mareh 21, 2026 NOTARY PUI
|
||||||
|
|
||||||
|
\Watte Management Contact with Cumberland Pineau RWMA,
|
||||||
|
Page Hof 1
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
EXHIBIT A
|
||||||
|
‘GENERAL SPECIFICATIONS - INDEX
|
||||||
|
|
||||||
|
1.0 DEFINITIONS OF ITEMS INCLUDED IN THIS CONTRACT
|
||||||
|
|
||||||
|
11 Authority
|
||||||
|
|
||||||
|
1.2 Disposal Site
|
||||||
|
|
||||||
|
13 Disposal Site
|
||||||
|
|
||||||
|
14 Exeladed Waste
|
||||||
|
|
||||||
|
15 Garbage
|
||||||
|
|
||||||
|
16 Rubbish
|
||||||
|
|
||||||
|
U7 Solid Waste
|
||||||
|
|
||||||
|
18 Yond Waste
|
||||||
|
|
||||||
|
20 DEFINITIONS OF ITEMS EXCLUDED FROM THIS CONTRACT
|
||||||
|
2. Hazardous Waste
|
||||||
|
22 offal Waste
|
||||||
|
23 Special Waste
|
||||||
|
30. SCOPE OF WORK,
|
||||||
|
3.1 General
|
||||||
|
3.2. Work Not Covered By Contract
|
||||||
|
40. GENERAL PROVISIONS.
|
||||||
|
41 Hours of Operation
|
||||||
|
|
||||||
|
42 Holidays
|
||||||
|
43 Office
|
||||||
|
|
||||||
|
44 Disposal
|
||||||
|
45 Delivery
|
||||||
|
46 Point of Contac
|
||||||
|
|
||||||
|
5.0 BASIS OF PRICES AND METHOD OF PAYMENT
|
||||||
|
5.1 Disposal Rates (Exhibits C)
|
||||||
|
|
||||||
|
5.2 Modification to Rates
|
||||||
|
53 Contactor Billings to Authority
|
||||||
|
|
||||||
|
(60 COMPLIANCE WITH LAWS
|
||||||
|
110 RISK ALLOCATION AND INDEMNITY
|
||||||
|
{0 LICENSES AND TAXES,
|
||||||
|
|
||||||
|
9.0 FORCE MAJEURE
|
||||||
|
|
||||||
|
100 ASSIGNMENT OF CONTRACT
|
||||||
|
SOTITLE TO WASTE
|
||||||
|
|
||||||
|
120 TERMINATION OF CONTRACT
|
||||||
|
|
||||||
|
130 MISCELLANEOUS TERMS
|
||||||
|
|
||||||
|
‘ase megane Coa wit Cmbnd ae RMA
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
EXHIBIT A
|
||||||
|
‘GENERAL SPECIFICATIONS
|
||||||
|
|
||||||
|
1.0 DEFINITIONS OF ITEMS INCLUDED IN THIS CONTRACT. As used herein, the following terms
|
||||||
|
‘hall have the following meanings:
|
||||||
|
|
||||||
|
1.1. Authority - The Cumberland Plateau Regional Waste Management Authority which includes the
|
||||||
|
{geographical arca comprised ofall of the incorporated and unincorporated arcas within each of the
|
||||||
|
Counties which is a “Member” ofthe Authority - Buchanan, Dickenson, and Russell Counties and
|
||||||
|
‘any County within the State of Virginia adjacent to (having a common boundary with) any Member
|
||||||
|
that may enter into an agreement with the Authority after the date hereof relating to such adjacent
|
||||||
|
County's use of the Authority's Transfer Stations (collectively the “Service Area").
|
||||||
|
|
||||||
|
4.2 Construction and Demolition Waste or C&D - waste building materials resulting from construction,
|
||||||
|
‘remodeling, repair, or demolition operations that are directly or indirectly the by-products of |
|
||||||
|
‘construction work or tha result from demolition of buildings or other structures, but specifically
|
||||||
|
‘excluding inert debris, land-clearing debris, yard debris, or used asphalt, asphalt mixed with dirt
|
||||||
|
‘sand, gravel, rock, concrete, or similar materials.
|
||||||
|
|
||||||
|
1.3. Disnosal Site -Contracor's Eco-Safe Solid Waste Landfill disposal facility locate in Sullivan
|
||||||
|
‘County, Tennessee, permitted or approved by all governmental bodies and agencies having
|
||||||
|
Jurisdiction and requiring such licenses, permits or approvals to receive for processing or final
|
||||||
|
disposal of Solid Waste,
|
||||||
|
|
||||||
|
1.4. Excluded Waste - any waste or material that (i) the acceptance and handling of which by
|
||||||
|
Contractor would cause a violation of any permit, condition, legal or regulatory requirement. (i)
|
||||||
|
can cause substantial damage to Contractor's equipment or facilites, (itt) presents a danger tothe
|
||||||
|
hncalth or safety of the public or Contractor's employees, (iv) is or contains Hazardous Waste,
|
||||||
|
‘industrial waste, liquid waste, Special Waste that has not been profiled and pre-approved by
|
||||||
|
Contractor, untreated medical waste, (v) is or contains solid or dissolved material in domestic
|
||||||
|
sewage, or solid or dissolved material in irrigation return flows, or industrial discharges subject to
|
||||||
|
regulation by permit, or (vi) results from activities associated with the exploration, development, or
|
||||||
|
‘production of oil or gas or geothermal resources, (vii) is or contains batteries or fuels, (vill) is oF
|
||||||
|
‘contains motor oil or paint, (x) is or contains televisions (x) is or contains batteries, (xi) is oF
|
||||||
|
‘contains florescent lightbulbs, (xii) is or contains white goods, (xii) is or contains treated/de-
|
||||||
|
‘characterized wastes, (xiv) is or contains any whole tres, (xvi) i oF contains sludge, and/or (xivii)
|
||||||
|
is or contains other solid or liquid waste specifically prohibited for disposal at the disposal facility
|
||||||
|
by the Tennessce Department of Environment and Conservation or any other regulatory agency
|
||||||
|
having jurisdiction over such landfill, in accordance with applicable law. Title to and liability for
|
||||||
|
Excluded Waste shall remain with the generator all times. Contractor has no obligation to accept,
|
||||||
|
transport, process or dispose of any Exchuded Waste.
|
||||||
|
|
||||||
|
1.5. Garbage, Waste materials consisting of putrescible or animal and vegetable waste materials
|
||||||
|
resulting (tom the handling, preparation, cooking, and consumption of food, including waste
|
||||||
|
‘materials from markets, storage facilities, handling and sale of produce and other food products,
|
||||||
|
‘and all small dead animals (excluding Offal Waste) and farge animals (excluding Orffal Waste).
|
||||||
|
such as livestock, deer, etc. which large animals arc limited to three carcasses or less per load so
|
||||||
|
Tong as such disposal does not cause the violation of any applicable permit, condition, legal or
|
||||||
|
regulatory requirement,
|
||||||
|
|
||||||
|
1.6 Rubbish, Nonputrescible waste materials (excluding ashes), consisting of both combustible and
|
||||||
|
‘noncombustible waste materials. Combustible rubbish includes paper, rags, cartons, wood,
|
||||||
|
‘excelsio.furiture, rubber, plastics or similar materials: noncombustible rubbish includes glas,
|
||||||
|
‘eockery, tin cans, aluminum cans, metal furniture and similar materials that will not burn at
|
||||||
|
ordinary incinerator temperatures (1,600 degrees Fabrenheit to 1,800 degrees Fahrenbeit).
|
||||||
|
|
||||||
|
1.7. Solid Waste~ all non-hazardous Garbage, Rubbish, Yard Waste andlor C&D that is collected
|
||||||
|
and/or transported by the Authority or its authorized agents that can legally be received atthe
|
||||||
|
Disposal Facility. The term “Solid Waste” or “Waste” specifically excludes Excluded Waste.
|
||||||
|
|
||||||
|
8. Yard Waste - any vegetative matter resulting from private landscaping or regular yard maintenance,
|
||||||
|
including, but not limited to, tree limbs, branches. yard debris, bagged grass clippings and bagged
|
||||||
|
leaves, excluding items over six (6) feet long.
|
||||||
|
|
||||||
|
‘Waste Management Contact wth Cumberlnd Plateau RWMA.
|
||||||
|
Page 3of 1
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
2.0 DEFINITIONS OF ITEMS EXCLUDED FROM THIS CONTRACT. As used herein, the following
|
||||||
|
‘terms shall have the following meanings:
|
||||||
|
|
||||||
|
2.1 Hazardous Waste (excluded from this Contract)- Hazardous Waste is a form of Excluded Waste
|
||||||
|
and is defined as any radioactive, volatile, corrosive, highly flammable, explosive, biomedical,
|
||||||
|
infectious, biohazardous, oxic of listed or characteristic Hazardous Waste as defined by federal,
|
||||||
|
state, provincial or local law or any otherwise regulated waste. Hazardous Waste shall include, but
|
||||||
|
‘ot be limited to, any amount of waste listed or characterized as hazardous by the United States
|
||||||
|
Environmental Protection Agency or any state agency pursuant tothe Resource Conservation and
|
||||||
|
Recovery Act of 1976, as amended, and including future amendments thereto, and any other
|
||||||
|
applicable federal, state ar local laws or regulations.
|
||||||
|
|
||||||
|
22. Offal Waste excluded from this Contract)~ Waste animal (land or marine) matter from
|
||||||
|
‘establishments such as butcher shops, slaughterhouses, food processing and packing plants,
|
||||||
|
rendering plants and fertilizer plans,
|
||||||
|
|
||||||
|
23. Special Waste (excluded from this Contract} Special Waste is a form of Exchuded Waste and is
|
||||||
|
defined ag noshazardous, solid waste that is subject to additional governmental regulations or
|
||||||
|
special handling requirements in collection, transportation, processing or disposal asa result ofthe
|
||||||
|
characteristics of, or processes which generate such wast. Special Waste must be profiled and pre-
|
||||||
|
approved in writing by Contractor before it canbe delivered to the Disposal Facility. Special Waste
|
||||||
|
includes, but is nt limited to:
|
||||||
|
|
||||||
|
(2) wast iron froma commercial or industria activity,
|
||||||
|
|
||||||
|
(©) waste generated by an industrial process ra pollution control process;
|
||||||
|
|
||||||
|
{6) waste which may contain fre liquids,
|
||||||
|
|
||||||
|
{4) waste which may contain residue and debris from the cleanup ofa spill of petroleum, chemical
|
||||||
|
or commercial products or wastes or contaminated residuals,
|
||||||
|
|
||||||
|
(6) articles from the cleanup of a facility which generates, stores, teat, recycles or disposes of
|
||||||
|
chemical substances, commercial products or wastes;
|
||||||
|
|
||||||
|
(9, wastes which are nonhazardous as a result of proper treatment pursuant 10 Subtle C of the
|
||||||
|
Resouree Conservation and Recovery Act of 1976 (°RCRA");
|
||||||
|
|
||||||
|
{g) asbestos containing or asbestos bearing material that has been properly secured under existing
|
||||||
|
federal, stat, provincial and local laws, rules and regulations;
|
||||||
|
|
||||||
|
(0 containers that once contained hazardous substances, chemicals, or insecticides so long as such
|
||||||
|
containers are “empty” as defined by RCRA;
|
||||||
|
|
||||||
|
(municipal or commercial solid waste that may have come into contact with any of the
|
||||||
|
foregoing:
|
||||||
|
|
||||||
|
().Giker cake shudge wastes from wastewater weatment processes;
|
||||||
|
|
||||||
|
(W) wastes containing any regulated polychlorinated biphenyls and,
|
||||||
|
|
||||||
|
(0) ash, sludge, whole ies and powders.
|
||||||
|
|
||||||
|
30 SCOPE OF WORK
|
||||||
|
|
||||||
|
3.1 General. The work under this Contract shall consist of disposing of all Solid Waste transported by
|
||||||
|
the Authority's agent to Eco-Safe's Landfill in Blountville, TN in accordance with and subject to
|
||||||
|
the terms and conditions of this Contract.
|
||||||
|
|
||||||
|
3.2, Work Not Covered By Contract. The work under this Contract does not include transportation
|
||||||
|
{rom the Authority's Transfer Stations and/or disposal of Hazardous Waste, Offal Waste, Special
|
||||||
|
Waste nor Excluded Waste materials.
|
||||||
|
|
||||||
|
4.0 GENERAL PROVISIONS,
|
||||||
|
|
||||||
|
441_ Hours of Operation
|
||||||
|
Disposal of Solid Waste shall be in accordance with normal operating hours (6:30 am to 4:30 pm.
|
||||||
|
‘Monday through Friday) ofthe Disposal Site. Exceptions to operation hours shall be affected only
|
||||||
|
‘upon the mutual agreement of the Authority and Contractor, oF when Contractor reasonably
|
||||||
|
determines that an exception is necessary in order to complete disposal due to unusual circumstances.
|
||||||
|
Ifthe Contractor has an interruption in accepting Solid Waste during the agreed upon hours,
|
||||||
|
contractor agrees to immediately notify the Authority's Executive Director ofthe interruption.
|
||||||
|
Contractor will make reasonable efforts to allow the Authority and its agents to unload ina timely
|
||||||
|
‘manner. The Authority's Executive Director and Contractor will make reasonable efforts to
|
||||||
|
coordinate hours of operation for delivery under special circumstances, emergencies or unexpected
|
||||||
|
delays at the landfill to allow the Authority to be in compliance with state and federal requirements
|
||||||
|
|
||||||
|
42 Holidays ~The following shall be holidays for purposes of this Contract:
|
||||||
|
|
||||||
|
Waste Management Contact with Cumberland Plateau RWMA
|
||||||
|
Page dof
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
New Veat’s Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day
|
||||||
|
|
||||||
|
Contractor or the Authority may decide o observe any or all ofthe above-mentioned holidays by
|
||||||
|
suspension of disposal service on the holiday.
|
||||||
|
|
||||||
|
43. Office ~The Contractor shall maintain an office or such other facilities through which it can be
|
||||||
|
contacted by direct visit or by local (oll fre) call from anywhere in the Authority's area. It shall
|
||||||
|
‘be equipped with sufficient telephones and shall have a responsible person in charge from 8:00
|
||||||
|
‘AM. 10 5:00 P.M on regular days of operation.
|
||||||
|
|
||||||
|
44. Disposal ~ The Authority will use the Eco Safe Sanitary Landiil, directly or via Cumberland
|
||||||
|
Plateau Transfer Stations, forthe disposal of all the Authority's Solid Waste delivered to the
|
||||||
|
‘Authority's Transfer Stations in accordance with the terms and provisions of this Contract.
|
||||||
|
|
||||||
|
45. Delivery — All Solid Waste willbe delivered by an agent of the Auhority. During the erm ofthis
|
||||||
|
‘Contract, the Authority and is authorized agents shall have a license to enter the Disposal Facility
|
||||||
|
for the limited purpose of, and only to the extent necessary for, offloading Solid Waste atthe
|
||||||
|
location and in the manner directed by Contractor. Except in an emergency, or at the express
|
||||||
|
direction of Contractor, the Authority's personne! or its agents shall not leave the immediate
|
||||||
|
vicinity oftheir vehicle. After offloading the Solid Waste, the Authority's personnel or ts agents
|
||||||
|
shall promptly leave the Disposal Facility. Under no circumstances shall the Authority’ personnel
|
||||||
|
“orits agents engage in any scavenging of waste. Contractor may refuse to accept Solid Waste
|
||||||
|
from, and shall deny an entrance license to, any of the Authority's personne! or its agents whom
|
||||||
|
Contractor believes is under the influence of alcohol or other chemical substances.
|
||||||
|
|
||||||
|
46 Point of Contact — All dealing, contacts, etc, between the Contractor and the Authority shall be
|
||||||
|
directed by the Contractor to the Authority’s point of contact specified in the applicable Exhibit E
|
||||||
|
and, by the Authority tothe Contractor's General Manager or Operations Manager.
|
||||||
|
|
||||||
|
5.0 BASIS OF PRICES AND METHOD OF PAYMENT
|
||||||
|
|
||||||
|
5.1. Disnosal Rates (Exhibit C) - The prices to be paid by the Authority forthe disposal of Solid Waste
|
||||||
|
from all Cumberland Plateau Transfer Stations atthe Disposal Site shall be as shown on Exhibit C.
|
||||||
|
|
||||||
|
5.2 _ Modification to Rates - The fees in Exhibit C which may be charged by the Contractor for the
|
||||||
|
first and subsequent years ofthe term under this Contract shall be effective October 27 annually.
|
||||||
|
|
||||||
|
5.3 Contractor Billings to Authority ~The Contractor shal bill the Authority for Solid Waste disposal
|
||||||
|
services rendered tothe Authority once a month and willbe issued within ten (10) days following
|
||||||
|
the end ofthe month and the Authority hall pay the Contractor within 60 days of invoice date.
|
||||||
|
Such billing and payment shall be based on the price rates and schedules sot forth in Exhibit C.
|
||||||
|
‘Number of tons deposited for disposal shall be determined by the Eco-Safe Landfill tickets and
|
||||||
|
stored tare weight at Eco-Safe Scale House of which Contractor agrees to provide verification and
|
||||||
|
inspection by Authority upon Authority request and asthe Authority deems necessary, Payments
|
||||||
|
‘not made bythe Authority on or before their due date shall be subject to late Fes of: a the greater
|
||||||
|
‘of five dollars ($5) or one and one-half percent (1.5%) per month or portion thereof o.b) the
|
||||||
|
‘maximum allowed by lav, iess than a)
|
||||||
|
|
||||||
|
6.0 COMPLIANCE WITH LAWS
|
||||||
|
|
||||||
|
‘The Contractor shall conduct operations under this Conteact in compliance with al applicable laws;
|
||||||
|
provided, however, that the Contract shall govern the obligations ofthe Contractor where there exist
|
||||||
|
conflicting ordinances of the Authority on the subject.
|
||||||
|
|
||||||
|
7.0 RISK ALLOCATION AND INDEMNITY,
|
||||||
|
|
||||||
|
7.1. Authority shal be responsible for any and all claims for persona injuries or death, or the loss of life oF
|
||||||
|
damage to property to the extent caused by the Authority's negligence or acts of willful misconduct or
|
||||||
|
those of its contractors or agents. The Contractor shall indemnify and hold harmless the Authority
|
||||||
|
and its member counties, officers, agents, servants and employees from and against any and all suits,
|
||||||
|
actions. legal proceedings claims, demands, damages, costs, expenses and atlomeys' fees to the extent
|
||||||
|
resulting from a willful or negligent act or omission of the Contractor, its officers, agents, servants
|
||||||
|
and employees in the performance ofthe Contract. In addition, the Contractor on account of damage
|
||||||
|
{o property or personal injury, including death, arising through operations under this Contract, the
|
||||||
|
Contractor agrees to indemnify the Authority and i's member counties against any expense, liability
|
||||||
|
‘or payment damage for property or personal injury, including death and injuries to the Contractor's
|
||||||
|
|
||||||
|
\Warte Manageren! Contact with Cumberland Plateau RWMA,
|
||||||
|
Page 5 of
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
‘employees tothe extent resulting from a willful or negligent act or omission of the Contractor, its
|
||||||
|
officers agent, servants and employees inthe performance of the Contract, including the use bythe
|
||||||
|
Contractor of equipment or facilities furnished by the Authority,
|
||||||
|
|
||||||
|
72 Contractor has the right to refuse or reject after acceptance any waste materials load delivered under
|
||||||
|
this Contract that contains Excluded Waste delivered to the Disposal Facility. Contractor shall
|
||||||
|
‘promptly give notice to the Authority upon the discovery of any Excluded Waste afler delivery of a
|
||||||
|
‘waste materials load, so that the Authority can arrange forthe transport and disposal of such Excluded
|
||||||
|
Waste in accordance with applicable federal, state or local laws or regulations. Inthe event any
|
||||||
|
Excluded Waste is not discovered by Contractor before iti disposed of in Contractor's landfill,
|
||||||
|
‘Contractor may, upon notification and approval ofthe Authority's Executive Digector, remove,
|
||||||
|
transport and dispose of such Excluded Waste at a location authorized to accept such Excluded Waste
|
||||||
|
in accordance with all applicable laws and charge the depositor or gencrator of such Excluded Waste
|
||||||
|
all direct and indirect costs incurred duc to removal, remediation, handling, transportation, delivery
|
||||||
|
and disposal of such Excluded Waste. The Authority shall provide all reasonable assistance to
|
||||||
|
Contractor to conduct an investigation to determine the identity ofthe depositor or generator ofthe
|
||||||
|
Excluded Waste and to collect the costs incurred by Contractor in conncetion with such Excluded
|
||||||
|
‘Waste. Subject to the Authority's providing all such reasonable assistance to Contractor, Contractor
|
||||||
|
shall release Authority fom any liability for any such costs incurred by Contractor in connection with
|
||||||
|
such Excluded Waste, except tothe extent that such Excluded Waste is determined to be attributed 19
|
||||||
|
the Authority. If Contractor rejects a load that is notin violation of acceptable waste, Contractor will
|
||||||
|
pay additional costs the Authority incurs asa result
|
||||||
|
|
||||||
|
8.0 LICENSES AND TAXES:
|
||||||
|
|
||||||
|
‘The Contractor shall obtain al licenses and permits (other than the license and permit granted by this
|
||||||
|
Contract) and promptly pay all taxes required by the State.
|
||||||
|
|
||||||
|
EQRCEMAJEURE
|
||||||
|
|
||||||
|
Except for Authority's obligation to pay amounts due 10 Contractor, any failure or delay in performance
|
||||||
|
‘under this Contract due to contingencies beyond a party's reasonable control, including, but not limited to,
|
||||||
|
‘strikes, riots, terrorist acts, compliance with applicable laws or governmental orders, fires, bad weather and
|
||||||
|
acts of God, acts of war, epidemics, pandemics, and the inability to obtain Iabor, materials or equipment
|
||||||
|
‘due to the foregoing circumstances, shall not constitute a breach of this Contract, but shall entitle the
|
||||||
|
affected pany to be relieved of performance wnder this Contract during the erm of such event and for a
|
||||||
|
reasonable time thereafter.
|
||||||
|
|
||||||
|
10.0 ASSIGNMENT OF CONTRACT
|
||||||
|
|
||||||
|
Neither pany shall assign this Contract in its entirety without the other party's prior written consent
|
||||||
|
consent shall not be unreasonably withheld. Notwithstanding the foregoing, Contractor may assign this
|
||||||
|
CConiract without the Authority’ consent to its parent companies or any of their subsidiaries to any person
|
||||||
|
cor entity who purchases any operations from Contractor or as a collateral assignment to any lender 10
|
||||||
|
Contractor. In the event Contractor slls operations to a person or entity, Conractor shall ensure the same
|
||||||
|
terms and conditions willbe assumed by the purchaser inluding the same or lower total disposal fees.
|
||||||
|
|
||||||
|
ich
|
||||||
|
|
||||||
|
11.0 TETLETO WASTE
|
||||||
|
|
||||||
|
Title to Solid Waste delivered by the Authority shall pass tothe Contractor when accepted by Contractor's
|
||||||
|
landfill, Prior thereto, ttle Wo the Solid Waste shall be in, and al risks and responsibilities theretofore shall
|
||||||
|
‘be bome by the Authority. Tile o and liability for any Excluded Waste shall remain with the generator or
|
||||||
|
depositor of such waste and shall at no time pass to Contractor.
|
||||||
|
|
||||||
|
12.0 TERMINATION OF CONTRACT
|
||||||
|
|
||||||
|
12.1 Inthe event ofa failure by Contractor to perform any material provision ofthis Contract, the
|
||||||
|
‘Authority shall give written notice of such breach 1 the Contractor along witha least tity (30)
|
||||||
|
days (the “cure period" to correct such breach. Authority may terminate this Contract aftr such
|
||||||
|
cure period if Contractor has not adequately corrected such breach in accordance with this Contract
|
||||||
|
and Authority o notifies Contractor in writing of such termination action. At such time, Authority
|
||||||
|
shall pay Contractor only all charges and fees forthe services performed on or before such
|
||||||
|
termination date. Thereafer, in the event such termination occtrs, Authority, sit sole and
|
||||||
|
exclusive remedy may exercise is rights under Contactors performance bond, and procure the
|
||||||
|
services of another waste services provider to complete the work covered under this Contact forthe
|
||||||
|
remainder of the time period covered by this Contract. Except for such ight, following any such
|
||||||
|
termination and the final payment from the Authority tothe Contractor, neither party shall have any
|
||||||
|
|
||||||
|
‘Waste Management Contract with Cumberland Plteau RWMA
|
||||||
|
Page 6 of Il
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
further obligation under this Contract other than for claims for personal injuries or property damage
|
||||||
|
as expressly provided in this Contract and arising prior to such termination date
|
||||||
|
|
||||||
|
122. In the event ofa failure by Authority to perform any material provision ofthis Contract, the
|
||||||
|
‘written notice of such breach to the Authority along with at least thirty (30)
|
||||||
|
|
||||||
|
*)to correct such breach. Contractor may terminate this Contract after suck
|
||||||
|
cure period if Authority has not adequately corrected such breach in accordance with this Contract
|
||||||
|
and Contractor so notifies Authority in writing of such termination action. At such time, Authority
|
||||||
|
shall pay Contractor fr all charges and fees forthe services performed on or before such
|
||||||
|
{termination dat. Thereafter, following any such termination and the final payment from the
|
||||||
|
“Authority tothe Contractor, nether party shall have any further obligation under this Contact other
|
||||||
|
than for claims for personal injuries or property damage as expressly provided in these terms and
|
||||||
|
aising prior to such termination dat.
|
||||||
|
|
||||||
|
123 Either panty may terminate this Agreement upon written notice to the other ifthe offending panty:
|
||||||
|
‘makes an assignment forthe benefit of creditors, or files a voluntary petition in bankruptcy,
|
||||||
|
receivership or insolvency, or files an answer in any involuntary proceeding of that nature admitting
|
||||||
|
the material allegations ofthe petition, or if a proceeding in bankruptcy, receivership or insolvency
|
||||||
|
shall be instituted against the offending and such proceeding is not dismissed within sixty (60) days.
|
||||||
|
|
||||||
|
124 In the event either party waives default by the other party, such waiver shall not be construed or
|
||||||
|
‘determined to be a continuing waiver of the same or any subsequent breach or default.
|
||||||
|
|
||||||
|
13.0 MISCELLANEOUS TERMS
|
||||||
|
|
||||||
|
13.1 No intellectual property (IP) rights in any of Contractor's IP are granted to Authority under this
|
||||||
|
Contract.
|
||||||
|
|
||||||
|
13.2 This Contract shall be binding upon and inure solely to the benefit of the parties and their permitted
|
||||||
|
assigns.
|
||||||
|
|
||||||
|
133 If any provision of this Contract shall be invalid, legal or unenforceable, it shall be modified so as
|
||||||
|
to be valid, legal and enforceable but so as most nearly to retain the intent ofthe partes. If'such
|
||||||
|
1odification isnot possible, such provision shall be severed from this Contac. ta either cae, the
|
||||||
|
validity, legality nd enforceability ofthe remaining provisions of this Contract shall notin any
|
||||||
|
way be affected thereby.
|
||||||
|
|
||||||
|
13.4 The failure or delay on the part of cither party to exercise any right, power, privilege or remedy
|
||||||
|
under this Contract shall not constitute a waiver thereof. No modification by either party of any
|
||||||
|
provision shall be deemed to have been made unless made in writing, Any waiver by a party for
|
||||||
|
|
||||||
|
‘one or more similar events shall not be construed to apply to any other events whether similar or
|
||||||
|
ol.
|
||||||
|
|
||||||
|
13.5 This Contract shall be interpreted and governed by the law of the Commonwealth of Virginia and
|
||||||
|
Jurisdiction and venue for any litigation commenced under this contract shal ie in the Twenty-
|
||||||
|
inth (29) Judicial District of the Commonwealth of Virginia or the United States District Court
|
||||||
|
for the Western District of Virgina for federal coun.
|
||||||
|
|
||||||
|
13.6 This Contract sets forth the entire agreement of the parties and supersedes al prior agreements,
|
||||||
|
whether written or oral, that exist between the partes regarding the subject matter of this Contract.
|
||||||
|
|
||||||
|
[Remandier of page left innetionlly blank]
|
||||||
|
|
||||||
|
[Signatures on first page]
|
||||||
|
|
||||||
|
‘Waste Management Contract wth Cuber Plaeau RWMA,
|
||||||
|
‘Page TF
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Workers’ Compensation
|
||||||
|
|
||||||
|
Statutory
|
||||||
|
|
||||||
|
ty $1,000,000 each Bodily Injury by Accident
|
||||||
|
$81,000,000 policy limit Bodily Injury by Disease
|
||||||
|
$1,000,000 each occurrence Bodily Injury by Disease
|
||||||
|
|
||||||
|
‘Automobite Liability
|
||||||
|
|
||||||
|
Bodily Injury/Property Damage ‘$3,000,000
|
||||||
|
|
||||||
|
Combined ~ Single Limit ‘Coverage is to apply to all owned, non-owned, hired and
|
||||||
|
|
||||||
|
leased vehicles (including trailers)
|
||||||
|
|
||||||
|
Pollution Liabilty Endorsement MCS-90 endorsement for pollution liability coverage
|
||||||
|
Commercial General Liability
|
||||||
|
|
||||||
|
Bodily Injury/Property Damage. ‘$2,500,000 each occurrence
|
||||||
|
|
||||||
|
Combined ~ Single Limit ‘$5,000,000 general aggregate
|
||||||
|
|
||||||
|
Al such insurance policies will be primary without the right of contribution from any other insurance coverage
|
||||||
|
‘maintained by Authority. All policies required hercin shal be writen by insurance carriers with a rating of
|
||||||
|
‘AM, Bests of atleast “A~” and a financial size category of atleast VII. Upon Authority's request, Contractor
|
||||||
|
shall furnish Authority with a centificate of insurance, evidencing that such coverages are in effect. Such
|
||||||
|
cerifcae: (i) will also provide for 30 days prior written notice of cancellation tothe Authority; (i sball show
|
||||||
|
Authority as an additional insured under the Automobile and General Liability polices; and, (ii) shall contain
|
||||||
|
‘waivers of subrogation in favor of Authority excluding Worker's Compensation policy) except with respect to
|
||||||
|
the sole negligence or willfal misconduct of Authority. In addition, the following requirements apply to the
|
||||||
|
required Commercial General Liability policy
|
||||||
|
|
||||||
|
+ The Commercial General Liability policy must include Contractual Liability coverage specially
|
||||||
|
covering Contractor's Indemnification of Authority herein.
|
||||||
|
Coverage must be provided for roducts'Completed Operations.
|
||||||
|
The poicy shal also contain a cross Liabilty/Severbiliy of interests provision assuring that the acts of
|
||||||
|
‘one insured do not affect the applicability of coverage to another insured.
|
||||||
|
|
||||||
|
‘Waste Management Contact with Cumberland Plateau RWMA
|
||||||
|
Page BoE Ll
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
EXHIBITC
|
||||||
|
CONTRACTOR'S PROPOSAL/PRICING
|
||||||
|
|
||||||
|
Disposal Raics (all Transfer Stations) includes annual price increase 4%
|
||||||
|
|
||||||
|
Year | (October 27, 2023-October 27, 2024) $27.00 /Ton
|
||||||
|
Year 2 (October 27, 2024-October 27, 2025) $28.08 / Ton
|
||||||
|
Year 3 (October 27, 2025-October 27, 2026) $29.20/ Ton
|
||||||
|
Year 4 (October 27, 2026-October 27, 2027) $30.36 / Ton
|
||||||
|
Year 5 (October 27, 2027-October 27, 2028) $31.57/ Ton
|
||||||
|
|
||||||
|
Waste Management Contract with Comber Plateau RWMA
|
||||||
|
Page 9 of
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Waste Management
|
||||||
|
|
||||||
|
‘To he provided by Contractor.
|
||||||
|
|
||||||
|
irae wth Cumberland isteay RWMA,
|
||||||
|
Page 10 1
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
EXHIBIT E
|
||||||
|
CONTACT INFORMATION
|
||||||
|
|
||||||
|
‘Authority:
|
||||||
|
|
||||||
|
Toby Edwards, Executive Director
|
||||||
|
‘Cumberland Plateau Regional Waste Management Authority
|
||||||
|
|
||||||
|
137 Highland Drive
|
||||||
|
P.O. Box 386
|
||||||
|
|
||||||
|
Lebanon, Virginia 24266
|
||||||
|
Phone: (276) 833-5403,
|
||||||
|
Cell (276) 698-3414
|
||||||
|
|
||||||
|
Contractor:
|
||||||
|
|
||||||
|
Steven Clark, Sr. District Manager
|
||||||
|
|
||||||
|
Eco-Safe Systems, LLC d/b/a Waste Management
|
||||||
|
385 Harr Lane
|
||||||
|
|
||||||
|
Blountville, Tennessce 37617
|
||||||
|
|
||||||
|
Phone: (615) 477-6223
|
||||||
|
|
||||||
|
Justin Rodda, District Manager
|
||||||
|
|
||||||
|
Eco-Safe Systems, LLC d/b/a Waste Management
|
||||||
|
385 Harr Lane
|
||||||
|
|
||||||
|
Blountville, Tennessee 37617
|
||||||
|
|
||||||
|
Phone: (423)361-8047
|
||||||
|
|
||||||
|
Waste Management Contac with Cuberlnd laeau RWMA
|
||||||
|
Page UL oft
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,878 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: 2013 Transportation contract
|
||||||
|
file: ../2013 Transportation contract.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Cumberland_Waste_FOIA_May_2024
|
||||||
|
- Transportation Contracts
|
||||||
|
- '2013'
|
||||||
|
docDate: '2013'
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 733171
|
||||||
|
sha256sum: 4f4f0932f7bcd583c58aa759f58dd6e063f3e5dd7ae5494aea5cca500f2f0483
|
||||||
|
sha1sum: 226404b4b4d6c8be9bc8e7fff0978fa9adf50566
|
||||||
|
---
|
||||||
|
|
||||||
|
OLID WASTE TRANSPORTATION AGREEME!
|
||||||
|
|
||||||
|
THIS AGREEMENT is made and entered into this the 22. day of Alu
|
||||||
|
2013, by and between the CUMBERLAND PLATEAU REGIONAL WASTE
|
||||||
|
MANAGEMENT AUTHORITY, an authority created under the provisions of the
|
||||||
|
Virginia Water and Sewer Authorities Act, (hereinafter called “Authority”) and Eco-Safe
|
||||||
|
Systems, LLC, a Tennessee limited liability company, (hereinafter call “Advanced” or
|
||||||
|
“Advanced Disposal”).
|
||||||
|
|
||||||
|
WHEREAS, the Authority desires to engage an independent contractor to provide
|
||||||
|
professional services of operating a solid waste transportation system for transportation of
|
||||||
|
all of the solid waste generated within the Authority’s region and delivered to the
|
||||||
|
Authority’s three (3) solid waste transfer stations and such other as may be
|
||||||
|
designated and operated by the Authority to the Eco-Safe municipal solid waste landfill
|
||||||
|
owned and operated by Eco-Safe Landfill, LLC and located in Blountville, Tennessee, for
|
||||||
|
disposal, and has found that it is exempt from obtaining competitive sealed bids and has
|
||||||
|
issued a Request for Proposal for Provision of Solid Waste Transportation Services date
|
||||||
|
July 17, 2013 for a Contract Date of October 28, 2013 (The “RFP”) for competitive
|
||||||
|
negotiation;
|
||||||
|
|
||||||
|
WHEREAS, Advance Disposal desires to provide such transportation services for the
|
||||||
|
Authority and has submitted its Proposal in response to the RFP;
|
||||||
|
|
||||||
|
WHEREAS, the Authority has selected Advanced Disposal and desires to engage
|
||||||
|
Advanced Disposal to perform such transportation services all in accordance with and
|
||||||
|
subject to the terms and conditions of this Agreement.
|
||||||
|
|
||||||
|
NOW, THEREFORE, in consideration of the premises and the following mutual
|
||||||
|
agreements and covenants, the Authority and Advanced Disposal, each intending to be
|
||||||
|
legally bound, agree as follows:
|
||||||
|
|
||||||
|
1.00 RECITALS; DEFINITIONS
|
||||||
|
|
||||||
|
‘The parties acknowledge and agree that the “whereas” recitals set forth above are true and
|
||||||
|
correct and are incorporated herein by this reference.
|
||||||
|
|
||||||
|
1.01 Advanced Disposal _Eco-Safe Systems Sanitary Landfill - The
|
||||||
|
Authority’s designated sanitary landfill will be the Eco-Safe municipal
|
||||||
|
solid waste landfill owned and operated by Eco-Safe Landfill, LLC and
|
||||||
|
located in the City of Blountville Tennessee, in Sullivan County,
|
||||||
|
Tennessee.
|
||||||
|
|
||||||
|
1.02 Cumberland Plateau Region — The geographic area comprised of all of
|
||||||
|
the incorporated and unincorporated areas within each of the Counties
|
||||||
|
|
||||||
|
which is a Member of the Authority, and any County in the State of
|
||||||
|
Virginia adjacent to (having a common boundary with) any Member that
|
||||||
|
may enter into an agreement with the Authority after the date hereof
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
1.03
|
||||||
|
|
||||||
|
1,04
|
||||||
|
|
||||||
|
1.05
|
||||||
|
|
||||||
|
1.06
|
||||||
|
|
||||||
|
1.07
|
||||||
|
|
||||||
|
1.08
|
||||||
|
1.09
|
||||||
|
|
||||||
|
1.10
|
||||||
|
Lill
|
||||||
|
|
||||||
|
relating to such adjacent County’s use of the Cumberland Plateau
|
||||||
|
Transfer Stations.
|
||||||
|
|
||||||
|
Cumberland Plateau Solid Waste - Any Solid Waste as defined herein
|
||||||
|
generated within the Cumberland Plateau Region.
|
||||||
|
|
||||||
|
Cumberland Plateau Special Waste - Any Special Waste as defined
|
||||||
|
herein generated within the Cumberland Plateau Region.
|
||||||
|
|
||||||
|
Cumberland Plateau Transfer Stations —- The three (3) Solid Waste
|
||||||
|
transfer stations or other stations or sites operated by the Authority and
|
||||||
|
located in the Cumberland Plateau Region Counties of Dickenson,
|
||||||
|
Buchanan, and Russell for acceptance, transfer, transportation, and
|
||||||
|
unloading of Cumberland Plateau Solid Waste to the Advanced Disposal
|
||||||
|
Eco-Safe Systems, Sanitary Landfill in accordance with the terms and
|
||||||
|
provisions of this Agreement...
|
||||||
|
|
||||||
|
Governmental Approvals ~ All permits, licenses and approvals required
|
||||||
|
for the transportation to and/or disposal of Cumberland Plateau Solid
|
||||||
|
|
||||||
|
Waste at the Advanced Disposal Eco-Safe Systems Sanitary Landfill.
|
||||||
|
|
||||||
|
Hazardous Waste - Any chemical, compound, mixture, substance or
|
||||||
|
article which is designated by the United States Environmental Protection
|
||||||
|
‘Agency or by any State having jurisdiction to be “hazardous” as that term
|
||||||
|
is defined by or pursuant to federal or state law and as otherwise defined
|
||||||
|
in the Disposal Contract between the Authority and Advanced dated of
|
||||||
|
even date herewith (the “Disposal Contract”).
|
||||||
|
|
||||||
|
Members ~ The Counties of Russell, Buchanan and Dickenson, Virginia.
|
||||||
|
|
||||||
|
Non-Conforming Wastes - Any waste excluded from the definition of
|
||||||
|
Solid Waste as provided in Section 1.11 and any Special Waste which
|
||||||
|
has not been approved by Eco Safe Systems, LLC and, if required, by any
|
||||||
|
governmental agency having jurisdiction and otherwise have the meaning
|
||||||
|
of Excluded Waste as set forth in the Disposal Contract.
|
||||||
|
|
||||||
|
Service Commencement Date — October 27, 2013.
|
||||||
|
|
||||||
|
Solid Waste — Any garbage, trash, rubbish, brush and other waste
|
||||||
|
material allowed under the Governmental Approvals issued for the
|
||||||
|
operation of the Advanced Disposal Eco-Safe Systems Sanitary Landfill
|
||||||
|
to be disposed of at the Advanced Disposal Eco-Safe Systems Sanitary
|
||||||
|
Landfill but excluding (a) any Hazardous Waste, (b) asbestos and (c) any
|
||||||
|
other material not allowed under any of the Governmental Approvals
|
||||||
|
issued with respect to the operation of the Advanced Disposal Eco-Safe
|
||||||
|
Systems Sanitary Landfill or pursuant to applicable laws and regulations.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
2.00
|
||||||
|
|
||||||
|
3.00
|
||||||
|
|
||||||
|
1.12 Special Waste - Any Solid Waste which requires special processing,
|
||||||
|
handling or disposal techniques which are different from the techniques
|
||||||
|
normally utilized for handling or disposal or contains an added element
|
||||||
|
of expense to transport or dispose of as determined by ECO SAFE
|
||||||
|
SYSTEMS, LLC or requires approval from any State agency and/or ECO
|
||||||
|
SAFE SYSTEMS, LLC, and as otherwise defined in the Disposal
|
||||||
|
Contract. Examples of such Special Waste types may include, but are not
|
||||||
|
limited to: white goods, fly ash, combustion ash, sludge, drilling fluids
|
||||||
|
and drill cuttings, asbestos, industrial wastes, liquid wastes, infectious
|
||||||
|
wastes and residue, pollution control residue, debris or contaminated soil
|
||||||
|
and water from the cleanup of a spill.
|
||||||
|
|
||||||
|
1.13 Transportation Fee - The amount set forth in Section 7.00 hereof, as
|
||||||
|
adjusted, charges by Advanced Disposal for the performance of
|
||||||
|
transportation services hereunder.
|
||||||
|
|
||||||
|
1.14 Ton—2,000 pounds.
|
||||||
|
|
||||||
|
SCOPE OF SERVICES
|
||||||
|
|
||||||
|
Subject to the terms and conditions hereof and the performance of the
|
||||||
|
Authority’s agreements and duties hereunder, Advanced Disposal shall furnish
|
||||||
|
all labor and at least five (5) tractors, eleven (1§) trailers, three (3) yard tractors
|
||||||
|
and any and/or all equipment or material necessary to provide Cumberland
|
||||||
|
Plateau Solid Waste Transportation services from such three (3) Cumberland
|
||||||
|
Plateau Transfer Stations to the Advanced Disposal Eco Safe Sanitary Landfill
|
||||||
|
from and after the Service Commencement Date in accordance with and subject
|
||||||
|
to the terms and conditions of this Agreement. Advanced Disposal will not have
|
||||||
|
a minimum tonnage on the amount of waste placed into each of the transport
|
||||||
|
trailers hauling from the three (3) Cumberland Plateau Transfer Stations to the
|
||||||
|
ADVANCED DISPOSAL ECO-SAFE SYSTEMS Sanitary Landfill however it
|
||||||
|
is understood that the Authority will maximize load volumes within legal limits
|
||||||
|
in order to ensure effieciencies in the transportation service, nor will a charge be
|
||||||
|
placed on the Authority for not meeting a minimum tonnage. The Authority
|
||||||
|
agrees to not load more waste into the transport trailers than the allowable by the
|
||||||
|
Federal Department of Transportation and State Department of Transportation.
|
||||||
|
|
||||||
|
CUMBERLAND PLATEAU SOLID WASTE 'RANSPORTATION
|
||||||
|
SERVICES
|
||||||
|
|
||||||
|
3.01 Acceptance and Loading of Solid Waste: Load Limits — The Authority
|
||||||
|
will accept all Cumberland Plateau Solid Waste delivered to the
|
||||||
|
‘Cumberland Plateau Transfer Stations. The Authority shall not accept any
|
||||||
|
Non-Conforming Wastes at the Cumberland Plateau Transfer Stations.
|
||||||
|
‘The Authority will promptly load, pack and tarp all Solid Wastes
|
||||||
|
accepted at the Cumberland Plateau Transfer Stations into Advanced
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
3.02
|
||||||
|
|
||||||
|
3.03
|
||||||
|
|
||||||
|
3.04
|
||||||
|
|
||||||
|
3.05
|
||||||
|
|
||||||
|
Disposal collection trailers for transportation to and unloading of waste
|
||||||
|
into the ADVANCED DISPOSAL Eco Safe Systems Sanitary Landfill.
|
||||||
|
The Authority will use its best reasonable business efforts to load each
|
||||||
|
collection trailer to its maximum legal capacity per load or such lesser
|
||||||
|
weight per load as is mutually acceptable to both parties subject in all
|
||||||
|
events to any maximum vehicle weight limits imposed by applicable law.
|
||||||
|
Under this agreement, Advanced Disposal will not impose a minimum
|
||||||
|
capacity per load upon the Authority.
|
||||||
|
|
||||||
|
Compliance - The Authority will conduct operations with respect to each
|
||||||
|
of the Cumberland Plateau Transfer Stations in accordance with all
|
||||||
|
applicable federal and state laws, rules and regulations, and the terms and
|
||||||
|
conditions of all permits, licenses and approvals issued for the operation
|
||||||
|
of the Cumberland Plateau Transfer Stations.
|
||||||
|
|
||||||
|
Inspection - The Authority may, on a reasonable basis as the Authority
|
||||||
|
deems necessary, make inspections of the Advanced Disposal’s records
|
||||||
|
that pertain solely to this Agreement and the services contemplated
|
||||||
|
hereby during normal business hours, however, such inspections shall be
|
||||||
|
made only by authorized employees or agents of the Authority.
|
||||||
|
|
||||||
|
Transportation — From and after the Service Commencement Date,
|
||||||
|
‘Advanced Disposal shall transport all Cumberland Plateau Solid Waste
|
||||||
|
and Cumberland Plateau Special Waste (approved for disposal by
|
||||||
|
Advanced Disposal Eco Safe Sanitary Landfill pursuant to Section 1.12
|
||||||
|
hereof) accepted at each of the Cumberland Plateau Transfer Stations,
|
||||||
|
directly or via any hub Cumberland Plateau Transfer Station, to the
|
||||||
|
Advanced Disposal Eco Safe Sanitary Landfill as agreed upon in the
|
||||||
|
RFP.
|
||||||
|
|
||||||
|
Use of Cumberland Plateau Transfer Stations and Advanced Disposal
|
||||||
|
Eco Safe Systems Sanitary Landfill — The Authority will use the
|
||||||
|
Advanced Disposal Eco Safe Sanitary Landfill, directly or via
|
||||||
|
Cumberland Plateau Transfer Stations, for disposal of all Cumberland
|
||||||
|
Plateau Solid Waste and such approved Cumberland Plateau Special
|
||||||
|
Waste delivered to the Cumberland Plateau Transfer Stations from and
|
||||||
|
after the Service Commencement Date in accordance with the terms and
|
||||||
|
provisions of the Authority and Disposal Contract (as defined above),
|
||||||
|
between the Authority and ADVANCED DISPOSAL. In the event that
|
||||||
|
the Advanced Disposal Eco Safe Sanitary Landfill becomes unavailable
|
||||||
|
for the disposal of Cumberland Plateau Solid Waste during the term of
|
||||||
|
this Agreement, the Authority (or its subcontractor, if applicable) will
|
||||||
|
negotiate with Advanced Disposal with respect to any necessary
|
||||||
|
adjustment to the Transportation Fee to reflect any increased or decreased
|
||||||
|
costs of transportation as a result of such Advanced Disposal Eco Safe
|
||||||
|
Sanitary Landfill becoming unavailable. The Authority will also use its
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
3.06
|
||||||
|
|
||||||
|
best efforts to enter into Agreements with each Member, each
|
||||||
|
municipality located within the limits of each Member and each generator
|
||||||
|
and commercial hauler of any Cumberland Plateau Special Waste
|
||||||
|
(approved for disposal by ADVANCED DISPOSAL pursuant to Section
|
||||||
|
1.12 hereof) for their use of the Cumberland Plateau Transfer Stations for
|
||||||
|
the disposal of all Cumberland Plateau Solid Waste and Cumberland
|
||||||
|
Plateau Special Waste collected and/or generated by such Member,
|
||||||
|
municipality, generator or commercial hauler from and after the Service
|
||||||
|
Commencement Date and throughout the initial and any and all renewal
|
||||||
|
terms of this Agreement (the ‘Use Agreements”). It is contemplated that
|
||||||
|
pursuant to the Use Agreements such Members and municipalities would
|
||||||
|
agree, among other things, to continue or implement waste collection
|
||||||
|
systems or take such other action allowed by applicable law to utilize the
|
||||||
|
Authority and its Cumberland Plateau Transfer Stations for all
|
||||||
|
Cumberland Plateau Special Waste generated within the jurisdiction of
|
||||||
|
the Members and such municipalities.
|
||||||
|
|
||||||
|
Transportation Operations and Holidays —- The following shall be
|
||||||
|
holidays for purposes of this Agreement:
|
||||||
|
|
||||||
|
Hours of Operation-Any time restrictions shall be affected only upon the
|
||||||
|
mutual agreement of the Authority's Director and Advanced Disposal’s
|
||||||
|
‘owner or agent.
|
||||||
|
|
||||||
|
Holidays- Advanced Disposal shall specify holidays to be observed
|
||||||
|
subject to the Authority’s personnel’s approval. The following Holiday's
|
||||||
|
are observed by the Authority and its landfill- New Year’s Day,
|
||||||
|
Memorial Day, Independence Day, Labor Day, Thanksgiving Day and
|
||||||
|
Christmas Day.
|
||||||
|
|
||||||
|
Office- Advanced Disposal shall maintain an office or such other
|
||||||
|
facilities through which it can be contacted. It shall be equipped with
|
||||||
|
sufficient telephones and shall have a responsible person in charge from
|
||||||
|
8:00 a.m. to 5:00 p.m. Monday through Friday/on regular collection days
|
||||||
|
to handle complaints as needed.
|
||||||
|
|
||||||
|
‘The Authority or its member counties may decide to observe any or all of
|
||||||
|
the above mentioned holidays by suspension of _ transportation
|
||||||
|
services on the holiday. The Authority or its member counties will give
|
||||||
|
Advanced Disposal advance notice of the Authority’s or ADVANCED
|
||||||
|
DISPOSAL Eco-Safe Systems Sanitary Landfill’s observance of any
|
||||||
|
holiday and the Authority may also suspend its transfer station operations
|
||||||
|
on such observed holiday.
|
||||||
|
|
||||||
|
Service Delivery- If Advanced Disposal is unable to perform the duties
|
||||||
|
under this agreement other than due to a breach of this Agreement by the
|
||||||
|
Authority or an event of Force Majeure, as set forth in Section 10.03, the
|
||||||
|
Authority's personnel has the right and privilege to secure another service
|
||||||
|
provider and Advanced Disposal will be responsible for any additional
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
3.07
|
||||||
|
|
||||||
|
3.08
|
||||||
|
|
||||||
|
costs incurred.
|
||||||
|
|
||||||
|
~ Title to, and liability for, Solid Waste transported by Advanced
|
||||||
|
Disposal shall pass to Advanced Disposal immediately upon Advanced
|
||||||
|
Disposal’s acceptance of same; provided however, provided that that
|
||||||
|
Advanced Disposal shall not accept title to waste or materials that is
|
||||||
|
Excluded Waste or Nonconforming Waste regardless of whether the such
|
||||||
|
waste is loaded or unloaded. Acceptance by Advanced Disposal shall be
|
||||||
|
defined as the loading of the Solid Waste into Advanced Disposal’s
|
||||||
|
hauling trailers by the Authority. Title to and liability for the Solid Waste
|
||||||
|
under this Agreement shall remain with Advanced Disposal until they
|
||||||
|
deliver same, and it is accepted by, the Advanced Disposal Eco Safe
|
||||||
|
Systems Sanitary Landfill in accordance with terms and conditions of the,
|
||||||
|
Disposal Contract with the Authority. Title to and liability for Non
|
||||||
|
Conforming Wastes and Excluded Waste shall remain with the Authority
|
||||||
|
and shall never pass to Advanced Disposal or Advanced Disposal Eco
|
||||||
|
Safe Systems Sanitary Landfill.
|
||||||
|
|
||||||
|
‘Special Waste — Where requested by Advanced Disposal, the Authority
|
||||||
|
shall assist Advanced Disposal or the Advanced Disposal Eco Safe
|
||||||
|
Systems Sanitary Landfill in identifying each generator of Cumberland
|
||||||
|
Plateau Special Waste and shall also require each generator of
|
||||||
|
Cumberland Plateau Special Waste, in addition to any label, marking,
|
||||||
|
manifest or other such documentation required by any applicable law,
|
||||||
|
regulation or permit, to provide the Authority, Advanced Disposal and
|
||||||
|
the Advanced Disposal Eco Safe Systems Sanitary Landfill, in advance
|
||||||
|
of any shipment of Special Waste, a representative sample of the Special
|
||||||
|
Waste to be transported (if applicable) and disposed of at the Advanced
|
||||||
|
Disposal Eco Safe Systems Sanitary Landfill 1, and a detailed written
|
||||||
|
physical and chemical description or analysis of the Special Waste
|
||||||
|
including, without limitation, a listing of unique characteristics
|
||||||
|
significance to the handling of such Special Waste (“Waste
|
||||||
|
Characterization Date Sheet” or “WCDS"). The Authority shall promptly
|
||||||
|
furnish to Advanced Disposal and its landfill any information regarding
|
||||||
|
known, suspected or planned changes in composition of any such Special
|
||||||
|
Waste and the Authority shall accordingly update the WCDS. The
|
||||||
|
Authority warrants that all Special Waste specified in a WCDS and
|
||||||
|
accepted at any Cumberland Plateau Transfer Station shall conform to the
|
||||||
|
description set forth on the WCDS. Such Special Waste shall not be
|
||||||
|
received at the Cumberland Plateau Transfer Stations or delivered to the
|
||||||
|
Advanced Disposal Eco Safe Systems Landfill for transportation and
|
||||||
|
disposal until such WCDS and representative sampling are analyzed and
|
||||||
|
approved by the Authority and ADVANCED DISPOSAL. The Authority
|
||||||
|
and Advanced Disposal shall have the right to reject loads of bulky
|
||||||
|
Special Wastes if in landfill’s judgment such loads would disrupt any
|
||||||
|
normal operating procedures.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
4.00
|
||||||
|
|
||||||
|
5.00
|
||||||
|
|
||||||
|
EFFECTIVE DATE
|
||||||
|
|
||||||
|
This Agreement shall be effective upon the execution of this Agreement by the
|
||||||
|
Authority and Advanced Disposal, and performance of transportation services by
|
||||||
|
Advanced Disposal hereunder shall commence in the Service Commencement
|
||||||
|
Date in accordance with the terms and conditions of this Agreement section 1.10.
|
||||||
|
|
||||||
|
INDEMNITY
|
||||||
|
|
||||||
|
5.01
|
||||||
|
|
||||||
|
5.02
|
||||||
|
|
||||||
|
Indemnity by the Advanced Disposal,. - Advanced Disposal and its
|
||||||
|
subcontractors will indemnify and save harmless the Authority from and
|
||||||
|
against any and all suits, actions, legal proceedings, claims, demands,
|
||||||
|
damages, costs, expenses, and reasonable attorneys’ fees incurred by the
|
||||||
|
Authority to the extent resulting from (a) any breach by Advanced
|
||||||
|
Disposal of any of its agreements hereunder, and (b) any negligent act or
|
||||||
|
omission of Advanced Disposal, its employees or agents in the
|
||||||
|
performance of transportation services under this Agreement; provided,
|
||||||
|
however, that Advanced Disposal or its subcontractors shall not be
|
||||||
|
obligated to indemnify the Authority from and against any suits, actions,
|
||||||
|
legal proceedings, claims, demands, damages, costs, expenses or
|
||||||
|
attorneys’ fees to the extent resulting from any negligent act or omission
|
||||||
|
of the Authority or of any of its officers, agents, servants, employees or
|
||||||
|
contactors or to the extent resulting from any breach by the Authority of
|
||||||
|
any of its agreements hereunder.
|
||||||
|
|
||||||
|
Indemnity by Authority - The Authority will indemnify, defend and save
|
||||||
|
harmless Advanced Disposal, and its parent companies and affiliates, and
|
||||||
|
respective officers, directors, members, managers, employees,
|
||||||
|
subcontractors, agents and representatives from and against any and all
|
||||||
|
suits, actions, legal proceedings, claims, demands, damages, costs,
|
||||||
|
expenses, and reasonable attorneys’ fees incurred by Advanced Disposal
|
||||||
|
to the extent resulting from (a) any breach by the Authority of any of its
|
||||||
|
agreements hereunder, and (b) any negligent act or omission of the
|
||||||
|
Authority or any of its officers, agents, servants, employees or
|
||||||
|
contractors; provided, however, that the Authority shall not be obligated
|
||||||
|
to indemnify Advanced Disposal from and against any suits, actions,
|
||||||
|
legal proceedings, claims, demands, damages, costs, expenses or
|
||||||
|
attorneys’ fees to the extent resulting from any negligent act or omission
|
||||||
|
of Advanced Disposal or of any of its officers, agents, servants,
|
||||||
|
employees or contractors or to the extent resulting from any breach
|
||||||
|
Advanced Disposal of any of its agreements hereunder.
|
||||||
|
|
||||||
|
6.00 TERM
|
||||||
|
|
||||||
|
This Agreement is for an initial term beginning on the date of execution of this
|
||||||
|
Agreement and shall remain in full force and effect from and after the date hereof
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
7.00
|
||||||
|
|
||||||
|
8.00
|
||||||
|
|
||||||
|
until the expiration of a period of five (5) years from then and after the Service
|
||||||
|
Commencement Date. This Agreement shail automatically be extended upon the
|
||||||
|
same terms and conditions without any further action by the parties for a five (5)
|
||||||
|
year renewal term commencing upon the expiration of the initial term unless either
|
||||||
|
party gives the other party written notice of termination at least ninety (90) days
|
||||||
|
prior to the expiration of the initial term of this Agreement. It is understood that
|
||||||
|
this contract has a set base price on transportation and a fuel surcharge as
|
||||||
|
referenced in the proposal with a CPI on the base rate formula presented in the
|
||||||
|
proposal.
|
||||||
|
|
||||||
|
B, ISTMENTS
|
||||||
|
|
||||||
|
7.01 Base Price and Transportation Fees Per Ton — For Cumberland Plateau
|
||||||
|
Solid Waste transportation services rendered hereunder, Advanced
|
||||||
|
Disposal will charge the Authority and the Authority will pay to Advanced
|
||||||
|
Disposal, without set-off or deduction, the Transportation Fee specified on
|
||||||
|
Exhibit A hereto, as adjusted in accordance with the terms and provisions
|
||||||
|
herein, for each Ton of Cumberland Plateau Solid Waste or Special Waste
|
||||||
|
transported by Advanced Disposal at the Cumberland Plateau Transfer
|
||||||
|
Stations for transportation hereunder. The tons transported will be
|
||||||
|
determined by the Eco Safe Landfill tickets net of stored tare weight at Eco
|
||||||
|
Safe Scale House of which verification will be afforded to the Authority as
|
||||||
|
deemed necessary. The Transportation Base Rate per ton Fee, under this
|
||||||
|
agreement shall be set at $17.18 per ton for Buchanan County, $17.17 per
|
||||||
|
ton for Dickenson County and $15.08 per ton for Russel! County. On the
|
||||||
|
date that is twelve months following the Service Commencement Date and
|
||||||
|
each subsequent twelve-month period after the Service Commencement
|
||||||
|
Date the base rate will automatically increase as agreed upon by both
|
||||||
|
parties in exhibit A hereto.
|
||||||
|
|
||||||
|
7.02 Advanced Disposal Billings to Authority — Advanced Disposal will invoice
|
||||||
|
the Authority on a monthly basis on or before the tenth (10") day each
|
||||||
|
month for all transportation services rendered during the preceding
|
||||||
|
calendar month and the Authority will remit payment for each invoice
|
||||||
|
without set-off or deduction to Advanced Disposal within 30 calendar days
|
||||||
|
of the date of such invoice. Such billing shall be based on the
|
||||||
|
‘Transportation Fees as adjusted pursuant herein.
|
||||||
|
|
||||||
|
INSURANCE
|
||||||
|
|
||||||
|
The Authority and Advanced Disposal shall each maintain in full force and effect
|
||||||
|
Employer's Liability, Workmen’s Compensation, Public Liability and Property
|
||||||
|
Damage Insurance. Before commencement of work hereunder, the Authority and
|
||||||
|
Advanced Disposal will furnish each other with certificates of insurance to the
|
||||||
|
effect that such insurance has been procured and is in force. The certificates shall
|
||||||
|
contain the following express obligations:
|
||||||
|
|
||||||
|
“This is to certify that the policies of insurance described herein have been
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
9.00
|
||||||
|
|
||||||
|
issued to the insured for whom this certificate is executed and are in force at this
|
||||||
|
time. In the event of cancellation or material change in a policy affecting the
|
||||||
|
certificate holder, thirty (30) days prior written notice will be given the certificate
|
||||||
|
holder.”
|
||||||
|
|
||||||
|
The Authority and Advanced Disposal shall each carry the following types of
|
||||||
|
insurance in at least the limits specified below:
|
||||||
|
|
||||||
|
Coverages of Li
|
||||||
|
|
||||||
|
Workmen’s Compensation Statutory
|
||||||
|
|
||||||
|
Employer's Liability $500,000
|
||||||
|
|
||||||
|
Bodily Injury Liability $500,000 each occurrence
|
||||||
|
Except Automobile $1,000,000 aggregate
|
||||||
|
|
||||||
|
Property Damage Liability $500,000 each occurrence
|
||||||
|
Except Automobile $1,000,000 aggregate
|
||||||
|
|
||||||
|
Automobile Bodily Injury $500,000 each person
|
||||||
|
Liability $1,000,000 each occurrence
|
||||||
|
|
||||||
|
Automobile Property Damage $500,000 each occurrence
|
||||||
|
Liability
|
||||||
|
|
||||||
|
Excess Umbrella Liabi $5,000,000 each occurrence
|
||||||
|
|
||||||
|
As an alternative to the above, Advanced Disposal may insure the above public
|
||||||
|
liability and property coverages under any plan or plans of self-insurance approved
|
||||||
|
by the State of Virginia. The coverages may be provided by Advanced Disposal,
|
||||||
|
Inc., a Delaware corporation, or any other corporation affiliated with Advanced
|
||||||
|
Disposal.
|
||||||
|
|
||||||
|
DEFAULT
|
||||||
|
|
||||||
|
Except as otherwise provided herein, if either party breaches any of the material
|
||||||
|
provisions of this Agreement and fails to cure such breach within a period of thirty
|
||||||
|
(30) days after receiving written notice setting forth a detailed description of such
|
||||||
|
breach from the other party, unless a longer period of time is required to cure such
|
||||||
|
breach and the party breaching shall have failed to commence to cure such breach
|
||||||
|
within said thirty (30) day period and pursue diligently to completion thereof, then
|
||||||
|
the other party may terminate this Agreement.
|
||||||
|
|
||||||
|
10.00 MISCELLANEOUS
|
||||||
|
|
||||||
|
10.01 Transferability — No assignment of this Agreement or any right accruing
|
||||||
|
under this Agreement shall be made in whole or in part by the Authority
|
||||||
|
without the express prior written consent of Advanced Disposal or by
|
||||||
|
Advanced Disposal without the express prior written consent of the
|
||||||
|
‘Authority, except that Advanced Disposal without consent of the Authority
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
10.02
|
||||||
|
|
||||||
|
10.03
|
||||||
|
|
||||||
|
10.04
|
||||||
|
|
||||||
|
may assign and delegate any of its rights and obligations under this
|
||||||
|
Agreement or subcontract the performance of any services to be rendered
|
||||||
|
hereunder to any corporation or other entity which controls, or is controlled
|
||||||
|
by , or under common control with Advanced Disposal or its affiliates.
|
||||||
|
|
||||||
|
Liquidated Damages — Work shall be completed in a prompt, lawful, and
|
||||||
|
professional manner and in accordance with the terms of this agreement. In
|
||||||
|
addition to any other remedy contained herein, it is understood that the
|
||||||
|
Authority may deduct from payment due or to become due to Advanced
|
||||||
|
Disposal amounts as liquidated damages upon proof of any of the following
|
||||||
|
occurrences by Advanced Disposal. Failure of Advanced Disposal to fulfill
|
||||||
|
certain aspects of this agreement shall carry monetary penalties as
|
||||||
|
payments due to the Authority as follows:
|
||||||
|
|
||||||
|
A) Failure to provide on-request. service within 24 hours-
|
||||||
|
$100/trailer/incident;
|
||||||
|
|
||||||
|
B) Failure to deliver empty trailer(s) at time of scheduled haul or pickup-
|
||||||
|
$100/day/container;
|
||||||
|
|
||||||
|
C) Failure to maintain secure loads of materials, and allowing materials to
|
||||||
|
fall out or blow out of transport containers being hauled onto State, City
|
||||||
|
or County roads-8200/incident;
|
||||||
|
|
||||||
|
D) Failure to respond to and resolve complaints within a 24 hours-
|
||||||
|
$200/incident;
|
||||||
|
|
||||||
|
E) Failure to provide the agreed upon trackers, trailers and yard trucks that
|
||||||
|
impedes the Authority’s ability to manage its solid waste-$200/incident.
|
||||||
|
|
||||||
|
Force Majeure — Except for the Authority’s obligation to pay Advanced
|
||||||
|
Disposal for services rendered hereunder in accordance with the terms and
|
||||||
|
provisions of Section 7.00 hereof, the obligations of the Authority and
|
||||||
|
Advanced Disposal hereunder are subject to and excused in the event of the
|
||||||
|
occurrence any contingency beyond its reasonable control including,
|
||||||
|
without limitation, (i) strikes, riots, wars, acts of God, (ii) governmental
|
||||||
|
orders, decrees and regulations, including, without limitation, if Advanced
|
||||||
|
Disposal is for any reason delayed or barred by governmental of judicial
|
||||||
|
action with respect to the construction or operation or Advanced Disposal.
|
||||||
|
|
||||||
|
Severability — In case of any one or more of the provisions contained in this
|
||||||
|
Agreement shall, for any reason, be held to be invalid, illegal or
|
||||||
|
unenforceable in any respect or its inclusion shall result in the invalidity,
|
||||||
|
illegality or unenforceability of this Agreement, such invalidity, illegality
|
||||||
|
or unenforceability shall not affect any other provision of this Agreement
|
||||||
|
and this Agreement shall be construed as if such invalid, illegal or
|
||||||
|
unenforceable provision had never been contained herein; provided,
|
||||||
|
however, that it is the intention of the parties hereto that in lieu of each
|
||||||
|
term, clause, or provision that is held to be invalid, illegal or unenforceable,
|
||||||
|
there shall be added as part of this Agreement a term, clause or provision as
|
||||||
|
similar in terms to such invalid, illegal or unenforceable term, clause or
|
||||||
|
provision as may be possible and be valid, legal or enforceable.
|
||||||
|
|
||||||
|
10
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
10.05
|
||||||
|
|
||||||
|
10.06
|
||||||
|
|
||||||
|
10.07
|
||||||
|
|
||||||
|
10.08
|
||||||
|
|
||||||
|
10.09
|
||||||
|
|
||||||
|
Cumulative Remedies ~ All rights, remedies and powers shall be deemed
|
||||||
|
cumulative and not exclusive of any rights, remedies or powers available.
|
||||||
|
No delay or omission to exercise any right, remedy or power shall impair
|
||||||
|
such right, remedy or power or shall be construed to be a waiver or any
|
||||||
|
breach or any acquiescence therein. Any such right, remedy or power may
|
||||||
|
be exercised from time to time, independently or concurrently, and as often
|
||||||
|
as shall be deemed expedient. No single or partial exercise of any right,
|
||||||
|
remedy or power shall preclude other or further exercise thereof.
|
||||||
|
|
||||||
|
Independent Contractor; No Agency — Advanced Disposal will act
|
||||||
|
hereunder as an independent contractor and not as an agent of the
|
||||||
|
Authority. Similarly, the Authority is not an agent of Advanced Disposal or
|
||||||
|
empowered or authorized to obligate Advanced Disposal in any way.
|
||||||
|
|
||||||
|
Performance Bond or Letter of Credit — Advanced Disposal will furnish a
|
||||||
|
performance bond or Letter of Credit to the Authority in the amount of
|
||||||
|
100% of the estimated cost of three (3) months of transportation services
|
||||||
|
hereunder determined by the initial Transportation Fee as provided in
|
||||||
|
Section 7.00 hereof. With respect to any default by Advanced Disposal
|
||||||
|
hereunder, the Authority’s sole remedy with respect thereto shall be to
|
||||||
|
exercise its rights under such performance bond or Letter of Credit.
|
||||||
|
|
||||||
|
Entire Agreement — This Agreement constitutes the entire agreement and
|
||||||
|
understanding between the parties relating to the subject matter hereof and
|
||||||
|
cancels and supersedes all prior negotiations, representations, proposals,
|
||||||
|
understandings and agreements, either written or oral, relating to the
|
||||||
|
subject matter hereof. This Agreement shall not be modified, altered,
|
||||||
|
changed or amended unless in writing and signed by both parties following
|
||||||
|
the first initial calendar year and in conformance with applicable
|
||||||
|
procurement laws.
|
||||||
|
|
||||||
|
Choice of Law-This Agreement shall be interpreted and governed by the
|
||||||
|
Laws of the Commonwealth of Virginia and jurisdiction and venue for any
|
||||||
|
litigation commenced under this Agreement shall lie in the Commonwealth
|
||||||
|
of Virginia.
|
||||||
|
|
||||||
|
IN WITNESS WHEREOF, the Authority and Advanced Disposal have entered into this
|
||||||
|
Agreement (triplicate counterpart originals) on the day and year first above written.
|
||||||
|
|
||||||
|
ATTEST:
|
||||||
|
|
||||||
|
Tit
|
||||||
|
|
||||||
|
CUMBERLAND PLATE. REGIONAL
|
||||||
|
Yd, ieee ree
|
||||||
|
» EGY weed
|
||||||
|
U
|
||||||
|
|
||||||
|
ra
|
||||||
|
|
||||||
|
Drechy of laste Senuces rite, Cleon)
|
||||||
|
|
||||||
|
(SEAL)
|
||||||
|
|
||||||
|
11
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
ATTEST: ECO saepfres LLC
|
||||||
|
By: 7 By: U—
|
||||||
|
|
||||||
|
TweDeputy Genecal Consl) tite COO
|
||||||
|
Assistant Storetaxy (SEAL)
|
||||||
|
|
||||||
|
12
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
EXHIBIT A TO SOLID WASTE TRANSPORTATION AGREEMENT
|
||||||
|
|
||||||
|
Transportation Fee under Section 7.00 from the following Cumberland Plateau Transfer
|
||||||
|
Station to the ADVANCED DISPOSAL Eco Safe Landfill:
|
||||||
|
|
||||||
|
Base Price Per Ton Per Year with No CPI
|
||||||
|
|
||||||
|
Yearl Year2 Year3 Year4 YearS
|
||||||
|
|
||||||
|
Buchanan County Transfer Station $ 17.18 $ 17.61 $ 18.05 $ 1850 $ 18.96
|
||||||
|
Dickenson County Transfer Station $ 17.17 $ 17.60 $ 18.04 $ 18.49 $ 18.95
|
||||||
|
Russell County Transfer Station $ 15.08 $ 15.45 $ 15.83 $ 16.22 $ 16.62
|
||||||
|
|
||||||
|
Fuel Surcharge Per Load Per County:
|
||||||
|
|
||||||
|
Buchanan County Transfer Station: Fuel surcharge will be $3.13 for every $0.10
|
||||||
|
Diesel Fuel increases above $3.836 per gallon for
|
||||||
|
each load hauled from Buchanan County. If/when
|
||||||
|
the price of Fuel drops below $3.836 per gallon,
|
||||||
|
this fuel surcharge would work in reverse.
|
||||||
|
|
||||||
|
Dickenson County Transfer Station: Fuel surcharge will be $3.13 for every $0.10
|
||||||
|
Diesel Fuel increases above $3.836 per gallon for
|
||||||
|
each load hauled from Dickenson County.
|
||||||
|
If/when the price of Fuel drops below $3.836 per
|
||||||
|
gallon, this fuel surcharge would work in reverse.
|
||||||
|
|
||||||
|
Russell County Transfer Station: Fuel surcharge will be $1.86 for every $0.10
|
||||||
|
Diesel Fuel increases above $3.836 per gallon for
|
||||||
|
each load hauled from Russell County. If/when
|
||||||
|
the price of Fuel drops below $3.836 per gallon,
|
||||||
|
this fuel surcharge would work in reverse.
|
||||||
|
|
||||||
|
The above Transportation Fee shall be adjusted in accordance with the terms and
|
||||||
|
provision of this Agreement.
|
||||||
|
|
||||||
|
IN WITNESS WHEREOF, the Authority and Advanced Disposal have entered into this
|
||||||
|
‘Agreement (triplicate counterpart originals) on the day and year first above written,
|
||||||
|
|
||||||
|
ATTEST: CUMBERLAND PLATEAY REGIONAL
|
||||||
|
|
||||||
|
ATTEST: ECO-SAFE SYSTEMS, LLC.
|
||||||
|
|
||||||
|
13
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
py_G724 | wy. dA —
|
||||||
|
|
||||||
|
Title: DeQu| General Cavinsel Titte_ COO
|
||||||
|
Assistant Seoretary
|
||||||
|
|
||||||
|
EXHIBIT B TO SOLID WASTE TRANSPORTATION AGREEME!
|
||||||
|
Russell County
|
||||||
|
|
||||||
|
Price Range
|
||||||
|
|
||||||
|
Variance to
|
||||||
|
|
||||||
|
Base Fuel Surcharge
|
||||||
|
Start End ($3836) Miles =MPG Gallons — Per Load
|
||||||
|
|
||||||
|
$3.230 $3.330 ($0.606) 9200 5.00 18.40 $ (11.15)
|
||||||
|
$3331 $3.431—($0.505) 92.00 5.00 18.40 $ (9.29)
|
||||||
|
$3.432 $3532 ($0404) 92.00.00 18.40 $ (7.43)
|
||||||
|
$3533 $3,633 (0.303) 92.00 5.00 18.40 $ (5.58)
|
||||||
|
$3.634 —-$3.734. ($0.202) 92.00 5.00 18.40 $ (3.72)
|
||||||
|
$3.735 $3835 ($0.101) 92.00 5.00 18.40 $ (1.86)
|
||||||
|
$3.836
|
||||||
|
|
||||||
|
$3.837 $3,937 $0.101 92.00 5.00 18.40
|
||||||
|
$3.938 $4.0388 —«$0.202, 92.00 5.00 18.40
|
||||||
|
$4,039 $4139 $0.303. «92.00 5.00 18.40
|
||||||
|
$4.140 $4,240 $0.404 92.00 5.00 18.40
|
||||||
|
$4.21 $4341 $0,505 92.00 5.00 18.40
|
||||||
|
$4342 $4,442 $0.606 92.00 5.00 18.40
|
||||||
|
$4.493 $4543 $0.707 92.00 5.00 18.40
|
||||||
|
$4544 $4,644 $0.808 92.00 5.00 18.40
|
||||||
|
$4,645 $4,745 $0.909 92.00 5.00 18.40
|
||||||
|
|
||||||
|
$ 1.86
|
||||||
|
$
|
||||||
|
$
|
||||||
|
$
|
||||||
|
$
|
||||||
|
$
|
||||||
|
$
|
||||||
|
$
|
||||||
|
$
|
||||||
|
$4.746 $4,846 $1.010 92.00 5.00 18.40 $ 18.58
|
||||||
|
$
|
||||||
|
$
|
||||||
|
$
|
||||||
|
$
|
||||||
|
$
|
||||||
|
$
|
||||||
|
$
|
||||||
|
$
|
||||||
|
$
|
||||||
|
$
|
||||||
|
|
||||||
|
3.72
|
||||||
|
5.58
|
||||||
|
7.43
|
||||||
|
9.29
|
||||||
|
11.15
|
||||||
|
13.01
|
||||||
|
14.87
|
||||||
|
|
||||||
|
$4,847 $4,947 $1111 92.00 5.00 18.40
|
||||||
|
$4948 $5.048 $1212 92.00 5.00 18.40
|
||||||
|
$5.049 $5.149 $1313 92.00 5.00 18.40
|
||||||
|
$5.150 $5,250 $2.414 9200 5.00 18.40
|
||||||
|
$5.251 $5,351 $1515 92.00 5.00 18.40
|
||||||
|
$5.352 $5.452 $1616 92.00 5.00 18.40
|
||||||
|
$5.453 $5553 $1717 92.00 5.00 18.40
|
||||||
|
$5,554 $5.654 $1.818 92.00 5.00 18.40
|
||||||
|
$5.655 $5,755 $1919 92.00 5.00 18.40
|
||||||
|
$5.756 $5.856 $2.020 92.00 5.00 18.40
|
||||||
|
|
||||||
|
14
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Buchanan County
|
||||||
|
|
||||||
|
Price Range
|
||||||
|
Variance to
|
||||||
|
|
||||||
|
Base Fuel Surcharge
|
||||||
|
Start End ($3.836) Miles MPG _ Gallons —Per Load
|
||||||
|
$3.230 $3.330 ($0.606) 155.00 5.00 31.00 $ (18.79)
|
||||||
|
$3.331 $3431 (0.505) 155.00 5.00 31.00 $ (15.66)
|
||||||
|
$3.432 $3,532 ($0.404) 155.00 5.00 31.00 $ (12.52)
|
||||||
|
$3,533 $3,633 ($0.303) 155.00 5.00 31.00 $ (9.39)
|
||||||
|
$3.634 $3,734 ($0.202) 155.00 5.00 31.00 $ (6.26)
|
||||||
|
$3.735 $3,835 ($0.101) 155.00 5.00 31.00 $ (3.13)
|
||||||
|
$3.836
|
||||||
|
$3.837 $3.937 $0.101 155.00 5.00 31.00 $ 3.13
|
||||||
|
$3.938 $4,038 $0.202, 155.00 5.00 31.00 $ 6.26
|
||||||
|
$4.039 $4,139 $0.303 155.00 5.00 31.00 $ 9.39
|
||||||
|
$4140 $4,240 $0.404 «155.00 5.00 31.00 $ 12.52
|
||||||
|
$4.241 $4,341 —-$0.505 155.00 5.00 31.00 $ 15.66
|
||||||
|
$4.342 $4,442 $0.606 155.00 5.00 31.00 $ 18.79
|
||||||
|
$4.443 $4,543 $0.707 155.00 5.00 31.00 $ 21.92
|
||||||
|
$4.544 $4,644 $0.808 155.00 5.00 31.00 $ 25.05
|
||||||
|
$4.645 $4,745 $0.909 155.00 5.00 31.00 $ 28.18
|
||||||
|
$4.746 $4,846 $1.010 155.00 5.00 31.00 $ 31.31
|
||||||
|
$4847 $4,947 $1.11 155.00 5.00 31.00 $ 34.44
|
||||||
|
$4.948 $5,048 $1.212 155.00 5.00 31.00 $ 37.57
|
||||||
|
$5,049 $5,149 $1,313 155.00 5.00 31.00 $ 40.70
|
||||||
|
$5.150 $5.250 $1.414 155.00 5.00 31.00 $ 43.83
|
||||||
|
$5.251 $5,351 $1.515 155.00 5.00 31.00 $ 46.97
|
||||||
|
$5,352 $5.452 $1616 155.00 5.00 31.00 $ 50.10
|
||||||
|
$5.453 $5,553 $1.717 155.00 5.00 31.00 $ 53.23
|
||||||
|
$5.554 $5,654 $1.818 155.00 5.00 31.00 $ 56.36
|
||||||
|
$5.655 $5,755 $1.919 155.00 5.00 31.00 $ 59.49
|
||||||
|
$5,756 $5.856 $2.020 155.00 5.00 31.00 $ 62.62
|
||||||
|
|
||||||
|
15
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Dickenson County
|
||||||
|
|
||||||
|
Price Range
|
||||||
|
Variance to
|
||||||
|
|
||||||
|
Base Fuel Surcharge
|
||||||
|
Start End ($3.836) Miles. =MPG Gallons —_—Per Load
|
||||||
|
$3.230 $3,330 ——($0.606) 155.00 5.00 31.00 $ (18.79)
|
||||||
|
$3.331 $3431 ($0.505) 155.00 5.00 3100 $ (15.66)
|
||||||
|
$3432 $3.532 ($0.404) 155.00 5.00 31.00 $ (12.52)
|
||||||
|
$3.533 $3633 ($0.303) 155.00 5.00 3100 $ (9.39)
|
||||||
|
$3.634 $3,734 ($0.202) 155.00 5.00 31.00 $ (6.26)
|
||||||
|
$3,735 $3.835 ($0.101) 155.00 © 5.00 31.00 $ (3.13)
|
||||||
|
$3.836
|
||||||
|
$3837 $3,937 $0.101 155.00 5.00 31.00 $ 3.13
|
||||||
|
$3.938 $4,038 —$0.202 155.00 5.00 31.00 $ 6.26
|
||||||
|
$4,039 $4.139 © $0.303 «155.00 5.00 31.00 $ 9.39
|
||||||
|
$4,140 $4.240 $0.404 «155.00 5.00 31.00 $ 12.52
|
||||||
|
$4.241 $4341 $0.505 155.00 5.00 31.00 $ 15.66
|
||||||
|
$4,342 $4,442 $0.606 155.00 5.00 31.00 $ 18.79
|
||||||
|
$4,443 $4.543 ‘$0.707 155.00 5.00 3100 $ 21.92
|
||||||
|
$4,544 $4,644 $0.808 155.00 5.00 31.00 $ 25.05
|
||||||
|
$4.645 $4.745, $0.909 155.00 5.00 3100 $ 28.18
|
||||||
|
$4.746 $4,846 $1.010 155.00 5.00 3100 $ 31.31
|
||||||
|
$4,847 $4.947 $1111 155.00 5.00 3100 $ (34.44
|
||||||
|
$4,948 $5.048 $1.212 155.00 5.00 3100 $ 37.57
|
||||||
|
$5.049 $5,149 $1.313 155.00 5.00 3100 $ 40.70
|
||||||
|
$5.150 _ $5.250 $1.414 155.00 5.00 31.00 $ 43.83
|
||||||
|
$5,251 $5.351 $1515 155.00 5.00 3100 $ 46.97
|
||||||
|
95.352 $5.452 $1.616 155.00 5.00 31.00 $ 50.10
|
||||||
|
$5.453 $5.553 $1.717 155.00 5.00 3100 $ 53.23
|
||||||
|
$5.554 —$5.654 $1.818 155.00 5.00 31.00 $ 56.36
|
||||||
|
$5.655 $5,755 $1919 155.00 5.00 31.00 $ 59.49
|
||||||
|
$5.756 $5.856 $2.020 155.00 5.00 31.00 $ 62.62
|
||||||
|
|
||||||
|
16
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,251 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: 2017 Transpotation extension
|
||||||
|
file: ../2017 Transpotation extension.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Cumberland_Waste_FOIA_May_2024
|
||||||
|
- Transportation Contracts
|
||||||
|
- '2017'
|
||||||
|
docDate: '2017'
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 230564
|
||||||
|
sha256sum: 9c6540802c64315f5c09e8144f8d355ccac533e6b2069385ae51e4c5bb2d26a8
|
||||||
|
sha1sum: 9c5724158f406657c4d8f1ee2d79c8497b7d41f1
|
||||||
|
---
|
||||||
|
|
||||||
|
AMENDMENT TO
|
||||||
|
SOLID WASTE TRANSPORTATION AGREEMENT
|
||||||
|
|
||||||
|
This Amendment to that certain Solid Waste Transportation Agreement (this “Amendment”) is
|
||||||
|
made as of this 14" day of December 2017 (“Effective Date") by and between Eco-Safe Systems, LLC, a
|
||||||
|
Tennessee limited liability company (hereinafter “Advanced Disposal”), and Cumberland Plateau
|
||||||
|
Regional Waste Management Authority, an authority created under the provisions of the Virginia Water
|
||||||
|
and Sewer Authorities Act (hereinafter called the “Authority”).
|
||||||
|
|
||||||
|
WITNESSETH:
|
||||||
|
|
||||||
|
WHEREAS, the parties entered into that certain Solid Waste Transportation Agreement dated
|
||||||
|
‘Axugust 22, 2013 (the “Agreement”);
|
||||||
|
|
||||||
|
WHEREAS, the parties have agreed to renew the Agreement and execute and deliver this
|
||||||
|
Amendment;
|
||||||
|
|
||||||
|
WHEREAS, in connection with such renewal of the term of the Agreement, the parties wish to
|
||||||
|
amend the Agreement on the terms and conditions as hereinafter set forth.
|
||||||
|
|
||||||
|
NOW, THEREFORE, in consideration of the mutual grants and covenants contained herein, and
|
||||||
|
for other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged,
|
||||||
|
the parties hereto agree as follows:
|
||||||
|
|
||||||
|
Section 1. Defined Terms. All capitalized terms used herein and not otherwise defined herein
|
||||||
|
shall have the respective meanings ascribed thereto in the Agreement.
|
||||||
|
|
||||||
|
Section 2. Amendments, This Amendment shall be deemed to be an amendment to the
|
||||||
|
Agreement and shall not be construed in any way as 1 replacement or substitution therefor. All of the
|
||||||
|
terms and provisions of this Amendment are hereby incorporated into the Agreement as if such terms and
|
||||||
|
provisions were set forth therein in full. Subject to the foregoing and to the terms hereof, Advanced
|
||||||
|
Disposal and the Authority hereby agres that the Agreement is hereby amended as follows:
|
||||||
|
|
||||||
|
(a) The term of the Agreement shall be renewed as of October 27,
|
||||||
|
2018 for an additional term of five years.
|
||||||
|
|
||||||
|
(b) The rates charged by Advanced Disposal and paid by the
|
||||||
|
Authority during the Renewal Term are as set forth below:
|
||||||
|
|
||||||
|
(Rate § Per Ton):
|
||||||
|
|
||||||
|
Ts Year Year? Years Year? Year 10
|
||||||
|
Buchanan $17.50 x $18.57 $19.12 $19.70
|
||||||
|
Dickenson $17.31 $18.36 $18.91 $19.48
|
||||||
|
Russell $15.67 $16.62 $17.12 $17.64
|
||||||
|
|
||||||
|
(©) As of the Effective Date of this Amendment the Fuel Surcharge
|
||||||
|
as set forth in Exhibit A of the Agreement shall be amended in
|
||||||
|
ppart to reduce the base rate of $3.836 per gallon to $3.13 per
|
||||||
|
gallon and to eliminate any fuel credit adjustment.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
(@) As of the Effective Date of this Amendment Exhibit B of the
|
||||||
|
Agreement shall be amended consistent with the amendments set
|
||||||
|
|
||||||
|
(©) As of the Effective Date of this Amendment the Fuel Surcharge
|
||||||
|
shall be recalculated for each billing period, based on the
|
||||||
|
average national on-highway diesel prices during the applicable
|
||||||
|
period for the Midwest (PADD2) region as published by the
|
||||||
|
|
||||||
|
United States Energy Information Administration available at:
|
||||||
|
cll i f i
|
||||||
|
|
||||||
|
Section 3. Reference to and Effect upon the Existing Agreement.
|
||||||
|
|
||||||
|
(i) Effectiveness: Recitals. This Amendment shall be effective as of the date set
|
||||||
|
forth above. Upon the effectiveness of this each reference in the Agreement to “this
|
||||||
|
Agrsement”, this “Contract”, “hereunder”, “hereof”, “herein”, or words of like import, and each reference
|
||||||
|
|
||||||
|
amended hereby. The partics agree that the “whereas” recitals set forth above are true and correct and are
|
||||||
|
hereby incorporated into this Amendment by reference.
|
||||||
|
|
||||||
|
(i) Authority. Each party represents and warrants to the other party that (i) this
|
||||||
|
‘Amendment has been duly and validly authorized, executed and delivered by it, and isa valid and binding
|
||||||
|
Agreement enforceable against it accordance with its terms; (i) the persons executing this Amendment on
|
||||||
|
behalf ofthe applicable party has been authorized and empowered to do S0; (i) each party has full power
|
||||||
|
and authority to enter into and perform this Amendment in accordance with its terms. The partes
|
||||||
|
Helaiowledge and agree that this Amendment shall inure to the benefit of and be enforceable by the parties
|
||||||
|
hereto.
|
||||||
|
|
||||||
|
Ratification and Confirmation Generally. Except as specifically amended above,
|
||||||
|
the Agreement shall remain in full force and effect and all of its respective terms and conditions arc
|
||||||
|
hereby ratified and confirmed.
|
||||||
|
|
||||||
|
Section4. Governing Law. This Amendment shall be governed by and construed in
|
||||||
|
‘accordance with the laws of the State of Virginia.
|
||||||
|
|
||||||
|
Section 5. Counterparts. This Amendment may be executed in any number of separate
|
||||||
|
Counterparts, each of which when so executed and delivered shall be deemed to be an original and all of
|
||||||
|
which taken together shall constitute one and the same instrument.
|
||||||
|
|
||||||
|
Section. Headings. Section headings in this Amendment are included herein for
|
||||||
|
convenience of reference only and shell not constitute @ part of this Amendment for any other purpose.
|
||||||
|
|
||||||
|
Section 7. Suceessors_and Assigns. This Amendment shall be binding upon Advanced
|
||||||
|
Disposal and the Authority and their respective successors and assigns.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
JN WITNESS WHEREOF, the parties herto have caused thi Amendment to be executed by
|
||||||
|
Topresentatives as of the date first above written.
|
||||||
|
|
||||||
|
ECO-SAFE SYSTEMS, LLC
|
||||||
|
ot Justin Rodda
|
||||||
|
RVP: Guy Thompson
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
AMENDMENT TO
|
||||||
|
SOLID WASTE TRANSPORTATION AGREEMENT
|
||||||
|
|
||||||
|
‘This Amendment to that certain Solid Waste Transportation Agreement (this “Amendment”) is
|
||||||
|
made as of this 14° day of December 2017 (“Effective Date”) by and between Eco-Safe Systems, LLC, a
|
||||||
|
Tennessee limited liability company (hereinafter “Advanced Disposal”), and Cumberland Plateau
|
||||||
|
Regional Waste Management Authority, an authority created under the provisions of the Virginia Water
|
||||||
|
and Sewer Authorities Act (hereinafter called the “Authority”).
|
||||||
|
|
||||||
|
WITNESSETH:
|
||||||
|
|
||||||
|
WHEREAS, the parties entered into that certain Solid Waste Transportation Agreement dated
|
||||||
|
August 22, 2013 (the “Agreement”);
|
||||||
|
|
||||||
|
WHEREAS, the parties have agreed to renew the Agreement and execute and deliver this
|
||||||
|
Amendment;
|
||||||
|
|
||||||
|
WHEREAS, in connection with such renewal of the term of the Agreement, the parties wish to
|
||||||
|
amend the Agreement on the terms and conditions as hereinafter set forth.
|
||||||
|
|
||||||
|
NOW, THEREFORE, in consideration of the mutual grants and covenants contained herein, and
|
||||||
|
for other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged,
|
||||||
|
the parties hereto agree as follows:
|
||||||
|
|
||||||
|
Section 1. Defined Terms. All capitalized terms used herein and not otherwise defined herein
|
||||||
|
shall have the respective meanings ascribed thereto in the Agreement.
|
||||||
|
|
||||||
|
Section 2. Amendments. This Amendment shall be deemed to be an amendment to the
|
||||||
|
Agreement and shall not be construed in any way as a replacement or substitution therefor. All of the
|
||||||
|
terms and provisions of this Amendment are hereby incorporated into the Agreement as if such terms and
|
||||||
|
provisions were set forth therein in full. Subject to the foregoing and to the terms hereof, Advanced
|
||||||
|
Disposal and the Authority hereby agree that the Agreement is hereby amended as follows:
|
||||||
|
|
||||||
|
(a) The term of the Agreement shall be renewed as of October 27,
|
||||||
|
2018 for an additional term of five years.
|
||||||
|
|
||||||
|
(b) The rates charged by Advanced Disposal and paid by the
|
||||||
|
Authority during the Renewal Term are as set forth below:
|
||||||
|
|
||||||
|
(Rate $ Per Ton):
|
||||||
|
|
||||||
|
TS Year 6 Ye Year & Year9 Year 10
|
||||||
|
Buchanan $17.50 $18.03 $18.57 $19.12 $19.70
|
||||||
|
Dickenson $17.31 $17.83 $18.36 $18.91 $19.48
|
||||||
|
Russell $15.67 $16.14 $16.62 Si7.12 $17.64
|
||||||
|
|
||||||
|
(©) As of the Effective Date of this Amendment the Fuel Surcharge
|
||||||
|
as set forth in Exhibit A of the Agreement shall be amended in
|
||||||
|
part to reduce the base rate of $3.836 per gallon to $3.13 per
|
||||||
|
gallon and to eliminate any fuel credit adjustment.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
(@) As of the Effective Date of this Amendment Exhibit B of the
|
||||||
|
‘Agreement shall be amended consistent with the amendments set
|
||||||
|
forth in (c) above.
|
||||||
|
|
||||||
|
(e) As of the Effective Date of this Amendment the Fuel Surcharge
|
||||||
|
shall be recalculated for each billing period, based on the
|
||||||
|
average national on-highway diesel prices during the applicable
|
||||||
|
period for the Midwest (PADD2) region as published by the
|
||||||
|
United States Energy Information Administration available at:
|
||||||
|
|
||||||
|
hutp:/www.eia.gow/petroleunvgasdiesel,
|
||||||
|
Section 3. Reference to and Effect upon the Existing Agreement.
|
||||||
|
|
||||||
|
(i) Effectiveness: Recitals. This Amendment shall be effective as of the date set
|
||||||
|
forth above. Upon the effectiveness of this Amendment, each reference in the Agreement to “this
|
||||||
|
Agreement”, this “Contract”, “hereunder”, “hereof”, “herein”, or words of like import, and each reference
|
||||||
|
to the Agreement in any other related document shall mean and be a reference to the Agreement as
|
||||||
|
amended hereby. The parties agree that the “whereas” recitals set forth above are true and correct and are
|
||||||
|
hereby incorporated into this Amendment by reference.
|
||||||
|
|
||||||
|
(ii) Authority. Each party represents and warrants to the other party that (i) this
|
||||||
|
Amendment has been duly and validly authorized, executed and delivered by it, and is a valid and binding
|
||||||
|
agreement enforceable against it accordance with its terms; (ii) the persons executing this Amendment on
|
||||||
|
behalf of the applicable party has been authorized and empowered to do so; (iii) each party has full power
|
||||||
|
and authority to enter into and perform this Amendment in accordance with its terms. The parties
|
||||||
|
acknowledge and agree that this Amendment shall inure to the benefit of and be enforceable by the parties
|
||||||
|
hereto.
|
||||||
|
|
||||||
|
iii) Ratification and Confirmation Generally. Except as specifically amended above,
|
||||||
|
the Agreement shall remain in full force and effect and all of its respective terms and conditions are
|
||||||
|
hereby ratified and confirmed.
|
||||||
|
|
||||||
|
Section 4. Governing Law. This Amendment shall be governed by and construed in
|
||||||
|
accordance with the laws of the State of Virginia.
|
||||||
|
|
||||||
|
Section 5. _ Counterparts. This Amendment may be executed in any number of separate
|
||||||
|
counterparts, each of which when so executed and delivered shall be deemed to be an original and all of
|
||||||
|
which taken together shall constitute one and the same instrument,
|
||||||
|
|
||||||
|
Section6. Headings. Section headings in this Amendment are included herein for
|
||||||
|
convenience of reference only and shall not constitute a part of this Amendment for any other purpose.
|
||||||
|
|
||||||
|
Section 7. Successors and Assigns. This Amendment shall be binding upon Advanced
|
||||||
|
Disposal and the Authority and their respective successors and assigns.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
IN WITNESS WHEREOF, the parties hereto have caused this Amendment to be executed by
|
||||||
|
their duly authorized representatives as of the date first above written.
|
||||||
|
|
||||||
|
ECO-SAFE SYSTEMS, LLC
|
||||||
|
|
||||||
|
By:
|
||||||
|
|
||||||
|
Its
|
||||||
|
|
||||||
|
CUMBERLAND PLATEAU REGIONAL. WASTE
|
||||||
|
|
||||||
|
MANAGEMENT AUTHORITY
|
||||||
|
By: a
|
||||||
|
Its
|
||||||
|
\
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,621 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: 2023 Transportation contract
|
||||||
|
file: ../2023 Transportation contract.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Cumberland_Waste_FOIA_May_2024
|
||||||
|
- Transportation Contracts
|
||||||
|
- '2023'
|
||||||
|
docDate: '2023'
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 536827
|
||||||
|
sha256sum: 56813bc69abc16802b8007f2adbda95fbb48218fe4f39fa6badae1648cec091f
|
||||||
|
sha1sum: 388854c13d9d077546027ec93c4c8efaf5b4d3b6
|
||||||
|
---
|
||||||
|
|
||||||
|
Ot Sey
|
||||||
|
|
||||||
|
SOLID WASTE TRANSPORTATION CONTRACT
|
||||||
|
|
||||||
|
74
|
||||||
|
THIS AGREEMENT is made and entered into this the 7 day of te
|
||||||
|
2023, by and between the CUMBERLAND PLATEAU REGIONAL WASTE
|
||||||
|
MANAGEMENT AUTHORITY, an authority created under the provisions of the
|
||||||
|
Virginia Water and Sewer Authorities Act, (hereinafter called “Authority”) and
|
||||||
|
|
||||||
|
CUSTOM ECOLOGY, INC., a Delaware corporation, authorized to conduct business in
|
||||||
|
Virginia (hereinafter called “CEI”).
|
||||||
|
|
||||||
|
WHEREAS, the Authority desires to engage an independent contractor to provide
|
||||||
|
professional services of operating a solid waste transportation system for transportation
|
||||||
|
of all of the solid waste generated within the Authority’s region and delivered to the
|
||||||
|
Authority’s three (3) solid waste transfer stations and such other sites as may be
|
||||||
|
designated and operated by the Authority to the Eco-Safe Sanitary Landfill (Eco-Safe
|
||||||
|
Systems, LLC, a subsidiary of Waste Management, Inc.) for disposal, and has found that
|
||||||
|
it is exempt from obtaining competitive sealed bids and has issued a Request for Proposal
|
||||||
|
for Provision of Solid Waste Transportation Services date April 27, 2023 for a Contract
|
||||||
|
Date of October 27, 2023 (The “RFP”) for competitive negotiation;
|
||||||
|
|
||||||
|
WHEREAS, CEI desires to provide such transportation services for the Authority and has
|
||||||
|
submitted its Proposal in response to the RFP.
|
||||||
|
|
||||||
|
WHEREAS, the Authority has selected CE! and desires to engage CEI to perform such
|
||||||
|
transportation services all in accordance with and subject to the terms and conditions of
|
||||||
|
this Contract,
|
||||||
|
|
||||||
|
NOW, THEREFORE, in consideration of the premises and the following mutual
|
||||||
|
agreements and covenants, the Authority and CEI, each intending to be legally bound,
|
||||||
|
agree as follows:
|
||||||
|
|
||||||
|
1,00 DEFINITIONS
|
||||||
|
|
||||||
|
1.01 Eco-Safe Sanitary Landfill - The Authority's designated sanitary landfill will be
|
||||||
|
Eco-Safe Solid Waste disposal facility located in Sullivan County, Tennessee.
|
||||||
|
|
||||||
|
1.02 Cumberland Plateau Region - The geographic area comprised of all of the
|
||||||
|
incorporated and unincorporated areas within each of the Counties which is a Member of
|
||||||
|
the Authority, and any County in the State of Virginia adjacent to (having a common
|
||||||
|
boundary with) any Member that may enter into an agreement with the Authority after
|
||||||
|
the date hereof relating to such adjacent County’s use of the Cumberland Plateau
|
||||||
|
Transfer Stations,
|
||||||
|
|
||||||
|
1,03 Cumberland Plateau Solid Waste — Any Solid Waste as defined herein generated
|
||||||
|
within the Cumberland Plateau Region.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
1.04 Cumberland Plateau Special Waste ~ Any Special Waste as defined herein
|
||||||
|
generated within the Cumberland Plateau Region.
|
||||||
|
|
||||||
|
1.05 Cumberland Plateau Transfer Stations — The three (3) Solid Waste transfer
|
||||||
|
stations or other stations or sites operated by the Authority and located in the Cumberland
|
||||||
|
Plateau Region Counties of Dickenson, Buchanan, and Russell for acceptance, transfer,
|
||||||
|
transportation, and unloading of Cumberland Plateau Solid Waste to the Eco-Safe
|
||||||
|
Sanitary Landfill in accordance with the terms and provisions of this Agreement, or such
|
||||||
|
other sanitary landfill as may be designated by the Authority. Should the Authority
|
||||||
|
designate another landfill, the parties shall re-negotiate the transportation costs.
|
||||||
|
|
||||||
|
1.06 Governmental Approvals — All permits, licenses and approvals required for the
|
||||||
|
transportation to and/or disposal of Cumberland Plateau Solid Waste at the Eco-Safe
|
||||||
|
Sanitary Landfill.
|
||||||
|
|
||||||
|
1.07 _ Hazardous Waste — Any chemical, compound, mixture, substance or article which
|
||||||
|
is designated by the United States Environmental Protection Agency or by any State
|
||||||
|
having jurisdiction to be “hazardous” as that term is defined by or pursuant to federal or
|
||||||
|
state law.
|
||||||
|
|
||||||
|
1,08 Members — The Counties of Russell, Buchanan and Dickenson, Virginia.
|
||||||
|
|
||||||
|
1,09 Non-Conforming Wastes ~ Any waste excluded from the definition of Solid
|
||||||
|
Waste as provided in Section 1.12 and any Special Waste which has not been approved
|
||||||
|
by Eco-Safe and, if required, by any governmental agency having jurisdiction.
|
||||||
|
|
||||||
|
1.10 Service Commencement Date — October 27, 2023.
|
||||||
|
|
||||||
|
1.11 Solid Waste - Any garbage, trash, rubbish, brush and other waste material
|
||||||
|
allowed under the Governmental Approvals issued for the operation of the Advanced
|
||||||
|
Disposal Eco Safe Systems Sanitary Landfill to be disposed of at the Eco-Safe Sanitary
|
||||||
|
Landfill but excluding (a) any Hazardous Waste, (b) asbestos and (c) any other material
|
||||||
|
not allowed under any of the Governmental Approvals issued with respect to the
|
||||||
|
operation of the Eco-Safe Sanitary Landfill or pursuant to applicable laws and
|
||||||
|
regulations.
|
||||||
|
|
||||||
|
1.12 Special Waste — Any Solid Waste which requires special processing, handling or
|
||||||
|
disposal techniques which are different from the techniques normally utilized for
|
||||||
|
handling or disposal or contains an added element of expense to transport or dispose of as
|
||||||
|
determined by Eco-Safe Systems, LLC or requires approval from any State agency and/or
|
||||||
|
Eco-Safe Systems, LLC. Examples of such Special Waste types may include, but are not
|
||||||
|
limited to: fly ash, combustion ash, sludge, drilling fluids and drill cuttings, asbestos,
|
||||||
|
industrial wastes, liquid wastes, infectious wastes and residue, pollution control residue,
|
||||||
|
debris or contaminated soil and water from the cleanup of a spill.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
1.13 Transportation Fee ~The amount set forth in Section 7.00 hereof, as adjusted,
|
||||||
|
charges by CEI for the performance of transportation services hereunder.
|
||||||
|
|
||||||
|
1.14 Ton -2,000 pounds,
|
||||||
|
|
||||||
|
2.00 SCOPE OF SERVICES
|
||||||
|
|
||||||
|
Subject to the terms and conditions hereof and the performance of the Authority's
|
||||||
|
agreements and duties hereunder, CEI shall furnish all labor and at least five (5) tractors,
|
||||||
|
twelve (12) trailers, three (3) yard tractors and/or all equipment or material necessary to
|
||||||
|
provide Cumberland Plateau Solid Waste Transportation services from such three (3)
|
||||||
|
Cumberland Plateau Transfer Stations to the Eco-Safe Sanitary Landfill from and after
|
||||||
|
the Service Commencement Date in accordance with and subject to the terms and
|
||||||
|
conditions of this Agreement. CE] will not have a minimum tonnage on the amount of
|
||||||
|
waste placed into each of the transport trailers hauling from the three (3) Cumberland
|
||||||
|
Plateau Transfer Stations to the Eco-Safe Sanitary Landfill, however it is understood that
|
||||||
|
the Authority will maximize load volumes within legal limits in order to ensure
|
||||||
|
efficiencies in transportation systems nor will a charge be placed on the Authority for not
|
||||||
|
meeting a minimum tonnage. The Authority agrees to not load more waste into the
|
||||||
|
transport trailers than the allowable by the Federal Department of Transportation and
|
||||||
|
State Department of Transportation.
|
||||||
|
|
||||||
|
3.00 CUMBERLAND PLATEAU SOLID WASTE TRANSPORTATION SERVICES
|
||||||
|
|
||||||
|
3.01 Acceptance and Loading of Solid Waste; Load Limits - The Authority will accept
|
||||||
|
all Cumberland Plateau Solid Waste delivered to the Cumberland Plateau Transfer
|
||||||
|
Stations. The Authority shall not accept any Non-Conforming Wastes at the Cumberland
|
||||||
|
Plateau Transfer Stations. The Authority will promptly load, all Solid Wastes accepted at
|
||||||
|
the Cumberland Plateau Transfer Stations into CEI collection trailers for transportation to
|
||||||
|
and unloading of waste into the Eco-Safe Sanitary Landfill. The Authority will use its
|
||||||
|
best reasonable business efforts to load each collection trailer to its maximum legal
|
||||||
|
capacity per load or such lesser weight per load as is mutually acceptable to both parties
|
||||||
|
subject in all events to any maximum vehicle weight limits imposed by applicable law.
|
||||||
|
Under this agreement, CEI will not impose a minimum capacity per load upon the
|
||||||
|
Authority.
|
||||||
|
|
||||||
|
3.02 Compliance — The Authority will conduct operations with respect to each of the
|
||||||
|
Cumberland Plateau Transfer Stations in accordance with all applicable federal and state
|
||||||
|
laws, rules and regulations, and the terms and conditions of all permits, licenses and
|
||||||
|
approvals issued for the operation of the Cumberland Plateau Transfer Stations.
|
||||||
|
|
||||||
|
3.03 Inspection ~ The Authority may, on a reasonable basis as the Authority deems
|
||||||
|
necessary, make inspections of the CEI records during normal business hours, however,
|
||||||
|
such inspections shall be made only by authorized employees or agents of the Authority.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
3.04 Transportation — From and after the Service Commencement Date, CEI shall
|
||||||
|
transport all Cumberland Plateau Solid Waste and Cumberland Plateau Special Waste
|
||||||
|
(approved for disposal by Eco-Safe Sanitary Landfill pursuant to Section 1.12 hereof)
|
||||||
|
accepted at each of the Cumberland Plateau Transfer Stations, directly to the Eco-Safe
|
||||||
|
Sanitary Landfill as agreed upon in the RFP.
|
||||||
|
|
||||||
|
3.05 Use of Cumberland Plateau Transfer Stations and Eco-Safe Sanitary Landfill —
|
||||||
|
The Authority will use the Eco-Safe Sanitary Landfill, directly or via Cumberland
|
||||||
|
Plateau Transfer Stations, for disposal of all Cumberland Plateau Solid Waste and such
|
||||||
|
|
||||||
|
“approved Cumberland Plateau Special Waste delivered to the Cumberland Plateau
|
||||||
|
|
||||||
|
Transfer Stations from and after the Service Commencement Date in accordance with the
|
||||||
|
terms and provisions of the Authority and Eco-Safe/Waste Management Solid Waste
|
||||||
|
Disposal Agreement, as amended, between the Authority and Eco-Safe Systems, LLC. In
|
||||||
|
the event that the Eco-Safe Sanitary Landfill becomes unavailable for the disposal of
|
||||||
|
Cumberland Plateau Solid Waste during the term of this Agreement, the Authority (or its
|
||||||
|
subcontractor, if applicable) will negotiate with CEI with respect to any necessary
|
||||||
|
adjustment to the Transportation Fee to reflect any increased or decreased costs of
|
||||||
|
transportation as a result of such Eco-Safe Sanitary Landfill becoming unavailable. The
|
||||||
|
Authority will also use its best efforts to enter into Agreements with each Member, each
|
||||||
|
muni lity located within the limits of each Member and each generator and
|
||||||
|
commercial hauler of any Cumberland Plateau Special Waste (approved for disposal by
|
||||||
|
Eco-Safe Systems, LLC pursuant to Section 1.12 hereof) for their use of the Cumberland
|
||||||
|
Plateau Transfer Stations for the disposal of all Cumberland Plateau Solid Waste and
|
||||||
|
Cumberland Plateau Special Waste collected and/or generated by such Member,
|
||||||
|
municipality, generator or commercial hauler from and after the Service Commencement
|
||||||
|
Date and throughout the initial and any and all renewal terms of this Agreement (the ‘Use
|
||||||
|
Agreements”). It is contemplated that pursuant to the Use Agreements such Members and
|
||||||
|
municipalities would agree, among other things, to continue or implement waste
|
||||||
|
collection systems or take such other action allowed by applicable law to utilize the
|
||||||
|
Authority and its Cumberland Plateau Transfer Stations for all Cumberland Plateau
|
||||||
|
Special Waste generated within the jurisdiction of the Members and such municipalities.
|
||||||
|
|
||||||
|
3.06 Transportation Operations and Holidays — The following shall be holidays for
|
||||||
|
purposes of this Agreement:
|
||||||
|
|
||||||
|
Hours of Operation-Any time restrictions shall be affected only upon the mutual
|
||||||
|
agreement of the Authority’s Executive Director and CEI owner or agent.
|
||||||
|
Holidays- CEI shall specify holidays to be observed subject to the Authority’s
|
||||||
|
personnel’s approval. The following Holiday’s are observed by the Authority and it
|
||||||
|
landfill- New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgi
|
||||||
|
Day and Christmas Day.
|
||||||
|
|
||||||
|
Office- CEI shall maintain an office or such other facilities through which it can be
|
||||||
|
contacted. It shall be equipped with sufficient telephones and shall have a responsible
|
||||||
|
person in charge from 8:00 a.m. to 5:00 p.m. Monday through Friday/on regular
|
||||||
|
collection days to handle complaints as needed.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
The Authority or its member counties may decide to observe any or all of the above-
|
||||||
|
mentioned holidays by suspension of transportation services on the holiday. The
|
||||||
|
Authority or its member counties will give CEI advance notice of the Authority’s or Eco-
|
||||||
|
Safe’s observance of any holiday and the Authority may also suspend its transfer station
|
||||||
|
operations on such observed holiday.
|
||||||
|
|
||||||
|
Service Delivery- If CEI is unable to perform the duties under this agreement, the
|
||||||
|
Authority’s personnel has the right and privilege to secure another service provider and
|
||||||
|
CEI will be responsible for any additional costs incurred.
|
||||||
|
|
||||||
|
3.07 Title - Title to, and liability for, Solid Waste transported by CEI shall pass to CEI
|
||||||
|
immediately upon CEI’s acceptance of same. Acceptance by CEI shall be defined as the
|
||||||
|
loading of the Solid Waste into CEI’s hauling trailers by the Authority. Title to and
|
||||||
|
liability for the Solid Waste under this Agreement shall remain with CEI until they
|
||||||
|
deliver same, and it is accepted by, Eco-Safe under their Disposal Contract with the
|
||||||
|
Authority. Title to and liability for Non Conforming Wastes shall remain with the
|
||||||
|
Authority and shall never pass to CEI or Eco-Safe sanitary landfill.
|
||||||
|
|
||||||
|
3.08 Special Waste — Where requested by the Authority or Eco-Safe landfill, the
|
||||||
|
Authority shall assist CEI or its landfill in identifying each generator of Cumberland
|
||||||
|
Plateau Special Waste and shall also require each generator of Cumberland Plateau
|
||||||
|
Special Waste, in addition to any label, marking, manifest or other such documentation
|
||||||
|
required by any applicable law, regulation or permit, to provide the Authority and Eci-
|
||||||
|
Safe’s landfill, in advance of any shipment of Special Waste, a representative sample of
|
||||||
|
the Special Waste to be transported (if applicable) and disposed of by the Authority’s
|
||||||
|
Landfill, and a detailed written physical and chemical description or analysis of the
|
||||||
|
Special Waste including, without limitation, a listing of unique characteristics
|
||||||
|
significance to the handling of such Special Waste (“Waste Characterization Date Sheet”
|
||||||
|
or “WCDS"), The Authority shall promptly furnish to CEI and its landfill any
|
||||||
|
information regarding known, suspected or planned changes in composition of any such
|
||||||
|
Special Waste and the Authority shall accordingly update the WCDS. The Authority
|
||||||
|
warrants that all Special Waste specified in a WCDS and accepted at any Cumberland
|
||||||
|
Plateau Transfer Station shall conform to the description set forth on the WCDS, Such
|
||||||
|
Special Waste shall not be received at the Cumberland Plateau Transfer Stations or
|
||||||
|
delivered to the Eco-Safe’s Landfill for transportation and disposal until such WCDS and
|
||||||
|
representative sampling are analyzed and approved by the Authority and Eco-Safe. The
|
||||||
|
Authority and its landfill shall have the right to reject loads of bulky Special Wastes if in
|
||||||
|
landfill’s judgment such loads would disrupt any normal operating procedures.
|
||||||
|
|
||||||
|
4.00 EFFECTIVE DATE
|
||||||
|
|
||||||
|
This Agreement shall be effective upon the execution of this Agreement by the Authority
|
||||||
|
and CEI, and performance of transportation services by CEI. hereunder shall commence
|
||||||
|
in the Service Commencement Date in accordance with the terms and conditions of this
|
||||||
|
Agreement section 1.10.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
5.00 INDEMNITY
|
||||||
|
|
||||||
|
5.01 Indemnity by the CEI, Inc. — Custom Ecology, Inc. and its subcontractors will
|
||||||
|
indemnify and save harmless the Authority from and against any and all suits, actions,
|
||||||
|
legal proceedings, claims, demands, damages, costs, expenses, and reasonable attorneys’
|
||||||
|
fees incurred by CEI or its subcontractors to the extent resulting from (a) any breach by
|
||||||
|
the Authority of any of its agreements hereunder, and (b) any negligent act or omission of
|
||||||
|
CEI, its employees or agents in the performance of transportation services under this
|
||||||
|
Agreement; provided, however, that CEI or its subcontractors shall not be obligated to
|
||||||
|
indemnify the Authority from and against any suits, actions, legal proceedings, claims,
|
||||||
|
demands, damages, costs, expenses or attorneys” fees to the extent resulting from any
|
||||||
|
negligent act or omission of the Authority or of any of its officers, agents, servants,
|
||||||
|
employees or contactors or to the extent resulting from any breach by the Authority of
|
||||||
|
any of its agreements hereunder.
|
||||||
|
|
||||||
|
5.02 Indemnity by Authority — To the extent permitted by law, the Authority will
|
||||||
|
indemnify and save harmless Custom Ecology, Inc. and its subcontractors from and
|
||||||
|
against any and all suits, actions, legal proceedings, claims, demands, damages, costs,
|
||||||
|
expenses, and reasonable attorneys’ fees incurred by CEI to the extent resulting from (a)
|
||||||
|
any breach by the Authority of any of its agreements hereunder, and (b) any negligent act
|
||||||
|
or omission of the Authority or any of its officers, agents, servants, employees or
|
||||||
|
contractors; provided, however, that the Authority shall not be obligated to indemnify
|
||||||
|
CEI from and against any suits, actions, legal proceedings, claims, demands, damages,
|
||||||
|
costs, expenses or attorneys” fees to the extent resulting from any negligent act or
|
||||||
|
omission of CEI or of any of its officers, agents, servants, employees or contractors or to
|
||||||
|
the extent resulting from any breach CEI of any of its agreements hereunder.
|
||||||
|
|
||||||
|
6.00 TERM
|
||||||
|
|
||||||
|
This Agreement is for an initial term beginning on the date of execution of this
|
||||||
|
Agreement and shall remain in full force and effect from and after the date hereof until
|
||||||
|
the expiration of a period of five (5) years from then and after the Service
|
||||||
|
Commencement Date. Upon mutual agreement by the parties the Contract may be
|
||||||
|
extended in additional five (5) year extensions under the same terms and conditions. It is
|
||||||
|
understood that both parties must agree, with written notification, of this extension at
|
||||||
|
least sixty (60) days prior to the expiration date as defined herein. Rates must be agreed
|
||||||
|
upon by both parties.
|
||||||
|
|
||||||
|
7.00 | BASIS AND METHOD OR PAYMENT/ADJUSTMENTS
|
||||||
|
|
||||||
|
7.01 Base Price and Transportation Fees Per Ton — For Cumberland Plateau Solid
|
||||||
|
Waste transportation services rendered hereunder, CEI will charge the Authority and the
|
||||||
|
Authority will pay to CEI, without set-off or deduction, the transportation fee specified
|
||||||
|
on Exhibit A hereto, as adjusted in accordance with the terms and provisions herein, for
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
each Ton of Cumberland Plateau Solid Waste or Special Waste transported by CE] at the
|
||||||
|
Cumberland Plateau Transfer Stations for transportation hereunder. The tons transported
|
||||||
|
will be determined by the Eco-Safe’s Landfill tickets and stored tare weight at Eco-Safe
|
||||||
|
Scale House of which verification will be afforded to the Authority as it deems necessary.
|
||||||
|
The Transportation Base Rate per ton Fee, under this agreement shall be set at $22.31 per
|
||||||
|
ton for Buchanan County, $22.04 per ton for Dickenson County and $20.27 per ton for
|
||||||
|
Russell County. Following the commencement of the second year and each subsequent
|
||||||
|
year after the Service Commencement Date the base rate will increase as agreed upon by
|
||||||
|
both parties in exhibit A hereto.
|
||||||
|
|
||||||
|
7.02 ~ Custom Ecology Inc. Billings to Authority ~ CEI will invoice the Authority on a
|
||||||
|
monthly basis on or before the tenth (10th) day each month for all transportation services
|
||||||
|
rendered during the preceding calendar month and the Authority will remit payment for
|
||||||
|
each invoice without set-off or deduction to CEI within 30 calendar days of the date of
|
||||||
|
such invoice. Such billing shall be based on the Transportation Fees as adjusted pursuant
|
||||||
|
herein.
|
||||||
|
|
||||||
|
8.00 INSURANCE
|
||||||
|
|
||||||
|
The Authority and CEI shall each maintain in full force and effect Employer's Liability,
|
||||||
|
Workmen’s Compensation, Public Liability and Property Damage Insurance. Before
|
||||||
|
commencement of work hereunder, CEI will furnish the Authority with certificates of
|
||||||
|
insurance to the effect that such insurance has been procured and is in force. The
|
||||||
|
certificates shall contain the following express obligatior
|
||||||
|
that the policies of insurance described herein have been issued
|
||||||
|
to the insured for whom this certificate is executed and are in force at this time. In the
|
||||||
|
event of cancellation or material change in a policy affecting the certificate holder, thirty
|
||||||
|
(30) days prior written notice will be given the certificate holder.”
|
||||||
|
|
||||||
|
The Authority and CEI shall each carry the following types of insurance in at least the
|
||||||
|
limits specified below:
|
||||||
|
|
||||||
|
Coverages Limits of Liability
|
||||||
|
Workmen’s Compensation Statutory
|
||||||
|
Employer's Liability $500,000
|
||||||
|
Bodily Injury Liability $500,000 each occurrence
|
||||||
|
Except Automobile $1,000,000 aggregate
|
||||||
|
Property Damage Liability $500,000 each occurrence
|
||||||
|
Except Automobile $1,000,000 aggregate
|
||||||
|
Automobile Bodily Injury $500,000 each person
|
||||||
|
Liability $1,000,000 each occurrence
|
||||||
|
|
||||||
|
Automobile Property Damage $500,000 each occurrence
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Liability
|
||||||
|
Excess Umbrella Liability $5,000,000 each occurrence
|
||||||
|
|
||||||
|
As an alternative to the above, CEI may insure the above public liability and property
|
||||||
|
coverages under any plan or plans of self-insurance approved by the State of Virginia.
|
||||||
|
The coverages may be provided by CEI, Inc., a Delaware corporation, or any other
|
||||||
|
corporation affiliated with CEI.
|
||||||
|
|
||||||
|
9.00 DEFAULT
|
||||||
|
|
||||||
|
Except as otherwise provided herein, if either party breaches any of the material
|
||||||
|
provisions of this Agreement and fails to cure such breach within a period of thirty (30)
|
||||||
|
days after receiving written notice setting forth a detailed description of such breach from
|
||||||
|
the other party, unless a longer period of time is required to cure such breach and the
|
||||||
|
party breaching shall have failed to commence to cure such breach within said thirty (30)
|
||||||
|
day period and pursue diligently to completion thereof, then the other party may
|
||||||
|
terminate this Agreement.
|
||||||
|
|
||||||
|
10.00 MISCELLANEOUS
|
||||||
|
|
||||||
|
10.01 Transferability — No assignment of this Agreement or any right accruing under
|
||||||
|
this Agreement shall be made in whole or in part by the Authority without the express
|
||||||
|
prior written consent of CEI or by CEI without the express prior written consent of the
|
||||||
|
Authority, except that CEI without consent of the Authority may assign and delegate any
|
||||||
|
of its rights and obligations under this Agreement or subcontract the performance of any
|
||||||
|
services to be rendered hereunder to any corporation or other entity which controls, or is
|
||||||
|
controlled by , or under common control with CEI.
|
||||||
|
|
||||||
|
10.02. Liquidated Damages — Work shall be completed in a prompt, lawful, and
|
||||||
|
professional manner and in accordance with the terms of this agreement. In addition to.
|
||||||
|
any other remedy contained herein, it is understood that the Authority may deduct from
|
||||||
|
payment due or to become due to CEI amounts as liquidated damages upon proof of any
|
||||||
|
of the following occurrences by CEI. Said right and exercise thereof does not preclude
|
||||||
|
the Authority from any damages to which it would otherwise be entitled. Failure of CEI
|
||||||
|
to fulfill certain aspects of this agreement shall carry monetary penalties as payments due
|
||||||
|
to the Authority as follows:
|
||||||
|
|
||||||
|
A) Failure to provide on-request service within 24 hours-$500/trailer/incident;
|
||||||
|
|
||||||
|
B) Failure to deliver empty trailer(s) at time of scheduled haul or pickup-
|
||||||
|
$500/day/container;
|
||||||
|
|
||||||
|
C) Failure to maintain secure loads of materials, and allowing materials to fall out or
|
||||||
|
blow out of transport containers being hauled onto State, City or County roads-
|
||||||
|
$500/incident;
|
||||||
|
|
||||||
|
D) Failure to respond to and resolve complaints within a 24 hours- $1,000/incident;
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
E) Failure to provide the agreed upon tractors, trailers and yard trucks that impedes
|
||||||
|
the Authority’s ability to manage its solid waste-$1,500/incident.
|
||||||
|
|
||||||
|
10.03 Force Majeure ~ Except for the Authority's obligation to pay CEI for services
|
||||||
|
rendered hereunder in accordance with the terms and provisions of Section 7.00 hereof,
|
||||||
|
the obligations of the Authority and CEI hereunder are subject to and excused in the
|
||||||
|
event of the occurrence any contingency beyond its reasonable control including, without
|
||||||
|
limitation, (j) strikes, riots, wars, acts of God, (ii) governmental orders, decrees and
|
||||||
|
regulations, including, without limitation, if CE] is for any reason delayed or barred by
|
||||||
|
governmental of judicial action with respect to the construction or operation or CEI.
|
||||||
|
|
||||||
|
10.04 Severability — In case of any one or more of the provisions contained in this
|
||||||
|
Agreement shall, for any reason, be held to be invalid, illegal or unenforceable in any
|
||||||
|
respect or its inclusion shall result in the invalidity, illegality or unenforceability of this
|
||||||
|
Agreement, such invalidity, illegality or unenforceability shall not affect any other
|
||||||
|
provision of this Agreement and this Agreement shall be construed as if such invalid,
|
||||||
|
illegal or unenforceable _ provision had never been contained herein; provided,
|
||||||
|
however, that it is the intention of the parties hereto that in lieu of each term, clause, or
|
||||||
|
provision that is held to be invalid, illegal or unenforceable, there shall be added as part
|
||||||
|
of this Agreement a term, clause or provision as similar in terms to such invalid, illegal or
|
||||||
|
unenforceable term, clause or provision as may be possible and be valid, legal or
|
||||||
|
enforceable,
|
||||||
|
|
||||||
|
10.05 Cumulative Remedies ~ All rights, remedies and powers shall be deemed
|
||||||
|
cumulative and not exclusive of any rights, remedies or powers available. No delay or
|
||||||
|
omission to exercise any right, remedy or power shall impair such right, remedy or power
|
||||||
|
or shall be construed to be a waiver or any breach or any acquiescence therein. Any such
|
||||||
|
right, remedy or power may be exercised from time to time, independently or
|
||||||
|
concurrently, and as often as shall be deemed expedient. No single or partial exercise of
|
||||||
|
any right, remedy or power shall preclude other or further exercise thereof.
|
||||||
|
|
||||||
|
10.06 Independent Contractor; No Agency — CEI will act hereunder as an contractor and
|
||||||
|
not as an agent of the Authority. Similarly, the Authority is not an agent of CEI or
|
||||||
|
empowered or authorized to obligate CEI in any way.
|
||||||
|
|
||||||
|
10.07 Performance Bond or Letter of Credit — CEI will furnish a performance bond or
|
||||||
|
Letter of Credit to the Authority in the amount of 100% of the estimated cost of three (3)
|
||||||
|
menths of transportation services hereunder determined by the initial Transportation Fee
|
||||||
|
as provided in Section 7.00 hereof. With respect to any default by CEI hereunder, the
|
||||||
|
Authority’s sole remedy with respect thereto shall be to exercise its rights under such
|
||||||
|
performance bond or Letter of Credit.
|
||||||
|
|
||||||
|
10.08 Entire Agreement — This Agreement constitutes the entire agreement and
|
||||||
|
understanding between the parties relating to the subject matter hereof and cancels and
|
||||||
|
supersedes all prior negotiations, representations, proposals, understandings and
|
||||||
|
agreements, either written or oral, relating to the subject matter hereof. This Agreement
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
shall not be modified, altered, changed or amended unless in writing and signed by both
|
||||||
|
parties following the first initial calendar year and in conformance with applicable
|
||||||
|
procurement laws,
|
||||||
|
|
||||||
|
10.09 Choice of Law-This Agreement shall be interpreted and governed by the Laws of
|
||||||
|
|
||||||
|
the Commonwealth of Virginia and jurisdiction and venue for any litigation commenced
|
||||||
|
under this Agreement shall lie in the Commonwealth of Virginia.
|
||||||
|
|
||||||
|
IN WITNESS WHEREOF, the Authority and Advanced Disposal have entered into this
|
||||||
|
Agreement (triplicate counterpart originals) on the day and year first above written.
|
||||||
|
|
||||||
|
Cumberland Plateau Regional Waste Management
|
||||||
|
|
||||||
|
BY: bileLeg
|
||||||
|
Ronald P, CPRWMA Chairman
|
||||||
|
COMMON’ TH 3 VI ame
|
||||||
|
COUNTY OF to-wit:
|
||||||
|
|
||||||
|
7 ing = was signed, sygm and agknowledged before me by
|
||||||
|
q 2 ,onthis _|
|
||||||
|
fy commissign expires:
|
||||||
|
UA
|
||||||
|
|
||||||
|
Authority
|
||||||
|
|
||||||
|
gy of flys
|
||||||
|
|
||||||
|
‘Toby Franklin Edwards
|
||||||
|
NOTARY PUBLIC
|
||||||
|
‘Commonwealth of Virginia
|
||||||
|
Reg. #7342683
|
||||||
|
My Commission Expires 7/31/2024
|
||||||
|
|
||||||
|
, 2023.
|
||||||
|
|
||||||
|
ies
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
EXHIBIT A TO SOLID WASTE TRANSPORTATION AGREEMENT.
|
||||||
|
|
||||||
|
Transportation Fee under Section 7.00 from the following Cumberland Plateau Transfer
|
||||||
|
Station to the Eco-Safe Landfill
|
||||||
|
Base Price Per Ton for Year One is as follows:
|
||||||
|
|
||||||
|
Buchanan County Transfer Stati $22.31 Ton
|
||||||
|
Dickenson County Transfer Station: $22.04 Ton
|
||||||
|
Russell County Transfer Station: $20.27 Ton
|
||||||
|
|
||||||
|
An annual three percent (3%) CPI increase shall be applied to the base rate after year one
|
||||||
|
and each year thereafter.
|
||||||
|
|
||||||
|
Fuel Surcharge Per Ton Per County:
|
||||||
|
Buchanan County Transfer Station: Fuel surcharge will be $3.13 for every $0.10 Diesel
|
||||||
|
Fuel increases above $3.13 per gallon for each ton hauled from Buchanan County.
|
||||||
|
|
||||||
|
Dickenson County Transfer Station: Fuel surcharge will be $3.13 for every $0.10 Diesel
|
||||||
|
Fuel increases above $3.13 per gallon for each ton hauled from Dickenson County.
|
||||||
|
|
||||||
|
Russell County Transfer Station: Fuel surcharge will be $1.86 for every $0.10 Diesel
|
||||||
|
Fuel increases above $3.13 per gallon for each ton hauled from Russell County.
|
||||||
|
|
||||||
|
The above Transportation Fee shall be adjusted in accordance with the terms and
|
||||||
|
provision of this Agreement. ( Please <ze exilsix BS)
|
||||||
|
|
||||||
|
ATTEST: CUMBERLAND PLATEAU REGIONAL WASTE MANAGEMENT
|
||||||
|
AUTHORITY
|
||||||
|
|
||||||
|
By: ALLEN By Aishy Ln
|
||||||
|
|
||||||
|
Title: fai amen Title Vice - Chairman
|
||||||
|
|
||||||
|
ATTEST: custo a
|
||||||
|
By: IO) By: Waa
|
||||||
|
|
||||||
|
Title: 22) Title: Bien oeucl (a7)
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
‘Cumberland Plateau Regional Waste Mangement Authority
|
||||||
|
{Custom Ecology, Ine. formesty Staford Transport Inc
|
||||||
|
|
||||||
|
Fuel Surcharge Calculation
|
||||||
|
Date Prepared: 7/167202
|
||||||
|
|
||||||
|
Effective Month of Fuel Surcharge Change: [sul
|
||||||
|
|
||||||
|
(eek & S
|
||||||
|
|
||||||
|
Weekly Retall On-Highway Diesel Price for week of: [77am] Prices [$ 3a
|
||||||
|
(Fue Surcharge Grange per tabfe Below ‘a0
|
||||||
|
ate Subject 1 vel Sucharg
|
||||||
|
‘Base Freigit |For Round] Taar
|
||||||
|
ype ot | ate Peron] Tap ane | rue surcharge ‘ec by Teale | surcharge ret arson
|
||||||
|
nign pesnation | waste | toad) | Miles _| Per below Tipe | Peeton [tate
|
||||||
|
[Boden County Fason, cA [A ETS EY CTT 22 7
|
||||||
|
County oston, GA wsw_[$ 2204350 [8 00 2 1 aE
|
||||||
|
uss County nd, FL SW [$2027 30 [$0101 Z| _osi| $2827
|
||||||
|
S040. a 5
|
||||||
|
300 ' 5
|
||||||
|
I 030. ' a
|
||||||
|
030. a =
|
||||||
|
S00 a :
|
||||||
|
930. a =
|
||||||
|
030, a z
|
||||||
|
300 + a
|
||||||
|
‘Tecive cate of agreenent 2/2021
|
||||||
|
* Loading charge at Cay County TS per Ton $5.36 Mounts | — Dave at
|
||||||
|
eck Price | Reco
|
||||||
|
aie] 713785]
|
||||||
|
"TABLE FOR FUEL SURCHARGE CALCULATION.
|
||||||
|
oo Pe |
|
||||||
|
Average Pie/ Gaon Surcharge
|
||||||
|
Esme [s si[e 07
|
||||||
|
o. $3m8[ ww [$s _sa7[s 03
|
||||||
|
to. $878 to [s_s2a7[ $039,
|
||||||
|
1. 528) we [sas 0
|
||||||
|
. $328] wm [s_sa[s oat
|
||||||
|
to. $3328 | to Sa77[s 047
|
||||||
|
cm ssa we [ssa7[s os
|
||||||
|
1. ‘$348 [ssa [some
|
||||||
|
wo. 3 sa8[ te [$s _ssa7[s 04s,
|
||||||
|
‘o. $558[ [sss] s 06.
|
||||||
|
. [s_ss78 | w [s ses 07
|
||||||
|
e. ‘$50 [ we [$s _sar7 [$046
|
||||||
|
e. sso] ww [s_sm7|s 00.
|
||||||
|
to. ‘= sna [ tw [sss 030.
|
||||||
|
. $370| ww [se [¢ ost
|
||||||
|
cH ‘3508 to | s_san|s 05
|
||||||
|
. $35m|w [$s _ss27[¢ 05
|
||||||
|
o. $30m| wo [s_s977|¢ 054
|
||||||
|
7 $_3378| w _[s_60o|s 035
|
||||||
|
‘, $60] —w [$607 [¢ 036
|
||||||
|
ra $6078 wm |s_6u7| $057
|
||||||
|
cH $6128] ww [s_6177|¢_ 058
|
||||||
|
‘, $618 wo [sea [s 058
|
||||||
|
rc $628] wm [$627 [$080
|
||||||
|
rc $6278] w [8 _6n7|¢ os
|
||||||
|
‘ 3 638| we [3 637 [sos
|
||||||
|
to, $638| ww |s_6a7|¢ 083
|
||||||
|
‘e. $6428 wo [sear |s___ 04
|
||||||
|
1 $6a7a| | sesu7 [$055
|
||||||
|
o. $650| wo [sss 06
|
||||||
|
1 3 6576[ | _eea7 [sos
|
||||||
|
e. $_66m| [som [+08
|
||||||
|
‘ 3 66[ wo |s_em7[s 088
|
||||||
|
1. $678[ we |s_677|s 07
|
||||||
|
1. 367 wo [seas 09
|
||||||
|
1) 6am [$s a7 }¢ 072
|
||||||
|
we. s6em| wo |s 6s7]$ 073
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,580 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: 2024 Users Agreement
|
||||||
|
file: ../2024 Users Agreement.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Cumberland_Waste_FOIA_May_2024
|
||||||
|
- Users Agreement with 3 Counties
|
||||||
|
- '2024'
|
||||||
|
docDate: '2024'
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 840044
|
||||||
|
sha256sum: f9fb6c218b43461e4e894f54c4efc941d3600423e4a39e76e3ab85a9be4f1d33
|
||||||
|
sha1sum: efb781954fd68477532dc5555115e01fe9ed00de
|
||||||
|
---
|
||||||
|
|
||||||
|
USER AGREEMENT
|
||||||
|
FOR
|
||||||
|
SOLID WASTE DISPOSAL
|
||||||
|
|
||||||
|
THIS AGREEMENT, made and executed this the ayegay day wreauaey 2024
|
||||||
|
|
||||||
|
by and between the COUNTY OF DICKENSON, Virginia, the COUNTY OF BUt \NAN,
|
||||||
|
Virginia, and the COUNTY OF RUSSELL, Virginia, political subdivisions of the
|
||||||
|
COMMONWEALTH OF VIRGINIA, hereinafter referred to as “Users,” and the
|
||||||
|
CUMBERLAND PLATEAU WASTE MANAGEMENT AUTHORITY, a body politic and
|
||||||
|
corporate and a political subdivision of the COMMONWEALTH OF VIRGINIA, an Authority
|
||||||
|
created by the aforesaid Users, pursuant to the Virginia Water and Sewer Authorities Act,
|
||||||
|
hereinafter referred to as “Authority.”
|
||||||
|
|
||||||
|
ARTICLE I - BASIC INTENT AND PURPOSE.
|
||||||
|
|
||||||
|
1. This Agreement is entered into as authorized by the Virginia Water and Waste
|
||||||
|
Authorities Act, Va. Code Ann. § 15.2-5100 ef seq, (hereinafter the “Act”),
|
||||||
|
|
||||||
|
2. The Authority has all the powers, rights and duties as described in the Act and as
|
||||||
|
specified in its Articles of Incorporation and may exercise the same in the
|
||||||
|
performance of its functions as set out in the Act.
|
||||||
|
|
||||||
|
3. The purposes for which the Authority was created are to acquire, purchase, lease
|
||||||
|
as lessee, construct, reconstruct, improve, extend, operate, maintain and finance a
|
||||||
|
Garbage and Refuse Collection and Disposal System, as that term is defined in the
|
||||||
|
Act, within, without, or partly within and partly without the Counties of
|
||||||
|
|
||||||
|
Buchanan, Dickenson and Russell, Virginia.
|
||||||
|
|
||||||
|
4. The Authority, subject to the terms and conditions hereinafter set out, desires to
|
||||||
|
maintain a safe, sanitary and environmentally sound Disposal System (hereinafter
|
||||||
|
defined) and for and by such Disposal System to accept and dispose of the
|
||||||
|
Disposable Solid Waste (as the term is defined herein, and hereinafter referred to
|
||||||
|
as DSW) of the Users.
|
||||||
|
|
||||||
|
5. The Users, subject to the terms and conditions hereinafter set out, desire to use the
|
||||||
|
Authority's Disposal System for the disposal of DSW generated within, collected
|
||||||
|
by, or otherwise under the control of the User.
|
||||||
|
|
||||||
|
USER AGREEMENT
|
||||||
|
Page| t
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
. The Disposal System shall be established, operated and maintained in accordance
|
||||||
|
with the Authority’s Plan of Operation, attached hereto and made a part hereof,
|
||||||
|
which is intended to be effective upon the date of execution of this Agreement,
|
||||||
|
and which may be amended by the Authority from time to time.
|
||||||
|
|
||||||
|
ARTICLES II - DEFINITIONS
|
||||||
|
|
||||||
|
. Disposable Solid Waste (hereinafter DSW) — Any Solid Waste other than
|
||||||
|
Hazardous Waste, specifically including Processible Solid Waste, Special Waste
|
||||||
|
(approved, as set forth in the Plan of Operation) and Non-Processible Solid Waste
|
||||||
|
(as such terms are defined in the Plan of Operation).
|
||||||
|
|
||||||
|
Disposal System — All those facilities owned, leased or operated by the Authority
|
||||||
|
|
||||||
|
designed to collect, manage and/or dispose of Solid Waste and those designed to
|
||||||
|
accomplish recycling and/or volume waste reduction by methods other than
|
||||||
|
DSW; and the land, structures, vehicles and equipment for use in connection
|
||||||
|
therewith.
|
||||||
|
|
||||||
|
|. Hazardous Waste — a Solid Waste or combination of Solid Waste which, because
|
||||||
|
of its quantity, concentration or physical, chemical or infectious characteristics
|
||||||
|
may: (a) cause or significantly contribute to an increase in mortality or an increase
|
||||||
|
in serious irreversible, or incapacitating reversible, illness; or (b) pose a
|
||||||
|
substantial present or potential hazard to human health, the Disposal System, or
|
||||||
|
the environment when improperly treated, stored, transported, disposed of or
|
||||||
|
otherwise managed. The foregoing definition is intended to include any waste
|
||||||
|
now or hereafter designated as “hazardous” by State or Federal agencies
|
||||||
|
(including the United States Environmental Protection Agency) with jurisdiction
|
||||||
|
and authority to promulgate and enforce rules and regulations for the handling and
|
||||||
|
disposal of hazardous and other wastes,
|
||||||
|
|
||||||
|
. Non-Conforming Waste ~ (a) Any waste excluded from the definition of Solid
|
||||||
|
Waste and (b) Special Waste (as defined in the Plan of Operation) which has not
|
||||||
|
been approved by the Authority.
|
||||||
|
|
||||||
|
. Plan_of Operation — A plan adopted by the Authority, as amended or
|
||||||
|
supplemented, setting forth the types of material acceptable to the Authority for
|
||||||
|
|
||||||
|
USER AGREEMENT
|
||||||
|
Page |2
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
disposal, the times and places where material will be received by the Authority,
|
||||||
|
the methods of collecting fees charged by the Authority for disposal service, and
|
||||||
|
such other information as will describe operational procedures, control use of the
|
||||||
|
Disposal System and provide instruction and guidelines to users of the Disposal
|
||||||
|
System. The Plan of Operation shall be marked as Exhibit
|
||||||
|
by reference into this User Agreement. Said Plan of Operation shall be subject to
|
||||||
|
|
||||||
|
“A” and incorporated
|
||||||
|
|
||||||
|
annual review at the same time this User Agreement is subject to annual review.
|
||||||
|
If any changes are made to the Plan of Operation by the parties, such changes
|
||||||
|
shall also be subject to the approval of the Department of Environmental Quality.
|
||||||
|
|
||||||
|
. Solid Waste ~ Any garbage, trash, brush, refuse, sludge (as defined in the Plan of
|
||||||
|
Operation) and other discarded material, including solid, liquid, semi-solid or
|
||||||
|
contained gaseous material, resulting from industrial, commercial, mining and
|
||||||
|
agricultural operations and from community activities and residences, but does
|
||||||
|
|
||||||
|
not include: (i) solid and dissolved materials in domestic sewage; (ii) solid or
|
||||||
|
dissolved material in irrigation return flows or in industrial discharges which are
|
||||||
|
sources subject to permit from the State Water Control board; (iii) source, special
|
||||||
|
nuclear, or by-product material as defined by the Federal Atomic Energy Act of
|
||||||
|
1954, as amended; (iv) to the extent such Solid Waste is transported from the
|
||||||
|
‘Transfer Stations to any landfill operated by an entity other than the Authority,
|
||||||
|
and other materials not allowed under the permits, licenses and approvals relating
|
||||||
|
to such landfill; or (v) asbestos.
|
||||||
|
|
||||||
|
Tipping Fee ~ The charge made by the Authority for the disposal of DSW (as set
|
||||||
|
forth in the Plan of Operation). The Tipping Fee shall be calculated by
|
||||||
|
determining the total of: (a) the disposal fee charged by any landfill operator with
|
||||||
|
whom the Authority may contract for the ultimate disposal of any Solid Waste
|
||||||
|
delivered hereunder; (b) the amount of principal premium, if any, and interest or
|
||||||
|
any other amounts due, or to become due, with respect to any indebtedness of the
|
||||||
|
Authority or required to avoid a default with respect to such indebtedness; and (c)
|
||||||
|
all expenses of the Authority relating to the operation and maintenance of the
|
||||||
|
Disposal System as per the line item budget approved annually by the Authority
|
||||||
|
Board, excluding administrative costs defined below) including any reserves
|
||||||
|
|
||||||
|
USER AGREEMENT
|
||||||
|
Page |3
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
required by Authority. This amount shall be divided by the tonnage projected to
|
||||||
|
be received to derive a cost per ton to be charged for use of the Disposal System.
|
||||||
|
‘The tipping fee is the same for all three member counties per the components of
|
||||||
|
this paragraph. However, transportation costs for each member county is
|
||||||
|
determined by mileage from the county’s transfer station to the landfill. The cost
|
||||||
|
per mile will be uniform for each county with only the actual mileage varying.
|
||||||
|
The Authority will invoice each county separately for its transportation costs.
|
||||||
|
The parties agree to annually review the component costs making up the tipping
|
||||||
|
fee and transportation costs to make appropriate annual adjustment to said tipping.
|
||||||
|
fee and transportation costs (costs per mile). The annual adjusted tipping fee and
|
||||||
|
transportation costs are subject to the approval of the Board of Supervisors of
|
||||||
|
each of the Users and the Board of the Authority. Once the User Agreement is
|
||||||
|
approved either initially or upon subsequent annual reviews, said approved User
|
||||||
|
jing on all the parties. It is acknowledged by all the
|
||||||
|
parties that the landfill charge is based on a five year contract that is procured
|
||||||
|
Pursuant to 15.2-5136. The parties further acknowledge that the Authority is
|
||||||
|
contractually bound by this five year contract in regard to the landfill charge and
|
||||||
|
|
||||||
|
‘Agreement shall be bi
|
||||||
|
|
||||||
|
bound by another contract for transportation charges. The parties agree that such
|
||||||
|
contracts are binding upon the Authority and while in effect restrict the
|
||||||
|
Authority’s ability to make any adjustments to landfill contract costs and
|
||||||
|
transportation contract costs. However, the parties further agree that the
|
||||||
|
contract for access to the landfill and the contract for transportation services to
|
||||||
|
transport the solid waste from the transfer stations to the landfill are subject to
|
||||||
|
review and approval of the Board of Supervisors of the three Users.
|
||||||
|
|
||||||
|
. Administrative Fee—The Authority has administrative costs that include items in
|
||||||
|
the current Authority fiscal line item budget as approved by the Authority Board.
|
||||||
|
These costs include, but are not limited to, IT support, bookkeeping costs, salary
|
||||||
|
and fringe benefits of Authority employees, legal costs, office rental, and VACO
|
||||||
|
insurance. The Authority will present its proposed line item annual budget for
|
||||||
|
the upcoming year to the member County Administrators annually on or before
|
||||||
|
|
||||||
|
USER AGREEMENT
|
||||||
|
Page |4
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
March 15 to be included in each County Board of Supervisor’s next monthly
|
||||||
|
meeting agenda for review and approval .
|
||||||
|
|
||||||
|
‘The total monthly administrative costs of the Authority shall be divided equally
|
||||||
|
among the Users and paid through monthly invoices submitted to the Users by the
|
||||||
|
Authority.
|
||||||
|
ARTICLE III - TERM OF AGREEMENT
|
||||||
|
1. This Agreement shall become effective and operations hereunder shall commence on
|
||||||
|
or about July 1st, 2024. This Agreement shall be binding upon the parties,
|
||||||
|
commencing upon the execution hereof, and extending for a period of one (1) year.
|
||||||
|
Prior to the end of the one-year term, any further extensions must be approved by the
|
||||||
|
Board of Supervisors of each of the User and the Authority Board annually.
|
||||||
|
ARTICLE IV - DELIVERY CONDITIONS.
|
||||||
|
|
||||||
|
1. The Users hereby agree to deliver or cause to be delivered to the Disposal System
|
||||||
|
in accordance with the Plan of Operation substantially all (at least 95 percent per
|
||||||
|
year) of the DSW which is generated or collected by or within or under the
|
||||||
|
control of each of the Users from the effective date of this Agreement. Each of the
|
||||||
|
Users will also use best efforts to enter into contractual agreements with each
|
||||||
|
locality, generator and commercial hauler of DSW in their respective counties for
|
||||||
|
their use of the Disposal System.
|
||||||
|
|
||||||
|
2. Subject to the terms and conditions of this Agreement and the Plan of Operation,
|
||||||
|
the Authority hereby agrees to receive and accept all DSW delivered to the
|
||||||
|
Disposal System by each of the Users after the effective date of this Agreement
|
||||||
|
and throughout the remaining term of this Agreement.
|
||||||
|
|
||||||
|
3. The Authority shall provide one or more Transfer Stations to each of the Users for
|
||||||
|
the disposal of DSW. The location of all Transfer Stations shall be specified in the
|
||||||
|
Plan of Operation. The Authority shall have the right to designate a separate point
|
||||||
|
or points of delivery for any grades or categories of DSW which in its opinion
|
||||||
|
require special handling or methods of disposal.
|
||||||
|
|
||||||
|
4, The Users hereby agree not to build or, to the extent of their legal authority, allow
|
||||||
|
to be built any facilities that would compete with the Disposal System during the
|
||||||
|
|
||||||
|
duration of the term of this Agreement.
|
||||||
|
USER AGREEMENT
|
||||||
|
Page |5
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
ARTICLE V —- CHARGES AND FEES FOR USE OF
|
||||||
|
AUTHORITY DISPOSAL SYSTEM
|
||||||
|
|
||||||
|
. The Users agree to pay to the Authority rates, fees, and other charges as approved
|
||||||
|
by the Authority’s Board of Directors in compliance with Va. Code Ann. §15.2-
|
||||||
|
5136 subject to approval of the Board of Supervisors of each User. The Authority
|
||||||
|
agrees to comply with § 15.2-5136 when fixing rates, fees, and other charges. .
|
||||||
|
Each of the Users shall have the right to set the fees to be charged to the public at
|
||||||
|
each transfer station in their respective county for the disposal of DSW.
|
||||||
|
|
||||||
|
. The Authority shall invoice each User for the Tipping Fees on a monthly basis
|
||||||
|
(within ten (10) days after the end of the month). Such invoices will show the
|
||||||
|
total tonnage received by the Authority attributable to the User during the billing
|
||||||
|
period of all DSW. Such invoices shall be due and payable without offset within
|
||||||
|
Thirty (30) days of the date of the invoice.
|
||||||
|
|
||||||
|
. The DSW delivered to the Disposal System will be weighed for the purpose of
|
||||||
|
determining the actual tonnage reccived. Fractions of tons actually received shall
|
||||||
|
be invoiced on an accumulated basis each month. In the event of malfunction of
|
||||||
|
the Authority’s weighing scales or other measuring device, an estimate of the
|
||||||
|
amount of DSW received will be computed based on the average amount received
|
||||||
|
per vehicle, when dumping records for such vehicle for the six (6) months
|
||||||
|
immediately preceding are available, or when such records are not available, will
|
||||||
|
be computed based on the average amount received per vehicle of like size and/or
|
||||||
|
compaction ratio.
|
||||||
|
|
||||||
|
. The Authority shall keep proper books and records in accordance with generally
|
||||||
|
accepted accounting principles which shall be available for inspection by the User
|
||||||
|
at all reasonable times.
|
||||||
|
|
||||||
|
. Any proposed amendment of rates, fees or other charges imposed by the
|
||||||
|
Authority on the Users pursuant to this Agreement is subject to approval by the
|
||||||
|
|
||||||
|
USER AGREEMENT
|
||||||
|
Page | 6
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Users after the Authority has provided adequate documentation to demonstrate
|
||||||
|
that an increase or decrease is necessary under § 15.2-5136.
|
||||||
|
|
||||||
|
ARTICLE VI - TITLE TO SOLID WASTE; LIABILITY FOR SOLID WASTE
|
||||||
|
|
||||||
|
1, Title to all DSW delivered to the Disposal System by each of the Users shall pass
|
||||||
|
to the Authority when recorded by the Authority’s weighing scales or other
|
||||||
|
measuring devices at the Authority’s facilities, EXCEPT that title to Hazardous
|
||||||
|
Waste and Non-Conforming Waste shall not vest or pass to the Authority, even if
|
||||||
|
Hazardous Waste and Non-Conforming Waste is delivered to and unknowingly
|
||||||
|
accepted by the Authority. Inoperability or unavailability of the Authority’s
|
||||||
|
measuring devices shall not alter the transfer of title to DSW delivered to and
|
||||||
|
accepted by the Authority.
|
||||||
|
|
||||||
|
2. In the event that Hazardous Waste is inadvertently or unknowingly delivered to
|
||||||
|
and/or accepted by the Authority, it is understood and agreed between the parties
|
||||||
|
that liability for any environmental contamination, adverse effects, penalties or
|
||||||
|
damages resulting from, and necessary costs of correction, may be imposed upon
|
||||||
|
the Users by any regulatory bodies with adequate jurisdiction.
|
||||||
|
|
||||||
|
ARTICLE VII - DEFAULT
|
||||||
|
|
||||||
|
1. In the event of default, the non-defaulting party shall have the right, but not the
|
||||||
|
obligation, to cure such default and to charge the defaulting party for the cost of
|
||||||
|
curing said default, and to obtain reimbursement thereof.
|
||||||
|
|
||||||
|
2. Upon the occurrence of a default by the Authority hereunder, any of the Users,
|
||||||
|
after giving notice of such default to the Authority, may bring appropriate legal
|
||||||
|
proceedings to require the Authority to perform its duties under the Act and this
|
||||||
|
Agreement or to enjoin any acts in violation of the Act or this Agreement.
|
||||||
|
However, prior to any of the Users initiating legal action against the Authority,
|
||||||
|
the User(s) must give the Authority written notice of the default and provide the
|
||||||
|
Authority thirty (30) days to cure said default.
|
||||||
|
|
||||||
|
USER AGREEMENT
|
||||||
|
Page |7
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
. Upon the occurrence of a default by any User, the Authority, after giving notice of
|
||||||
|
such default to all parties, may bring appropriate legal action to require the User
|
||||||
|
to perform its duties under the Act and this Agreement or to enjoin any acts in
|
||||||
|
violation of the Act or this Agreement. However, prior to the Authority initiating
|
||||||
|
legal action against a User, the Authority must give the User written notice of the
|
||||||
|
default and provide the User thirty (30) days to cure said default,
|
||||||
|
|
||||||
|
}. No remedy in this Agreement conferred upon or reserved to the parties is intended
|
||||||
|
to be exclusive of any other remedy, and each remedy is cumulative and in
|
||||||
|
addition to every other remedy given under this Agreement or now or hereafter
|
||||||
|
existing as provided by law.
|
||||||
|
|
||||||
|
ARTICLE VIII - NO PARTNERSHIP
|
||||||
|
|
||||||
|
Nothing herein shall be construed to constitute a joint venture between the
|
||||||
|
Authority and the Users or the formation of a partnership.
|
||||||
|
|
||||||
|
ARTICLE IX - FORCE MAJEURE.
|
||||||
|
|
||||||
|
. Failure of any party to perform hereunder, including failure of any User to deliver
|
||||||
|
or cause to be delivered DSW, or inability of the Authority to accept DSW, by
|
||||||
|
reason of Force Majeure (as defined in the Plan of Operation) shall not constitute
|
||||||
|
a default or be cause for termination of this Agreement. However, the party so
|
||||||
|
failing to perform shall immediately notify the other party of the failure, including
|
||||||
|
reasons thereof, and shall make reasonable efforts to correct such failure to
|
||||||
|
perform at the earliest possible date.
|
||||||
|
|
||||||
|
. If, by reason of Force Majeure, the Authority cannot accept DSW at the Transfer
|
||||||
|
Station located within the User’s region, the Authority shall immediately provide
|
||||||
|
for and notify the User of an alternate delivery points(s).
|
||||||
|
|
||||||
|
. Solely in the event that no facilities of the Authority are available for disposal of
|
||||||
|
DSW the User shall have the right, but not the obligation, to dispose of or cause to
|
||||||
|
be disposed of DSW at locations other than the Transfer Station located within the
|
||||||
|
User’s region until the cause of the Authority’s inability to accept the User’s
|
||||||
|
DSW is cured, but not thereafter.
|
||||||
|
|
||||||
|
USER AGREEMENT
|
||||||
|
Page | 8
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
ARTICLE X - EXTENT OF AGREEMENT
|
||||||
|
|
||||||
|
This Agreement, together with the Plan of Operation, represents the entire
|
||||||
|
agreement between the parties hereto and supersedes all prior negotiations,
|
||||||
|
representations or agreements, cither written or oral. This Agreement shall not be
|
||||||
|
modified, altered or amended unless in writing and signed by the parties.
|
||||||
|
|
||||||
|
ARTICLE XI - GENERAL
|
||||||
|
|
||||||
|
1. In the event that any provisions of this Agreement shall be held to be invalid, the
|
||||||
|
remaining provisions shall be valid and binding upon the parties.
|
||||||
|
|
||||||
|
2. One or more waivers by either party hereto of performance of any obligation
|
||||||
|
and/or covenant hereunder shall not be construed as a waiver of subsequent
|
||||||
|
breach of any obligation and/or covenant.
|
||||||
|
|
||||||
|
3. Neither the Users nor the Authority shall delegate or assign duties under this
|
||||||
|
Agreement without the written consent of the other.
|
||||||
|
|
||||||
|
4. The construction and performance of this Agreement shall be in accordance with
|
||||||
|
the laws of the Commonwealth of Virginia. In the event of a dispute between the
|
||||||
|
Authority and a User, the venue for resolution of that dispute shall lie in the
|
||||||
|
Circuit Court of the User. In the event a dispute between the Authority and two
|
||||||
|
or more Users occurs or a dispute occurs between or among Users, the Chief
|
||||||
|
Judge of the 29" Judicial Circuit shall determine the venue and appoint a judge to
|
||||||
|
hear the case.
|
||||||
|
|
||||||
|
5. Any notices hereunder shall be in writing addressed to the party as set forth below
|
||||||
|
or at such other address as may be designated in writing to the other parties
|
||||||
|
hereto,
|
||||||
|
|
||||||
|
6. Inthe event the Authority has an adi trative fee surplus at the end of any
|
||||||
|
fiscal year and at the end of audit of said fiscal year, such surplus amounts shall
|
||||||
|
be divided equally among the three (3) member counties, based on a review and
|
||||||
|
vote of the Authority Board.
|
||||||
|
|
||||||
|
IN WITNESS WHEREOF, the parties hereto have caused this Agreementgo be
|
||||||
|
|
||||||
|
properly executed and attested by duly authorized officials as of this the [day of
|
||||||
|
aS » 2024,
|
||||||
|
|
||||||
|
USER AGREEMENT
|
||||||
|
Page |9
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
id u Regional Waste Mani Ai
|
||||||
|
|
||||||
|
By LEA, (SEAL)
|
||||||
|
|
||||||
|
CPRWMA Chairman, Ron Peters
|
||||||
|
135 Highland Drive, Suite C
|
||||||
|
Lebanon, Virginia 24266
|
||||||
|
Telephone: (276) 883-5403
|
||||||
|
|
||||||
|
ATTEST:
|
||||||
|
(SEAL)
|
||||||
|
CPRWMA Secretary
|
||||||
|
APPROVED AS TO FORM ONLY:
|
||||||
|
(SEAL)
|
||||||
|
|
||||||
|
' RJ. Thornbury, Esq. Counsel for the CPRWMA
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA,
|
||||||
|
|
||||||
|
AT LARGE, to wit:
|
||||||
|
The foregoing contract was subscribed and acknowledged before me by Ron Peters, Chairman of the
|
||||||
|
CPRWMA Board, rt cS ‘Secretary of ¢ CRRWMA. and RJ. Thornbury, Counsel
|
||||||
|
i for CPWRMA this the
|
||||||
|
i
|
||||||
|
f My Commission expires: [3 =
|
||||||
|
My Registration # is :
|
||||||
|
|
||||||
|
My orp. Ears 7902
|
||||||
|
|
||||||
|
USER AGREEMENT
|
||||||
|
Page | 10
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
a
|
||||||
|
|
||||||
|
Dickenson County Bc rvisors
|
||||||
|
|
||||||
|
By. (Shot Crnbhw (SEAL)
|
||||||
|
|
||||||
|
Shelby Willis, Chairman
|
||||||
|
P.O. Box 1098
|
||||||
|
|
||||||
|
Clintwood, Virginia 24228
|
||||||
|
Telephone: (276) 926-1676
|
||||||
|
Fax: (276) 926-1649
|
||||||
|
|
||||||
|
(SEAL)
|
||||||
|
|
||||||
|
n.. County Administrator
|
||||||
|
|
||||||
|
APPROVED 4S TO FORM:
|
||||||
|
LZ: eo
|
||||||
|
Ts yf: Le ___ (SEAL)
|
||||||
|
Williten Sturgill, Esq. a
|
||||||
|
|
||||||
|
County Attorney of Dickenson County, Va.
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA,
|
||||||
|
AT LARGE, to wit:
|
||||||
|
|
||||||
|
The foregoing contract was subscribed and acknowledged before me by Shelby Willis, Chairman of the
|
||||||
|
|
||||||
|
Dickenson County Board of Supervisors, Larry Barton, County Administrator the Dickenson County, Va.
|
||||||
|
|
||||||
|
and William Sturgill, County Attomey of Dickenson County, Va., this the 2Zday of
|
||||||
|
2024 in De kensore County, Va.
|
||||||
|
|
||||||
|
My Commission expires: 07-3/- 2024
|
||||||
|
|
||||||
|
My Registration # is
|
||||||
|
|
||||||
|
USER AGREEMENT
|
||||||
|
Page | 11
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Count of!
|
||||||
|
|
||||||
|
By. oe. (SEAL)
|
||||||
|
Roser Re, Chaim :
|
||||||
|
P.O. Drawer 950
|
||||||
|
Grundy, Va. 24614
|
||||||
|
Telephone: 276-935-6503
|
||||||
|
Fax: 276-935-4479
|
||||||
|
|
||||||
|
ATTEST:
|
||||||
|
|
||||||
|
Pith C te (SEAL)
|
||||||
|
|
||||||
|
Robert Craig Hom ”
|
||||||
|
County Administrator
|
||||||
|
|
||||||
|
APPROYED AS TO FORM:
|
||||||
|
LLaanae LE, 00
|
||||||
|
Lawrence L. Moise III, Esq.,
|
||||||
|
|
||||||
|
County Attomey
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA,
|
||||||
|
AT LARGE, to wit:
|
||||||
|
|
||||||
|
The foregoing contract was subscribed and acknowledged before me by Roger Rife, Chairman of the
|
||||||
|
|
||||||
|
Buchanan County Board of Supervisors, Robert Craig Horn, County Administrator-gnd Lawrence L.
|
||||||
|
Moise Ill, County Attomey this the £3 day of yee 2024 in
|
||||||
|
|
||||||
|
County, Va.
|
||||||
|
|
||||||
|
My Commission expi
|
||||||
|
My Registration # is
|
||||||
|
|
||||||
|
USER AGREEMENT
|
||||||
|
Page | 12
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Russell County Board of Supervisors
|
||||||
|
|
||||||
|
(SEAL)
|
||||||
|
|
||||||
|
Steve Breeding, Chairman
|
||||||
|
137 Highland Drive
|
||||||
|
Lebanon, Va. 24266
|
||||||
|
Telephone: 276-889-8000
|
||||||
|
Fax: 276-889-801 |
|
||||||
|
|
||||||
|
(SEAL)
|
||||||
|
County Administrator
|
||||||
|
APPROVED AS TO FORM:
|
||||||
|
= _ (SEAL)
|
||||||
|
Terry Kilgore, Esq.,
|
||||||
|
County Attorney
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA,
|
||||||
|
AT LARGE, to wit:
|
||||||
|
|
||||||
|
‘The foregoing contract was subscribed and acknowledged before me by Steve Breeding, Chairman of the
|
||||||
|
|
||||||
|
Russell County Board of Supervisors, Lonzo Lester, County Admipistrator and Terry Kilgore, Esq.
|
||||||
|
County Attorney, this the /# day of Rossel County, Va.
|
||||||
|
|
||||||
|
My Commission expi
|
||||||
|
My Registration # is
|
||||||
|
|
||||||
|
USER AGREEMENT
|
||||||
|
Page |13,
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Fee Schedule
|
||||||
|
|
||||||
|
Schedule II
|
||||||
|
Disposal for all Three Counties |
|
||||||
|
Oct 27, 2023 to Oct 26, 2024 $27.00 per ton
|
||||||
|
Oct 27, 2024 to Oct 26, 2025 $28.08 per ton
|
||||||
|
Oct 27, 2025 to Oct 26, 2026 $29.20 per ton
|
||||||
|
Oct 27, 2026 to Oct 26, 2027 $30.36 per ton
|
||||||
|
Oct 27, 2027 to Oct 27, 2028 $31.57 per ton
|
||||||
|
|
||||||
|
Transportation Rate (Different for each County-Milage)
|
||||||
|
|
||||||
|
2024 2025 2026 2027 2028
|
||||||
|
BC $22.31 $22.98 $23.67 $24.38 $25.11
|
||||||
|
|
||||||
|
DC $22.04 $22.70 $23.38 $24.08 $24.80
|
||||||
|
|
||||||
|
RC $20.27 $20.88 $21.51 $22.16 $22.82
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,76 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: 18302 Golden Pond CE ATP Signed (2)
|
||||||
|
file: ../18302 Golden Pond CE ATP Signed (2).pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Golden Pond Gob Pile Project
|
||||||
|
- '1830'
|
||||||
|
docDate: '1830'
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 538131
|
||||||
|
sha256sum: 0b016a55af67be2411d64bf2269183f641fc418890e5bc7b6e7c4097b1cc4a54
|
||||||
|
sha1sum: 8efeacc894c9b05ce4363babf1c0cb0230a8d9b0
|
||||||
|
---
|
||||||
|
|
||||||
|
United States Department of the Interior
|
||||||
|
OFFICE OF SURFACE MINING.
|
||||||
|
|
||||||
|
RECLAMATION AND ENFORCEMENT
|
||||||
|
|
||||||
|
‘Charleston Field Oice
|
||||||
|
1027 Virginia Steet, East
|
||||||
|
Charleston, West Virginia 25301
|
||||||
|
|
||||||
|
Lesa Baker, Project Coordinator
|
||||||
|
Department of Mines, Minerals and Energy
|
||||||
|
Division of Mined Land Reclamation
|
||||||
|
|
||||||
|
3405 Mountain Empire Rd.
|
||||||
|
|
||||||
|
Big Stone Gap, VA 24219
|
||||||
|
|
||||||
|
Dear Mrs. Baker,
|
||||||
|
|
||||||
|
OSMRE has thoroughly reviewed DMLR’s CE regarding the Golden Pond Gob Pile Project, Site
|
||||||
|
18302, and determined the project conforms to the exclusion criteria in the Department of the
|
||||||
|
Interior, Departmental Manual, Part 516, DM 6, Chapter 13, and is excluded from further NEPA
|
||||||
|
|
||||||
|
compliance.
|
||||||
|
|
||||||
|
Accordingly, pursuant to section 4-160-50D.3 of the Federal Assistance Manual, and section
|
||||||
|
403(b) of SMCRA, you are authorized to proceed with this project and expend Federal funds in
|
||||||
|
accordance with AML grant terms and conditions. In accordance with OSM Directive AML-1,
|
||||||
|
please update the Abandoned Mine Land Inventory System (e-AMLIS) from “unfunded” to
|
||||||
|
“funded” based on your budget estimate for the project.
|
||||||
|
|
||||||
|
chard W. Buckley, Chief
|
||||||
|
Field Support Branch
|
||||||
|
|
||||||
|
Enclosure
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
socioeconomics)
|
||||||
|
(_) Fish and Wildlife
|
||||||
|
|
||||||
|
| V. RESPONSIBLE OFFICIAL CERTIFICATION
|
||||||
|
|
||||||
|
Signature: esa Baker Date: October 16, 2018
|
||||||
|
|
||||||
|
Lesa Baker
|
||||||
|
AML Project Coordinator
|
||||||
|
|
||||||
|
Vi. OSM DETERMINATION
|
||||||
|
|
||||||
|
X __ This project conforms with the exclusion criteria in 516 DM 6,
|
||||||
|
Appendix 8, and is excluded from further NEPA compliance.
|
||||||
|
|
||||||
|
not conform with the exclusion criteria in 516 DM 6,
|
||||||
|
requires an environmental assessment.
|
||||||
|
|
||||||
|
Date:_Alou. O18
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,188 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: FinalInspection 18302GoldenPonddGobRemoval
|
||||||
|
file: ../FinalInspection_18302GoldenPonddGobRemoval.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Golden Pond Gob Pile Project
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 202907
|
||||||
|
sha256sum: c541b5165c546c133d39599688066a9f835d2b2ec6b59900d39403fe0c940fe3
|
||||||
|
sha1sum: 444d22b000e090b67317745bfe47bcce3d59dbce
|
||||||
|
---
|
||||||
|
|
||||||
|
FINAL INSPECTION
|
||||||
|
ABANDONED MINED LANDS
|
||||||
|
|
||||||
|
Golden Pond Gob Removal
|
||||||
|
|
||||||
|
Project Type: Enhanceme
|
||||||
|
nt
|
||||||
|
|
||||||
|
Grant Year: 2019 Final Inspection
|
||||||
|
Date:
|
||||||
|
|
||||||
|
2/23/2023
|
||||||
|
|
||||||
|
Construction Start Date: 2/5/2019 Construction End Date: 10/29/2021
|
||||||
|
|
||||||
|
Contract No.:
|
||||||
|
|
||||||
|
Project No.:
|
||||||
|
|
||||||
|
Location:
|
||||||
|
|
||||||
|
County:
|
||||||
|
|
||||||
|
C196013
|
||||||
|
|
||||||
|
18302
|
||||||
|
|
||||||
|
RUSSELL Contract Expiration
|
||||||
|
Date:
|
||||||
|
|
||||||
|
3/31/2023
|
||||||
|
|
||||||
|
Project Contractor: Russell County Reclamation, LLC
|
||||||
|
|
||||||
|
Contractor's
|
||||||
|
Address:
|
||||||
|
|
||||||
|
2700 Lee Highway Bristol VA 24202
|
||||||
|
|
||||||
|
Original Contract
|
||||||
|
Amount:
|
||||||
|
|
||||||
|
$0.00
|
||||||
|
|
||||||
|
Total Change Orders (CO): $0.00
|
||||||
|
|
||||||
|
Total Contract Amount: $0.00
|
||||||
|
|
||||||
|
Total Amount Invoiced:
|
||||||
|
|
||||||
|
Number of people
|
||||||
|
no longer at risk: 100
|
||||||
|
|
||||||
|
Number of people
|
||||||
|
employed: 10
|
||||||
|
|
||||||
|
Total number of change orders: 2
|
||||||
|
|
||||||
|
Page 1 of 2
|
||||||
|
|
||||||
|
DT Ty FINAL INSPECTION.
|
||||||
|
© Energy ABANDONED MINED LANDS
|
||||||
|
|
||||||
|
Golden Pond Gob Removal
|
||||||
|
|
||||||
|
Project Type: Enhanceme Grant Year: 2019 Final Inspection 2123/2023
|
||||||
|
nt Date:
|
||||||
|
Construction Start Date: 2/5/2019 Construction End Date: 10/29/2021
|
||||||
|
|
||||||
|
Contract No: 196013
|
||||||
|
Project No.: 18302
|
||||||
|
|
||||||
|
Location:
|
||||||
|
|
||||||
|
County: RUSSELL Contract Expiration 3/31/2023
|
||||||
|
Date:
|
||||||
|
|
||||||
|
Project Contractor: Russell County Reclamation, LLC
|
||||||
|
|
||||||
|
Contractor's 2700 Lee Highway Bristol VA 24202
|
||||||
|
Address:
|
||||||
|
Original Contract $0.00
|
||||||
|
Amount:
|
||||||
|
Total Change Orders (CO): $0.00 Number of people
|
||||||
|
no longer at risk: 100
|
||||||
|
Total Contract Amount: $0.00
|
||||||
|
Total Amount Invoiced: Number of people
|
||||||
|
employed 10
|
||||||
|
Total number of change orders: 2
|
||||||
|
|
||||||
|
Page 1 of 2
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Features Reclaimed:
|
||||||
|
|
||||||
|
This project has been constructed in accordance with the approved engineering
|
||||||
|
plans and any applicable grant requirements (True/False) True
|
||||||
|
|
||||||
|
Comments:
|
||||||
|
|
||||||
|
Checklist:
|
||||||
|
|
||||||
|
Contractor Evaluation:
|
||||||
|
|
||||||
|
Permit(s) Requirements Complete:
|
||||||
|
|
||||||
|
Bond Release Recommended:
|
||||||
|
|
||||||
|
Retainage Release
|
||||||
|
Recommended:
|
||||||
|
|
||||||
|
Material(s) Certification(s):
|
||||||
|
|
||||||
|
Cost Breakdown Attachment Included (True/False):
|
||||||
|
|
||||||
|
NA
|
||||||
|
|
||||||
|
Y
|
||||||
|
|
||||||
|
Y
|
||||||
|
|
||||||
|
NA
|
||||||
|
|
||||||
|
NA
|
||||||
|
|
||||||
|
False
|
||||||
|
|
||||||
|
eAMLIS entry Date:
|
||||||
|
|
||||||
|
Total Cost $0.00
|
||||||
|
|
||||||
|
Problem Area Feature Reclaimed Priority Quantity Cost
|
||||||
|
|
||||||
|
0.00
|
||||||
|
|
||||||
|
GO P3 32.00 0.00
|
||||||
|
|
||||||
|
Page 2 of 2
|
||||||
|
|
||||||
|
Features Reclaimed
|
||||||
|
|
||||||
|
Problem Area Feature Reclaimed Priority Quantity Cost
|
||||||
|
0.00
|
||||||
|
Go P3 32.00 0.00
|
||||||
|
|
||||||
|
Total Cost $0.00
|
||||||
|
|
||||||
|
This project has been constructed in accordance with the approved engineering
|
||||||
|
|
||||||
|
plans and any applicable grant requirements (True/False) True
|
||||||
|
Comments:
|
||||||
|
|
||||||
|
Chee!
|
||||||
|
|
||||||
|
Contractor Evaluation: NA
|
||||||
|
|
||||||
|
Permit(s) Requirements Complete: Y
|
||||||
|
|
||||||
|
Bond Release Recommended: Y
|
||||||
|
Retainage Release NA
|
||||||
|
Recommended:
|
||||||
|
|
||||||
|
Material(s) Certification(s): NA
|
||||||
|
|
||||||
|
Cost Breakdown Attachment Included (True/False): False
|
||||||
|
|
||||||
|
eAMLIS entry Date:
|
||||||
|
|
||||||
|
Page 2 of 2
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,31 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: Findings map
|
||||||
|
file: ../Findings map.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Golden Pond Gob Pile Project
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 425908
|
||||||
|
sha256sum: 7211b22e599fec01b1e41ed839cc44f2c1706d2d9ab435a83417000f4c563026
|
||||||
|
sha1sum: 9188d0db76c008112b59f48b9db7f6664779145b
|
||||||
|
---
|
||||||
|
|
||||||
|
FY2018 Golden Pond Gob Pile Removal Pro-
|
||||||
|
|
||||||
|
ject (Site No. 18302)
|
||||||
|
|
||||||
|
Virginia Carbo Quad
|
||||||
|
|
||||||
|
Located off State Route 615, along Dumps
|
||||||
|
|
||||||
|
Creek, south of South Clinchfield in Russell
|
||||||
|
|
||||||
|
County, Virginia
|
||||||
|
|
||||||
|
Golden Pond Gob Pile Removal
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
File diff suppressed because it is too large
Load Diff
|
|
@ -0,0 +1,242 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: Golden Pond Findings Signed 101618
|
||||||
|
file: ../Golden_Pond_Findings_Signed_101618.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Golden Pond Gob Pile Project
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 381089
|
||||||
|
sha256sum: 93ae70995ac4a9aae30f55d4e32718bcb7acfb88edd158237e4f89e46f80f6ce
|
||||||
|
sha1sum: 6653131479ec7f1a5d7b830468e96d46eff19b40
|
||||||
|
---
|
||||||
|
|
||||||
|
owvisions
|
||||||
|
ENERGY
|
||||||
|
GAS AND OL.
|
||||||
|
|
||||||
|
GEOLOGY AND MINERAL RESOURCES
|
||||||
|
‘MINEO LANO RECLAMATION
|
||||||
|
MINERAL MING
|
||||||
|
|
||||||
|
wanes
|
||||||
|
ADMINISTRATION.
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
|
||||||
|
Department of Mines, Minerals and Energy
|
||||||
|
P.O, Drawer 900
|
||||||
|
Big Stone Gap. Virginia 24219-0900
|
||||||
|
(276) 523-8100 FAX (276) 523-8148
|
||||||
|
www.dinme.virginia,goy
|
||||||
|
|
||||||
|
MEM NDUI
|
||||||
|
TO; Golden Pond Gob Pile Removal Project File
|
||||||
|
|
||||||
|
FROM: Gavin M. Bledsoe, Reclamation Services Manager
|
||||||
|
Lesa C. Baker, Abandoned Mine Land Projects Coordinator
|
||||||
|
Gregory F. Baker, Reclamation Program Manager
|
||||||
|
Phillip C. Mullins, Chief Engineer
|
||||||
|
|
||||||
|
RE: Determinations and Findings for Government Financed Construction
|
||||||
|
Project; AML Enhancement
|
||||||
|
|
||||||
|
DATE: — October 16, 2018
|
||||||
|
|
||||||
|
The "Golden Pond”, is a 32 acre AML gob pile site (mapped as a Tailings Pond) and it is AML
|
||||||
|
cligible. The initial Chapter 19 permit application for Clinchtield Coal Company (Moss 3) Permit
|
||||||
|
Number 1300481 (issued 12/29/1983) notes the area as Pond 7, "The sediment control structure
|
||||||
|
esigned as Pond 7(Sediment basin No 7 in Virginia DMLR Permit Neto 2607-U) in the surface
|
||||||
|
Grainage plan for the Moss No. 3 Preparation Plant was completed by November 1980.” Permit
|
||||||
|
2607-U was permitted to Clinchfield Coal Company on SO7/78. Virginia primacy date is
|
||||||
|
December 15, 1981. All mapping both current and historic doce. not show any evidence this
|
||||||
|
Renate has been affected by a Title V permit. The permit was transferred tn Russell County
|
||||||
|
Reclamation LLC, Permit Umber 1302253 on 4/2/18, The Permittee deleted Pond 7 or the "Golden
|
||||||
|
Pond" feature from the permit, effective June 5, 2018, This 32-acre 80b pile has had no recovery
|
||||||
|
|
||||||
|
EQUAL OPPORTUNITY EMPLOYER
|
||||||
|
‘TDD (800) 828-1120 Virginia Relay Center
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
interest from the adjacent preparation plant for the many years of its existence. This removal
|
||||||
|
project could be the last chance to remove this gob area.
|
||||||
|
|
||||||
|
There is no continuing responsibility for any individual, firm, or organization to
|
||||||
|
reclaim this site.
|
||||||
|
|
||||||
|
Over the past twenty years, DMME has made a concerted effort to eliminate
|
||||||
|
abandoned mine related sediment from entering the Guest River. DMME's work has
|
||||||
|
been accomplished through routine AML projects and also through partnership efforts
|
||||||
|
with the Guest River local watershed group, Lonesome Pine Soil and Water
|
||||||
|
Conservation District, and the Upper Tennessee River Roundtable. Complete removal
|
||||||
|
of the pile will be another effort to eliminate AML sediment from the stream.
|
||||||
|
|
||||||
|
Incidental coal recovered during the complete removal of the pile will be trucked to
|
||||||
|
Dominion’s Virginia City Hybrid Energy Center near St. Paul. The gob product from
|
||||||
|
the Golden Pond Gob Pile project would be blended with high Btu coal to produce a
|
||||||
|
fuel source for the power plant. Many other gob piles have provided fuel for the power
|
||||||
|
plant. DMME has realized tremendous cost savings through reclaiming these piles
|
||||||
|
under the AML enhancement rule.
|
||||||
|
|
||||||
|
DMME would accomplish reclamation of the Golden Pond Gob pile through
|
||||||
|
compleie removal of the pile. Unmarketable material would be backfilled and covered
|
||||||
|
with suitable material then seeded.
|
||||||
|
|
||||||
|
It must be highlighted that permitting this gob pile would not ensure abatement of
|
||||||
|
the AML hazards, Under a permit, a company could only mine the profitable area of
|
||||||
|
the pile, leaving the remainder as abandoned mine lands that would continue to have
|
||||||
|
combustion potential. Further, any permitting of the pile would complicate AML
|
||||||
|
eligibility determinations.
|
||||||
|
|
||||||
|
In order to accomplish the Golden Pond Gob Pile Removal project, we have
|
||||||
|
|
||||||
|
consulted and made the following determinations:
|
||||||
|
|
||||||
|
1, There is little likelihood of coal being mined at a site under a Title V permit.
|
||||||
|
This determination takes into account information including
|
||||||
|
|
||||||
|
* The gob pile has been in place for over eighty years and has not been
|
||||||
|
|
||||||
|
permitted for coal surface mining and reclamation operations.
|
||||||
|
|
||||||
|
+ Paramont Coal Company Virginia, LLC operates a coal preparation
|
||||||
|
plant a few mile from the pile. In over thirty years, Paramont hasnt
|
||||||
|
made efforts to mine and reprocess this pile. DMME personnel believe
|
||||||
|
the costs associated with permitting and reclaiming the site as Title V
|
||||||
|
operation far exceed any profits that could be realized through
|
||||||
|
reprocessing the pile.
|
||||||
|
|
||||||
|
There are no gob pile reprocessing operations in the area,
|
||||||
|
|
||||||
|
“The pile’s size makes this a difficult operation to recover or mine.
|
||||||
|
|
||||||
|
2. There is little likelibood that nearby or adjacent mining activities might create
|
||||||
|
new environmental problems or adversely affect existing environmental
|
||||||
|
problems at the site. This determination takes into account information
|
||||||
|
including:
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
The project site is isolated.
|
||||||
|
|
||||||
|
Coal mining in areas nearby or adjacent to the project is conducted
|
||||||
|
|
||||||
|
under permanent program regulations that protect and enhance
|
||||||
|
|
||||||
|
environmental features.
|
||||||
|
+ Coal reserves in this area are largely mined out.
|
||||||
|
|
||||||
|
3. There is little likelihood that reclamation activities at the site might adversely
|
||||||
|
affect nearby or adjacent mining activities. This determination takes into
|
||||||
|
account information including:
|
||||||
|
|
||||||
|
4 The Gob removal actives will be coordinated with Russell County
|
||||||
|
Reclamation LLC PN 1302253 and (Pilot 2017) Project Reclaim
|
||||||
|
#91706.
|
||||||
|
+ The reclamation project would implement effective environmental
|
||||||
|
safeguards.
|
||||||
|
“There is no history of acidic or toxic material with this pile and
|
||||||
|
associated strata.
|
||||||
|
|
||||||
|
oo
|
||||||
|
|
||||||
|
In consideration of the findings and determinations referenced above, we make the
|
||||||
|
following recommendations:
|
||||||
|
1. The Golden Pond Gob Pile Removal Project will be accomplished as a
|
||||||
|
government financed construction project.
|
||||||
|
2. Incidental coal recovery is not likely to occur during project excavation and this
|
||||||
|
recovery however if itis the site will be exempt from the requirements of the
|
||||||
|
Virginia Coal Surface Mining Control and Reclamation Act of 1979. The most
|
||||||
|
successful and permanent reclamation alternative is to totally remove the pile
|
||||||
|
and dispose of the unmarketable material on previously mined lands to
|
||||||
|
eliminate AML features. Gob material will be removed from the pond in several
|
||||||
|
increments and coal removal would be limited to the incidental coal that could
|
||||||
|
be recovered as the gob pile material is removed to natural ground. The limits of
|
||||||
|
gob removal and incidental coal recovery will be limited to that area shown on
|
||||||
|
the attached map. Coal that is not directly associated with gob will not be
|
||||||
|
removed from the project site.
|
||||||
|
3. Proceeds from the incidental coal extraction will go to offset the project
|
||||||
|
reclamation cost. The gob removal will ultimately create the site for Project
|
||||||
|
Reclaim that will develop an industrial site to support economic development in
|
||||||
|
Russell County.
|
||||||
|
|
||||||
|
In stating the above recommendations, we concur to the following determinations:
|
||||||
|
|
||||||
|
1. The boundaries of the Golden Pond Gob Pile Removal Project and limits of
|
||||||
|
incidental coal extraction are the boundaries shown on Attachment A.
|
||||||
|
|
||||||
|
2. A listing and status of mining permits adjacent or near the Golden Pond Gob Pile
|
||||||
|
Removal Project is shown on Attachment B.
|
||||||
|
|
||||||
|
3. Typical sections of the pile and disposal area are shown on Attachment C.
|
||||||
|
|
||||||
|
4. Total removal of the pile is an engineering necessity to achieve the successful
|
||||||
|
and permanent abatement of the abandoned mine land features. Coal recovery
|
||||||
|
through reprocessing and proper refuse disposal will occur.
|
||||||
|
|
||||||
|
5. Prior to commencement of reclamation activity, the Division will have specific
|
||||||
|
plans and specifications for the project. The project will be conducted in
|
||||||
|
accordance with the provisions of 30 CFR Subchapter R. The Division will also
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
ensure that the project contractor provides the Division with documents that
|
||||||
|
clearly authorize the extraction of coal and payment of royalties.
|
||||||
|
|
||||||
|
esc. Bakertilbl- _CZogpt —
|
||||||
|
|
||||||
|
Abandoned Mine Land Projects Coordinator Reclamation Program Manager
|
||||||
|
ATED Tass (Mable
|
||||||
|
Reclamation Services Manager Chief Engineer
|
||||||
|
|
||||||
|
ia
|
||||||
|
|
||||||
|
Division Diregtor
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Attachment A
|
||||||
|
Golden Pond Gob Pile Removal
|
||||||
|
Project limits in red
|
||||||
|
|
||||||
|
Proje Redan
|
||||||
|
|
||||||
|
Se here impoondmem
|
||||||
|
ae arseaaz wr
|
||||||
|
De 50500 11
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Attachment B
|
||||||
|
Golden Pond Gob Pile Removal
|
||||||
|
Adjacent permits
|
||||||
|
|
||||||
|
Russell County Reclamation 1302253; coal preparation and refuse disposal; in
|
||||||
|
active status.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Attachment C
|
||||||
|
Golden Pond Gob Pile Removal
|
||||||
|
Typical sections
|
||||||
|
|
||||||
|
Tititt
|
||||||
|
|
||||||
|
= las
|
||||||
|
Bes
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,97 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: Signed Eligibility 081618
|
||||||
|
file: ../Signed_Eligibility_081618.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Golden Pond Gob Pile Project
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 71661
|
||||||
|
sha256sum: 0efd7b82eafa710bc4bf309f29be1d0d08c3f06cb21a49bd659c9ef7d3148789
|
||||||
|
sha1sum: 83571453baedb4e899c7623909dd688c3e6d9dbe
|
||||||
|
---
|
||||||
|
|
||||||
|
pwsons
|
||||||
|
enensy
|
||||||
|
|
||||||
|
GAS AND OK
|
||||||
|
|
||||||
|
HED LAND RECLAMATION
|
||||||
|
RE RAL MINIS
|
||||||
|
|
||||||
|
nena RESOURCES
|
||||||
|
nes
|
||||||
|
|
||||||
|
ADUSTAATION
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
|
||||||
|
Department of Mines, Minerals and Energy
|
||||||
|
Division of Mined Land Reclamation:
|
||||||
|
P,0. Drawer 90
|
||||||
|
bg Stone Gap. Virgina 25219-0900
|
||||||
|
(216) 523-8100 276) S233
|
||||||
|
wow de irginia gov
|
||||||
|
|
||||||
|
August 14,2018
|
||||||
|
|
||||||
|
PROJECT ELIGIBILITY DOCUMENTATION
|
||||||
|
GOLDEN POND GOB PILE PROJECT - (SITE No. 18302)
|
||||||
|
FY18 AML CONSOLIDATED GRANT
|
||||||
|
|
||||||
|
The FY2018 Golden Pond Gob Pile Removal Project (Site No. 18302
|
||||||
|
615, along Dumps Creek, south of South Clinchfield in Russell County, Virginia. Project area
|
||||||
|
mapping is comprised of a section of the Carbo USGS 7.5 Minute Quadrangle. The project
|
||||||
|
coordinates are 82° 10' 44.21"W and 36° 57° 38.77"N. The project area is contained within the
|
||||||
|
South Clinchfield Problem Area, VA-O821.
|
||||||
|
|
||||||
|
Reclamation will include eliminating a Priority 3 Gob Pile (GO) that resulted from mining that
|
||||||
|
occurred prior to December 15, 1981, the effective date of Virginia's primacy. The gob feature
|
||||||
|
is an upland feature and removal would not impact streams or wetlands. Sediment will be
|
||||||
|
controlled within the structure as well as through the use of sediment fence and sediment
|
||||||
|
channels. All disturbed areas will be promptly revegetated with non-invasive species agreed to
|
||||||
|
by state and federal agencies.
|
||||||
|
|
||||||
|
The gob structure is the result of pre-law coal processing and loading conducted at the Moss #3 facility.
|
||||||
|
Lesa Baker, DMME's AML Project Coordinator researched the "Golden Pond", the 32 acre AML gob pile
|
||||||
|
site (mapped as a Tailings Pond) and it is AML eligible. The initial Chapter 19 permit application for
|
||||||
|
Clinchfield Coal Company (Moss 3) Permit Number 130048! (issued 12/29/1983) notes the area as Pond
|
||||||
|
7. The description therein notes, “Pond 7 is in the process of being eliminated from the permit. The
|
||||||
|
isturbed drainage Pond 7 controls is the disturbed area of Pond 7 itself." The approved reclamation plan
|
||||||
|
involved vegetating the area only. This pond was not eliminated. A letter dated March 27, 1981 to
|
||||||
|
DMME during the review of the permit notes “The sediment control structure designed as Pond
|
||||||
|
7(Sediment basin No 7 in Virginia DMLR Permit Number 2607-U) in the surface drainage plan for the
|
||||||
|
Moss No. 3 Preparation Plant was completed by November 1980.” Permit 2607-U was permitted to
|
||||||
|
Clinchfield Coal Company on 8/07/78. Virginia primacy date is December 15, 1981. All mapping both
|
||||||
|
current and historic does not show any evidence this structure has been affected by a Title V permit. The
|
||||||
|
permit was transferred to Russell County Reclamation LLC, Permit Umber 1302253 on 4/2/18. The
|
||||||
|
permittee deleted Pond 7 or the "Golden Pond" feature from the permit, effective June 5, 2018.
|
||||||
|
|
||||||
|
‘The abandoned mined land features are a result of underground mining and surface activities that were
|
||||||
|
conducted prior to December 15, 1981. There have been no permanent program activities to impact these
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
features since abandonment of the mine site. There is no continuing responsibility for any individual,
|
||||||
|
firm, or organization to reclaim this feature.
|
||||||
|
|
||||||
|
Thave reviewed the eligibility documentation for this project and find the project meets eligibility criteria
|
||||||
|
of Section 404 of Public Law 95-87 and the criteria of the State Reclamation Plan. I recommend your
|
||||||
|
approval.
|
||||||
|
|
||||||
|
Shion @ Lube Ligust 6 YS
|
||||||
|
|
||||||
|
Lesa Baker Date
|
||||||
|
Abandoned Mine Land Projects Coordinator
|
||||||
|
|
||||||
|
Z,rvprore __Disapprove
|
||||||
|
oly ior shshx
|
||||||
|
|
||||||
|
Randy R. Casey, Date
|
||||||
|
Division Directpr
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,122 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: aiHNM0008430
|
||||||
|
file: ../aiHNM0008430.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Golden Pond Gob Pile Project
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 36996
|
||||||
|
sha256sum: 490907ea0e8d82c4ad9e7ffff96aee43afed19ee75c4e211481e7ba4b79822d5
|
||||||
|
sha1sum: 2c6e1bd3be6c41821c62b675141370004142a5d9
|
||||||
|
---
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 01/07/19
|
||||||
|
5/06 Page 1 of 1
|
||||||
|
|
||||||
|
|
||||||
|
HNM0008430
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER
|
||||||
|
|
||||||
|
Golden Pond Gob Removal 18302 2018 HNM0008430
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED
|
||||||
|
|
||||||
|
C196013 03/31/21 0
|
||||||
|
|
||||||
|
CONTRACTOR NAME ENGINEER NAME
|
||||||
|
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
|
||||||
|
SITE CONTACT PERSON: Kevin Large
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION
|
||||||
|
|
||||||
|
12/12/18 10:00 AM 11:15 AM FROZEN
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMENTS
|
||||||
|
|
||||||
|
A meeting was held on site on 12-12-18 with Heather McDonald-Taylor, Lesa Baker and Clara Harris from DMME and
|
||||||
|
William Wampler, Kevin Large and Dave Powers with the company. The site was reviewed and future plans discussed.
|
||||||
|
Work has not yet begun on the site. Large scale material removal cannot begin until the material within the structure is
|
||||||
|
partially dried. Pumping cannot commence until the ponds on permit 1302253 are approved to receive the drainage.
|
||||||
|
That is addressed in application 1010465. That application is likely to be approved soon. Pumping will commence as
|
||||||
|
soon as the application is approved. Large scale gob removal will likely not commence until spring.
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNM0008430
|
||||||
|
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
Dh DIVISION OF MINED LAND RECLAMATION
|
||||||
|
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
Virginia Depay TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
Mines Minerals and Energy
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
PROJECT NAME, PROJECT NO. GRANT YEAR | REPORT NUMBER
|
||||||
|
|
||||||
|
Golden Pond Gob Removal 48302 2018 HNM0008430
|
||||||
|
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE, PERCENT OF CONTRACT COMPLETED
|
||||||
|
|
||||||
|
C196013 03/31/21 0
|
||||||
|
CONTRACTOR NAME ENGINEER NAME,
|
||||||
|
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
|
||||||
|
‘SITE CONTACT PERSON: Kevin Large
|
||||||
|
|
||||||
|
INSPECTION DATE, ARRIVAL DEPARTURE. GROUND CONDITION
|
||||||
|
42/12/18 10:00 AM 14:15 AM FROZEN
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
[ COMMENTS:
|
||||||
|
|
||||||
|
‘A meeting was held on site on 12-12-16 with Heather McDonald-Taylor, Lesa Baker and Clara Harris from DMME and
|
||||||
|
William Wampler, Kevin Large and Dave Powers with the company. The site was reviewed and future plans discussed.
|
||||||
|
Work has not yet begun on the site. Large scale material removal cannot begin until the material within the structure is
|
||||||
|
partially dried. Pumping cannot commence until the ponds on permit 1302253 are approved to receive the drainage.
|
||||||
|
That is addressed in application 1010465. That application is likely to be approved soon. Pumping will commence as
|
||||||
|
soon as the application is approved. Large scale gob removal will ikely not commence until spring
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 01/07/19
|
||||||
|
5/06 Page 1 of 1
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,134 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: aiHNM0008488
|
||||||
|
file: ../aiHNM0008488.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Golden Pond Gob Pile Project
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 37655
|
||||||
|
sha256sum: acb8286bd76861230fd5ec4bb2b17fdaa0db9821e1e392f3f5142c714aead482
|
||||||
|
sha1sum: bce2c3eaf6f903cc5be55aff0e9cf49cc0b02eba
|
||||||
|
---
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 02/05/19
|
||||||
|
5/06 Page 1 of 1
|
||||||
|
|
||||||
|
|
||||||
|
HNM0008488
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER
|
||||||
|
|
||||||
|
Golden Pond Gob Removal 18302 2018 HNM0008488
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED
|
||||||
|
|
||||||
|
C196013 03/31/21 0
|
||||||
|
|
||||||
|
CONTRACTOR NAME ENGINEER NAME
|
||||||
|
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
|
||||||
|
SITE CONTACT PERSON: Kevin Large
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION
|
||||||
|
|
||||||
|
01/14/19 10:00 AM 11:30 AM FROZEN
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMENTS
|
||||||
|
|
||||||
|
The following equipment was checked by DM Inspector Vernon Johnson, Jr on 12-26-18 and found to be in safe operating
|
||||||
|
condition: (1) Caterpillar excavator with flip screen bucket, (1) Caterpillar 980 G loader, (1) Caterpillar 938 H Loader, (1)
|
||||||
|
John Deere65 dozer, (1) Volvo EC250 excavator with long boom, (2) Volvo A40G off-road trucks and (1) Volvo A30G off-
|
||||||
|
road truck.
|
||||||
|
|
||||||
|
On 1-14-19, the site was reviewed by DMLR engineer Pat Leady and water quality specialist Andrew Hensley. The
|
||||||
|
primary purpose of the visit was to review the area between Golden Pond and Pond 2 to determine the best plan for
|
||||||
|
conveying water to Pond 2.
|
||||||
|
|
||||||
|
The company continues to screen refuse in anticipation of the start of the project; however, fines removal has not yet
|
||||||
|
commenced. Application 1010465 has received technical approval and is awaiting approval of the cost bond. Approval of
|
||||||
|
application 1010465 will allow the company to begin pumping water from Golden Pond in to the permitted ponds.
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNMo0008488
|
||||||
|
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
Dh DIVISION OF MINED LAND RECLAMATION
|
||||||
|
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
Virginia Depay TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
Mines Minerals and Energy
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
PROJECT NAME, PROJECT NO. GRANT YEAR | REPORT NUMBER
|
||||||
|
|
||||||
|
Golden Pond Gob Removal 48302 2018 HNM0008488
|
||||||
|
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE, PERCENT OF CONTRACT COMPLETED
|
||||||
|
|
||||||
|
C196013 03/31/21 0
|
||||||
|
CONTRACTOR NAME ENGINEER NAME,
|
||||||
|
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
|
||||||
|
‘SITE CONTACT PERSON: Kevin Large
|
||||||
|
|
||||||
|
INSPECTION DATE, ARRIVAL DEPARTURE. GROUND CONDITION
|
||||||
|
01/14/19 10:00 AM 14:30 AM FROZEN
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
COMMENTS: ]
|
||||||
|
|
||||||
|
The following equipment was checked by DM Inspector Vernon Johnson, Jr on 12-26-18 and found to be in safe operating
|
||||||
|
condition: (1) Caterpillar excavator with flip screen bucket, (1) Caterpillar 980 G loader, (1) Caterpillar 938 H Loader, (1)
|
||||||
|
John Deere65 dozer, (1) Volvo EC250 excavator with long boom, (2) Volvo A40G off-road trucks and (1) Volvo A30G off-
|
||||||
|
road truck.
|
||||||
|
|
||||||
|
On 1-14-19, the site was reviewed by DMLR engineer Pat Leady and water quality specialist Andrew Hensley. The
|
||||||
|
primary purpose of the visit was to review the area between Golden Pond and Pond 2 to determine the best plan for
|
||||||
|
‘conveying water to Pond 2.
|
||||||
|
|
||||||
|
The company continues to screen refuse in anticipation of the start of the project; however, fines removal has not yet
|
||||||
|
‘commenced. Application 1010465 has received technical approval and is awaiting approval of the cost bond. Approval of
|
||||||
|
application 1010465 will allow the company to begin pumping water from Golden Pond in to the permitted ponds.
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 02/05/19
|
||||||
|
5/06 Page 1 of 1
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,152 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: aiHNM0008528
|
||||||
|
file: ../aiHNM0008528.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Golden Pond Gob Pile Project
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 37828
|
||||||
|
sha256sum: 1d5e9fe8c316de647394da16c975e38fc10fa5e751b19379aa5c3e8685b04199
|
||||||
|
sha1sum: c003d85d9c5879b75486caae2a206c266025e583
|
||||||
|
---
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 03/07/19
|
||||||
|
5/06 Page 1 of 1
|
||||||
|
|
||||||
|
|
||||||
|
HNM0008528
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER
|
||||||
|
|
||||||
|
Golden Pond Gob Removal 18302 2018 HNM0008528
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED
|
||||||
|
|
||||||
|
C196013 03/31/21 0
|
||||||
|
|
||||||
|
CONTRACTOR NAME ENGINEER NAME
|
||||||
|
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
|
||||||
|
SITE CONTACT PERSON: Kevin Large
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION
|
||||||
|
|
||||||
|
02/05/19
|
||||||
|
02/20/19
|
||||||
|
02/21/19
|
||||||
|
|
||||||
|
02:30 PM
|
||||||
|
09:00 AM
|
||||||
|
09:00 AM
|
||||||
|
|
||||||
|
04:30 PM
|
||||||
|
10:00 AM
|
||||||
|
09:30 AM
|
||||||
|
|
||||||
|
WET
|
||||||
|
WET
|
||||||
|
WET
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMENTS
|
||||||
|
|
||||||
|
2/5/19-Upon approval of application 1010465, the permittee breached a portion of the berm around Golden Pond and
|
||||||
|
began allowing it to gravity drain into the Pond 2 series. A ditch was constructed, along with multiple small sumps to
|
||||||
|
control the drainage.
|
||||||
|
|
||||||
|
|
||||||
|
2/20/19-I checked the drainage from the Pond 2 series and Golden Pond. The drainage from Golden Pond was
|
||||||
|
discolored, but the Pond 2 series was, for the most part, handling it. The company was preparing to chemically treat the
|
||||||
|
Golden Pond discharge in preparation for heavy rain that was predicted for the next couple of days.
|
||||||
|
|
||||||
|
|
||||||
|
2/21/19- I again checked the drainage from the Pond 2 Series and Golden Pond. The company had constructed
|
||||||
|
additional sumps between Golden Pond and Pond 2 to ensure the Pond 2 discharge stayed in compliance.
|
||||||
|
|
||||||
|
Removal of material from Golden Pond has still not commenced. The company wants to allow the material to dry more,
|
||||||
|
before removal begins.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNM0008528
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
Dh DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
-ginia Depai TELEPHONE: (276) 523-8198
|
||||||
|
Mines Minerals and Energy
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
PROJECT NAME, PROJECT NO. GRANT YEAR | REPORT NUMBER
|
||||||
|
Golden Pond Gob Removal 48302 2018 HNM0008528
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE, PERCENT OF CONTRACT COMPLETED
|
||||||
|
C196013 03/31/21 0
|
||||||
|
CONTRACTOR NAME ENGINEER NAME,
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
‘SITE CONTACT PERSON: Kevin Large
|
||||||
|
INSPECTION DATE, ARRIVAL DEPARTURE. GROUND CONDITION
|
||||||
|
02/05/19 02:30 PM 04:30 PM WET
|
||||||
|
02/20/19 09:00 AM 10:00 AM WET
|
||||||
|
02/21/19 09:00 AM 09:30 AM WET
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
‘COMMENTS
|
||||||
|
|
||||||
|
215/19-Upon approval of application 1010465, the permittee breached a portion of the berm around Golden Pond and
|
||||||
|
began allowing it to gravity drain into the Pond 2 series. A ditch was constructed, along with multiple small sumps to
|
||||||
|
|
||||||
|
control the drainage.
|
||||||
|
|
||||||
|
2120/19-1 checked the drainage from the Pond 2 series and Golden Pond. The drainage from Golden Pond was
|
||||||
|
discolored, but the Pond 2 series was, for the most part, handling it. The company was preparing to chemically treat the
|
||||||
|
Golden Pond discharge in preparation for heavy rain that was predicted for the next couple of days.
|
||||||
|
|
||||||
|
2121/19- | again checked the drainage from the Pond 2 Series and Golden Pond, The company had constructed
|
||||||
|
additional sumps between Golden Pond and Pond 2 to ensure the Pond 2 discharge stayed in compliance.
|
||||||
|
|
||||||
|
Removal of material from Golden Pond has still not commenced. The company wants to allow the material to dry more,
|
||||||
|
|
||||||
|
before removal begins.
|
||||||
|
|
||||||
|
DMLR-AML-130S
|
||||||
|
5/06 Page 1 of 1
|
||||||
|
|
||||||
|
Printed: 03/07/19
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,202 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: aiHNM0008582
|
||||||
|
file: ../aiHNM0008582.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Golden Pond Gob Pile Project
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 346461
|
||||||
|
sha256sum: 89c90d0ef17345c5e18e45d4cea02d8ab66f92463f47350d2b2b83130ad39968
|
||||||
|
sha1sum: 16f345b8805e182d643d3fb09eb06f733baf08d0
|
||||||
|
---
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 03/29/19
|
||||||
|
5/06 Page 1 of 2
|
||||||
|
|
||||||
|
|
||||||
|
HNM0008582
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER
|
||||||
|
|
||||||
|
Golden Pond Gob Removal 18302 2018 HNM0008582
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED
|
||||||
|
|
||||||
|
C196013 03/31/21 2
|
||||||
|
|
||||||
|
CONTRACTOR NAME ENGINEER NAME
|
||||||
|
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
|
||||||
|
SITE CONTACT PERSON: Kevin Large
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION
|
||||||
|
|
||||||
|
03/07/19
|
||||||
|
03/21/19
|
||||||
|
03/28/19
|
||||||
|
|
||||||
|
01:00 PM
|
||||||
|
10:00 AM
|
||||||
|
02:30 PM
|
||||||
|
|
||||||
|
02:00 PM
|
||||||
|
11:00 AM
|
||||||
|
04:00 PM
|
||||||
|
|
||||||
|
WET
|
||||||
|
DRY
|
||||||
|
DRY
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMENTS
|
||||||
|
|
||||||
|
3/7/19-The company was still working to drain the structure. A sample was collected at outfall 002 on permit 1302253 for
|
||||||
|
lab analysis to ensure compliance with the NPDES permit. The total suspended solids in the sample were 13.6 mg/l, the
|
||||||
|
iron concentration was 0.491 mg/l and the manganese concentration was 0.065 mg/l. All parameters were in compliance
|
||||||
|
with the NPDES permit approved for permit 1302253.
|
||||||
|
|
||||||
|
3/21/19-Excavation of the material within the structure had commenced. The company was removing the top 18 inches of
|
||||||
|
refuse from the outer edge of the structure. The company estimated the moisture content of the refuse to be around 18%.
|
||||||
|
The material had a dry, powdery feel and should not create any issue with haulage.
|
||||||
|
|
||||||
|
3/28/19-Excavation of material continues, with the company still excavating the upper 18 inches. The water discharging
|
||||||
|
from Golden Pond was much less than in previous weeks. The discharge was estimated to be less than 1 gallon per
|
||||||
|
minute and was clear. Photos of the site are shown below.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Dm
|
||||||
|
|
||||||
|
-ginia Depai
|
||||||
|
Mines Minerals and Energy
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
|
||||||
|
HNM0008582
|
||||||
|
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMA’
|
||||||
|
|
||||||
|
TION
|
||||||
|
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
‘TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
PROJECT NAME PROJECT NO. GRANT YEAR | REPORT NUMBER
|
||||||
|
Golden Pond Gob Removal 18302 2018 HINM0008582
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED
|
||||||
|
196013 03/31/21 2
|
||||||
|
CONTRACTOR NAME ENGINEER NAME
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
SITE CONTACT PERSON: Kevin Large
|
||||||
|
INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION
|
||||||
|
03/07/19 01:00 PM 02:00 PM WET
|
||||||
|
03/21/19 10:00 AM 11:00 AM DRY
|
||||||
|
03/28/19 02:30 PM 04:00 PM DRY
|
||||||
|
INSPECTION BY ‘ATTACHMENTS
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
[ COMMENTS ]
|
||||||
|
|
||||||
|
3/7/19-The company was still working to drain the structure. A sample was collected at outfall 002 on permit 1302253 for
|
||||||
|
lab analysis to ensure compliance with the NPDES permit. The total suspended solids in the sample were 13.6 mgil, the
|
||||||
|
iron concentration was 0.491 mg/l and the manganese concentration was 0.065 mg/l. All parameters were in compliance
|
||||||
|
with the NPDES permit approved for permit 1302253.
|
||||||
|
|
||||||
|
3/21/19-Excavation of the material within the structure had commenced. The company was removing the top 18 inches of
|
||||||
|
refuse from the outer edge of the structure. The company estimated the moisture content of the refuse to be around 18%.
|
||||||
|
The material had a dry, powdery feel and should not create any issue with haulage.
|
||||||
|
|
||||||
|
3/28/19-Excavation of material continues, with the company stil excavating the upper 18 inches. The water discharging
|
||||||
|
from Golden Pond was much less than in previous weeks. The discharge was estimated to be less than 1 gallon per
|
||||||
|
minute and was clear. Photos of the site are shown below.
|
||||||
|
|
||||||
|
DMLR-AML-130S
|
||||||
|
5/06
|
||||||
|
|
||||||
|
Page 1 of 2
|
||||||
|
|
||||||
|
Printed: 03/29/19
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 03/29/19
|
||||||
|
5/06 Page 2 of 2
|
||||||
|
|
||||||
|
|
||||||
|
HNM0008582
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNM0008582
|
||||||
|
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
Dh DIVISION OF MINED LAND RECLAMATION
|
||||||
|
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
Virginia Depay TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
Mines Minerals and Energy
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 03/29/19
|
||||||
|
5/06 Page 2 of 2
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,183 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: aiHNM0008620
|
||||||
|
file: ../aiHNM0008620.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Golden Pond Gob Pile Project
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 218903
|
||||||
|
sha256sum: 555b646d6b88ef1dbb651bb2a0a930940eb866784e9ea80e96928fd7f7a3dce3
|
||||||
|
sha1sum: 4789b482c5f1d9a71f81d5b6cf9fc6717996bb7d
|
||||||
|
---
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 05/08/19
|
||||||
|
5/06 Page 1 of 2
|
||||||
|
|
||||||
|
|
||||||
|
HNM0008620
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER
|
||||||
|
|
||||||
|
Golden Pond Gob Removal 18302 2018 HNM0008620
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED
|
||||||
|
|
||||||
|
C196013 03/31/21 2
|
||||||
|
|
||||||
|
CONTRACTOR NAME ENGINEER NAME
|
||||||
|
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
|
||||||
|
SITE CONTACT PERSON: Kevin Large
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION
|
||||||
|
|
||||||
|
04/02/19
|
||||||
|
04/17/19
|
||||||
|
04/24/19
|
||||||
|
|
||||||
|
03:00 PM
|
||||||
|
09:15 AM
|
||||||
|
03:00 PM
|
||||||
|
|
||||||
|
04:45 PM
|
||||||
|
11:00 AM
|
||||||
|
04:30 PM
|
||||||
|
|
||||||
|
WET
|
||||||
|
WET
|
||||||
|
WET
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMENTS
|
||||||
|
|
||||||
|
Excavation of material continues, with the company still excavating in layers of 18 inches. The discharge from the
|
||||||
|
structure was estimated to be approximately 1 gallon per minute and was clear. The company is working to drain the
|
||||||
|
northern portion of the pond to give better access to the area approved for building construction. A photo of the site is
|
||||||
|
shown below.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNM0008620
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
Dh DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
Virginia Depay TELEPHONE: (276) 523-8198
|
||||||
|
Mines Minerals and Energy
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
PROJECT NAME PROJECT NO. GRANT YEAR |_ REPORT NUMBER
|
||||||
|
Golden Pond Gob Removal 18302 2018 HINM0008620
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE, PERCENT OF CONTRACT COMPLETED
|
||||||
|
6196013 03/31/24 2
|
||||||
|
CONTRACTOR NAME ENGINEER NAME
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
‘SITE CONTACT PERSON: Kevin Large
|
||||||
|
INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION
|
||||||
|
|
||||||
|
04/02/19 03:00 PM 04:45 PM WET
|
||||||
|
|
||||||
|
0417/19 09:15 AM 11:00 AM WET
|
||||||
|
|
||||||
|
04/24/19 03:00 PM 04:30 PM WET
|
||||||
|
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
‘COMMENTS
|
||||||
|
|
||||||
|
Excavation of material continues, with the company still excavating in layers of 18 inches. The discharge from the
|
||||||
|
structure was estimated to be approximately 1 gallon per minute and was clear. The company is working to drain the
|
||||||
|
|
||||||
|
northern portion of the pond to give better access to the area approved for building construction.
|
||||||
|
|
||||||
|
shown below.
|
||||||
|
|
||||||
|
DMLR-AML-130S
|
||||||
|
5/06
|
||||||
|
|
||||||
|
Page 1 of 2
|
||||||
|
|
||||||
|
A photo of the site is
|
||||||
|
|
||||||
|
Printed: 05/08/19
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 05/08/19
|
||||||
|
5/06 Page 2 of 2
|
||||||
|
|
||||||
|
|
||||||
|
HNM0008620
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNM0008620
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
9a ‘TELEPHONE: (276) 523-8198
|
||||||
|
Mines Minerals and Energy
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 05/08/19
|
||||||
|
5/06 Page 2 of 2
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,345 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: aiHNM0008664
|
||||||
|
file: ../aiHNM0008664.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Golden Pond Gob Pile Project
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 907381
|
||||||
|
sha256sum: 7f940e47507ccdf72903476c9bbc4af8559ed6cdebc3f3f354f33e2baf987b82
|
||||||
|
sha1sum: 2ef4202e5cc81a3f538813ca2aba0ccece57a1ad
|
||||||
|
---
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 05/31/19
|
||||||
|
5/06 Page 1 of 5
|
||||||
|
|
||||||
|
|
||||||
|
HNM0008664
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER
|
||||||
|
|
||||||
|
Golden Pond Gob Removal 18302 2018 HNM0008664
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED
|
||||||
|
|
||||||
|
C196013 03/31/21 2
|
||||||
|
|
||||||
|
CONTRACTOR NAME ENGINEER NAME
|
||||||
|
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
|
||||||
|
SITE CONTACT PERSON: Kevin Large
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION
|
||||||
|
|
||||||
|
05/02/19
|
||||||
|
05/07/19
|
||||||
|
05/22/19
|
||||||
|
05/29/19
|
||||||
|
|
||||||
|
09:00 AM
|
||||||
|
03:00 PM
|
||||||
|
09:15 AM
|
||||||
|
03:15 PM
|
||||||
|
|
||||||
|
10:30 AM
|
||||||
|
04:30 PM
|
||||||
|
11:00 AM
|
||||||
|
04:30 PM
|
||||||
|
|
||||||
|
WET
|
||||||
|
WET
|
||||||
|
WET
|
||||||
|
WET
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMENTS
|
||||||
|
|
||||||
|
Material removal continued throughout the month with the primary focus on Zone 1. The contractor hopes to excavate a
|
||||||
|
ditch from Zone 1 to help dewater the building site in Zones 3, 4, and 5. There is an area of vegetation in Zone 2 that is
|
||||||
|
currently unstable for equipment. The contractor is continuing to work to try to dewater that zone. Zone 11 is largely
|
||||||
|
open to allow for the dewatering of Golden Pond in to permitted siltation structures. The dewatering area was lowered at
|
||||||
|
the 5/29/19 inspection and the flow from the structure had increased. It appeared on the 5/29 inspection that the
|
||||||
|
contractor had drained the structure to a point that no surface water was visible.
|
||||||
|
|
||||||
|
A meeting was held on site on 5/2/19 with DMME and OSM. Heather McDonald-Taylor, Lesa Baker and Clara Harris
|
||||||
|
were present for DMME. Tonya Mullins, Debra Zirkle and Ronnie Vicars were present for OSM. The entire site was
|
||||||
|
reviewed and a general discussion was held on payment for placement of the backfill material as part of the associated
|
||||||
|
Project Reclaim. The company was to follow up with Clara Harris of DMME to determine how best to document the
|
||||||
|
volume of material placed in order to ensure accurate payment.
|
||||||
|
|
||||||
|
Photos of the site are shown below.
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNMO0008664
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
Dh DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
-ginia Depai TELEPHONE: (276) 523-8198
|
||||||
|
Mines Minerals and Energy
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
PROJECT NAME, PROJECT NO. GRANT YEAR | REPORT NUMBER
|
||||||
|
Golden Pond Gob Removal 48302 2018 HNM0008664
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE, PERCENT OF CONTRACT COMPLETED
|
||||||
|
C196013 03/31/21 2
|
||||||
|
CONTRACTOR NAME ENGINEER NAME,
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
‘SITE CONTACT PERSON: Kevin Large
|
||||||
|
INSPECTION DATE, ARRIVAL DEPARTURE. GROUND CONDITION
|
||||||
|
05/02/19 09:00 AM 10:30 AM WET
|
||||||
|
05/07/19 03:00 PM 04:30 PM WET
|
||||||
|
05/22/19 09:15 AM 11:00 AM WET
|
||||||
|
05/29/19 03:15 PM 04:30 PM WET
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
‘COMMENTS
|
||||||
|
|
||||||
|
Material removal continued throughout the month with the primary focus on Zone 1. The contractor hopes to excavate a
|
||||||
|
ditch from Zone 1 to help dewater the building site in Zones 3, 4, and 5. There is an area of vegetation in Zone 2 that is
|
||||||
|
currently unstable for equipment. The contractor is continuing to work to try to dewater that zone. Zone 11 is largely
|
||||||
|
‘open to allow for the dewatering of Golden Pond in to permitted siltation structures. The dewatering area was lowered at
|
||||||
|
the 5/29/19 inspection and the flow from the structure had increased. It appeared on the 5/29 inspection that the
|
||||||
|
contractor had drained the structure to a point that no surface water was visible.
|
||||||
|
|
||||||
|
‘A meeting was held on site on 5/2/19 with DMME and OSM. Heather McDonald-Taylor, Lesa Baker and Clara Harris
|
||||||
|
were present for DMME. Tonya Mullins, Debra Zirkle and Ronnie Vicars were present for OSM. The entire site was
|
||||||
|
reviewed and a general discussion was held on payment for placement of the backfill material as part of the associated
|
||||||
|
Project Reclaim. The company was to follow up with Clara Harris of DMME to determine how best to document the
|
||||||
|
volume of material placed in order to ensure accurate payment.
|
||||||
|
|
||||||
|
Photos of the site are shown below.
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 05/31/19
|
||||||
|
5/06 Page 1 of 5
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 05/31/19
|
||||||
|
5/06 Page 2 of 5
|
||||||
|
|
||||||
|
|
||||||
|
HNM0008664
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
An area located near the building site that had been excavated to solid prior to backfill placement.
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNMo008664
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
Dh DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
-ginta Depay TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
Mines Minerals and Energy
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
An area located near the building site that had been excavated to solid prior to backfill placement.
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 05/34/19
|
||||||
|
5106 Page 2 of 5
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 05/31/19
|
||||||
|
5/06 Page 3 of 5
|
||||||
|
|
||||||
|
|
||||||
|
HNM0008664
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Material Excavation and Removal in Zone 1
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
Dh DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
‘TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
Mines Minerals and Energy
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
HNMO0008664
|
||||||
|
|
||||||
|
Material Excavation and Removal in Zone 1
|
||||||
|
|
||||||
|
DMLR-AML-130S
|
||||||
|
5106 Page 3 of 5
|
||||||
|
|
||||||
|
Printed: 05/31/19
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 05/31/19
|
||||||
|
5/06 Page 4 of 5
|
||||||
|
|
||||||
|
|
||||||
|
HNM0008664
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Unstable material located in Zone 2.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
Die DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
‘ginia Deparsafanber TELEPHONE: (276) 523-8198
|
||||||
|
Mines Minerals and Energy
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
Unstable material located in Zone 2.
|
||||||
|
|
||||||
|
DMLR-AML-130S
|
||||||
|
5106 Page 4 of 5
|
||||||
|
|
||||||
|
HNMO0008664
|
||||||
|
|
||||||
|
Printed: 05/31/19
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 05/31/19
|
||||||
|
5/06 Page 5 of 5
|
||||||
|
|
||||||
|
|
||||||
|
HNM0008664
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNMO0008664
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
Dh DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
‘TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
Mines Minerals ond Energy
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 05/34/19
|
||||||
|
5106 Page 5 of 5
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,253 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: aiHNM0008705
|
||||||
|
file: ../aiHNM0008705.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Golden Pond Gob Pile Project
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 425958
|
||||||
|
sha256sum: d93c2e4adf2623650b1e5bdf79f6f8f604741b83db6915bbf09660f8ff51d631
|
||||||
|
sha1sum: d1b3d17d5a468bc4b0fd6cf0c7a6eed749e088dc
|
||||||
|
---
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 07/03/19
|
||||||
|
5/06 Page 1 of 3
|
||||||
|
|
||||||
|
|
||||||
|
HNM0008705
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER
|
||||||
|
|
||||||
|
Golden Pond Gob Removal 18302 2018 HNM0008705
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED
|
||||||
|
|
||||||
|
C196013 03/31/21 2
|
||||||
|
|
||||||
|
CONTRACTOR NAME ENGINEER NAME
|
||||||
|
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
|
||||||
|
SITE CONTACT PERSON: Kevin Large
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION
|
||||||
|
|
||||||
|
06/24/19
|
||||||
|
06/19/19
|
||||||
|
06/03/19
|
||||||
|
|
||||||
|
02:15 PM
|
||||||
|
02:30 PM
|
||||||
|
04:00 PM
|
||||||
|
|
||||||
|
02:45 PM
|
||||||
|
04:30 PM
|
||||||
|
04:05 PM
|
||||||
|
|
||||||
|
WET
|
||||||
|
WET
|
||||||
|
DRY
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMENTS
|
||||||
|
|
||||||
|
Material removal continued throughout the month. The company completed excavation of the ditch from Zone 1 to the
|
||||||
|
building site in the vicinity of Zones 3 and 4. Since completion of the ditch the focus of material removal has been in the
|
||||||
|
building zones. During the 6/19/19 inspection, the contractor had opened up a large pit in the vicinity of Zone 4. Solid
|
||||||
|
ground was visible in the bottom of the pit, and pictures were taken to document that the contractor had excavated to solid
|
||||||
|
at the building site. Heavy rains throughout the month has left the material saturated and much more difficult to work.
|
||||||
|
|
||||||
|
Photos of the site are shown below.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNM0008705
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
Dh DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
Virginia Depay TELEPHONE: (276) 523-8198
|
||||||
|
Mines Minerals and Energy
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
PROJECT NAME PROJECT NO. GRANT YEAR |_ REPORT NUMBER
|
||||||
|
Golden Pond Gob Removal 18302 2018 HNM0008705:
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE, PERCENT OF CONTRACT COMPLETED
|
||||||
|
6196013 03/31/24 2
|
||||||
|
CONTRACTOR NAME ENGINEER NAME
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
‘SITE CONTACT PERSON: Kevin Large
|
||||||
|
INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION
|
||||||
|
|
||||||
|
06/24/19 02:15 PM 02:45 PM WET
|
||||||
|
|
||||||
|
06/19/19 02:30 PM 04:30 PM WET
|
||||||
|
|
||||||
|
06/03/19 04:00 PM 04:05 PM DRY
|
||||||
|
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
‘COMMENTS
|
||||||
|
|
||||||
|
Material removal continued throughout the month. The company completed excavation of the ditch from Zone 1 to the
|
||||||
|
building site in the vicinity of Zones 3 and 4. Since completion of the ditch the focus of material removal has been in the
|
||||||
|
building zones. During the 6/19/19 inspection, the contractor had opened up a large pit in the vicinity of Zone 4. Solid
|
||||||
|
ground was visible in the bottom of the pit, and pictures were taken to document that the contractor had excavated to solid
|
||||||
|
at the building site. Heavy rains throughout the month has left the material saturated and much more difficult to work.
|
||||||
|
|
||||||
|
Photos of the site are shown below.
|
||||||
|
|
||||||
|
DMLR-AML-130S
|
||||||
|
5/06
|
||||||
|
|
||||||
|
Page 1 of 3
|
||||||
|
|
||||||
|
Printed: 07/03/19
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 07/03/19
|
||||||
|
5/06 Page 2 of 3
|
||||||
|
|
||||||
|
|
||||||
|
HNM0008705
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
An area located at the building site that had been excavated to solid prior to backfill placement.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNM0008705
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
‘TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
Mines Minerals and Energy
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
“enigma
|
||||||
|
|
||||||
|
An area located at the building site that had been excavated to solid prior to backfill placement.
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 07/03/19
|
||||||
|
5/06 Page 2 of 3
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 07/03/19
|
||||||
|
5/06 Page 3 of 3
|
||||||
|
|
||||||
|
|
||||||
|
HNM0008705
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Ditch construction from Zone 1 to Zone 3
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNM0008705
|
||||||
|
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
Dh DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
-ginia Depay TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
Mines Minerals and Energy
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
SS)
|
||||||
|
men
|
||||||
|
|
||||||
|
Ditch construction from Zone 1 to Zone 3
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 07/03/19
|
||||||
|
5/06 Page 3 of 3
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,182 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: aiHNM0008739
|
||||||
|
file: ../aiHNM0008739.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Golden Pond Gob Pile Project
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 395187
|
||||||
|
sha256sum: 9024e2cd1d3fd833e2076d5e4f3b5e505680c23c6a8704c622d2b218c2bdb135
|
||||||
|
sha1sum: 06554032e3f07996800f4981ff995db3c0180e0b
|
||||||
|
---
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 08/07/19
|
||||||
|
5/06 Page 1 of 2
|
||||||
|
|
||||||
|
|
||||||
|
HNM0008739
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER
|
||||||
|
|
||||||
|
Golden Pond Gob Removal 18302 2018 HNM0008739
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED
|
||||||
|
|
||||||
|
C196013 03/31/21 8
|
||||||
|
|
||||||
|
CONTRACTOR NAME ENGINEER NAME
|
||||||
|
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
|
||||||
|
SITE CONTACT PERSON: Kevin Large
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION
|
||||||
|
|
||||||
|
07/18/19
|
||||||
|
07/22/19
|
||||||
|
|
||||||
|
02:00 PM
|
||||||
|
09:15 AM
|
||||||
|
|
||||||
|
02:30 PM
|
||||||
|
01:00 PM
|
||||||
|
|
||||||
|
WET
|
||||||
|
WET
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMENTS
|
||||||
|
|
||||||
|
Material removal continued throughout the month. The company excavated primarily in the building zone during July.
|
||||||
|
Below are two photos documenting that the material was excavated to solid ground in this area.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNM0008739
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
Dh DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
-ginia Depay TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
Mines Minerals and Energy
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
PROJECT NAME, PROJECT NO. GRANT YEAR | REPORT NUMBER
|
||||||
|
Golden Pond Gob Removal 48302 2018 HNM0008739
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE, PERCENT OF CONTRACT COMPLETED
|
||||||
|
€196013 03/31/21 8
|
||||||
|
CONTRACTOR NAME ENGINEER NAME,
|
||||||
|
Russell County Reclamation, LLC ‘SCOTTY COX
|
||||||
|
‘SITE CONTACT PERSON: Kevin Large
|
||||||
|
INSPECTION DATE, ARRIVAL, DEPARTURE. GROUND CONDITION
|
||||||
|
07/18/19 02:00 PM 02:30 PM WET
|
||||||
|
07/2219 09:15 AM 01:00 PM WET
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
[ ‘COMMENTS
|
||||||
|
|
||||||
|
Material removal continued throughout the month. The company excavated primarily in the building zone during July.
|
||||||
|
Below are two photos documenting that the material was excavated to solid ground in this area.
|
||||||
|
|
||||||
|
VV
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 08/07/19
|
||||||
|
5/06 Page 1 of 2
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 08/07/19
|
||||||
|
5/06 Page 2 of 2
|
||||||
|
|
||||||
|
|
||||||
|
HNM0008739
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNM0008739
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
‘TELEPHONE: (276) 523-8198
|
||||||
|
Mines Minerals and Energy
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 08/07/19
|
||||||
|
5/06 Page 2 of 2
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,187 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: aiHNM0008781
|
||||||
|
file: ../aiHNM0008781.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Golden Pond Gob Pile Project
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 192006
|
||||||
|
sha256sum: 158e313f93870403d6cd9a93c8b9fde13db5b1eee1389e444f68c3ff8f7c33ba
|
||||||
|
sha1sum: 7c3377cab1b83b79c294fc0f5c23663c7fb40891
|
||||||
|
---
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 09/13/19
|
||||||
|
5/06 Page 1 of 2
|
||||||
|
|
||||||
|
|
||||||
|
HNM0008781
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER
|
||||||
|
|
||||||
|
Golden Pond Gob Removal 18302 2018 HNM0008781
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED
|
||||||
|
|
||||||
|
C196013 03/31/21 8
|
||||||
|
|
||||||
|
CONTRACTOR NAME ENGINEER NAME
|
||||||
|
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
|
||||||
|
SITE CONTACT PERSON: Kevin Large
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION
|
||||||
|
|
||||||
|
08/06/19
|
||||||
|
08/15/19
|
||||||
|
|
||||||
|
03:30 PM
|
||||||
|
02:00 PM
|
||||||
|
|
||||||
|
05:00 PM
|
||||||
|
02:45 PM
|
||||||
|
|
||||||
|
DRY
|
||||||
|
DRY
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMENTS
|
||||||
|
|
||||||
|
Material removal continued throughout the month. The company continued to excavate from the building zone during
|
||||||
|
August. Below are two photos documenting that the material was excavated to solid ground in this area. A photo of the
|
||||||
|
site is shown below.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNM0008781
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
Dimi DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
Virginia Depay TELEPHONE: (276) 523-8198
|
||||||
|
Mines Minerals and Energy
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
PROJECT NAME PROJECT NO. GRANT YEAR [REPORT NUMBER
|
||||||
|
Golden Pond Gob Removal 18302 2018 HINM0008781
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE, PERCENT OF CONTRACT COMPLETED
|
||||||
|
'C196013 03/31/24 8
|
||||||
|
CONTRACTOR NAME ENGINEER NAME
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
‘SITE CONTACT PERSON: Kevin Large
|
||||||
|
INSPECTION DATE DEPARTURE GROUND CONDITION
|
||||||
|
08/06/19 05:00 PM DRY
|
||||||
|
08/15/19 02:45 PM DRY
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
‘COMMENTS:
|
||||||
|
|
||||||
|
Material removal continued throughout the month. The company continued to excavate from the building zone during
|
||||||
|
August. Below are two photos documenting that the material was excavated to solid ground in this area. A photo of the
|
||||||
|
|
||||||
|
site is shown below.
|
||||||
|
|
||||||
|
DMLR-AML-130S
|
||||||
|
5/06
|
||||||
|
|
||||||
|
Page 1 of 2
|
||||||
|
|
||||||
|
Printed: 09/13/19
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 09/13/19
|
||||||
|
5/06 Page 2 of 2
|
||||||
|
|
||||||
|
|
||||||
|
HNM0008781
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNM0008781
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
Dh DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
‘TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
Mines Minerals ond Energy
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 09/13/19
|
||||||
|
5/06 Page 2 of 2
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,233 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: aiHNM0008826
|
||||||
|
file: ../aiHNM0008826.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Golden Pond Gob Pile Project
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 476777
|
||||||
|
sha256sum: 0295cf5e4e8b388610c4bd79cca99cd82424233759bf2966ae8e198335d18499
|
||||||
|
sha1sum: 7b0ba60579a1064589ba91d8a199c56041e986eb
|
||||||
|
---
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 10/04/19
|
||||||
|
5/06 Page 1 of 3
|
||||||
|
|
||||||
|
|
||||||
|
HNM0008826
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER
|
||||||
|
|
||||||
|
Golden Pond Gob Removal 18302 2018 HNM0008826
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED
|
||||||
|
|
||||||
|
C196013 03/31/21 15
|
||||||
|
|
||||||
|
CONTRACTOR NAME ENGINEER NAME
|
||||||
|
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
|
||||||
|
SITE CONTACT PERSON: Kevin Large
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION
|
||||||
|
|
||||||
|
09/11/19
|
||||||
|
09/16/19
|
||||||
|
09/26/19
|
||||||
|
|
||||||
|
02:00 PM
|
||||||
|
09:15 AM
|
||||||
|
03:00 PM
|
||||||
|
|
||||||
|
03:30 PM
|
||||||
|
10:15 PM
|
||||||
|
03:30 PM
|
||||||
|
|
||||||
|
WET
|
||||||
|
WET
|
||||||
|
WET
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMENTS
|
||||||
|
|
||||||
|
Material removal continued throughout the month. The company continued to excavate from the building zone during
|
||||||
|
September. Sumps between the structure and permitted sediment ponds were cleaned on September 19th. Photos of
|
||||||
|
the site are shown below.
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNMo008826
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
Dh DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
Virginia Depay TELEPHONE: (276) 523-8198
|
||||||
|
Mines Minerals and Energy
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
PROJECT NAME PROJECT NO. GRANT YEAR [REPORT NUMBER
|
||||||
|
Golden Pond Gob Removal 18302 2018 HINM0008826
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED
|
||||||
|
196013 03/31/21 15
|
||||||
|
CONTRACTOR NAME ENGINEER NAME
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
SITE CONTACT PERSON: Kevin Large
|
||||||
|
INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION
|
||||||
|
09/11/19 02:00 PM 03:30 PM WET
|
||||||
|
09/16/19 09:15 AM 10:15 PM WET
|
||||||
|
09/26/19 03:00 PM 03:30 PM WET
|
||||||
|
INSPECTION BY ‘ATTACHMENTS
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
[ COMMENTS
|
||||||
|
|
||||||
|
Material removal continued throughout the month. The company continued to excavate from the building zone during
|
||||||
|
|
||||||
|
September. Sumps between the structure and permitted sediment ponds were cleaned on September 19",
|
||||||
|
|
||||||
|
the site are shown below.
|
||||||
|
|
||||||
|
DMLR-AML-130S
|
||||||
|
5/06
|
||||||
|
|
||||||
|
Page 1 of 3
|
||||||
|
|
||||||
|
Photos of
|
||||||
|
|
||||||
|
Printed: 10/04/19
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 10/04/19
|
||||||
|
5/06 Page 2 of 3
|
||||||
|
|
||||||
|
|
||||||
|
HNM0008826
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNM0008826
|
||||||
|
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
Di DIVISION OF MINED LAND RECLAMATION
|
||||||
|
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
Virginia Depay TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
Mines Minerals and Energy
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
DMLR-AML-130S : — : Printed: 10/04/19
|
||||||
|
5/06 Page 2 of 3
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 10/04/19
|
||||||
|
5/06 Page 3 of 3
|
||||||
|
|
||||||
|
|
||||||
|
HNM0008826
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNM0008826
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
Dh DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
‘TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
Mines Minerals ond Energy
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 10/04/19
|
||||||
|
5/06 Page 3 of 3
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,193 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: aiHNM0008872
|
||||||
|
file: ../aiHNM0008872.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Golden Pond Gob Pile Project
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 380694
|
||||||
|
sha256sum: f3b30bd997bdeb705c53a01741b346ab8d3eabf522ffe346508ea5d6c79628c1
|
||||||
|
sha1sum: f9fd3e8c89cc76e77cc10c0452b08ef92f5cdb9f
|
||||||
|
---
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 11/12/19
|
||||||
|
5/06 Page 1 of 2
|
||||||
|
|
||||||
|
|
||||||
|
HNM0008872
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER
|
||||||
|
|
||||||
|
Golden Pond Gob Removal 18302 2018 HNM0008872
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED
|
||||||
|
|
||||||
|
C196013 03/31/21 15
|
||||||
|
|
||||||
|
CONTRACTOR NAME ENGINEER NAME
|
||||||
|
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
|
||||||
|
SITE CONTACT PERSON: Kevin Large
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION
|
||||||
|
|
||||||
|
10/02/19
|
||||||
|
10/09/19
|
||||||
|
10/17/19
|
||||||
|
|
||||||
|
04:00 PM
|
||||||
|
04:00 PM
|
||||||
|
02:30 PM
|
||||||
|
|
||||||
|
04:30 PM
|
||||||
|
04:30 PM
|
||||||
|
04:30 PM
|
||||||
|
|
||||||
|
WET
|
||||||
|
WET
|
||||||
|
WET
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMENTS
|
||||||
|
|
||||||
|
Material removal continued throughout the month. The company is nearing the end of the building site with the
|
||||||
|
excavation. Photos of the site are shown below.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNM0008872
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
Dh DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
-ginia Depai TELEPHONE: (276) 523-8198
|
||||||
|
Mines Minerals and Energy
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
PROJECT NAME, PROJECT NO. GRANT YEAR | REPORT NUMBER
|
||||||
|
Golden Pond Gob Removal 48302 2018 HNM0008872
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE, PERCENT OF CONTRACT COMPLETED
|
||||||
|
C196013 03/31/21 15
|
||||||
|
CONTRACTOR NAME ENGINEER NAME,
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
‘SITE CONTACT PERSON: Kevin Large
|
||||||
|
INSPECTION DATE, ARRIVAL DEPARTURE. GROUND CONDITION
|
||||||
|
10/02/19 (04:00 PM (04:30 PM WET
|
||||||
|
10/09/19 04:00 PM 04:30 PM WET
|
||||||
|
40/17/19 02:30 PM 04:30 PM WET
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
[ ‘COMMENTS
|
||||||
|
|
||||||
|
Material removal continued throughout the month. The company is nearing the end of the buil
|
||||||
|
excavation. Photos of the site are shown below.
|
||||||
|
|
||||||
|
ing site with the
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 11/12/19
|
||||||
|
5/06 Page 1 of 2
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 11/12/19
|
||||||
|
5/06 Page 2 of 2
|
||||||
|
|
||||||
|
|
||||||
|
HNM0008872
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNMo008872
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
ia Depa TELEPHONE: (276) 523-8198
|
||||||
|
Mines Minerals and Energy
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 11/12/19
|
||||||
|
5/06 Page 2 of 2
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,167 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: aiHNM0008911
|
||||||
|
file: ../aiHNM0008911.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Golden Pond Gob Pile Project
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 185662
|
||||||
|
sha256sum: de2e0ce4bc1dcb4848cc06c97a48ad0552883819b4045ccdaeb31b1d9d77ea02
|
||||||
|
sha1sum: 2db1edb56ae47e588766daf8ef7d041feab5600b
|
||||||
|
---
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 12/16/19
|
||||||
|
5/06 Page 1 of 2
|
||||||
|
|
||||||
|
|
||||||
|
HNM0008911
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER
|
||||||
|
|
||||||
|
Golden Pond Gob Removal 18302 2018 HNM0008911
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED
|
||||||
|
|
||||||
|
C196013 03/31/21 15
|
||||||
|
|
||||||
|
CONTRACTOR NAME ENGINEER NAME
|
||||||
|
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
|
||||||
|
SITE CONTACT PERSON: Kevin Large
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION
|
||||||
|
|
||||||
|
11/07/19
|
||||||
|
11/21/19
|
||||||
|
|
||||||
|
02:30 PM
|
||||||
|
09:30 AM
|
||||||
|
|
||||||
|
04:00 PM
|
||||||
|
10:30 AM
|
||||||
|
|
||||||
|
WET
|
||||||
|
WET
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMENTS
|
||||||
|
|
||||||
|
Material removal continued throughout the month. Excavation is beginning to move beyond the building site. A photo of
|
||||||
|
the site is shown below.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNM0008911
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
Dh DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
-ginia Depai TELEPHONE: (276) 523-8198
|
||||||
|
Mines Minerals and Energy
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
PROJECT NAME, PROJECT NO. GRANT YEAR | REPORT NUMBER
|
||||||
|
Golden Pond Gob Removal 48302 2018 HNM0008911
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE, PERCENT OF CONTRACT COMPLETED
|
||||||
|
€196013 03/31/21 15
|
||||||
|
CONTRACTOR NAME ENGINEER NAME,
|
||||||
|
Russell County Reclamation, LLC ‘SCOTTY COX
|
||||||
|
‘SITE CONTACT PERSON: Kevin Large
|
||||||
|
INSPECTION DATE, ARRIVAL DEPARTURE. GROUND CONDITION
|
||||||
|
41/07/19 02:30 PM (04:00 PM WET
|
||||||
|
44/21/19 09:30 AM 10:30 AM WET
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
[ ‘COMMENTS ]
|
||||||
|
Material removal continued throughout the month. Excavation is beginning to move beyond the building site. A photo of
|
||||||
|
the site is shown below,
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 12/16/19
|
||||||
|
5/06 Page 1 of 2
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 12/16/19
|
||||||
|
5/06 Page 2 of 2
|
||||||
|
|
||||||
|
|
||||||
|
HNM0008911
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNM0008911
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
Dh DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
‘TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
Mines Minerals ond Energy
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 12/16/19
|
||||||
|
5/06 Page 2 of 2
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,124 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: aiHNM0009019
|
||||||
|
file: ../aiHNM0009019.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Golden Pond Gob Pile Project
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 36538
|
||||||
|
sha256sum: f88f5b4223d6cdfcfacd9a00964119cec5a72f03d2bb82bf8b54869cb1b5efe5
|
||||||
|
sha1sum: 94ebb9a6dd42f2a99480af5d37f91c2aa2a6bb0a
|
||||||
|
---
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 02/04/20
|
||||||
|
5/06 Page 1 of 1
|
||||||
|
|
||||||
|
|
||||||
|
HNM0009019
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER
|
||||||
|
|
||||||
|
Golden Pond Gob Removal 18302 2018 HNM0009019
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED
|
||||||
|
|
||||||
|
C196013 03/31/21 15
|
||||||
|
|
||||||
|
CONTRACTOR NAME ENGINEER NAME
|
||||||
|
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
|
||||||
|
SITE CONTACT PERSON: Kevin Large
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION
|
||||||
|
|
||||||
|
01/15/20
|
||||||
|
01/23/20
|
||||||
|
|
||||||
|
03:30 PM
|
||||||
|
03:00 PM
|
||||||
|
|
||||||
|
04:30 PM
|
||||||
|
04:00 PM
|
||||||
|
|
||||||
|
WET
|
||||||
|
WET
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMENTS
|
||||||
|
|
||||||
|
Material removal continued throughout the month. Excavation has moved beyond the building site. At the time of the
|
||||||
|
inspection, excavators were working both sides of the structure.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNM0009019
|
||||||
|
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
Dh DIVISION OF MINED LAND RECLAMATION
|
||||||
|
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
Virginia Depay TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
Mines Minerals and Energy
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
PROJECT NAME, PROJECT NO. GRANT YEAR | REPORT NUMBER
|
||||||
|
|
||||||
|
Golden Pond Gob Removal 18302 2018 HNM0009019
|
||||||
|
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE, PERCENT OF CONTRACT COMPLETED
|
||||||
|
€196013 03/31/21 15
|
||||||
|
CONTRACTOR NAME ENGINEER NAME,
|
||||||
|
Russell County Reclamation, LLC ‘SCOTTY COX
|
||||||
|
‘SITE CONTACT PERSON: Kevin Large
|
||||||
|
INSPECTION DATE ARRIVAL DEPARTURE. GROUND CONDITION
|
||||||
|
01/15/20 03:30 PM 04:30 PM WET
|
||||||
|
01/23/20 03:00 PM 04:00 PM WET
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
[ COMMENTS
|
||||||
|
|
||||||
|
Material removal continued throughout the month. Excavation has moved beyond the building site. At the time of the
|
||||||
|
inspection, excavators were working both sides of the structure.
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 02/04/20
|
||||||
|
5/06 Page 1 of 1
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,214 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: aiHNM0009098
|
||||||
|
file: ../aiHNM0009098.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Golden Pond Gob Pile Project
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 447066
|
||||||
|
sha256sum: e50838447f647e2df4f53b580abd13cf074d87e6fbc8951b8196bb9014e19615
|
||||||
|
sha1sum: e254ebe486817c8b3600333d6e69c0a7987d2877
|
||||||
|
---
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 04/03/20
|
||||||
|
5/06 Page 1 of 3
|
||||||
|
|
||||||
|
|
||||||
|
HNM0009098
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER
|
||||||
|
|
||||||
|
Golden Pond Gob Removal 18302 2018 HNM0009098
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED
|
||||||
|
|
||||||
|
C196013 03/31/21 15
|
||||||
|
|
||||||
|
CONTRACTOR NAME ENGINEER NAME
|
||||||
|
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
|
||||||
|
SITE CONTACT PERSON: Kevin Large
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION
|
||||||
|
|
||||||
|
02/12/20
|
||||||
|
02/20/20
|
||||||
|
|
||||||
|
03:45 PM
|
||||||
|
03:30 PM
|
||||||
|
|
||||||
|
04:45 PM
|
||||||
|
04:30 PM
|
||||||
|
|
||||||
|
WET
|
||||||
|
WET
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMENTS
|
||||||
|
|
||||||
|
Material removal and backfilling is ongoing just beyond the building site. Weather conditions have slowed production at
|
||||||
|
the site.
|
||||||
|
|
||||||
|
|
||||||
|
Photos of the site are shown below.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNMoo09098
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
Dh DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
-ginta Depay TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
Mines Minerals and Energy
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
PROJECT NAME, PROJECT NO. GRANT YEAR | REPORT NUMBER
|
||||||
|
Golden Pond Gob Removal 48302 2018 HNM0009098
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE, PERCENT OF CONTRACT COMPLETED
|
||||||
|
€196013 03/31/21 15
|
||||||
|
CONTRACTOR NAME ENGINEER NAME,
|
||||||
|
Russell County Reclamation, LLC ‘SCOTTY COX
|
||||||
|
‘SITE CONTACT PERSON: Kevin Large
|
||||||
|
INSPECTION DATE, ARRIVAL, DEPARTURE. GROUND CONDITION
|
||||||
|
02/12/20 03:45 PM 04:45 PM WET
|
||||||
|
02/20/20 03:30 PM 04:30 PM WET
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
[ ‘COMMENTS
|
||||||
|
|
||||||
|
Material removal and backfiling is ongoing just beyond the building site. Weather conditions have slowed production at
|
||||||
|
the site
|
||||||
|
|
||||||
|
Photos of the site are shown below.
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 04/03/20
|
||||||
|
5/06 Page 1 of 3
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 04/03/20
|
||||||
|
5/06 Page 2 of 3
|
||||||
|
|
||||||
|
|
||||||
|
HNM0009098
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNM0009098
|
||||||
|
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
Dimi DIVISION OF MINED LAND RECLAMATION
|
||||||
|
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
Virginia Depay TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
Mines Minerals and Energy
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 04/03/20
|
||||||
|
5/06 Page 2 of 3
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 04/03/20
|
||||||
|
5/06 Page 3 of 3
|
||||||
|
|
||||||
|
|
||||||
|
HNM0009098
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNM0009098
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
Dh DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
‘TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
Mines Minerals ond Energy
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 04/03/20
|
||||||
|
5/06 Page 3 of 3
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,123 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: aiHNM0009101
|
||||||
|
file: ../aiHNM0009101.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Golden Pond Gob Pile Project
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 36349
|
||||||
|
sha256sum: 4cc4f019e7c6487ecc5bb1e959cc98a23c7588629186d1dd80ea1f7ac822af9a
|
||||||
|
sha1sum: eff560b006cf9e1ad8dcc3abc0e8110bc0cc0ed6
|
||||||
|
---
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 04/03/20
|
||||||
|
5/06 Page 1 of 1
|
||||||
|
|
||||||
|
|
||||||
|
HNM0009101
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER
|
||||||
|
|
||||||
|
Golden Pond Gob Removal 18302 2018 HNM0009101
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED
|
||||||
|
|
||||||
|
C196013 03/31/21 15
|
||||||
|
|
||||||
|
CONTRACTOR NAME ENGINEER NAME
|
||||||
|
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
|
||||||
|
SITE CONTACT PERSON: Kevin Large
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION
|
||||||
|
|
||||||
|
03/09/20
|
||||||
|
03/24/20
|
||||||
|
|
||||||
|
03:45 PM
|
||||||
|
03:30 PM
|
||||||
|
|
||||||
|
04:45 PM
|
||||||
|
04:30 PM
|
||||||
|
|
||||||
|
WET
|
||||||
|
WET
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMENTS
|
||||||
|
|
||||||
|
Material removal and backfilling is ongoing just beyond the building site. Weather conditions have slowed production at
|
||||||
|
the site.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNM0009101
|
||||||
|
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
Dh DIVISION OF MINED LAND RECLAMATION
|
||||||
|
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
Virginia Depay TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
Mines Minerals and Energy
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
PROJECT NAME, PROJECT NO. GRANT YEAR | REPORT NUMBER
|
||||||
|
|
||||||
|
Golden Pond Gob Removal 18302 2018 HNM0009101
|
||||||
|
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE, PERCENT OF CONTRACT COMPLETED
|
||||||
|
€196013 03/31/21 15
|
||||||
|
CONTRACTOR NAME ENGINEER NAME,
|
||||||
|
Russell County Reclamation, LLC ‘SCOTTY COX
|
||||||
|
‘SITE CONTACT PERSON: Kevin Large
|
||||||
|
INSPECTION DATE ARRIVAL DEPARTURE. GROUND CONDITION
|
||||||
|
03/09/20 03:45 PM 04:45 PM WET
|
||||||
|
03/24/20 03:30 PM 04:30 PM WET
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
[ COMMENTS
|
||||||
|
|
||||||
|
Material removal and backfiling is ongoing just beyond the building site. Weather conditions have slowed production at
|
||||||
|
the site
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 04/03/20
|
||||||
|
5/06 Page 1 of 1
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,166 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: aiHNM0009133
|
||||||
|
file: ../aiHNM0009133.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Golden Pond Gob Pile Project
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 367119
|
||||||
|
sha256sum: fcef0e4166625766aa70d7ad38434210aededb579806841158eb5c0e2a017f1f
|
||||||
|
sha1sum: 0ef937fcfd0a09ded4d14ccc4430ec72f00815d8
|
||||||
|
---
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 05/04/20
|
||||||
|
5/06 Page 1 of 2
|
||||||
|
|
||||||
|
|
||||||
|
HNM0009133
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER
|
||||||
|
|
||||||
|
Golden Pond Gob Removal 18302 2018 HNM0009133
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED
|
||||||
|
|
||||||
|
C196013 03/31/21 30
|
||||||
|
|
||||||
|
CONTRACTOR NAME ENGINEER NAME
|
||||||
|
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
|
||||||
|
SITE CONTACT PERSON: Kevin Large
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION
|
||||||
|
|
||||||
|
04/28/20
|
||||||
|
04/22/20
|
||||||
|
04/16/20
|
||||||
|
|
||||||
|
03:45 PM
|
||||||
|
03:45 PM
|
||||||
|
04:20 PM
|
||||||
|
|
||||||
|
05:00 PM
|
||||||
|
04:45 PM
|
||||||
|
04:45 PM
|
||||||
|
|
||||||
|
WET
|
||||||
|
WET
|
||||||
|
WET
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMENTS
|
||||||
|
|
||||||
|
Material removal and backfilling is ongoing along the outer edge of the structure. Backfilling of the structure is ongoing.
|
||||||
|
Most completed areas have now been covered with a mix of shot rock and soil. Photos of the site are shown below.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNM0009133
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
Dh DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
-ginta Depay TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
Mines Minerals and Energy
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
PROJECT NAME, PROJECT NO. GRANT YEAR | REPORT NUMBER
|
||||||
|
Golden Pond Gob Removal 48302 2018 HNM0009133
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE, PERCENT OF CONTRACT COMPLETED
|
||||||
|
€196013 03/31/21 30
|
||||||
|
CONTRACTOR NAME ENGINEER NAME,
|
||||||
|
Russell County Reclamation, LLC ‘SCOTTY COX
|
||||||
|
‘SITE CONTACT PERSON: Kevin Large
|
||||||
|
INSPECTION DATE, ARRIVAL, DEPARTURE. GROUND CONDITION
|
||||||
|
04/28/20 03:45 PM 05:00 PM WET
|
||||||
|
04/22/20 03:45 PM 04:45 PM WET
|
||||||
|
04/16/20 04:20 PM 04:45 PM WET
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
[ ‘COMMENTS
|
||||||
|
|
||||||
|
Material removal and backfiling is ongoing along the outer edge of the structure. Backfiling of the structure is ongoing.
|
||||||
|
Most completed areas have now been covered with a mix of shot rock and soil. Photos of the site are shown below.
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 05/04/20
|
||||||
|
5/06 Page 1 of 2
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 05/04/20
|
||||||
|
5/06 Page 2 of 2
|
||||||
|
|
||||||
|
|
||||||
|
HNM0009133
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNM0009133
|
||||||
|
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
Dh DIVISION OF MINED LAND RECLAMATION
|
||||||
|
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
Virginia Depay TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
Mines Minerals and Energy
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 05/04/20
|
||||||
|
5/06 Page 2 of 2
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,162 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: aiHNM0009175
|
||||||
|
file: ../aiHNM0009175.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Golden Pond Gob Pile Project
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 242918
|
||||||
|
sha256sum: 2651d7fa1356224d2c82da3d0e2987cff0de31041d95bd2ebb59e43440cdc44e
|
||||||
|
sha1sum: 8129f55c63bf48c88b67360caa0bef96eb2c1988
|
||||||
|
---
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 06/05/20
|
||||||
|
5/06 Page 1 of 2
|
||||||
|
|
||||||
|
|
||||||
|
HNM0009175
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER
|
||||||
|
|
||||||
|
Golden Pond Gob Removal 18302 2018 HNM0009175
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED
|
||||||
|
|
||||||
|
C196013 03/31/21 30
|
||||||
|
|
||||||
|
CONTRACTOR NAME ENGINEER NAME
|
||||||
|
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
|
||||||
|
SITE CONTACT PERSON: Kevin Large
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION
|
||||||
|
|
||||||
|
05/07/20
|
||||||
|
05/28/20
|
||||||
|
|
||||||
|
03:30 PM
|
||||||
|
03:00 PM
|
||||||
|
|
||||||
|
04:30 PM
|
||||||
|
04:30 PM
|
||||||
|
|
||||||
|
WET
|
||||||
|
WET
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMENTS
|
||||||
|
|
||||||
|
Material removal and backfilling is ongoing along the front of the structure. Backfilling of the structure is also ongoing.
|
||||||
|
Most completed areas have now been covered with a mix of shot rock and soil. A photo of the site is shown below.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNM0009175
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
Dh DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
-ginia Depai TELEPHONE: (276) 523-8198
|
||||||
|
Mines Minerals and Energy
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
PROJECT NAME, PROJECT NO. GRANT YEAR | REPORT NUMBER
|
||||||
|
Golden Pond Gob Removal 48302 2018 HNM0009175
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE, PERCENT OF CONTRACT COMPLETED
|
||||||
|
C196013 03/31/21 30
|
||||||
|
CONTRACTOR NAME ENGINEER NAME,
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
‘SITE CONTACT PERSON: Kevin Large
|
||||||
|
INSPECTION DATE, ARRIVAL DEPARTURE. GROUND CONDITION
|
||||||
|
05/07/20 03:30 PM (04:30 PM WET
|
||||||
|
05/28/20 03:00 PM 04:30 PM WET
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
[ ‘COMMENTS
|
||||||
|
|
||||||
|
Material removal and backfiling is ongoing along the front of the structure. Backfiling of the structure Is also ongoing.
|
||||||
|
Most completed areas have now been covered with a mix of shot rock and soil. A photo of the site is shown below.
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 06/05/20
|
||||||
|
5/06 Page 1 of 2
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 06/05/20
|
||||||
|
5/06 Page 2 of 2
|
||||||
|
|
||||||
|
|
||||||
|
HNM0009175
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNM0009175
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
Dh DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
Mines Minerals ond Energy
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 06/05/20
|
||||||
|
5/06 Page 2 of 2
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,126 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: aiHNM0009214
|
||||||
|
file: ../aiHNM0009214.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Golden Pond Gob Pile Project
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 157696
|
||||||
|
sha256sum: 6adc438c46ef23db2874bfada30a1cf62f1dbb40e85124b320eb363f2187f694
|
||||||
|
sha1sum: 12d63421c47fe2ecc21c9bd7b96e4a713426889e
|
||||||
|
---
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 07/07/20
|
||||||
|
5/06 Page 1 of 1
|
||||||
|
|
||||||
|
|
||||||
|
HNM0009214
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER
|
||||||
|
|
||||||
|
Golden Pond Gob Removal 18302 2018 HNM0009214
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED
|
||||||
|
|
||||||
|
C196013 03/31/21 50
|
||||||
|
|
||||||
|
CONTRACTOR NAME ENGINEER NAME
|
||||||
|
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
|
||||||
|
SITE CONTACT PERSON: Kevin Large
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION
|
||||||
|
|
||||||
|
06/02/20
|
||||||
|
06/23/20
|
||||||
|
|
||||||
|
03:00 PM
|
||||||
|
03:30 PM
|
||||||
|
|
||||||
|
04:30 PM
|
||||||
|
04:30 PM
|
||||||
|
|
||||||
|
WET
|
||||||
|
WET
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMENTS
|
||||||
|
|
||||||
|
Material removal and backfilling is ongoing. Most completed areas have now been covered with a mix of shot rock and
|
||||||
|
soil. A photo of the site is shown below.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNM0009214
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
Dh DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
-ginia Depai TELEPHONE: (276) 523-8198
|
||||||
|
Mines Minerals and Energy
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
PROJECT NAME, PROJECT NO. GRANT YEAR | REPORT NUMBER
|
||||||
|
Golden Pond Gob Removal 48302 2018 HNM0009214
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE, PERCENT OF CONTRACT COMPLETED
|
||||||
|
C196013 03/31/21 50
|
||||||
|
CONTRACTOR NAME ENGINEER NAME,
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
‘SITE CONTACT PERSON: Kevin Large
|
||||||
|
INSPECTION DATE, ARRIVAL DEPARTURE. GROUND CONDITION
|
||||||
|
06/02/20 03:00 PM (04:30 PM WET
|
||||||
|
06/23/20 03:30 PM 04:30 PM WET
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
[ ‘COMMENTS
|
||||||
|
|
||||||
|
Material removal and backfiling is ongoing. Most completed areas have now been covered with a mix of shot rock and
|
||||||
|
Soil. A photo of the site is shown below.
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 07/07/20
|
||||||
|
5/06 Page 1 of 1
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,168 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: aiHNM0009253
|
||||||
|
file: ../aiHNM0009253.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Golden Pond Gob Pile Project
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 465352
|
||||||
|
sha256sum: b495ae4b7543d07178c939414202392a8c800e41edc44011c0fd62dda947ef7d
|
||||||
|
sha1sum: 044adf2869112d182dd1bbe87037c26ac16fb9f8
|
||||||
|
---
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 08/14/20
|
||||||
|
5/06 Page 1 of 2
|
||||||
|
|
||||||
|
|
||||||
|
HNM0009253
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER
|
||||||
|
|
||||||
|
Golden Pond Gob Removal 18302 2018 HNM0009253
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED
|
||||||
|
|
||||||
|
C196013 03/31/21 70
|
||||||
|
|
||||||
|
CONTRACTOR NAME ENGINEER NAME
|
||||||
|
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
|
||||||
|
SITE CONTACT PERSON: William Wampler
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION
|
||||||
|
|
||||||
|
07/22/20
|
||||||
|
07/08/20
|
||||||
|
|
||||||
|
04:00 PM
|
||||||
|
03:45 PM
|
||||||
|
|
||||||
|
04:45 PM
|
||||||
|
04:30 PM
|
||||||
|
|
||||||
|
WET
|
||||||
|
WET
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMENTS
|
||||||
|
|
||||||
|
Material removal and backfilling is ongoing. Most completed areas have now been covered with a mix of shot rock and
|
||||||
|
soil. Photos of the site are shown below.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNM0009253
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
Dh DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
-ginta Depay TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
Mines Minerals and Energy
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
PROJECT NAME, PROJECT NO. GRANT YEAR | REPORT NUMBER
|
||||||
|
Golden Pond Gob Removal 48302 2018 HNM0009253
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE, PERCENT OF CONTRACT COMPLETED
|
||||||
|
C196013 03/31/21 70
|
||||||
|
CONTRACTOR NAME ENGINEER NAME,
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
SITE CONTACT PERSON: William Wampler
|
||||||
|
INSPECTION DATE, ARRIVAL DEPARTURE. GROUND CONDITION
|
||||||
|
07/22/20 (04:00 PM 04:45 PM WET
|
||||||
|
07/08/20 03:45 PM 04:30 PM WET
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
[ ‘COMMENTS
|
||||||
|
|
||||||
|
Material removal and backfiling is ongoing. Most completed areas have now been covered with a mix of shot rock and
|
||||||
|
‘soil. Photos of the site are shown below.
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 08/14/20
|
||||||
|
5106 Page 1 of 2
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 08/14/20
|
||||||
|
5/06 Page 2 of 2
|
||||||
|
|
||||||
|
|
||||||
|
HNM0009253
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
Dh DIVISION OF MINED LAND RECLAMATION
|
||||||
|
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
Virginia Depay TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
Mines Minerals and Energy
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
DMLR-AML-130S
|
||||||
|
5/06 Page 2 of 2
|
||||||
|
|
||||||
|
HNM0009253
|
||||||
|
|
||||||
|
Printed: 08/14/20
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,126 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: aiHNM0009329
|
||||||
|
file: ../aiHNM0009329.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Golden Pond Gob Pile Project
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 232534
|
||||||
|
sha256sum: 4c6800b44de6bee8e24b32b112da15e3cf7139ddacd6c7ec9d1b3bb905f8cfa8
|
||||||
|
sha1sum: a600b6afc73959781600e7b6d378e3cd7c456177
|
||||||
|
---
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 10/19/20
|
||||||
|
5/06 Page 1 of 1
|
||||||
|
|
||||||
|
|
||||||
|
HNM0009329
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER
|
||||||
|
|
||||||
|
Golden Pond Gob Removal 18302 2018 HNM0009329
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED
|
||||||
|
|
||||||
|
C196013 03/31/21 70
|
||||||
|
|
||||||
|
CONTRACTOR NAME ENGINEER NAME
|
||||||
|
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
|
||||||
|
SITE CONTACT PERSON: William Wampler
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION
|
||||||
|
|
||||||
|
08/11/20
|
||||||
|
08/19/20
|
||||||
|
|
||||||
|
03:00 PM
|
||||||
|
01:30 PM
|
||||||
|
|
||||||
|
04:30 PM
|
||||||
|
04:45 PM
|
||||||
|
|
||||||
|
WET
|
||||||
|
WET
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMENTS
|
||||||
|
|
||||||
|
Material removal and backfilling is ongoing. Most completed areas have now been covered with a mix of shot rock and
|
||||||
|
soil. Photos of the site are shown below.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNM0009329
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
Dh DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
-ginta Depay TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
Mines Minerals and Energy
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
PROJECT NAME, PROJECT NO. GRANT YEAR | REPORT NUMBER
|
||||||
|
Golden Pond Gob Removal 48302 2018 HNM0009329
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE, PERCENT OF CONTRACT COMPLETED
|
||||||
|
C196013 03/31/21 70
|
||||||
|
CONTRACTOR NAME ENGINEER NAME,
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
SITE CONTACT PERSON: William Wampler
|
||||||
|
INSPECTION DATE, ARRIVAL DEPARTURE. GROUND CONDITION
|
||||||
|
08/11/20 03:00 PM (04:30 PM WET
|
||||||
|
08/19/20 01:30 PM 04:45 PM WET
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
[ ‘COMMENTS
|
||||||
|
|
||||||
|
Material removal and backfiling is ongoing. Most completed areas have now been covered with a mix of shot rock and
|
||||||
|
‘soil. Photos of the site are shown below.
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 10/19/20
|
||||||
|
5/06 Page 1 of 1
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,176 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: aiHNM0009333
|
||||||
|
file: ../aiHNM0009333.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Golden Pond Gob Pile Project
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 360584
|
||||||
|
sha256sum: 9ca0f8b4c29b960440f6b6152bc35aac4d25dc17009d8868a6e6bad2d6779e09
|
||||||
|
sha1sum: 420d606d78142c6f778e14b06a424d8bd996fc2d
|
||||||
|
---
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 10/19/20
|
||||||
|
5/06 Page 1 of 2
|
||||||
|
|
||||||
|
|
||||||
|
HNM0009333
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER
|
||||||
|
|
||||||
|
Golden Pond Gob Removal 18302 2018 HNM0009333
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED
|
||||||
|
|
||||||
|
C196013 03/31/21 70
|
||||||
|
|
||||||
|
CONTRACTOR NAME ENGINEER NAME
|
||||||
|
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
|
||||||
|
SITE CONTACT PERSON: William Wampler
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION
|
||||||
|
|
||||||
|
09/01/20
|
||||||
|
09/08/20
|
||||||
|
09/28/20
|
||||||
|
|
||||||
|
03:45 PM
|
||||||
|
03:30 PM
|
||||||
|
02:30 PM
|
||||||
|
|
||||||
|
04:30 PM
|
||||||
|
04:30 PM
|
||||||
|
04:30 PM
|
||||||
|
|
||||||
|
WET
|
||||||
|
WET
|
||||||
|
WET
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMENTS
|
||||||
|
|
||||||
|
Material removal and backfilling is ongoing. Material is currently being stored on areas previously backfilled. The building
|
||||||
|
site has now been covered with a mix of shot rock and soil. Photos of the site are shown below.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
|
||||||
|
HNM0009333
|
||||||
|
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
Dh DIVISION OF MINED LAND RECLAMATION
|
||||||
|
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
Virginia Depay TELEPHONE: (276) 523-8198
|
||||||
|
Mines Minerals and Energy
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
PROJECT NAME, PROJECT NO. GRANT YEAR | REPORT NUMBER
|
||||||
|
Golden Pond Gob Removal 18302 2018 HNM0009333
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE, PERCENT OF CONTRACT COMPLETED
|
||||||
|
C196013 03/31/21 70
|
||||||
|
CONTRACTOR NAME ENGINEER NAME,
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
SITE CONTACT PERSON: William Wampler
|
||||||
|
INSPECTION DATE ARRIVAL DEPARTURE. GROUND CONDITION
|
||||||
|
09/01/20 03:45 PM (04:30 PM WET
|
||||||
|
09/08/20 03:30 PM 04:30 PM WET
|
||||||
|
09/28/20 02:30 PM 04:30 PM WET
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
‘COMMENTS
|
||||||
|
|
||||||
|
Material removal and backfilling is ongoing. Material is currently being stored or
|
||||||
|
|
||||||
|
in areas previously backfilled. The building
|
||||||
|
|
||||||
|
site has now been covered with a mix of shot rock and soil. Photos of the site are shown below.
|
||||||
|
|
||||||
|
DMLR-AML-130S
|
||||||
|
5106 Page 1 of 2
|
||||||
|
|
||||||
|
Printed: 10/19/20
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 10/19/20
|
||||||
|
5/06 Page 2 of 2
|
||||||
|
|
||||||
|
|
||||||
|
HNM0009333
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNM0009333
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
‘TELEPHONE: (276) 523-8198
|
||||||
|
Mines Minerals and Energy
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 10/19/20
|
||||||
|
5/06 Page 2 of 2
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,165 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: aiHNM0009391
|
||||||
|
file: ../aiHNM0009391.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Golden Pond Gob Pile Project
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 318820
|
||||||
|
sha256sum: 12096b25bde2e8fe9e88c391ccf0551d4a068ccdec9cd6889fc8806505181785
|
||||||
|
sha1sum: a083ac7d4a605c7f2f1ca3ab30606aa44d310c1b
|
||||||
|
---
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 11/25/20
|
||||||
|
5/06 Page 1 of 2
|
||||||
|
|
||||||
|
|
||||||
|
HNM0009391
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER
|
||||||
|
|
||||||
|
Golden Pond Gob Removal 18302 2018 HNM0009391
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED
|
||||||
|
|
||||||
|
C196013 03/31/21 70
|
||||||
|
|
||||||
|
CONTRACTOR NAME ENGINEER NAME
|
||||||
|
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
|
||||||
|
SITE CONTACT PERSON: Kevin Large
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION
|
||||||
|
|
||||||
|
10/27/20
|
||||||
|
10/15/20
|
||||||
|
|
||||||
|
03:45 AM
|
||||||
|
03:30 PM
|
||||||
|
|
||||||
|
04:30 PM
|
||||||
|
04:30 PM
|
||||||
|
|
||||||
|
WET
|
||||||
|
WET
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMENTS
|
||||||
|
|
||||||
|
Material removal and backfilling is ongoing. Material is currently being stored on areas previously backfilled. The building
|
||||||
|
site has now been covered with a mix of shot rock and soil. Photos of the site are shown below.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNM0009391
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
Dh DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
-ginia Depay TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
Mines Minerals and Energy
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
PROJECT NAME, PROJECT NO. GRANT YEAR | REPORT NUMBER
|
||||||
|
Golden Pond Gob Removal 48302 2018 HNM0009391
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE, PERCENT OF CONTRACT COMPLETED
|
||||||
|
C196013 03/31/21 70
|
||||||
|
CONTRACTOR NAME ENGINEER NAME,
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
‘SITE CONTACT PERSON: Kevin Large
|
||||||
|
INSPECTION DATE, ARRIVAL DEPARTURE. GROUND CONDITION
|
||||||
|
10/27/20 03:45 AM (04:30 PM WET
|
||||||
|
10/15/20 03:30 PM 04:30 PM WET
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
[ ‘COMMENTS ]
|
||||||
|
Material removal and backflling is ongoing. Material is currently being stored on areas previously backfilled. The building
|
||||||
|
site has now been covered with a mix of shot rock and soll. Photos of the site are shown below.
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 11/25/20
|
||||||
|
5106 Page 1 of 2
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 11/25/20
|
||||||
|
5/06 Page 2 of 2
|
||||||
|
|
||||||
|
|
||||||
|
HNM0009391
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNM0009391
|
||||||
|
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
Dh DIVISION OF MINED LAND RECLAMATION
|
||||||
|
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
Virginia Depay TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
Mines Minerals and Energy
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 11/25/20
|
||||||
|
5/06 Page 2 of 2
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,123 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: aiHNM0009473
|
||||||
|
file: ../aiHNM0009473.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Golden Pond Gob Pile Project
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 208322
|
||||||
|
sha256sum: 2c19fcf1e0540d57a3aceee2e22dc6845bd40263526969ffaefa27bd09d23b9b
|
||||||
|
sha1sum: b1685ea2d324684f6d6c04719f0500d487031687
|
||||||
|
---
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 02/05/21
|
||||||
|
5/06 Page 1 of 1
|
||||||
|
|
||||||
|
|
||||||
|
HNM0009473
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER
|
||||||
|
|
||||||
|
Golden Pond Gob Removal 18302 2018 HNM0009473
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED
|
||||||
|
|
||||||
|
C196013 03/31/21 80
|
||||||
|
|
||||||
|
CONTRACTOR NAME ENGINEER NAME
|
||||||
|
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
|
||||||
|
SITE CONTACT PERSON: Kevin Large
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION
|
||||||
|
|
||||||
|
12/01/20
|
||||||
|
12/10/20
|
||||||
|
|
||||||
|
03:30 PM
|
||||||
|
03:30 PM
|
||||||
|
|
||||||
|
04:30 PM
|
||||||
|
04:30 PM
|
||||||
|
|
||||||
|
WET
|
||||||
|
WET
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMENTS
|
||||||
|
|
||||||
|
Material removal and backfilling is ongoing. Material is currently being stored on areas previously backfilled as well as on
|
||||||
|
the permitted site. The building site has now been covered with a mix of shot rock and soil. Photos of the site are shown
|
||||||
|
below.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNM0009473
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
Dh DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
-ginia Depai TELEPHONE: (276) 523-8198
|
||||||
|
Mines Minerals and Energy
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
PROJECT NAME, PROJECT NO. GRANT YEAR | REPORT NUMBER
|
||||||
|
Golden Pond Gob Removal 48302 2018 HNM0009473
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE, PERCENT OF CONTRACT COMPLETED
|
||||||
|
C196013 03/31/21 80
|
||||||
|
CONTRACTOR NAME ENGINEER NAME,
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
‘SITE CONTACT PERSON: Kevin Large
|
||||||
|
INSPECTION DATE, ARRIVAL, DEPARTURE. GROUND CONDITION
|
||||||
|
42/01/20 03:30 PM (04:30 PM WET
|
||||||
|
42/10/20 03:30 PM 04:30 PM WET
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
[ ‘COMMENTS ]
|
||||||
|
Material removal and backfiling is ongoing. Material is currently being stored on areas previously backfilled as well as on
|
||||||
|
the permitted site. The building site has now been covered with a mix of shot rock and soil. Photos of the site are shown
|
||||||
|
below.
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 02/05/21
|
||||||
|
5106 Page 1 of 1
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,138 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: aiHNM0009476
|
||||||
|
file: ../aiHNM0009476.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Golden Pond Gob Pile Project
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 230573
|
||||||
|
sha256sum: ae87be6b40f1356dc1a33c47577a7535388044a435d2cf83e20d996276dcd17d
|
||||||
|
sha1sum: 2a87a24297960d30771bf982b59279ed62adbd91
|
||||||
|
---
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 02/05/21
|
||||||
|
5/06 Page 1 of 1
|
||||||
|
|
||||||
|
|
||||||
|
HNM0009476
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER
|
||||||
|
|
||||||
|
Golden Pond Gob Removal 18302 2018 HNM0009476
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED
|
||||||
|
|
||||||
|
C196013 03/31/21 80
|
||||||
|
|
||||||
|
CONTRACTOR NAME ENGINEER NAME
|
||||||
|
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
|
||||||
|
SITE CONTACT PERSON: Kevin Large
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION
|
||||||
|
|
||||||
|
01/06/21
|
||||||
|
01/13/21
|
||||||
|
01/27/21
|
||||||
|
|
||||||
|
03:30 PM
|
||||||
|
03:30 PM
|
||||||
|
03:30 PM
|
||||||
|
|
||||||
|
04:30 PM
|
||||||
|
04:30 PM
|
||||||
|
04:30 PM
|
||||||
|
|
||||||
|
WET
|
||||||
|
WET
|
||||||
|
WET
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMENTS
|
||||||
|
|
||||||
|
Material removal and backfilling is ongoing. Material removal has progressed to the outer edge of the structure. Material
|
||||||
|
is currently being stored on areas previously backfilled as well as on the permitted site. The contract expiration date is
|
||||||
|
03/31/21. A photo of the site is shown below.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNM0009476
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
Dh DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
-ginia Depay TELEPHONE: (276) 523-8198
|
||||||
|
Mines Minerals and Energy
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
PROJECT NAME PROJECT NO. GRANT YEAR [REPORT NUMBER
|
||||||
|
Golden Pond Gob Removal 18302 2018 HINM0009476.
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE, PERCENT OF CONTRACT COMPLETED
|
||||||
|
6196013 03/31/24 80
|
||||||
|
CONTRACTOR NAME ENGINEER NAME
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
‘SITE CONTACT PERSON: Kevin Large
|
||||||
|
INSPECTION DATE ARRIVAL, DEPARTURE GROUND CONDITION
|
||||||
|
|
||||||
|
01/06/24 03:30 PM 04:30 PM ‘WET
|
||||||
|
|
||||||
|
01/13/24 03:30 PM 04:30 PM WET
|
||||||
|
|
||||||
|
04/27/24 03:30 PM 04:30 PM WET
|
||||||
|
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
‘COMMENTS:
|
||||||
|
|
||||||
|
Material removal and backfilling is ongoing. Material removal has progressed to the outer edge of the structure. Material
|
||||||
|
is currently being stored on areas previously backfilled as well as on the permitted site. The contract expiration date is
|
||||||
|
|
||||||
|
03/31/21. A photo of the site is shown below.
|
||||||
|
|
||||||
|
DMLR-AML-130S
|
||||||
|
5106
|
||||||
|
|
||||||
|
Page 4 of 1
|
||||||
|
|
||||||
|
Printed: 02/05/21
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,132 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: aiHNM0009558
|
||||||
|
file: ../aiHNM0009558.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Golden Pond Gob Pile Project
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 36956
|
||||||
|
sha256sum: 0975b2c1283fe5743afd3806bbe9a181f3abbfdbf100248826c6c73dcc59a443
|
||||||
|
sha1sum: 211daa0f92ef734105826c35c363bfeff9bb8739
|
||||||
|
---
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 04/06/21
|
||||||
|
5/06 Page 1 of 1
|
||||||
|
|
||||||
|
|
||||||
|
HNM0009558
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER
|
||||||
|
|
||||||
|
Golden Pond Gob Removal 18302 2018 HNM0009558
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED
|
||||||
|
|
||||||
|
C196013 03/31/21 80
|
||||||
|
|
||||||
|
CONTRACTOR NAME ENGINEER NAME
|
||||||
|
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
|
||||||
|
SITE CONTACT PERSON: Kevin Large
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION
|
||||||
|
|
||||||
|
02/03/21
|
||||||
|
02/23/21
|
||||||
|
|
||||||
|
03:00 PM
|
||||||
|
03:30 PM
|
||||||
|
|
||||||
|
04:30 PM
|
||||||
|
04:30 PM
|
||||||
|
|
||||||
|
WET
|
||||||
|
WET
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMENTS
|
||||||
|
|
||||||
|
Material removal and backfilling is ongoing. Material removal has progressed to the outer edge of the structure. Material
|
||||||
|
is currently being stored on areas previously backfilled as well as on the permitted site. The contract expiration date is
|
||||||
|
03/31/21. With this inspection, a change order was processed extending the contract end date to 3/31/22.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNM0009558
|
||||||
|
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
Dh DIVISION OF MINED LAND RECLAMATION
|
||||||
|
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
Virginia Depay TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
Mines Minerals and Energy
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
PROJECT NAME, PROJECT NO. GRANT YEAR | REPORT NUMBER
|
||||||
|
|
||||||
|
Golden Pond Gob Removal 48302 2018 HNM0009558
|
||||||
|
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE, PERCENT OF CONTRACT COMPLETED
|
||||||
|
C196013 03/31/21 80
|
||||||
|
CONTRACTOR NAME ENGINEER NAME,
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
‘SITE CONTACT PERSON: Kevin Large
|
||||||
|
INSPECTION DATE ARRIVAL DEPARTURE. GROUND CONDITION
|
||||||
|
02/03/21 03:00 PM (04:30 PM WET
|
||||||
|
02/23/21 03:30 PM 04:30 PM WET
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
[ COMMENTS:
|
||||||
|
|
||||||
|
Material removal and backfilling is ongoing. Material removal has progressed to the outer edge of the structure. Material
|
||||||
|
is currently being stored on areas previously backfilled as well as on the permitted site. The contract expiration date is,
|
||||||
|
03/31/21. With this inspection, a change order was processed extending the contract end date to 3/31/22.
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 04/06/21
|
||||||
|
5/06 Page 1 of 1
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,185 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: aiHNM0009566
|
||||||
|
file: ../aiHNM0009566.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Golden Pond Gob Pile Project
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 237903
|
||||||
|
sha256sum: 663385eb3714d6954bedaa26cb03e084cc610bb951c03a5f5bee30ccba94cc5d
|
||||||
|
sha1sum: acb3bffe039c6b42abe7980e01d0ab0d0e7677ee
|
||||||
|
---
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 04/08/21
|
||||||
|
5/06 Page 1 of 2
|
||||||
|
|
||||||
|
|
||||||
|
HNM0009566
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER
|
||||||
|
|
||||||
|
Golden Pond Gob Removal 18302 2018 HNM0009566
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED
|
||||||
|
|
||||||
|
C196013 03/31/21 80
|
||||||
|
|
||||||
|
CONTRACTOR NAME ENGINEER NAME
|
||||||
|
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
|
||||||
|
SITE CONTACT PERSON: Kevin Large
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION
|
||||||
|
|
||||||
|
03/04/21
|
||||||
|
03/08/21
|
||||||
|
03/22/21
|
||||||
|
|
||||||
|
03:30 PM
|
||||||
|
03:30 PM
|
||||||
|
04:00 PM
|
||||||
|
|
||||||
|
04:30 PM
|
||||||
|
04:30 PM
|
||||||
|
04:30 PM
|
||||||
|
|
||||||
|
WET
|
||||||
|
WET
|
||||||
|
WET
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMENTS
|
||||||
|
|
||||||
|
Material removal and backfilling is ongoing. Material removal has progressed to the outer edge of the structure. Material
|
||||||
|
is currently being stored on areas previously backfilled as well as on the permitted site. The contract expiration has been
|
||||||
|
extended until to 3/31/22. Photos of the site area shown below.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNM0009566
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
Dh DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
-ginia Depay TELEPHONE: (276) 523-8198
|
||||||
|
Mines Minerals and Energy
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
PROJECT NAME PROJECT NO. GRANT YEAR [REPORT NUMBER
|
||||||
|
Golden Pond Gob Removal 18302 2018 HINM0009566.
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE, PERCENT OF CONTRACT COMPLETED
|
||||||
|
6196013 03/31/24 80
|
||||||
|
CONTRACTOR NAME ENGINEER NAME
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
‘SITE CONTACT PERSON: Kevin Large
|
||||||
|
INSPECTION DATE ARRIVAL, DEPARTURE GROUND CONDITION
|
||||||
|
|
||||||
|
03/04/24 03:30 PM 04:30 PM ‘WET
|
||||||
|
|
||||||
|
03/08/21 03:30 PM 04:30 PM WET
|
||||||
|
|
||||||
|
03/22/24 04:00 PM 04:30 PM WET
|
||||||
|
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
‘COMMENTS:
|
||||||
|
|
||||||
|
Material removal and backfilling is ongoing. Material removal has progressed to the outer edge of the structure. Material
|
||||||
|
is currently being stored on areas previously backfilled as well as on the permitted site. The contract expiration has been
|
||||||
|
‘extended until to 3/31/22. Photos of the site area shown below.
|
||||||
|
|
||||||
|
DMLR-AML-130S
|
||||||
|
5/06
|
||||||
|
|
||||||
|
Page 1 of 2
|
||||||
|
|
||||||
|
Printed: 04/08/21
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 04/08/21
|
||||||
|
5/06 Page 2 of 2
|
||||||
|
|
||||||
|
|
||||||
|
HNM0009566
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
Dh DIVISION OF MINED LAND RECLAMATION
|
||||||
|
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
Virginia Depay TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
Mines Minerals and Energy
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
DMLR-AML-130S
|
||||||
|
5/06 Page 2 of 2
|
||||||
|
|
||||||
|
HNM0009566
|
||||||
|
|
||||||
|
Printed: 04/08/21
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,170 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: aiHNM0009633
|
||||||
|
file: ../aiHNM0009633.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Golden Pond Gob Pile Project
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 356459
|
||||||
|
sha256sum: 7f4528a35d5c143b915513141008aee30ce60211a5a624ed9b718692ac85fcea
|
||||||
|
sha1sum: 946718362f6a5612c267606c73a1bc7cb1829131
|
||||||
|
---
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 06/30/21
|
||||||
|
5/06 Page 1 of 2
|
||||||
|
|
||||||
|
|
||||||
|
HNM0009633
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER
|
||||||
|
|
||||||
|
Golden Pond Gob Removal 18302 2018 HNM0009633
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED
|
||||||
|
|
||||||
|
C196013 03/31/21 80
|
||||||
|
|
||||||
|
CONTRACTOR NAME ENGINEER NAME
|
||||||
|
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
|
||||||
|
SITE CONTACT PERSON: Kevin Large
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION
|
||||||
|
|
||||||
|
04/05/21
|
||||||
|
04/27/21
|
||||||
|
|
||||||
|
04:00 PM
|
||||||
|
04:00 PM
|
||||||
|
|
||||||
|
04:30 PM
|
||||||
|
04:30 PM
|
||||||
|
|
||||||
|
WET
|
||||||
|
WET
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMENTS
|
||||||
|
|
||||||
|
Material removal and backfilling is ongoing. Material removal has progressed to the outer edge of the structure. Material
|
||||||
|
is currently being stored on areas previously backfilled as well as on the permitted site. The contract expiration has been
|
||||||
|
extended until to 3/31/22. Photos of the site area shown below.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNM0009633
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
Dh DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
-ginia Depay TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
Mines Minerals and Energy
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
PROJECT NAME, PROJECT NO. GRANT YEAR | REPORT NUMBER
|
||||||
|
Golden Pond Gob Removal 48302 2018 HNM0009633
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE, PERCENT OF CONTRACT COMPLETED
|
||||||
|
C196013 03/31/21 80
|
||||||
|
CONTRACTOR NAME ENGINEER NAME,
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
‘SITE CONTACT PERSON: Kevin Large
|
||||||
|
INSPECTION DATE, ARRIVAL DEPARTURE. GROUND CONDITION
|
||||||
|
04/05/21 (04:00 PM (04:30 PM WET
|
||||||
|
04/27/24 04:00 PM 04:30 PM WET
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
[ ‘COMMENTS
|
||||||
|
|
||||||
|
Material removal and backfilling is ongoing. Material removal has progressed to the outer edge of the structure. Material
|
||||||
|
is currently being stored on areas previously backfilled as well as on the permitted site. The contract expiration has been
|
||||||
|
‘extended until to 3/31/22. Photos of the site area shown below.
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 06/30/21
|
||||||
|
5/06 Page 1 of 2
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 06/30/21
|
||||||
|
5/06 Page 2 of 2
|
||||||
|
|
||||||
|
|
||||||
|
HNM0009633
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNM0009633
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
9a ‘TELEPHONE: (276) 523-8198
|
||||||
|
Mines Minerals and Energy
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 06/30/21
|
||||||
|
5/06 Page 2 of 2
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,171 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: aiHNM0009657
|
||||||
|
file: ../aiHNM0009657.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Golden Pond Gob Pile Project
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 310558
|
||||||
|
sha256sum: 2213cc65901a7d42075c21fd75b5e158ec3f86fcd8653edea920decf075bd140
|
||||||
|
sha1sum: 5869f4d49620ee5541725f4a84dcf2546db76ed0
|
||||||
|
---
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 06/30/21
|
||||||
|
5/06 Page 1 of 2
|
||||||
|
|
||||||
|
|
||||||
|
HNM0009657
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER
|
||||||
|
|
||||||
|
Golden Pond Gob Removal 18302 2018 HNM0009657
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED
|
||||||
|
|
||||||
|
C196013 03/31/21 80
|
||||||
|
|
||||||
|
CONTRACTOR NAME ENGINEER NAME
|
||||||
|
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
|
||||||
|
SITE CONTACT PERSON: Kevin Large
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION
|
||||||
|
|
||||||
|
06/08/21
|
||||||
|
06/22/21
|
||||||
|
|
||||||
|
04:00 PM
|
||||||
|
04:00 PM
|
||||||
|
|
||||||
|
04:30 PM
|
||||||
|
04:30 PM
|
||||||
|
|
||||||
|
WET
|
||||||
|
WET
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMENTS
|
||||||
|
|
||||||
|
Material removal and backfilling is ongoing. Material removal has progressed to the outer edge of the structure. Material
|
||||||
|
is currently being stored on areas previously backfilled as well as on the permitted site. The contract expiration has been
|
||||||
|
extended until to 3/31/22. Photos of the site area shown below.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNM0009657
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
Dh DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
-ginia Depay TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
Mines Minerals and Energy
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
PROJECT NAME, PROJECT NO. GRANT YEAR | REPORT NUMBER
|
||||||
|
Golden Pond Gob Removal 48302 2018 HNM0009657
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE, PERCENT OF CONTRACT COMPLETED
|
||||||
|
C196013 03/31/21 80
|
||||||
|
CONTRACTOR NAME ENGINEER NAME,
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
‘SITE CONTACT PERSON: Kevin Large
|
||||||
|
INSPECTION DATE, ARRIVAL DEPARTURE. GROUND CONDITION
|
||||||
|
06/08/21 (04:00 PM (04:30 PM WET
|
||||||
|
06/22/24 04:00 PM 04:30 PM WET
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
[ ‘COMMENTS
|
||||||
|
|
||||||
|
Material removal and backfilling is ongoing. Material removal has progressed to the outer edge of the structure. Material
|
||||||
|
is currently being stored on areas previously backfilled as well as on the permitted site. The contract expiration has been
|
||||||
|
‘extended until to 3/31/22. Photos of the site area shown below.
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 06/30/21
|
||||||
|
5/06 Page 1 of 2
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 06/30/21
|
||||||
|
5/06 Page 2 of 2
|
||||||
|
|
||||||
|
|
||||||
|
HNM0009657
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNM0009657
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
‘TELEPHONE: (276) 523-8198
|
||||||
|
Mines Minerals and Energy
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 06/30/21
|
||||||
|
5/06 Page 2 of 2
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,189 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: aiHNM0009732
|
||||||
|
file: ../aiHNM0009732.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Golden Pond Gob Pile Project
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 432318
|
||||||
|
sha256sum: 021d50107d16f2a07f552716897995768acd618386cec7c8c49559039a7adab4
|
||||||
|
sha1sum: 85de4c6017e2d1d2a59dd80341b759b3e7118e14
|
||||||
|
---
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 08/20/21
|
||||||
|
5/06 Page 1 of 2
|
||||||
|
|
||||||
|
|
||||||
|
HNM0009732
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER
|
||||||
|
|
||||||
|
Golden Pond Gob Removal 18302 2018 HNM0009732
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED
|
||||||
|
|
||||||
|
C196013 03/31/21 95
|
||||||
|
|
||||||
|
CONTRACTOR NAME ENGINEER NAME
|
||||||
|
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
|
||||||
|
SITE CONTACT PERSON: Kevin Large
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION
|
||||||
|
|
||||||
|
07/13/21
|
||||||
|
07/19/21
|
||||||
|
07/27/21
|
||||||
|
|
||||||
|
03:30 PM
|
||||||
|
04:00 PM
|
||||||
|
04:00 PM
|
||||||
|
|
||||||
|
04:30 PM
|
||||||
|
04:30 PM
|
||||||
|
04:30 PM
|
||||||
|
|
||||||
|
WET
|
||||||
|
WET
|
||||||
|
WET
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMENTS
|
||||||
|
|
||||||
|
Material removal and backfilling is ongoing. Material removal from the original location is complete. Material is currently
|
||||||
|
being stored on areas previously backfilled as well as on the permitted site. The contractor is working to remove that
|
||||||
|
material from the structure. The contract expiration has been extended until to 3/31/22. Photos of the site area shown
|
||||||
|
below.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNM0009732
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
Dh DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
-ginia Depay TELEPHONE: (276) 523-8198
|
||||||
|
Mines Minerals and Energy
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
PROJECT NAME PROJECT NO. GRANT YEAR [REPORT NUMBER
|
||||||
|
Golden Pond Gob Removal 18302 2018 HINM0009732
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE, PERCENT OF CONTRACT COMPLETED
|
||||||
|
6196013 03/31/24 95
|
||||||
|
CONTRACTOR NAME ENGINEER NAME
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
‘SITE CONTACT PERSON: Kevin Large
|
||||||
|
INSPECTION DATE ARRIVAL, DEPARTURE GROUND CONDITION
|
||||||
|
07/13/24 03:30 PM 04:30 PM WET
|
||||||
|
07/19/24 04:00 PM 04:30 PM WET
|
||||||
|
o7/27/24 04:00 PM 04:30 PM WET
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
‘COMMENTS:
|
||||||
|
|
||||||
|
Material removal and backfiling is ongoing. Material removal from the original location is complete. Material is currently
|
||||||
|
being stored on areas previously backfilled as well as on the permitted site. The contractor is working to remove that
|
||||||
|
material from the structure. The contract expiration has been extended until to 3/31/22. Photos of the site area shown
|
||||||
|
|
||||||
|
below.
|
||||||
|
|
||||||
|
DMLR-AML-130S
|
||||||
|
5/06
|
||||||
|
|
||||||
|
Page 1 of 2
|
||||||
|
|
||||||
|
Printed: 08/20/21
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 08/20/21
|
||||||
|
5/06 Page 2 of 2
|
||||||
|
|
||||||
|
|
||||||
|
HNM0009732
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNM0009732
|
||||||
|
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
Dh DIVISION OF MINED LAND RECLAMATION
|
||||||
|
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
Virginia Depay TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
Mines Minerals and Energy
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 08/20/21
|
||||||
|
5/06 Page 2 of 2
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,181 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: aiHNM0009752
|
||||||
|
file: ../aiHNM0009752.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Golden Pond Gob Pile Project
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 241869
|
||||||
|
sha256sum: 29c394e3793b853e1be7cfa1dfb8b1038d8a19c63333529e4c75882654500b2b
|
||||||
|
sha1sum: b0443179d9439f15f0c5d0ab189f09b276c2bf48
|
||||||
|
---
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 09/24/21
|
||||||
|
5/06 Page 1 of 2
|
||||||
|
|
||||||
|
|
||||||
|
HNM0009752
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER
|
||||||
|
|
||||||
|
Golden Pond Gob Removal 18302 2018 HNM0009752
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED
|
||||||
|
|
||||||
|
C196013 03/31/21 95
|
||||||
|
|
||||||
|
CONTRACTOR NAME ENGINEER NAME
|
||||||
|
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
|
||||||
|
SITE CONTACT PERSON: Kevin Large
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION
|
||||||
|
|
||||||
|
08/16/21
|
||||||
|
08/24/21
|
||||||
|
|
||||||
|
04:00 PM
|
||||||
|
04:00 PM
|
||||||
|
|
||||||
|
04:30 PM
|
||||||
|
04:45 PM
|
||||||
|
|
||||||
|
DRY
|
||||||
|
DRY
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMENTS
|
||||||
|
|
||||||
|
Material removal is now complete and the entire area has been covered with a mix of shot rock and soil. The site will be
|
||||||
|
seeded under the 2021 Revegetation Project. Photos of the site are shown below.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNM0009752
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
Dh DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
-ginta Depay TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
Mines Minerals and Energy
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
PROJECT NAME, PROJECT NO. GRANT YEAR | REPORT NUMBER
|
||||||
|
Golden Pond Gob Removal 48302 2018 HNM0009752
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE, PERCENT OF CONTRACT COMPLETED
|
||||||
|
C196013 03/31/21 95
|
||||||
|
CONTRACTOR NAME ENGINEER NAME,
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
‘SITE CONTACT PERSON: Kevin Large
|
||||||
|
INSPECTION DATE, ARRIVAL DEPARTURE. GROUND CONDITION
|
||||||
|
08/16/21 (04:00 PM (04:30 PM DRY
|
||||||
|
08/24/24 04:00 PM 04:45 PM DRY
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
[ ‘COMMENTS
|
||||||
|
|
||||||
|
Material removal is now complete and the entire area has been covered with a mix of shot rock and soil, The site will be
|
||||||
|
seeded under the 2021 Revegetation Project. Photos of the site are shown below.
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 09/24/21
|
||||||
|
5/06 Page 1 of 2
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 09/24/21
|
||||||
|
5/06 Page 2 of 2
|
||||||
|
|
||||||
|
|
||||||
|
HNM0009752
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
Dh DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
Virginia Depat ‘TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
Mines Minerals and Energy
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
DMLR-AML-130S
|
||||||
|
5/06 Page 2 of 2
|
||||||
|
|
||||||
|
HNM0009752
|
||||||
|
|
||||||
|
Printed: 09/24/21
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,196 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: aiHNM0009863
|
||||||
|
file: ../aiHNM0009863.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Golden Pond Gob Pile Project
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 287824
|
||||||
|
sha256sum: bf18ce68662e6ac36e46ad6d1cac9a9755ba173e53f7fc334c368a726a4d3fe5
|
||||||
|
sha1sum: 6d15737cebeb5b3a7b005887259e0ae7f332e3b0
|
||||||
|
---
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
VIRGINIA DEPARTMENT OF ENERGY
|
||||||
|
MINED LAND REPURPOSING
|
||||||
|
3405 MOUNTAIN EMPIRE ROAD, BIG STONE GAP, VA 24219
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 11/08/21
|
||||||
|
REV. 10/2021 Page 1 of 2
|
||||||
|
|
||||||
|
|
||||||
|
HNM0009863
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER
|
||||||
|
|
||||||
|
Golden Pond Gob Removal 18302 2018 HNM0009863
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED
|
||||||
|
|
||||||
|
C196013 03/31/21 95
|
||||||
|
|
||||||
|
CONTRACTOR NAME ENGINEER NAME
|
||||||
|
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
|
||||||
|
SITE CONTACT PERSON: Kevin Large
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION
|
||||||
|
|
||||||
|
10/18/21
|
||||||
|
10/29/21
|
||||||
|
|
||||||
|
08:30 AM
|
||||||
|
03:30 PM
|
||||||
|
|
||||||
|
10:00 AM
|
||||||
|
04:30 PM
|
||||||
|
|
||||||
|
DRY
|
||||||
|
WET
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMENTS
|
||||||
|
|
||||||
|
Material removal is now complete and the entire area has been covered with a mix of shot rock and soil. The site will be
|
||||||
|
seeded under the 2021 Revegetation Project. Seeding of the structure will occur under the 2021 Revegetation Project.
|
||||||
|
Seeding of the site began on 10/19/21 and concluded on 10/29/21. With completion of the seeding project Project
|
||||||
|
Reclaim Phase II is now eligible for release. Photos of the seeded site are shown below.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNMo0009863
|
||||||
|
|
||||||
|
@) a VIRGINIA DEPARTMENT OF ENERGY
|
||||||
|
|
||||||
|
(S nergy MINED LAND REPURPOSING
|
||||||
|
3405 MOUNTAIN EMPIRE ROAD, BIG STONE GAP, VA 24219
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
PROJECT NAME, PROJECT NO. GRANT YEAR | REPORT NUMBER
|
||||||
|
Golden Pond Gob Removal 48302 2018 HNM0009863
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE, PERCENT OF CONTRACT COMPLETED
|
||||||
|
C196013 03/31/21 95
|
||||||
|
CONTRACTOR NAME ENGINEER NAME,
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
‘SITE CONTACT PERSON: Kevin Large
|
||||||
|
INSPECTION DATE, ARRIVAL DEPARTURE. GROUND CONDITION
|
||||||
|
10/18/21 08:30 AM 10:00 AM DRY
|
||||||
|
10/29/21 03:30 PM 04:30 PM WET
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
[ ‘COMMENTS
|
||||||
|
Material removal is now complete and the entire area has been covered with a mix of shot rock and soil. The site will be
|
||||||
|
seeded under the 2021 Revegetation Project. Seeding of the structure will occur under the 2021 Revegetation Project.
|
||||||
|
Seeding of the site began on 10/19/21 and concluded on 10/29/21. With completion of the seeding project Project
|
||||||
|
Reclaim Phase Il is now eligible for release. Photos of the seeded site are shown below.
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 11/08/21
|
||||||
|
REV. 10/2021 Page 1 of 2
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
VIRGINIA DEPARTMENT OF ENERGY
|
||||||
|
MINED LAND REPURPOSING
|
||||||
|
3405 MOUNTAIN EMPIRE ROAD, BIG STONE GAP, VA 24219
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 11/08/21
|
||||||
|
REV. 10/2021 Page 2 of 2
|
||||||
|
|
||||||
|
|
||||||
|
HNM0009863
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNMoo09863
|
||||||
|
@) E wt RO UNL VIRGINIA DEPARTMENT OF ENERGY
|
||||||
|
|
||||||
|
erg MINED LAND REPURPOSING
|
||||||
|
3405 MOUNTAIN EMPIRE ROAD, BIG STONE GAP, VA 24219
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 11/08/21
|
||||||
|
|
||||||
|
REV. 10/2021 Page 2 of 2
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,182 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: aiHNM0009985
|
||||||
|
file: ../aiHNM0009985.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Golden Pond Gob Pile Project
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 105076
|
||||||
|
sha256sum: d910d49f28e24eb0113c2fcbe5947e27132fedcb51af83334b18144182abf26d
|
||||||
|
sha1sum: a0dc676d4e87af6426ddabae6e0a973c5e2cce5b
|
||||||
|
---
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
VIRGINIA DEPARTMENT OF ENERGY
|
||||||
|
MINED LAND REPURPOSING
|
||||||
|
3405 MOUNTAIN EMPIRE ROAD, BIG STONE GAP, VA 24219
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 01/03/22
|
||||||
|
REV. 10/2021 Page 1 of 2
|
||||||
|
|
||||||
|
|
||||||
|
HNM0009985
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER
|
||||||
|
|
||||||
|
Golden Pond Gob Removal 18302 2018 HNM0009985
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED
|
||||||
|
|
||||||
|
C196013 03/31/21 95
|
||||||
|
|
||||||
|
CONTRACTOR NAME ENGINEER NAME
|
||||||
|
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
|
||||||
|
SITE CONTACT PERSON: Kevin Large
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION
|
||||||
|
|
||||||
|
11/05/21 09:00 AM 09:30 AM DRY
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMENTS
|
||||||
|
|
||||||
|
Material removal is now complete and the entire area has been covered with a mix of shot rock and soil. The site was
|
||||||
|
seeded under the 2021 Revegetation Project. Seeding of the site began on 10/19/21 and concluded on 10/29/21. A
|
||||||
|
photo of the site is shown below.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNMooog985
|
||||||
|
@) a VIRGINIA DEPARTMENT OF ENERGY
|
||||||
|
(‘<4 nergy MINED LAND REPURPOSING
|
||||||
|
3405 MOUNTAIN EMPIRE ROAD, BIG STONE GAP, VA 24219
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
PROJECT NAME, PROJECT NO. GRANT YEAR | REPORT NUMBER
|
||||||
|
Golden Pond Gob Removal 48302 2018 HNM0009985
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE, PERCENT OF CONTRACT COMPLETED
|
||||||
|
C196013 03/31/21 95
|
||||||
|
CONTRACTOR NAME ENGINEER NAME,
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
‘SITE CONTACT PERSON: Kevin Large
|
||||||
|
INSPECTION DATE ARRIVAL DEPARTURE. GROUND CONDITION
|
||||||
|
41/05/24 09:00 AM 09:30 AM DRY
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
[ ‘COMMENTS ]
|
||||||
|
Material removal is now complete and the entire area has been covered with a mix of shot rock and soil. The site was
|
||||||
|
seeded under the 2021 Revegetation Project. Seeding of the site began on 10/19/21 and concluded on 10/29/21. A
|
||||||
|
|
||||||
|
photo of the site is shown below.
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 01/03/22
|
||||||
|
|
||||||
|
REV. 10/2021 Page 1 of 2
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
VIRGINIA DEPARTMENT OF ENERGY
|
||||||
|
MINED LAND REPURPOSING
|
||||||
|
3405 MOUNTAIN EMPIRE ROAD, BIG STONE GAP, VA 24219
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 01/03/22
|
||||||
|
REV. 10/2021 Page 2 of 2
|
||||||
|
|
||||||
|
|
||||||
|
HNM0009985
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNMooo9985
|
||||||
|
@) a VIRGINIA DEPARTMENT OF ENERGY
|
||||||
|
(‘<4 nergy MINED LAND REPURPOSING
|
||||||
|
3405 MOUNTAIN EMPIRE ROAD, BIG STONE GAP, VA 24219
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 01/03/22
|
||||||
|
|
||||||
|
REV. 10/2021 Page 2 of 2
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,225 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: aiHNM0009987
|
||||||
|
file: ../aiHNM0009987.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Golden Pond Gob Pile Project
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 175129
|
||||||
|
sha256sum: d4705fa2904eff568f2a97080de02d9334f8056ee8ce91b2d6125b1a4fead87d
|
||||||
|
sha1sum: 3a5633c74b1457f6bc3e93ce431efd13d6a72413
|
||||||
|
---
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
VIRGINIA DEPARTMENT OF ENERGY
|
||||||
|
MINED LAND REPURPOSING
|
||||||
|
3405 MOUNTAIN EMPIRE ROAD, BIG STONE GAP, VA 24219
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 01/03/22
|
||||||
|
REV. 10/2021 Page 1 of 3
|
||||||
|
|
||||||
|
|
||||||
|
HNM0009987
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER
|
||||||
|
|
||||||
|
Golden Pond Gob Removal 18302 2018 HNM0009987
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED
|
||||||
|
|
||||||
|
C196013 03/31/21 100
|
||||||
|
|
||||||
|
CONTRACTOR NAME ENGINEER NAME
|
||||||
|
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
|
||||||
|
SITE CONTACT PERSON: Kevin Large
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION
|
||||||
|
|
||||||
|
12/15/21 02:00 PM 02:30 PM DRY
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMENTS
|
||||||
|
|
||||||
|
Material removal is now complete and the entire area has been covered with a mix of shot rock and soil. The site was
|
||||||
|
seeded under the 2021 Revegetation Project. Seeding of the site began on 10/19/21 and concluded on 10/29/21. Photos
|
||||||
|
of the site are shown below.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNM0009987
|
||||||
|
|
||||||
|
@) a VIRGINIA DEPARTMENT OF ENERGY
|
||||||
|
(S nergy MINED LAND REPURPOSING
|
||||||
|
3405 MOUNTAIN EMPIRE ROAD, BIG STONE GAP, VA 24219
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
PROJECT NAME, PROJECT NO. GRANT YEAR | REPORT NUMBER
|
||||||
|
Golden Pond Gob Removal 48302 2018 HNM0009987
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE, PERCENT OF CONTRACT COMPLETED
|
||||||
|
C196013 03/31/21 100
|
||||||
|
CONTRACTOR NAME ENGINEER NAME,
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
‘SITE CONTACT PERSON: Kevin Large
|
||||||
|
INSPECTION DATE ARRIVAL, DEPARTURE. GROUND CONDITION
|
||||||
|
42/15/21 (02:00 PM 02:30 PM DRY
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
[ ‘COMMENTS ]
|
||||||
|
Material removal is now complete and the entire area has been covered with a mix of shot rock and soil. The site was
|
||||||
|
seeded under the 2021 Revegetation Project. Seeding of the site began on 10/19/21 and concluded on 10/29/21. Photos
|
||||||
|
|
||||||
|
of the site are shown below.
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 01/03/22
|
||||||
|
|
||||||
|
REV. 10/2021 Page 1 of 3
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
VIRGINIA DEPARTMENT OF ENERGY
|
||||||
|
MINED LAND REPURPOSING
|
||||||
|
3405 MOUNTAIN EMPIRE ROAD, BIG STONE GAP, VA 24219
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 01/03/22
|
||||||
|
REV. 10/2021 Page 2 of 3
|
||||||
|
|
||||||
|
|
||||||
|
HNM0009987
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNM0009987
|
||||||
|
|
||||||
|
@) a VIRGINIA DEPARTMENT OF ENERGY
|
||||||
|
|
||||||
|
(< nergy MINED LAND REPURPOSING
|
||||||
|
3405 MOUNTAIN EMPIRE ROAD, BIG STONE GAP, VA 24219
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 01/03/22
|
||||||
|
REV. 10/2021 Page 2 of 3
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
VIRGINIA DEPARTMENT OF ENERGY
|
||||||
|
MINED LAND REPURPOSING
|
||||||
|
3405 MOUNTAIN EMPIRE ROAD, BIG STONE GAP, VA 24219
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 01/03/22
|
||||||
|
REV. 10/2021 Page 3 of 3
|
||||||
|
|
||||||
|
|
||||||
|
HNM0009987
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNMoo09987
|
||||||
|
@) a VIRGINIA DEPARTMENT OF ENERGY
|
||||||
|
(‘<4 nergy MINED LAND REPURPOSING
|
||||||
|
3405 MOUNTAIN EMPIRE ROAD, BIG STONE GAP, VA 24219
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 01/03/22
|
||||||
|
|
||||||
|
REV. 10/2021 Page 3 of 3
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,239 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: aiHNM0010144
|
||||||
|
file: ../aiHNM0010144.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Golden Pond Gob Pile Project
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 23370
|
||||||
|
sha256sum: 0b385988d66b9c862635dec0365c509072651b104ee25d309e827f54509170ab
|
||||||
|
sha1sum: 758c63d215a470d15fb217fd1f2132046fdaa8ff
|
||||||
|
---
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
VIRGINIA DEPARTMENT OF ENERGY
|
||||||
|
MINED LAND REPURPOSING
|
||||||
|
3405 MOUNTAIN EMPIRE ROAD, BIG STONE GAP, VA 24219
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 04/06/22
|
||||||
|
REV. 10/2021 Page 1 of 2
|
||||||
|
|
||||||
|
|
||||||
|
HNM0010144
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER
|
||||||
|
|
||||||
|
Golden Pond Gob Removal 18302 2018 HNM0010144
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED
|
||||||
|
|
||||||
|
C196013 03/31/21 100
|
||||||
|
|
||||||
|
CONTRACTOR NAME ENGINEER NAME
|
||||||
|
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
|
||||||
|
SITE CONTACT PERSON: Kevin Large
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION
|
||||||
|
|
||||||
|
01/26/22
|
||||||
|
02/24/22
|
||||||
|
03/01/22
|
||||||
|
|
||||||
|
04:00 PM
|
||||||
|
09:15 AM
|
||||||
|
04:00 PM
|
||||||
|
|
||||||
|
04:30 PM
|
||||||
|
10:15 AM
|
||||||
|
04:30 PM
|
||||||
|
|
||||||
|
WET
|
||||||
|
WET
|
||||||
|
WET
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMENTS
|
||||||
|
|
||||||
|
Material removal is now complete and the entire area has been covered with a mix of shot rock and soil. The site was
|
||||||
|
seeded under the 2021 Revegetation Project. Seeding of the site began on 10/19/21 and concluded on 10/29/21.
|
||||||
|
Vegetation is beginning to establish. Photos of the site are shown below. The end date for the AML contract has been
|
||||||
|
extended to 3/31/23.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
viRGINiA
|
||||||
|
|
||||||
|
Q Energy
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
|
||||||
|
HNM0010144
|
||||||
|
|
||||||
|
VIRGINIA DEPARTMENT OF ENERGY
|
||||||
|
|
||||||
|
MINED LAND REPURPOSING
|
||||||
|
|
||||||
|
3405 MOUNTAIN EMPIRE ROAD,
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
PROJECT NAME,
|
||||||
|
|
||||||
|
PROJECT NO.
|
||||||
|
|
||||||
|
GRANT YEAR | REPORT NUMBER
|
||||||
|
|
||||||
|
Golden Pond Gob Removal
|
||||||
|
|
||||||
|
HNM0010144
|
||||||
|
|
||||||
|
48302
|
||||||
|
|
||||||
|
2018
|
||||||
|
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
|
||||||
|
CONTRACT NUMBER
|
||||||
|
|
||||||
|
EXPIRATION DATE,
|
||||||
|
|
||||||
|
PERCENT OF CONTRACT COMPLETED
|
||||||
|
|
||||||
|
196013 03/31/21 100
|
||||||
|
CONTRACTOR NAME ENGINEER NAME
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
SITE CONTACT PERSON: Kevin Large
|
||||||
|
INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION
|
||||||
|
01/26/22 04:00 PM 04:30 PM WET
|
||||||
|
o2eai22 09:15 AM 10:15 AM WET
|
||||||
|
03/01/22 04:00 PM 04:30 PM WET
|
||||||
|
INSPECTION BY ‘ATTACHMENTS
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
[ COMMENTS
|
||||||
|
|
||||||
|
Material removal is now complete and the entire area has been covered with a mix of shot rock and soil. The site was
|
||||||
|
seeded under the 2021 Revegetation Project. Seeding of the site began on 10/19/21 and concluded on 10/29/21
|
||||||
|
Vegetation is beginning to establish. Photos of the site are shown below. The end date for the AML contract has been
|
||||||
|
|
||||||
|
‘extended to 3/31/23.
|
||||||
|
|
||||||
|
DMLR-AML-130S
|
||||||
|
REV. 10/2021
|
||||||
|
|
||||||
|
Page 1 of 2
|
||||||
|
|
||||||
|
Printed: 04/06/22
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
VIRGINIA DEPARTMENT OF ENERGY
|
||||||
|
MINED LAND REPURPOSING
|
||||||
|
3405 MOUNTAIN EMPIRE ROAD, BIG STONE GAP, VA 24219
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 04/06/22
|
||||||
|
REV. 10/2021 Page 2 of 2
|
||||||
|
|
||||||
|
|
||||||
|
HNM0010144
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNM0010144
|
||||||
|
@) a VIRGINIA DEPARTMENT OF ENERGY
|
||||||
|
(‘<4 nergy MINED LAND REPURPOSING
|
||||||
|
3405 MOUNTAIN EMPIRE ROAD, BIG STONE GAP, VA 24219
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 04/06/22
|
||||||
|
|
||||||
|
REV. 10/2021 Page 2 of 2
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,254 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: aiHNM0010317
|
||||||
|
file: ../aiHNM0010317.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Golden Pond Gob Pile Project
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 378462
|
||||||
|
sha256sum: 328edb0ec17877d9b98133403a5101eaf0b0c18a70431dbfb86292dc448acce3
|
||||||
|
sha1sum: f1488cf6bf03f09e55106ae268b29a25187984ad
|
||||||
|
---
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
VIRGINIA DEPARTMENT OF ENERGY
|
||||||
|
MINED LAND REPURPOSING
|
||||||
|
3405 MOUNTAIN EMPIRE ROAD, BIG STONE GAP, VA 24219
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 07/06/22
|
||||||
|
REV. 10/2021 Page 1 of 3
|
||||||
|
|
||||||
|
|
||||||
|
HNM0010317
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER
|
||||||
|
|
||||||
|
Golden Pond Gob Removal 18302 2018 HNM0010317
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED
|
||||||
|
|
||||||
|
C196013 03/31/21 100
|
||||||
|
|
||||||
|
CONTRACTOR NAME ENGINEER NAME
|
||||||
|
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
|
||||||
|
SITE CONTACT PERSON: Kevin Large
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION
|
||||||
|
|
||||||
|
04/20/22
|
||||||
|
05/03/22
|
||||||
|
06/08/22
|
||||||
|
|
||||||
|
04:00 PM
|
||||||
|
02:30 PM
|
||||||
|
03:00 PM
|
||||||
|
|
||||||
|
04:30 PM
|
||||||
|
03:00 PM
|
||||||
|
03:30 PM
|
||||||
|
|
||||||
|
DRY
|
||||||
|
DRY
|
||||||
|
DRY
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMENTS
|
||||||
|
|
||||||
|
Material removal is now complete and the entire area has been covered with a mix of shot rock and soil. The site was
|
||||||
|
seeded under the 2021 Revegetation Project. Seeding of the site began on 10/19/21 and concluded on 10/29/21.
|
||||||
|
Vegetation has established in places, but is somewhat sparse in other places. Photos of the site are shown below. The
|
||||||
|
end date for the AML contract has been extended to 3/31/23.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Q Energy
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
VIRGINIA DEPARTMENT OF ENERGY
|
||||||
|
MINED LAND REPURPOSING
|
||||||
|
|
||||||
|
HNM0010317
|
||||||
|
|
||||||
|
3405 MOUNTAIN EMPIRE ROAD, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
PROJECT NAME PROJECT NO. GRANT YEAR | REPORT NUMBER
|
||||||
|
Golden Pond Gob Removal 18302 2018 HINM0010317
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED
|
||||||
|
196013 03/31/21 100
|
||||||
|
CONTRACTOR NAME ENGINEER NAME
|
||||||
|
Russell County Reclamation, LLC SCOTTY COX
|
||||||
|
SITE CONTACT PERSON: Kevin Large
|
||||||
|
INSPECTION DATE ‘ARRIVAL DEPARTURE GROUND CONDITION
|
||||||
|
04/20/22 04:00 PM 04:30 PM DRY
|
||||||
|
05/03/22 02:30 PM 03:00 PM DRY
|
||||||
|
06/08/22 03:00 PM 03:30 PM DRY
|
||||||
|
INSPECTION BY ‘ATTACHMENTS
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
[ ‘COMMENTS
|
||||||
|
|
||||||
|
Material removal is now complete and the entire area has been covered with a mix of shot rock and soil. The site was
|
||||||
|
‘seeded under the 2021 Revegetation Project. Seeding of the site began on 10/19/21 and concluded on 10/29/21.
|
||||||
|
Vegetation has established in places, but is somewhat sparse in other places. Photos of the site are shown below. The
|
||||||
|
‘end date for the AML contract has been extended to 3/31/23.
|
||||||
|
|
||||||
|
DMLR-AML-130S
|
||||||
|
REV. 10/2021
|
||||||
|
|
||||||
|
Page 1 of 3
|
||||||
|
|
||||||
|
Printed: 07/06/22
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
VIRGINIA DEPARTMENT OF ENERGY
|
||||||
|
MINED LAND REPURPOSING
|
||||||
|
3405 MOUNTAIN EMPIRE ROAD, BIG STONE GAP, VA 24219
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 07/06/22
|
||||||
|
REV. 10/2021 Page 2 of 3
|
||||||
|
|
||||||
|
|
||||||
|
HNM0010317
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNM0010317
|
||||||
|
|
||||||
|
@) a VIRGINIA DEPARTMENT OF ENERGY
|
||||||
|
(< nergy MINED LAND REPURPOSING
|
||||||
|
3405 MOUNTAIN EMPIRE ROAD, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 07/06/22
|
||||||
|
|
||||||
|
REV. 10/2021 Page 2 of 3
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
VIRGINIA DEPARTMENT OF ENERGY
|
||||||
|
MINED LAND REPURPOSING
|
||||||
|
3405 MOUNTAIN EMPIRE ROAD, BIG STONE GAP, VA 24219
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 07/06/22
|
||||||
|
REV. 10/2021 Page 3 of 3
|
||||||
|
|
||||||
|
|
||||||
|
HNM0010317
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNM0010317
|
||||||
|
@) a VIRGINIA DEPARTMENT OF ENERGY
|
||||||
|
(‘<4 nergy MINED LAND REPURPOSING
|
||||||
|
3405 MOUNTAIN EMPIRE ROAD, BIG STONE GAP, VA 24219
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 07/06/22
|
||||||
|
|
||||||
|
REV. 10/2021 Page 3 of 3
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
14
Amys_Drop_Box/Golden Pond Gob Pile Project/map/README.md
Normal file
14
Amys_Drop_Box/Golden Pond Gob Pile Project/map/README.md
Normal file
|
|
@ -0,0 +1,14 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: map
|
||||||
|
file: ../map.jpg
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Golden Pond Gob Pile Project
|
||||||
|
docDate: null
|
||||||
|
contentType: text/plain
|
||||||
|
contentLength: 306365
|
||||||
|
sha256sum: 0c78c60fc039558089c74ab67d150cb6bb58ee3fea0746dd1b239288ead707b8
|
||||||
|
sha1sum: 24e1ad104496bf3c19eeafa836f1c5dcb247edf4
|
||||||
|
---
|
||||||
|
|
||||||
|
|
@ -0,0 +1,15 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: 1302253 permit
|
||||||
|
file: ../1302253 permit.xlsx
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Last Two Inpsection Reports Moss 3 Project Reclaim
|
||||||
|
- '1302'
|
||||||
|
docDate: '1302'
|
||||||
|
contentType: text/plain
|
||||||
|
contentLength: 93617
|
||||||
|
sha256sum: 3f8e12682b1d3797766f4c43cf94e25a400edd780693e6eb83fcb3f38415130f
|
||||||
|
sha1sum: 268e41b20f78c8c527db642060bb3f047d36bebd
|
||||||
|
---
|
||||||
|
|
||||||
|
|
@ -0,0 +1,167 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: inHNM0011172
|
||||||
|
file: ../inHNM0011172.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Last Two Inpsection Reports Moss 3 Project Reclaim
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 24097
|
||||||
|
sha256sum: 43427709be9adf1e49b3cd09bfc0bf3494b5bf6a15a9096feb0092089c3cca2a
|
||||||
|
sha1sum: 86144b8264195687e9bcab7c62b8c092dd4092a1
|
||||||
|
---
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
VIRGINIA DEPARTMENT OF ENERGY
|
||||||
|
|
||||||
|
MINED LAND REPURPOSING
|
||||||
|
3405 MOUNTAIN EMPIRE ROAD, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-ENF-044S Printed: 02/13/24
|
||||||
|
REV. 10/2021 Page 1 of 1
|
||||||
|
|
||||||
|
|
||||||
|
HNM0011172
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMPANY NAME PERMIT COMPLAINT REPORT NUMBER
|
||||||
|
|
||||||
|
RUSSELL COUNTY RECLAMATION, LLC 1302253 HNM0011172
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
NAME AND BUSINESS ADDRESS OF PERMITTEE TYPE OF INSPECTION REPORT TYPE
|
||||||
|
|
||||||
|
KEVIN LARGE
|
||||||
|
P. O. BOX 17329
|
||||||
|
|
||||||
|
2389 LEE HIGHWAY
|
||||||
|
BRISTOL, VA 24209-7329
|
||||||
|
|
||||||
|
PARTIAL ROUTINE
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION DATE ARRIVAL DEPARTURE WEATHER
|
||||||
|
|
||||||
|
01/29/24 9:00 AM 12:00 PM FAIR
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
ACREAGE
|
||||||
|
|
||||||
|
PERMITTED DISTURBED REGRADED RECLAIMED BONDED
|
||||||
|
|
||||||
|
1,272.35 865.39 316.98 302.56 971.67
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COUNTY OPERATION STATUS LOCATION
|
||||||
|
|
||||||
|
RUSSELL ACTIVE ON DUMPS CREEK NEAR SOUTH CLINCHFIELD
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION BY COPY OF REPORT
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H. Mailed - Kevin Large
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
THE FOLLOWING PERFORMANCE STANDARD(S) WERE IN COMPLIANCE:
|
||||||
|
|
||||||
|
1. SM - SIGNS AND MARKERS
|
||||||
|
3. AO - AUTHORIZED TO OPERATE
|
||||||
|
|
||||||
|
2. RV - REVEGETATION
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
THE FOLLOWING PERFORMANCE STANDARD(S) WERE IN VIOLATION OR HAVE A PERMIT DEFECT:
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMENTS : PERMIT: 1302253 REPORT: HNM0011172
|
||||||
|
|
||||||
|
SIGNS AND MARKERS: Permit signs and markers are noted.
|
||||||
|
|
||||||
|
REVEGETATION: The outslopes of fill areas are supporting vegetation. The areas around the prep plant have been
|
||||||
|
covered with a topsoil mix and seeded. These areas are supporting vegetation.
|
||||||
|
|
||||||
|
AUTHORIZATION TO OPERATE: This permit has been transferred from PN 1302194. All mining and reclamation
|
||||||
|
obligations are now assumed by the new permittee, Russell County Reclamation, LLC. The MSHA# is 44-02277. On site
|
||||||
|
observations are consistent with permit information.
|
||||||
|
|
||||||
|
|
||||||
|
COMMENTS: A partial inspection was conducted. Mining and reclamation are still ongoing.
|
||||||
|
|
||||||
|
|
||||||
|
Q Energy
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
VIRGINIA DEPARTMENT OF ENERGY
|
||||||
|
MINED LAND REPURPOSING
|
||||||
|
|
||||||
|
‘TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
3405 MOUNTAIN EMPIRE ROAD, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
HNM0011172
|
||||||
|
|
||||||
|
INSPECTION
|
||||||
|
COMPANY NAME PERMIT COMPLAINT REPORT NUMBER
|
||||||
|
RUSSELL COUNTY RECLAMATION, LLC 1302253 HNM0011172
|
||||||
|
NAME AND BUSINESS ADDRESS OF PERMITTEE TYPE OF INSPECTION REPORT TYPE
|
||||||
|
KEVIN LARGE PARTIAL ROUTINE
|
||||||
|
P. 0. BOX 17329
|
||||||
|
2389 LEE HIGHWAY
|
||||||
|
BRISTOL, VA 24209-7329
|
||||||
|
INSPECTION DATE, ARRIVAL DEPARTURE WEATHER
|
||||||
|
01/29/24 9:00 AM 12:00 PM FAIR
|
||||||
|
ACREAGE
|
||||||
|
PERMITTED DISTURBED REGRADED RECLAIMED. BONDED
|
||||||
|
1,272.35 865.39 316.98 302.56 971.67
|
||||||
|
COUNTY OPERATION STATUS LOCATION
|
||||||
|
RUSSELL ACTIVE ON DUMPS CREEK NEAR SOUTH CLINCHFIELD
|
||||||
|
INSPECTION BY ‘COPY OF REPORT
|
||||||
|
MCDONALD-TAYLOR, H. Mailed - Kevin Large
|
||||||
|
‘THE FOLLOWING PERFORMANCE STANDARD(S) WERE IN COMPLIANCE:
|
||||||
|
1. SM- SIGNS AND MARKERS. 2. RV - REVEGETATION
|
||||||
|
3. AO - AUTHORIZED TO OPERATE,
|
||||||
|
THE FOLLOWING PERFORMANCE STANDARD(S) WERE IN VIOLATION OR HAVE A PERMIT DEFECT:
|
||||||
|
I
|
||||||
|
|
||||||
|
[COMMENTS =
|
||||||
|
|
||||||
|
PERMIT: 1302253 | REPORT: HNM0011172
|
||||||
|
|
||||||
|
SIGNS AND MARKERS: Permit signs and markers are noted,
|
||||||
|
|
||||||
|
REVEGETATION: The outslopes of fill areas are supporting vegetation. The areas around the prep plant have been
|
||||||
|
covered with a topsoil mix and seeded. These areas are supporting vegetation
|
||||||
|
|
||||||
|
AUTHORIZATION TO OPERATE: This permit has been transferred from PN 1302194. All mining and reclamation
|
||||||
|
obligations are now assumed by the new permittee, Russell County Reclamation, LLC. The MSHA¥# is 44-02277. On site
|
||||||
|
|
||||||
|
observations are consistent with permit information.
|
||||||
|
|
||||||
|
COMMENTS: A partial inspection was conducted. Mining and reclamation are still ongoing
|
||||||
|
|
||||||
|
DMLR-ENF-044S
|
||||||
|
REV. 10/2021
|
||||||
|
|
||||||
|
Page 1 of 1
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,159 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: inHNM0011203
|
||||||
|
file: ../inHNM0011203.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Last Two Inpsection Reports Moss 3 Project Reclaim
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 24341
|
||||||
|
sha256sum: d9f49164818ad6d053bf8ee5ffb01fbd479a245c1328f53e59c795b6c724a5af
|
||||||
|
sha1sum: 6123c5e67f24017044f7d06ba0639c5c30ac61b3
|
||||||
|
---
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
VIRGINIA DEPARTMENT OF ENERGY
|
||||||
|
|
||||||
|
MINED LAND REPURPOSING
|
||||||
|
3405 MOUNTAIN EMPIRE ROAD, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-ENF-044S Printed: 02/28/24
|
||||||
|
REV. 10/2021 Page 1 of 1
|
||||||
|
|
||||||
|
|
||||||
|
HNM0011203
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMPANY NAME PERMIT COMPLAINT REPORT NUMBER
|
||||||
|
|
||||||
|
RUSSELL COUNTY RECLAMATION, LLC 1302253 HNM0011203
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
NAME AND BUSINESS ADDRESS OF PERMITTEE TYPE OF INSPECTION REPORT TYPE
|
||||||
|
|
||||||
|
KEVIN LARGE
|
||||||
|
P. O. BOX 17329
|
||||||
|
|
||||||
|
2389 LEE HIGHWAY
|
||||||
|
BRISTOL, VA 24209-7329
|
||||||
|
|
||||||
|
PARTIAL ROUTINE
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION DATE ARRIVAL DEPARTURE WEATHER
|
||||||
|
|
||||||
|
02/13/24 2:30 PM 4:30 PM FAIR
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
ACREAGE
|
||||||
|
|
||||||
|
PERMITTED DISTURBED REGRADED RECLAIMED BONDED
|
||||||
|
|
||||||
|
1,272.35 865.39 316.98 302.56 971.67
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COUNTY OPERATION STATUS LOCATION
|
||||||
|
|
||||||
|
RUSSELL ACTIVE ON DUMPS CREEK NEAR SOUTH CLINCHFIELD
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION BY COPY OF REPORT
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H. Mailed - Kevin Large
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
THE FOLLOWING PERFORMANCE STANDARD(S) WERE IN COMPLIANCE:
|
||||||
|
|
||||||
|
1. SM - SIGNS AND MARKERS
|
||||||
|
3. HR - HAUL ROADS
|
||||||
|
|
||||||
|
2. RV - REVEGETATION
|
||||||
|
4. AO - AUTHORIZED TO OPERATE
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
THE FOLLOWING PERFORMANCE STANDARD(S) WERE IN VIOLATION OR HAVE A PERMIT DEFECT:
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMENTS : PERMIT: 1302253 REPORT: HNM0011203
|
||||||
|
|
||||||
|
SIGNS AND MARKERS: Permit signs and markers are noted.
|
||||||
|
|
||||||
|
REVEGETATION: The outslopes of fill areas are supporting vegetation. The areas around the prep plant have been
|
||||||
|
covered with a topsoil mix and seeded. These areas are supporting vegetation.
|
||||||
|
|
||||||
|
AUTHORIZATION TO OPERATE: This permit has been transferred from PN 1302194. All mining and reclamation
|
||||||
|
obligations are now assumed by the new permittee, Russell County Reclamation, LLC. The MSHA# is 44-02277. On site
|
||||||
|
observations are consistent with permit information.
|
||||||
|
|
||||||
|
HAULROADS: Haulroads and associated access roads are well maintained.
|
||||||
|
|
||||||
|
COMMENTS: A partial inspection was conducted. Mining and reclamation are still ongoing.
|
||||||
|
|
||||||
|
|
||||||
|
virGinia COMMONWEALTH OF VIRGINIA HNM0011203
|
||||||
|
G E ner VIRGINIA DEPARTMENT OF ENERGY
|
||||||
|
(<4 MINED LAND REPURPOSING
|
||||||
|
3405 MOUNTAIN EMPIRE ROAD, BIG STONE GAP, VA 24219
|
||||||
|
‘TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
INSPECTION
|
||||||
|
COMPANY NAME PERMIT COMPLAINT REPORT NUMBER
|
||||||
|
RUSSELL COUNTY RECLAMATION, LLC 1302253 HNM0011203
|
||||||
|
NAME AND BUSINESS ADDRESS OF PERMITTEE TYPE OF INSPECTION REPORT TYPE
|
||||||
|
KEVIN LARGE PARTIAL ROUTINE
|
||||||
|
P. 0. BOX 17329
|
||||||
|
2389 LEE HIGHWAY
|
||||||
|
BRISTOL, VA 24209-7329
|
||||||
|
INSPECTION DATE, ARRIVAL DEPARTURE WEATHER
|
||||||
|
02/13/24 2:30 PM 4:30 PM FAIR
|
||||||
|
ACREAGE
|
||||||
|
PERMITTED DISTURBED REGRADED RECLAIMED. BONDED
|
||||||
|
1,272.35 865.39 316.98 302.56 971.67
|
||||||
|
COUNTY OPERATION STATUS LOCATION
|
||||||
|
RUSSELL ACTIVE ON DUMPS CREEK NEAR SOUTH CLINCHFIELD
|
||||||
|
INSPECTION BY ‘COPY OF REPORT
|
||||||
|
MCDONALD-TAYLOR, H. Mailed - Kevin Large
|
||||||
|
‘THE FOLLOWING PERFORMANCE STANDARD(S) WERE IN COMPLIANCE:
|
||||||
|
1. SM- SIGNS AND MARKERS. 2. RV - REVEGETATION
|
||||||
|
3. HR - HAUL ROADS 4. AO - AUTHORIZED TO OPERATE,
|
||||||
|
THE FOLLOWING PERFORMANCE STANDARD(S) WERE IN VIOLATION OR HAVE A PERMIT DEFECT:
|
||||||
|
I
|
||||||
|
|
||||||
|
[COMMENTS = [__ PERMIT: 1302253 | REPORT: HNM0011203 |
|
||||||
|
SIGNS AND MARKERS: Permit signs and markers are noted.
|
||||||
|
|
||||||
|
REVEGETATION: The outslopes of fill areas are supporting vegetation. The areas around the prep plant have been
|
||||||
|
covered with a topsoil mix and seeded. These areas are supporting vegetation
|
||||||
|
|
||||||
|
AUTHORIZATION TO OPERATE: This permit has been transferred from PN 1302194. All mining and reclamation
|
||||||
|
obligations are now assumed by the new permittee, Russell County Reclamation, LLC. The MSHA¥ is 44-02277. On site
|
||||||
|
observations are consistent with permit information.
|
||||||
|
|
||||||
|
HAULROADS: Haulroads and associated access roads are well maintained.
|
||||||
|
|
||||||
|
COMMENTS: A partial inspection was conducted. Mining and reclamation are still ongoing
|
||||||
|
|
||||||
|
DMLR-ENF-044S
|
||||||
|
REV. 10/2021 Page 1 of 1
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
399
Amys_Drop_Box/Omnis Energy Coal Reclaim/README.md
Normal file
399
Amys_Drop_Box/Omnis Energy Coal Reclaim/README.md
Normal file
|
|
@ -0,0 +1,399 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: Omnis Energy Coal Reclaim
|
||||||
|
file: ../Omnis Energy Coal Reclaim.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 2473252
|
||||||
|
sha256sum: 737f814e70574b36ad5194fe1691994ddcc38a33565e33a8b215f5c6048c1ca4
|
||||||
|
sha1sum: 0358c9d32a79de697cb08997c9631a5bcefa8d89
|
||||||
|
---
|
||||||
|
|
||||||
|
Venue Uhiee
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
smn nf StS ES SES TEES EES SEE TP OEP YS SE OE SST
|
||||||
|
|
||||||
|
Disclaimer
|
||||||
|
|
||||||
|
Certain statements in the Memorandum may be regarded as “forward-looking statements” within the meaning of the Private Securities Litigation Reform Act of
|
||||||
|
11995, as amended. Certain forward-lookin uss the Company's plans, strategies and intentions, and may be identified by reference to a future
|
||||||
|
period or periods or by the use of forward: gy, Such as “expects, “believes,” "should," “would,” “could,” “approximately,”
|
||||||
|
|
||||||
|
“anticipates,” “estimates,” “targets,” “intends,” ‘projects,” "positioned," “strategy,” “future,” and “plans,” or variations of those terms. All statements
|
||||||
|
other than statements of historical fact are "forward-looking statéments” for purposes of federal and state securities laws. There is no guarantee that any of the
|
||||||
|
|
||||||
|
events anticipated by these forward-looking statements will occur. These statements involve known and unknown risks, uncertainties and other factors that may
|
||||||
|
cause the Company's actual results, levels of activity, performance or achievements to differ from those expressed or implied by the forward-looking statement.
|
||||||
|
|
||||||
|
‘These forward-looking statements are based on various assumptions and the current expectations of the management of the Company, and may not be
|
||||||
|
accurate because of risks and uncertainties surrounding these assumptions and expectations. Certain factors may cause actual results to differ significantly from
|
||||||
|
these forward-looking statements. If any of the events occur, there is no guarantee what effect they will have on the operations or financial condition of the
|
||||||
|
Major risks, uncertaintles and assumptions include, but are not limited to, risks relating to: the Company's capital and financin«
|
||||||
|
|
||||||
|
; the Company's ability to complete the CONSOL Balley project; the Company's ability to identify and execute on future projects; the Company's
|
||||||
|
|
||||||
|
ion of its business, including attracting and retaining key personnel and integrating and deriving synergies from future
|
||||||
|
a ‘edvances or changes in the energy, natural resources and agriculture industries, and the Company's ability
|
||||||
|
to adapt its business strategy accordingly; any unforeseen changes to or effects on liabilities, future capital expenditures, revenues, expenses, earnings,
|
||||||
|
indebtedness, financial condition, losses and future prospects; the effect of general economic conditions; changes in law or government regulation or failure to
|
||||||
|
obtain favorable changes in law or government regulation, including in each case tax and environmental regulations; the impact of the COVID-19 pandemic; and
|
||||||
|
‘other factors. However, it is not possible to predict or identify all such factors.
|
||||||
|
|
||||||
|
“Omnis Regenerative Energy”, "Carbon ORE”, “Mineral ORE” and "Hydrogen ORE” are trademarks of, or licensed by, Omnis Energy Refineries, LLC. All third-
|
||||||
|
party trademarks remain the property of their respective owners.
|
||||||
|
|
||||||
|
For more information, contact:
|
||||||
|
|
||||||
|
‘Omnis Energy Ref
|
||||||
|
|
||||||
|
30 Broad Street,
|
||||||
|
New York, NY 10004
|
||||||
|
|
||||||
|
Email: cgassenheimer@omnisenergy.com
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Today’s Presenters
|
||||||
|
|
||||||
|
Charles Gassenheimer
|
||||||
|
Co-Founder, President and CEO
|
||||||
|
|
||||||
|
Co-Founder and President of Omnis Eneray
|
||||||
|
|
||||||
|
Co-Founder and President of Carnegie Hudson Resources
|
||||||
|
|
||||||
|
Former Chairman and CEO of Enerl, a publicly listed lithium-ion battery company
|
||||||
|
Former CEO of a family office with approximately $5 billion under management
|
||||||
|
|
||||||
|
Served on numerous boards includ maker Think Global (Oslo, Norway) as well as a board member of the
|
||||||
|
Electric Drive Transport Association (EDTA), the Electrification Coalition, and the Richard G. Lugar Center for Renewable Energy
|
||||||
|
|
||||||
|
Former Partner and Managing Director of Satellite Asset Management
|
||||||
|
|
||||||
|
Chuck Shaynak
|
||||||
|
|
||||||
|
1F CONSOL Energy for over forty years in numerous Operating and Executive Management roles, serving as Senior Vice President
|
||||||
|
I ten years.
|
||||||
|
in oF managed fourteen different coal operations with CONSOL.
|
||||||
|
‘© Former member of the Pennsylvania Board of Coal Mine Safety
|
||||||
|
© BS graduate in Mining Engineering from Pennsylvania State University
|
||||||
|
|
||||||
|
Coonnis Enero
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Coal Waste Is a Multi Billion-Dollar Environmental Liability;
|
||||||
|
Omnis Energy Provides a Permanent Solution
|
||||||
|
|
||||||
|
The Problem: There are billions of tonnes of historical waste from coal mining and 70-90 million tonnes of waste are added annually. It is an
|
||||||
|
international environmental challenge that represents tens of billions of dollars of reclamation liabilities held by states and businesses.
|
||||||
|
|
||||||
|
The Solution: The Omnis Energy Technology Modules heal the environment by turning waste streams into a variety of value-added products.
|
||||||
|
|
||||||
|
Carbon ORE
|
||||||
|
|
||||||
|
te nah vt wa fr arty pts ee ray rs Co wate ol
|
||||||
|
Sip ies sen see Gr pas Sc ld scr
|
||||||
|
|
||||||
|
omnis Eneroy
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Remediating the Largest Environmental Liabilities in
|
||||||
|
North America
|
||||||
|
|
||||||
|
Coal Waste Remediation U.S. Abandoned Coal Mines and Refuse Impoundments
|
||||||
|
|
||||||
|
* In Pennsylvania alone, it is estimated that there are ove
|
||||||
|
unfunded or underfunded mining-related environmental
|
||||||
|
over 287,000 acres
|
||||||
|
|
||||||
|
= Much of the consists of abandoned coal refuse from coal
|
||||||
|
processing operations, some of which contain high levels of sulfur that
|
||||||
|
‘can produce acid mine drainage for decades
|
||||||
|
|
||||||
|
Untreated coal waste impoundments are environmental hazards that
|
||||||
|
permanently eradicate natural habitats
|
||||||
|
|
||||||
|
= Omnis Energy's modules can completely remediate these environmental
|
||||||
|
hazards, refining waste into high-value products to support the green
|
||||||
|
economy and restoring sites to their natural habitats
|
||||||
|
|
||||||
|
Uniqueness of Omnis Energy's Technology
|
||||||
|
|
||||||
|
= Omnis Energy uniquely converts coal waste to non-coal products
|
||||||
|
|
||||||
|
«IRS letter ruled that Carbon ORE is physically and chemically different
|
||||||
|
‘than coal [OMNIS final product]
|
||||||
|
|
||||||
|
= Asa result, Omnis Energy has the potential to be designated as a special
|
||||||
|
reclamation agent for each state
|
||||||
|
|
||||||
|
> Remediates a significant environmental burden while developing high-potential clean energy products
|
||||||
|
|
||||||
|
© erecta ISH T ta ttn ew Glomnis Enerou
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
es TSE 2S SSE SEE SE ES ES EE AE LR EE SS SS SS
|
||||||
|
|
||||||
|
The Omnis Regenerative Energy (ORE) Process
|
||||||
|
|
||||||
|
Reclaiming Particle Size Micro-Particle
|
||||||
|
Coal Waste Roduction
|
||||||
|
2 4 > — Anhydrous Ammonia
|
||||||
|
“Ne os eege + ogege (Haber-Bosch Process)
|
||||||
|
se
|
||||||
|
Venturi Process, \ Nanomaterial Additives
|
||||||
|
carbon 80888
|
||||||
|
Dewatering 4°49, (] _
|
||||||
|
Exhaust Gas Sole
|
||||||
|
= *| “capture ate
|
||||||
|
|
||||||
|
Carbon Forming 96990 | __. Natural Topsoil 89898
|
||||||
|
and Conditioning ©: Innewlone| Mineral Dewatering ,°.°,
|
||||||
|
|
||||||
|
Mineral ORE Hydrogen ORE
|
||||||
|
|
||||||
|
Os
|
||||||
|
|
||||||
|
e te: Pcs nen he! ea eset arent cnet es CGomnis Eneray
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
The Omnis Regenerative Energy (ORE) Process
|
||||||
|
|
||||||
|
e ge Pass nan sto 2 reper cre coe pcs omnis Enerau
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
eg EE RE ESE SS SS SN ES ES EE ESE OE SE SE
|
||||||
|
|
||||||
|
Carbon ORE - Lab Tested & Proven
|
||||||
|
|
||||||
|
Coal does not conduct electricity...
|
||||||
|
|
||||||
|
Coal does not burn clean...
|
||||||
|
|
||||||
|
Coal does not float...
|
||||||
|
|
||||||
|
- Carbon ORE does ww. Carbon ORE does
|
||||||
|
|
||||||
|
The U.S. Government has defined
|
||||||
|
Energy's Carbon ORE as “not coal
|
||||||
|
|
||||||
|
Theoretical Emissions Reductions and
|
||||||
|
|
||||||
|
‘Comparison Between Carbon ORE and Coal Higher Efficiency in Sub-Critical Power
|
||||||
|
|
||||||
|
«Carbon ORE is a cleaner substitute for er: ie
|
||||||
|
coal in power generation and other Petareetes = Seal
|
||||||
|
ial applications Total Moisture % AR <2% 6-30%
|
||||||
|
; of carbon ORE makes tan
|
||||||
|
|
||||||
|
k for high-purity carbon Ash % 0B <S% 59%
|
||||||
|
|
||||||
|
+ Apure source of energy derived from Volatile Matter 0B <10% 31-37%
|
||||||
|
material that would otherwise be wasted
|
||||||
|
5 toner etter: was nc bee Fed Carbon % DB > 85% © 34-52%
|
||||||
|
‘environmental footprint of any comparative a =
|
||||||
|
energy sources sulfur %DB —<0.5% 0.3-2.4%
|
||||||
|
= Energy dense - greater efficiency and less Heating Value tb. 6,600- ma6
|
||||||
|
energy required mavalue ar 719500 11,500 UB PRE NAP Caron CMe
|
||||||
|
ye eons
|
||||||
|
TAM Oe an: 8 ~ tn ar PR Por RB MEP = Nan Ac = be nis Ener
|
||||||
|
0 Fee Covicts nee
|
||||||
|
|
||||||
|
nj extn Back Da ro festa spsenrs, gape ey ete ere oS,
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Carbon ORE - Graphite Precursor Opportunities
|
||||||
|
|
||||||
|
Graphite Market
|
||||||
|
|
||||||
|
© Graphite is used in lithium-ion battery production, lubricants, solar
|
||||||
|
panels and electrodes
|
||||||
|
|
||||||
|
© Graphite market size in 2019 was $19
|
||||||
|
$37 billion by 2030
|
||||||
|
|
||||||
|
© Akey market demand driver for graphite is electric vehicles (lithium-
|
||||||
|
ion batteries)
|
||||||
|
|
||||||
|
The U.S. Government has defined graphite as "Critical to the nation’s
|
||||||
|
security and prosperity” and Presidential Executive Orders ask U.S.
|
||||||
|
Government Agencies to act with alacrity
|
||||||
|
|
||||||
|
n, forecasted to grow to
|
||||||
|
|
||||||
|
Projected Market Demand by 2028
|
||||||
|
|
||||||
|
1.106%
|
||||||
|
1.160%
|
||||||
|
12%
|
||||||
|
E 452%
|
||||||
|
a a a.
|
||||||
|
|
||||||
|
Strong Market Demand Amid the Growth of EV & Batteries
|
||||||
|
Electric Vehicle Sales Forecasts
|
||||||
|
|
||||||
|
‘eEurope MUS. mChna MJopan Southern RestotwWers SOMEVS
|
||||||
|
20
|
||||||
|
|
||||||
|
= °
|
||||||
|
ae) 2028 030 2005 Eas
|
||||||
|
|
||||||
|
Graphite is an Indispensable Component for Lithium Batteries
|
||||||
|
|
||||||
|
[= se #
|
||||||
|
=> =
|
||||||
|
|
||||||
|
o> nee
|
||||||
|
_ q ?
|
||||||
|
|
||||||
|
ronat ue
|
||||||
|
|
||||||
|
et cuertnts
|
||||||
|
|
||||||
|
(0) ‘eur: Boor, Sexier Mr Capa, Fer er
|
||||||
|
|
||||||
|
Commis Eneroy
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Mineral ORE - A Driver of Natural Land Regeneration
|
||||||
|
|
||||||
|
‘Carbon Credit Monetization
|
||||||
|
|
||||||
|
© What is Mineral ORE?
|
||||||
|
Mineral ORE is the residual material produced after separating Migeral ORE has the polsatil to
|
||||||
|
|
||||||
|
the Carbon ORE from coal waste. jestration potential of soils.
|
||||||
|
Farmers receive increased carbon
|
||||||
|
© How it Works credits as a result.
|
||||||
|
|
||||||
|
When applied to soil, Mineral ORE rebalances the texture and
|
||||||
|
mineral composition. As a result, degraded land is returned to a
|
||||||
|
productive state imenwre
|
||||||
|
|
||||||
|
we can halt the annual
|
||||||
|
Increase in C02 in the atmosphere
|
||||||
|
|
||||||
|
* Result
|
||||||
|
|
||||||
|
‘The biosphere is regenerated for sustainable benefits with
|
||||||
|
reduced need for fertilizers and chemicals
|
||||||
|
|
||||||
|
Commis Eneray
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
November 2022: West Virginia Governor announces Omnis Sublimation Recovery
|
||||||
|
Technologies (OSRT) to invest $60m to extract rare earth metals from coal
|
||||||
|
impoundments
|
||||||
|
|
||||||
|
A strategic asset to help grow West Virginia's economy.
|
||||||
|
|
||||||
|
OSRT’s technology can extract pure metals from coal
|
||||||
|
impoundment mineral waste using Ultra-High Heat
|
||||||
|
without acids or harmful chemicals. The technology
|
||||||
|
recovers 100% of the metals, including all critical,
|
||||||
|
|
||||||
|
strategic, and rare earth metals.
|
||||||
|
|
||||||
|
"Coal is such a big part of our state's
|
||||||
|
livelihood, and it amazing that we can
|
||||||
|
now take the coal waste and turn it into
|
||||||
|
‘something the world desperately needs, al!
|
||||||
|
|
||||||
|
inia Gover oa! while providing jobs to our hard-working
|
||||||
|
West Virginia Governor James C. Justice II pir cour prestsmte?
|
||||||
|
|
||||||
|
2] Gomis Enerau
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
How Can NAS Help?
|
||||||
|
|
||||||
|
Large Coal Waste Cleansing Market
|
||||||
|
|
||||||
|
ible by-product of mining and is a large
|
||||||
|
environmental liability in North America.
|
||||||
|
|
||||||
|
OMNIS's technology is commercially deployed, this would
|
||||||
|
iminate the need for future impoundments
|
||||||
|
|
||||||
|
= There are over 900 coal mines in the U.S., creating multi-
|
||||||
|
billion-dollar liabilities to both companies and states
|
||||||
|
|
||||||
|
Surface and Underground Coal Mines in the United States
|
||||||
|
|
||||||
|
© Surface mines
|
||||||
|
© Underground Mines
|
||||||
|
|
||||||
|
Identify
|
||||||
|
remedi
|
||||||
|
|
||||||
|
ighest priority sites for
|
||||||
|
ion
|
||||||
|
|
||||||
|
OMNIS has demonstrated that they can
|
||||||
|
recover waste coal fines that would
|
||||||
|
otherwise be disposed of
|
||||||
|
|
||||||
|
We are in the process of scaling up the
|
||||||
|
production at Bailey to achieve positive
|
||||||
|
economics
|
||||||
|
|
||||||
|
More work/funding is needed to
|
||||||
|
realized this broader vision/potential
|
||||||
|
|
||||||
|
Provide additional funding through the
|
||||||
|
|
||||||
|
Department of Interior's Abandoned
|
||||||
|
|
||||||
|
Mine Land Reclamation Fund (AML)
|
||||||
|
|
||||||
|
= Implement mobile treatment faci
|
||||||
|
concept that would allow for smaller
|
||||||
|
site clean-ups
|
||||||
|
|
||||||
|
= Mobile capabilities allow for greater
|
||||||
|
geographic reach
|
||||||
|
|
||||||
|
3) eur ey rain Artin
|
||||||
|
|
||||||
|
SREP NERS SRP cea npc = Mec R= Pee Ser Basi A= A P= Ps.
|
||||||
|
|
||||||
|
Glomnis eneray
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
48814
Amys_Drop_Box/Project Reclaim Environmental Assessment/README.md
Normal file
48814
Amys_Drop_Box/Project Reclaim Environmental Assessment/README.md
Normal file
File diff suppressed because it is too large
Load Diff
|
|
@ -0,0 +1,56 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: 2018 Pilot Sub-Recipient Approval
|
||||||
|
file: ../2018 Pilot Sub-Recipient Approval.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Project Reclaim II - Final Inspection
|
||||||
|
- '2018'
|
||||||
|
docDate: '2018'
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 158374
|
||||||
|
sha256sum: b146d4a913776353b511e2878dc0264889848ba250541a16a945ba839c55a613
|
||||||
|
sha1sum: 64fac3cd887cad53706b26f0e844db0751eb7de7
|
||||||
|
---
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
~~~ Forwarded message —---—
|
||||||
|
From: AR-Grants, OSM <osm-ar-grants@osmre.gov>
|
||||||
|
|
||||||
|
Date: Thu, Aug 29, 2019 at 10:29 AM
|
||||||
|
|
||||||
|
Subject: Re: S19AF20068 (VA FY2018 AML Pilot) PoP: 10/01/2019 - 09/30/2022
|
||||||
|
|
||||||
|
To: Harris, Clara (DMME) <clara harris@dmme virginia gov>
|
||||||
|
|
||||||
|
Ce: Tonya Mullins <tmullins@osmre.gov>, Roger Calhoun <rcalhoun@osmre.gov>, Richard Buckley
|
||||||
|
<rbuckley@osmre gov>
|
||||||
|
|
||||||
|
Good morning,
|
||||||
|
|
||||||
|
| forgot to mention that OSMRE has approved the following Sub-Recipients for S19AF20068 VA FY2018
|
||||||
|
AML Pilot:
|
||||||
|
|
||||||
|
S19AF20068 VA FY2018 AML Pilot
|
||||||
|
|
||||||
|
Appalachian Traditions, Inc. 839118564
|
||||||
|
|
||||||
|
Wise County Industrial Development Authority 60971376
|
||||||
|
DICKENSON COUNTY PUBLIC SERVICE AUTHORITY 361432347
|
||||||
|
Russell County Reclamation, LLC 081250497
|
||||||
|
LENOWISCO Planning District Commission 118113430
|
||||||
|
Cumberland Plateau Planning District Commission 119739324
|
||||||
|
Norton Industrial Development Authority 829453935
|
||||||
|
Russell County 040157851
|
||||||
|
SWVA Sportsmen Inc 080524562
|
||||||
|
|
||||||
|
The Nature Conservancy 072656630
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,198 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: 91806 Project Reclaim Phase II ATP FONSI signed
|
||||||
|
file: ../91806 Project Reclaim Phase II ATP FONSI signed.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Project Reclaim II - Final Inspection
|
||||||
|
- '9180'
|
||||||
|
docDate: '9180'
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 469219
|
||||||
|
sha256sum: b13cae14174aaa332ac90d2ec9fb7a0a7103d47b64b55cead0d91b6b7ea2bf49
|
||||||
|
sha1sum: 54a08acb2d8d3660e4607362e7970f397253dfcd
|
||||||
|
---
|
||||||
|
|
||||||
|
United States Department of the Interior
|
||||||
|
OFFICE OF SURFACE MINING
|
||||||
|
|
||||||
|
RECLAMATION AND ENFORCEMENT
|
||||||
|
Charleston Field Office
|
||||||
|
1027 Virginia Scot, East
|
||||||
|
Charleston, West Virginia 25301
|
||||||
|
|
||||||
|
December 9, 2020
|
||||||
|
Authorization to Proceed
|
||||||
|
|
||||||
|
Lesa Baker, Project Coordinator
|
||||||
|
Department of Mines, Minerals and Energy
|
||||||
|
Division of Mined Land Reclamation
|
||||||
|
|
||||||
|
3405 Mountain Empire Road
|
||||||
|
|
||||||
|
Big Stone Gap, Virginia 24219
|
||||||
|
|
||||||
|
Dear Mrs. Baker:
|
||||||
|
|
||||||
|
The Office of Surface Mining Reclamation and Enforcement (OSM) has determined that Project
|
||||||
|
Reclaim Phase II under the 2018 Pilot Program has met the following criteria:
|
||||||
|
|
||||||
|
1. The projects have been entered in the Enhanced Abandoned Mine Land Inventory
|
||||||
|
System (e-AMLIS) in problem area VA-00821 in compliance with Directive AML-1.
|
||||||
|
|
||||||
|
2. Environmental documents, including compliance information for the National
|
||||||
|
Environmental Policy Act (NEPA) and other environmental requirements and
|
||||||
|
documented with a Finding of No Significant Impact (FONSI) on December 9, 2020.
|
||||||
|
|
||||||
|
3. The ATP request included an AML eligibility statement and basis for claiming AML
|
||||||
|
eligibility.
|
||||||
|
|
||||||
|
Accordingly, pursuant to 30 CFR 886.16, you are authorized to proceed with this project and
|
||||||
|
expend Federal funds in accordance with AML grant terms and conditions. If this project
|
||||||
|
provided funding to a subrecipient through a subaward, the subrecipient must be approved by
|
||||||
|
OSM separately from this ATP. OSM subrecipient approval can be requested either through the
|
||||||
|
initial award application or through a separate request.
|
||||||
|
|
||||||
|
Si
|
||||||
|
|
||||||
|
Fe CORN 78 for:
|
||||||
|
|
||||||
|
Charleston Field Office
|
||||||
|
|
||||||
|
Enclosure
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
2
|
||||||
|
|
||||||
|
|
||||||
|
ENVIRONMENTAL ASSESSMENT (EA)
|
||||||
|
FINDING OF NO SIGNIFICANT IMPACT
|
||||||
|
|
||||||
|
|
||||||
|
Project Reclaim Phase II– AML Pilot/Site No. 91806
|
||||||
|
2018 VA AML Pilot Grant
|
||||||
|
|
||||||
|
|
||||||
|
Priority 3: Other/Associated with Priority 3, 32 AC Gob (Site 18302)
|
||||||
|
Estimated Cost: $1,645,340
|
||||||
|
Russell County, Virginia
|
||||||
|
|
||||||
|
|
||||||
|
The Virginia Department of Mines, Minerals and Energy (DMME), Division of Mined Land
|
||||||
|
Reclamation (DMLR), Abandoned Mine Land Section submitted an Authorization to Proceed
|
||||||
|
(ATP) request for Federal Abandoned Mine Land (AML) FY 2018 Pilot grant funds to the
|
||||||
|
Office of Surface Mining Reclamation and Enforcement (OSM), Charleston Field Office
|
||||||
|
(CHFO) for Project Reclaim Phase II. The ATP request consists of an Environmental
|
||||||
|
Assessment (EA), with consultation correspondence, project description, eligibility, and location
|
||||||
|
maps. E-amlis documentation has been submitted and obtained separately by DMME and are not
|
||||||
|
included within the Environmental Assessment.
|
||||||
|
|
||||||
|
Project Reclaim is located off State Route 615 on Dumps Creek of the Middle Fork Clinch
|
||||||
|
River, approximately 0.2 miles west of the intersection of State Routes 600 and 615 in Russell
|
||||||
|
County, Virginia. Coordinates for the approximate project location center are 36° 57' 47"N, and
|
||||||
|
82° 11’ 39"W. Project area mapping is comprised of a section of the Carbo USGS 7.5 Min.
|
||||||
|
Quadrangle. The project site is within the Clinchfield Problem Area, VA-00821.
|
||||||
|
|
||||||
|
Project work during Phase II will include continued backfill of an AML void/waste area with
|
||||||
|
rock material to create a larger area suitable for development. The fill material is screened refuse,
|
||||||
|
unscreened refuse or shot material from borrow areas contained within the existing DMME coal
|
||||||
|
permit number 1302253. The replacement material will be non-toxic and non-acid producing.
|
||||||
|
Erosion and sediment control measures include small excavated pits adjacent to the work areas to
|
||||||
|
catch drainage and if necessary use of ponds contained with the existing mine permit. All
|
||||||
|
drainage structures and access roads are also contained on the active mine permit and will be
|
||||||
|
maintained as required for no environmental impact. Strict erosion and sediment control
|
||||||
|
measures will be implemented throughout construction and all disturbed areas will be promptly
|
||||||
|
revegetated using seed mixtures agreed upon by state and federal agencies.
|
||||||
|
|
||||||
|
DMME records indicate the gob feature associated with the connected Golden Pond
|
||||||
|
Enhancement project (Site 18302) is eligible for AML funding, and was a result of mining
|
||||||
|
conducted prior to August 3, 1977, therefore, there is no continuing responsibility for any
|
||||||
|
individual, firm, or organization to reclaim the gob site; therefore DMME found the site eligible
|
||||||
|
for AML funding.
|
||||||
|
|
||||||
|
Phase II does not contain reclamation of AML features but will provide a socioeconomic
|
||||||
|
stimulus to the surrounding communities. As listed in the Consolidated Appropriations Act,
|
||||||
|
2018 (Public Law 115-141) the Department of the Interior’s (DOI) Office of Surface Mining
|
||||||
|
Reclamation and Enforcement (OSM) made funding available for projects in the Abandoned
|
||||||
|
Mine Land Reclamation Economic Development Pilot Program (AML Pilot) for Fiscal Year
|
||||||
|
(FY) 2018. Under this pilot program, eligible projects can be land adjacent to unreclaimed or
|
||||||
|
|
||||||
|
ENVIRONMENTAL ASSESSMENT (EA)
|
||||||
|
FINDING OF NO SIGNIFICANT IMPACT
|
||||||
|
|
||||||
|
Project Reclaim Phase II- AML Pilot/Site No. 91806
|
||||||
|
2018 VA AML Pilot Grant
|
||||||
|
|
||||||
|
Priority 3: Other/Associated with Priority 3, 32 AC Gob (Site 18302)
|
||||||
|
Estimated Cost: $1,645,340
|
||||||
|
Russell County, Virginia
|
||||||
|
|
||||||
|
The Virginia Department of Mines, Minerals and Energy (DMME), Division of Mined Land
|
||||||
|
Reclamation (DMLR), Abandoned Mine Land Section submitted an Authorization to Proceed
|
||||||
|
(ATP) request for Federal Abandoned Mine Land (AML) FY 2018 Pilot grant funds to the
|
||||||
|
Office of Surface Mining Reclamation and Enforcement (OSM), Charleston Field Office
|
||||||
|
(CHFO) for Project Reclaim Phase II. The ATP request consists of an Environmental
|
||||||
|
Assessment (EA), with consultation correspondence, project description, eligibility, and location
|
||||||
|
maps. E-amlis documentation has been submitted and obtained separately by DMME and are not
|
||||||
|
included within the Environmental Assessment.
|
||||||
|
|
||||||
|
Project Reclaim is located off State Route 615 on Dumps Creek of the Middle Fork Clinch
|
||||||
|
River, approximately 0.2 miles west of the intersection of State Routes 600 and 615 in Russell
|
||||||
|
County, Virginia. Coordinates for the approximate project location center are 36° 57’ 47"N, and
|
||||||
|
82° 11° 39"W. Project area mapping is comprised of a section of the Carbo USGS 7.5 Min,
|
||||||
|
Quadrangle. The project site is within the Clinchfield Problem Area, VA-00821.
|
||||||
|
|
||||||
|
Project work during Phase II will include continued backfill of an AML void/waste area with
|
||||||
|
rock material to create a larger area suitable for development. The fill material is screened refuse,
|
||||||
|
unscreened refuse or shot material from borrow areas contained within the existing DMME coal
|
||||||
|
permit number 1302253. The replacement material will be non-toxic and non-acid producing,
|
||||||
|
Erosion and sediment control measures include small excavated pits adjacent to the work areas to
|
||||||
|
catch drainage and if necessary use of ponds contained with the existing mine permit. All
|
||||||
|
drainage structures and access roads are also contained on the active mine permit and will be
|
||||||
|
maintained as required for no environmental impact. Strict erosion and sediment control
|
||||||
|
measures will be implemented throughout construction and all disturbed areas will be promptly
|
||||||
|
revegetated using seed mixtures agreed upon by state and federal agencies.
|
||||||
|
|
||||||
|
DMME records indicate the gob feature associated with the connected Golden Pond
|
||||||
|
Enhancement project (Site 18302) is eligible for AML funding, and was a result of mining
|
||||||
|
conducted prior to August 3, 1977, therefore, there is no continuing responsibility for any
|
||||||
|
individual, firm, or organization to reclaim the gob site; therefore DMME found the site eligible
|
||||||
|
for AML funding.
|
||||||
|
|
||||||
|
Phase II does not contain reclamation of AML features but will provide a socioeconomic
|
||||||
|
stimulus to the surrounding communities. As listed in the Consolidated Appropriations Act,
|
||||||
|
2018 (Public Law 115-141) the Department of the Interior's (DOI) Office of Surface Mining
|
||||||
|
Reclamation and Enforcement (OSM) made funding available for projects in the Abandoned
|
||||||
|
Mine Land Reclamation Economic Development Pilot Program (AML Pilot) for Fiscal Year
|
||||||
|
(FY) 2018. Under this pilot program, eligible projects can be land adjacent to unreclaimed or
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
previously reclaimed AML lands. All environmental consultations were completed, and
|
||||||
|
Tesponses were received from the coordinating agencies,
|
||||||
|
|
||||||
|
OSM has thoroughly reviewed the EA prepared by DMME’s Division of Mined Land
|
||||||
|
Reclamation submitted on December 9, 2020. The EA adequately discusses the environmental
|
||||||
|
issues and potential impacts for OSM’s authorization purposes for construction activities
|
||||||
|
performed under abandoned mine land reclamation grants and the AML pilot program.
|
||||||
|
|
||||||
|
Based on the analyses in this EA, we find that this project will have no significant impacts on the
|
||||||
|
quality of the human environment. Therefore, we conduce that no detailed environmental impact
|
||||||
|
statement is necessary.
|
||||||
|
|
||||||
|
Srugee Dll 12/9/20
|
||||||
|
|
||||||
|
Environngéntal Preparer Date
|
||||||
|
|
||||||
|
12 lea /ro20
|
||||||
|
Date
|
||||||
|
|
||||||
|
Acting Field Office Director
|
||||||
|
Charleston Field Office
|
||||||
|
OSMRE
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
File diff suppressed because it is too large
Load Diff
|
|
@ -0,0 +1,120 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: Initial Concept Approval Letter
|
||||||
|
file: ../Initial Concept Approval Letter.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Project Reclaim II - Final Inspection
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 182944
|
||||||
|
sha256sum: 658490e8a6a9b022979a8bf276c94606d1a1bfd4ed8435d34bac7593b667dd86
|
||||||
|
sha1sum: e1e90fe5c23329df15ffa73ab7b68aece31aaf6a
|
||||||
|
---
|
||||||
|
|
||||||
|
|
||||||
|
United States Department of the Interior
|
||||||
|
|
||||||
|
OFFICE OF SURFACE MINING
|
||||||
|
RECLAMATION AND ENFORCEMENT
|
||||||
|
|
||||||
|
Charleston Field Office
|
||||||
|
1027 Virginia Street, East
|
||||||
|
|
||||||
|
Charleston, West Virginia 25301
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
July 1, 2020
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Bradley C. Lambert
|
||||||
|
Deputy Director
|
||||||
|
Department of Mines, Minerals and Energy
|
||||||
|
3405 Mountain Empire Road
|
||||||
|
Big Stone Gap, VA 24219
|
||||||
|
|
||||||
|
|
||||||
|
Dear Mr. Lambert:
|
||||||
|
|
||||||
|
This letter is to inform you that the Office of Surface Mining Reclamation and Enforcement
|
||||||
|
(OSM) has completed our internal vetting process for the Project Reclaim Phase II Pilot
|
||||||
|
application. We are satisfied with the concept of the project and that it meets the intent of the
|
||||||
|
program.
|
||||||
|
|
||||||
|
Please proceed with submitting the necessary documents for sub-recipient approval through the
|
||||||
|
OSM Pittsburgh grants office, if you have not already done so, being mindful no federal funds
|
||||||
|
can be expended without this approval.
|
||||||
|
|
||||||
|
Contingent upon sub-recipient approval you may authorize project development activities as
|
||||||
|
included in the Applicant’s submitted budget, however construction activities, including any
|
||||||
|
property purchases or equipment purchases, cannot be initiated until OSM issues an official
|
||||||
|
Authorization to Proceed. We also recommend scheduling a meeting with the project partners,
|
||||||
|
OSM, and your office ahead of project work to assist with coordinating the proposed up-front
|
||||||
|
expenditures, NEPA, and any other ESA requirements needed for this project.
|
||||||
|
|
||||||
|
If you have any questions, please contact me.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Sincerely,
|
||||||
|
|
||||||
|
|
||||||
|
Richard W. Buckley For:
|
||||||
|
|
||||||
|
Ben Owens, Acting Director
|
||||||
|
Charleston Field Office
|
||||||
|
|
||||||
|
United States Department of the Interior
|
||||||
|
OFFICE OF SURFACE MINING
|
||||||
|
|
||||||
|
RECLAMATION AND ENFORCEMENT
|
||||||
|
Charleston Field Office
|
||||||
|
1027 Virginia Steet, East
|
||||||
|
‘Charleston, West Virginia 25301
|
||||||
|
|
||||||
|
July 1, 2020
|
||||||
|
|
||||||
|
Bradley C. Lambert
|
||||||
|
Deputy Director
|
||||||
|
|
||||||
|
Department of Mines, Minerals and Energy
|
||||||
|
3405 Mountain Empire Road
|
||||||
|
|
||||||
|
Big Stone Gap, VA 24219
|
||||||
|
|
||||||
|
Dear Mr. Lambert:
|
||||||
|
|
||||||
|
This letter is to inform you that the Office of Surface Mining Reclamation and Enforcement
|
||||||
|
(OSM) has completed our internal vetting process for the Project Reclaim Phase II Pilot
|
||||||
|
application. We are satisfied with the concept of the project and that it meets the intent of the
|
||||||
|
program.
|
||||||
|
|
||||||
|
Please proceed with submitting the necessary documents for sub-recipient approval through the
|
||||||
|
OSM Pittsburgh grants office, if you have not already done so, being mindful no federal funds
|
||||||
|
can be expended without this approval.
|
||||||
|
|
||||||
|
Contingent upon sub-recipient approval you may authorize project development activities as
|
||||||
|
included in the Applicant’s submitted budget, however construction activities, including any
|
||||||
|
property purchases or equipment purchases, cannot be initiated until OSM issues an official
|
||||||
|
Authorization to Proceed. We also recommend scheduling a meeting with the project partners,
|
||||||
|
OSM, and your office ahead of project work to assist with coordinating the proposed up-front
|
||||||
|
expenditures, NEPA, and any other ESA requirements needed for this project.
|
||||||
|
|
||||||
|
If you have any questions, please contact me.
|
||||||
|
|
||||||
|
Sincerely,
|
||||||
|
Kichard W. Buckley ‘ox:
|
||||||
|
|
||||||
|
Ben Owens, Acting Director
|
||||||
|
Charleston Field Office
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,904 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: Project Reclaim - Phase II
|
||||||
|
file: ../Project Reclaim - Phase II.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Project Reclaim II - Final Inspection
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 708244
|
||||||
|
sha256sum: e394be15a42c22ef901a7568aedc816f239e0b204b6bb93d7f2de1bae8921b68
|
||||||
|
sha1sum: 9e38564deb5d17b0173ba865538dc8134dcc8e84
|
||||||
|
---
|
||||||
|
|
||||||
|
AML PILOT PROGRAM SUBAWARD CONTRACT
|
||||||
|
|
||||||
|
Department of Mines, Minerals and Energy and
|
||||||
|
Russell County Reclamation, LLC
|
||||||
|
|
||||||
|
Contract Number: P091806
|
||||||
|
|
||||||
|
This AML Pilot Project subaward CONTRACT, made and entered into this 28th day of December,
|
||||||
|
2020, by and between the Commonwealth of Virginia, acting by and through the Department of
|
||||||
|
Mines, Minerals and Energy, Division of Mined Land Reclamation (hereinafter called “DMME”),
|
||||||
|
|
||||||
|
and Russell County Reclamation, LLC (hereinafter called “SUBRECIPIENT”
|
||||||
|
|
||||||
|
WITNESSETH:
|
||||||
|
|
||||||
|
WHEREAS, DMME is the agency of the Commonwealth of Virginia delegated the duties
|
||||||
|
and powers to implement and enforce the Virginia Coal Surface Mining Control and Reclamation
|
||||||
|
Act of 1979, Va, Code $§ 45.1-226 et seq., and the regulations promulgated thereunder (herein “State
|
||||||
|
Program”), as the same may be or become effective at any time or from time to time, as the
|
||||||
|
Commonvwealth’s permanent state regulatory program and abandoned mine land reclamation program
|
||||||
|
approved pursuant to the federal Surface Mining Control and Reclamation Act of 1977, (herein
|
||||||
|
referred to as “SMCRA”).
|
||||||
|
|
||||||
|
WHEREAS, as part of its State Program, DMME has an approved abandoned mine land
|
||||||
|
reclamation program (herein “AML Program”) as codified in Va. Code §§ 45.1-260 et seq. The
|
||||||
|
AML Program requires DMME to annually prepate and submit to the United States Secretary of
|
||||||
|
Interior applications for funding, including the implementation of specific AML reclamation projects;
|
||||||
|
|
||||||
|
WHEREAS, consistent with the Consolidated Appropriations Act, 2018 (Public Law 115-
|
||||||
|
141), the Department of the Interiors (DOT) Office of Surface Mining Reclamation and Enforcement
|
||||||
|
(OSMRE) had made funding available for projects in the Abandoned Mine Land Reclamation
|
||||||
|
Economic Development Pilot Program 2018 AML Pilot. The 2018 AML Pilot has provided the
|
||||||
|
|
||||||
|
Commonwealth of Virginia with a grant award of $10 million to accelerate the remediation of AML
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
sites with economic and community development end uses. This 2018 AML Pilot is an opportunity
|
||||||
|
for local communities and states to return impacted areas to productive reuse to achieve the economic
|
||||||
|
and community development goals identified for the community and/or region.
|
||||||
|
|
||||||
|
WHEREAS, the SUBRECIPIENT has submitted a complete grant application (Application)
|
||||||
|
(Attachment B.2) under the terms of the 2018 AML Pilot Program (Attachment B.1) for the Project
|
||||||
|
Reclaim Phase Il Project located in the South Clinchfield section of Russell County, Virginia. With
|
||||||
|
the AML features and land adjacent to these AML features known to DMME, the SUBRECIPIENT
|
||||||
|
will place an additional 174,000 cubic yards of backfill material that will produce final grade(s) that
|
||||||
|
are more uniform and level in elevation to further enhance the new industrial site. This work shall
|
||||||
|
be hereinafter called the PROJECT.
|
||||||
|
|
||||||
|
WHEREAS, the Application has been reviewed by the AML Pilot Advisory Committee and
|
||||||
|
submitted to OSMRE for vetting; and
|
||||||
|
|
||||||
|
WHEREAS, the OSMRE has determined that the applicant is approved for Subrecipient
|
||||||
|
Status (Attachment B.4); and
|
||||||
|
|
||||||
|
WHEREAS, the OSMRE is satisfied with the concept of the Project and that it meets the
|
||||||
|
intent of the AML Pilot program and has given the DMME notice to move forward by the issuance
|
||||||
|
of a Letter to Proceed with project development (Attachment B.3); and
|
||||||
|
|
||||||
|
WHEREAS, the SUBRECIPIENT has completed Project Development which included
|
||||||
|
preparation of an Environmental Assessment, Scope of Work, and project plans (Attachments A.1,
|
||||||
|
B.7, C); and
|
||||||
|
|
||||||
|
WHEREAS, the DMME has reviewed the project plans and the Environmental Assessment
|
||||||
|
has been submitted for OSMRE approval and a Finding of No Significant Impact (FONSI) and
|
||||||
|
Authorization to Proceed (ATP) (Attachment A.2) have been obtained from OSMRE; and
|
||||||
|
|
||||||
|
WHEREAS, the DMME and the OSMRE have determined that the PROJECT meets
|
||||||
|
|
||||||
|
identified characteristics and terms established for AML Pilot; and
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
WHEREAS, AML Pilot Program projects such as this PROJECT are government-financed
|
||||||
|
|
||||||
|
via a subaward from DMME through its grant award from the 2018 AML Pilot and the DMME
|
||||||
|
|
||||||
|
under the OSMRE’s approval has authority to reimburse the Subrecipient out of the AML Pilot
|
||||||
|
|
||||||
|
Grant for funds expended on project costs. The DMME and the OSMRE accepted and approved
|
||||||
|
|
||||||
|
funding based upon the proposed preliminary project budget (Attachment B.5) and DMME has
|
||||||
|
|
||||||
|
accepted a revised project budget (Attachment B.6)
|
||||||
|
|
||||||
|
WHEREAS, the SUBRECIPIENT will comply with the Environmental Assessment
|
||||||
|
|
||||||
|
(Attachment A.1), Scope of Work (Attachment B.7), budget (Attachment B.6), and detailed project
|
||||||
|
|
||||||
|
plans (Attachment C) as required by the DMME and the OSMRE.
|
||||||
|
|
||||||
|
NOW, THEREFORE, in consideration of the foregoing premises and the mutual covenants
|
||||||
|
|
||||||
|
hereinafter contained, the parties agree as follows:
|
||||||
|
|
||||||
|
I OBLIGATIONS OF SUBRECIPIENT - SUBRECIPIENT shall:
|
||||||
|
|
||||||
|
1
|
||||||
|
|
||||||
|
Prepare and provide to DMME a detailed construction plan for the Project, which
|
||||||
|
corresponds with the approved Scope of Work.
|
||||||
|
|
||||||
|
Allow the DMME to inspect, review and comment on the Project plan design and
|
||||||
|
any future amendments, changes, or modifications. A copy of the final Project plan
|
||||||
|
design approved by DMME is attached as Attachment C, which this plan is
|
||||||
|
incorporated herein and made a part thereof.
|
||||||
|
|
||||||
|
Strictly adhere to the OSMRE 2018 AML Pilot funding objectives contained in
|
||||||
|
Attachment B.| hereto and made a part hereof, the AML Subaward, and the
|
||||||
|
obligations of the SUBRECIPIENT contained within this CONTRACT (herein
|
||||||
|
“Award Conditions”).
|
||||||
|
|
||||||
|
Compliance with Federal Rules and Regulations: Funding for this CONTRACT is
|
||||||
|
authorized through the Catalog of Federal Domestic Assistance (CFDA) #15.252.
|
||||||
|
|
||||||
|
Expenditures made and services provided pursuant to this CONTRACT shall be in
|
||||||
|
|
||||||
|
3
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
accordance with 2 CFR Part 225, “Cost Principles for State, Local, and Indian Tribal
|
||||||
|
Governments” (OMB Circular A-87), and OMB Circular A-133, “Audits of States,
|
||||||
|
Local Governments and Non-Profit Organizations.” Since the SUBRECIPIENT is a
|
||||||
|
for-profit organization, it is governed by 48 CFR Part 31, Contract Cost Principles and
|
||||||
|
Procedures. The SUBRECIPIENT also is governed by the administrative
|
||||||
|
requirements of 10 CFR 600, Federal Financial Assistance Regulations. Any apparent
|
||||||
|
inconsistency between Federal statutes and regulations and the terms and conditions
|
||||||
|
contained in this award must be referred to the OSMRE Award Administrator for
|
||||||
|
guidance. It is the responsibility of the SUBRECIPIENT to identify such an
|
||||||
|
inconsistency and bring it to the attention of DMME. The SUBRECIPIENT shall
|
||||||
|
adhere, and require adherence by all recipients, subrecipients, vendors and
|
||||||
|
subcontractors performing work required by this CONTRACT, to the federal rules as
|
||||||
|
noted.
|
||||||
|
|
||||||
|
Provide and pay all funds required to complete construction of the PROJECT site
|
||||||
|
within the specified time period in accordance with the approved construction design,
|
||||||
|
including but not limited to the costs of all permits, licenses, land acquisitions, and/or
|
||||||
|
rights-of-way and easements pursuant to the Award Conditions.
|
||||||
|
|
||||||
|
Maintain on the PROJECT site all information required by 4 VAC 25-130-707.12
|
||||||
|
including a description of the Project, the exact location and boundaries of the
|
||||||
|
PROJECT and that the DMME administration of the PROJECT is being financed
|
||||||
|
with federal funds through its 2018 AML Pilot Program Grant.
|
||||||
|
|
||||||
|
Prior to commencement of construction at the PROJECT site, ensure that the Final
|
||||||
|
Construction Design Plan and/or addenda, amendments thereto are in accordance with
|
||||||
|
|
||||||
|
the Award Conditions. Any addenda or amendments to the Construction Design Plan
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
10.
|
||||||
|
|
||||||
|
i
|
||||||
|
|
||||||
|
12.
|
||||||
|
|
||||||
|
13.
|
||||||
|
|
||||||
|
14,
|
||||||
|
|
||||||
|
and/or construction documents shall be approved in writing by DMME and OSMRE
|
||||||
|
prior to their execution, issuance and/or implementation.
|
||||||
|
|
||||||
|
Provide to DMME copies of all documents and addenda the SUBRECIPIENT uses
|
||||||
|
in contracting for the performance of construction work for the PROJECT if any.
|
||||||
|
Afford DMME personnel notice of and opportunity to attend and participate in all pre-
|
||||||
|
construction conferences, and other relevant meetings concerning the PROJECT, if
|
||||||
|
any,
|
||||||
|
|
||||||
|
Provide free and reasonable access by DMME and OSMRE personnel to the
|
||||||
|
PROJECT site for the purpose of conducting weekly, or more frequent if necessary,
|
||||||
|
inspections.
|
||||||
|
|
||||||
|
Upon completion of the work required by the Construction Plan, provide DMME with
|
||||||
|
a copy of “as built” drawings of the PROJECT and/or a certification of completion.
|
||||||
|
Designate a Project Director who shall be knowledgeable of and responsible for
|
||||||
|
PROJECT activities and who shall act as the contact between DMME. and
|
||||||
|
SUBRECIPIENT.
|
||||||
|
|
||||||
|
Provide DMME with written monthly progress reports within fifteen (15) days
|
||||||
|
following the end of each calendar month after this CONTRACT is fully executed.
|
||||||
|
The report shall include all work accomplished, difficulties or delays encountered
|
||||||
|
along with necessary remedial actions(s), and a schedule of future work.
|
||||||
|
|
||||||
|
Provide to DMME written verification that all easements, licenses, and applicable
|
||||||
|
federal, state, or local permits or clearances required for the performance of the work
|
||||||
|
required to complete the PROJECT have been obtained prior to start of any work on
|
||||||
|
|
||||||
|
the PROJECT.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
15.
|
||||||
|
|
||||||
|
16.
|
||||||
|
|
||||||
|
17.
|
||||||
|
|
||||||
|
Provide professional supervision of all construction work performed at the PROJECT
|
||||||
|
site to ensure that the completed work conforms to the approved Final Construction
|
||||||
|
Plan.
|
||||||
|
|
||||||
|
Certify and acknowledge that the PROJECT boundaries and limits are as delineated
|
||||||
|
|
||||||
|
on Attachment A.3, and that no work outside said boundaries and limits shall be
|
||||||
|
|
||||||
|
ligible through the AML AWARD or covered under the terms of this CONTRACT.
|
||||||
|
|
||||||
|
Provide proof to DMME that the SUBRECIPIENT shall require its contractors to
|
||||||
|
|
||||||
|
maintain in full force and effect during the terms of this CONTRACT a public
|
||||||
|
|
||||||
|
liability insurance policy:
|
||||||
|
|
||||||
|
(a) Worker’s Compensation — Statutory requirements and benefits. Coverage is
|
||||||
|
compulsory for employers of three or mote employees, to include the employer.
|
||||||
|
Contractors who fail to notify the Commonwealth of increases in the number of
|
||||||
|
employees that change their workers’ compensation requirements und the Code of
|
||||||
|
Virginia during the course of the CONTRACT shall be in noncompliance with the
|
||||||
|
contract.
|
||||||
|
|
||||||
|
(b) Employers Liability - $100,000.
|
||||||
|
|
||||||
|
(c) Commercial General Liability - $1,000,000 per occurrence and $2,000,000 in the
|
||||||
|
aggregate, Commercial General Liability is to include bodily injury and property
|
||||||
|
damage, personal injury and advertising injury, products and completed operations
|
||||||
|
coverage. The Commonwealth of Virginia shall be added as an additional insured
|
||||||
|
to the policy by an endorsement. Coverage shall not exclude claims resulting
|
||||||
|
_from explosion, collapse or underground damage.
|
||||||
|
|
||||||
|
(d) Automobile Liability - $1,000,000 combined single limit (required only if'a motor
|
||||||
|
|
||||||
|
vehicle not owned by the Commonwealth is to be used in the CONTRACT).
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
18.
|
||||||
|
|
||||||
|
19.
|
||||||
|
|
||||||
|
20.
|
||||||
|
|
||||||
|
21.
|
||||||
|
|
||||||
|
SUBRECIPIENT must assure that the required coverage is maintained by the
|
||||||
|
|
||||||
|
SUBRECIPIENT (or third party of such motor vehicle).
|
||||||
|
The SUBRECIPIENT shall indemnify, defend and hold _ harmless
|
||||||
|
DMME/Commonwealth of Virginia, its agents, officers, employees, and designated
|
||||||
|
representatives from any claims, damages, suits, actions, liabilities and costs of any
|
||||||
|
nature or kind, whether at law or in equity, arising from or caused by performance by
|
||||||
|
the SUBRECIPIENT or its agents, whether for design or construction of the
|
||||||
|
PROJECT, or from the use of any materials, goods, or equipment of any kind or
|
||||||
|
nature or any service of any kind, provided that such liability is not attributable to the
|
||||||
|
sole negligence of the DMME. Nothing contained herein shall be deemed an
|
||||||
|
expressed or implied waiver of the sovereign immunity of DMME/Commonwealth
|
||||||
|
of Virginia.
|
||||||
|
Neither the SUBRECIPIENT, its officers, agents, employees, assignees, whether for
|
||||||
|
design or construction of the PROJECT, shall be deemed employees of the
|
||||||
|
Commonwealth of Virginia or of DMME by virtue of the PROJECT, the location
|
||||||
|
of the PROJECT, or the 2018 AML Pilot Award.
|
||||||
|
Upon completion of any audit of the PROJECT conducted under OMB Circular A-
|
||||||
|
128, promptly provide the DMME with a copy of any and all such audit reports.
|
||||||
|
|
||||||
|
The SUBRECIPIENT shall ensure that their contractors are responsible for
|
||||||
|
sequencing, scheduling, coordinating, and monitoring the progress of the work as well
|
||||||
|
as taking appropriate action to keep the work on schedule. The SUBRECIPIENT shall
|
||||||
|
prepare and submit to the agency after signing the contract, a contract performance
|
||||||
|
schedule for accomplishing the work based upon the completion time stated in the
|
||||||
|
contract.
|
||||||
|
|
||||||
|
The SUBRECIPIENT shall include in all Project Invitation for Bid packages the
|
||||||
|
DMME supplied Applicant Violator System (AVS) form (OMB #1029-0119)
|
||||||
|
(ATTACHMENT D.2). All bidders must submit the completed form with the required
|
||||||
|
|
||||||
|
7
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
23.
|
||||||
|
|
||||||
|
24,
|
||||||
|
|
||||||
|
25.
|
||||||
|
|
||||||
|
Project bid documents. Any subcontractors, which will earn more than 10 percent of
|
||||||
|
the AML Pilot portion of the project, shall submit the Applicant Violator System
|
||||||
|
(AYS) form documentation prior to the award of the bid(s) to the prime contractor.
|
||||||
|
All engineering contractors to be selected for the project design awards shall also
|
||||||
|
submit the Applicant Violator System (AVS) form. Prior to the award of any such
|
||||||
|
contract(s), the form(s) will be submitted to DMME for the required AVS check to
|
||||||
|
confirm bidder eligibility by the use of the Applicant Violator System. The Project
|
||||||
|
award may not be made until the AVS check has been completed. Pursuant to the
|
||||||
|
provisions of 30 CFR § 874.16, the DMME may direct the rejection of any
|
||||||
|
contractor(s), subcontractor(s), or engineering firm(s) if the AVS review determines
|
||||||
|
the entity, at the time of contract award, is not eligible to receive a permit or
|
||||||
|
conditional permit to conduct surface coal mining operations under the Virginia Coal
|
||||||
|
|
||||||
|
Surface Mining Reclamation Regulations.
|
||||||
|
|
||||||
|
Commit to no CONTRACT or CONTRACT extension whose performance could
|
||||||
|
extend beyond the 28th day of December 2023, the expiration date of the AML Pilot
|
||||||
|
Award,
|
||||||
|
|
||||||
|
Agree to not let the project be idled for a cumulative period exceeding sixty (60) days
|
||||||
|
and to return to work forces and equipment upon request of DMME at the end of the
|
||||||
|
sixty-day period. SUBRECIPIENT’s failure to perform this part may result in
|
||||||
|
termination of the CONTRACT and default under Articles X and XI
|
||||||
|
|
||||||
|
ANTI-DISCRIMINATION
|
||||||
|
A. During the performance of this CONTRACT, the SUBRECIPIENT agrees
|
||||||
|
as follows:
|
||||||
|
|
||||||
|
1. The SUBRECIPIENT and its Contractors shall not discriminate
|
||||||
|
against any employee or applicant for employment because of race,
|
||||||
|
religion, color, sex, national origin or disabilities, except where
|
||||||
|
religion, sex, or national origin is a bona fide occupational qualification
|
||||||
|
|
||||||
|
reasonably necessary to the normal operation of the SUBRECIPIENT
|
||||||
|
8
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
ith
|
||||||
|
|
||||||
|
or its Contractor exists. The SUBRECIPIENT agrees to, and will
|
||||||
|
require its Contractors to, post in conspicuous places, available to
|
||||||
|
employees and applicants for employment, notices setting forth the
|
||||||
|
provisions of this nondiscrimination clause.
|
||||||
|
|
||||||
|
2. The SUBRECIPIENT, in all solicitations or advertisements for
|
||||||
|
employees placed by or on behalf of the SUBRECIPIENT or its
|
||||||
|
Contractors, will state, and require that its Contractors state, that such
|
||||||
|
SUBRECIPIENT or Contractor is an equal opportunity employer.
|
||||||
|
|
||||||
|
3. Notices, advertisements and solicitations placed in accordance with
|
||||||
|
federal law, rule or regulation shall be deemed sufficient for the
|
||||||
|
purpose of meeting the requirements of this Section.
|
||||||
|
|
||||||
|
B. The SUBRECIPIENT and its Contractors will include the provisions of the
|
||||||
|
foregoing paragraphs 24.A.1; 24.4.2; and 24.A.3 in every subcontract or
|
||||||
|
purchase order over $10,000, so that the provisions will be binding upon each
|
||||||
|
subcontractor or vendor.
|
||||||
|
|
||||||
|
CERTIFICATIONS:
|
||||||
|
|
||||||
|
The SUBRECIPIENT assures and certifies to the DMME that it is, to the best of its
|
||||||
|
|
||||||
|
knowledge and belief, in compliance, and will continue in compliance, and it will require that
|
||||||
|
|
||||||
|
its Contractors conform, to the following Acts, as amended:
|
||||||
|
|
||||||
|
1 State and Local Government Conflict of Interests Act;
|
||||||
|
2. General Assembly Conflict of Interests Act;
|
||||||
|
3. Virginia Freedom of Information Act;
|
||||||
|
|
||||||
|
4. Virginia Fair Employment Contracting Act;
|
||||||
|
|
||||||
|
5. Virginia Governmental Frauds Act;
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
10.
|
||||||
|
|
||||||
|
ll.
|
||||||
|
|
||||||
|
12,
|
||||||
|
|
||||||
|
Virginia Public Procurement Act and related Agency Procurement and Surplus
|
||||||
|
Property Manual;
|
||||||
|
|
||||||
|
Virginians with Disabilities Act;
|
||||||
|
|
||||||
|
Americans with Disabilities Act;
|
||||||
|
|
||||||
|
Buy American Act (41 USC Chapter 83)
|
||||||
|
|
||||||
|
Energy Policy and Conservation Act (P.L. 94-163, 89 Stat. 871)
|
||||||
|
|
||||||
|
Federal Immigration Reform and Control act of 1986; and
|
||||||
|
|
||||||
|
Federal statutes relating to nondiscrimination, including but not limited to:
|
||||||
|
|
||||||
|
Title V1 of the Civil Rights Act of 1964 (P.L. 88-352) (prohibits discrimination
|
||||||
|
on the basis of race, color or national origin);
|
||||||
|
|
||||||
|
Title IX of the Education amendments of 1972, as amended (20 U.S.C.
|
||||||
|
Sections 1681-1683, and 1685-1686) prohibits discrimination on the basis of sex;
|
||||||
|
|
||||||
|
Section 504 of the Rehabilitation Act of 1973, as amended (29 U.S.C., Section
|
||||||
|
794) prohibits discrimination on the basis of handicaps;
|
||||||
|
|
||||||
|
The Age Discrimination Act of 1975, as amended (42 U.S.C., Sections 6101-
|
||||||
|
6107) which prohibits discrimination on the basis of age;
|
||||||
|
|
||||||
|
The Drug Abuse Office and Treatment Act of 1972 (P.L. 93-255), as amended,
|
||||||
|
relating to non-discrimination on the basis of drug abuse;
|
||||||
|
|
||||||
|
The Comprehensive Alcohol Abuse and Alcoholism Prevention, Treatment
|
||||||
|
and Rehabilitation Act of 1970 (P.L. 91-616), as amended, relating to
|
||||||
|
nondiscrimination on the basis of alcohol abuse or alcoholism:
|
||||||
|
|
||||||
|
Sections 523 and 527 of the Public Health Service Act of 1912 (42 U.S.C., 290
|
||||||
|
dd-3 and 290 ee-3), as amended, relating to confidentiality of alcohol and drug abuse
|
||||||
|
|
||||||
|
patient records;
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
13.
|
||||||
|
|
||||||
|
14,
|
||||||
|
|
||||||
|
15.
|
||||||
|
|
||||||
|
16.
|
||||||
|
|
||||||
|
17.
|
||||||
|
|
||||||
|
Title VIII of the Civil Rights Act of 1968 (42 U.S.C., Section 3601 et seq.), as
|
||||||
|
amended, relating to nondiscrimination in the sale, rental or financing of housing;
|
||||||
|
and/or any other nondiscrimination provisions in the specific statute(s) under which
|
||||||
|
application for Federal assistance is being made, and the requirement on any other
|
||||||
|
nondiscrimination statute(s) which may apply to the AML PILOT AWARD or this
|
||||||
|
CONTRACT.
|
||||||
|
|
||||||
|
Federal Lobbying Act, 31 U.S.C.A., Section 1352 (entitled, “Limitation on use of
|
||||||
|
appropriated funds to influence certain Federal contracting and financial transactions,
|
||||||
|
and the Virginia Lobbying Disclosure and Regulation Act, Sec, 2.1-779 through 2.1-
|
||||||
|
794, Code of Virginia, 1950 as amended, including, without limitation, obtaining and
|
||||||
|
delivering to the DMME all necessary certifications and disclosures.
|
||||||
|
|
||||||
|
Title II and III of the Uniform Relocation Assistance and Real Property Acquisition
|
||||||
|
Policies Act of 1970 (P.L. 91-646) which provides for fair and equitable treatment of
|
||||||
|
persons displaced or whose property is acquired as a result of Federal and federally
|
||||||
|
assisted programs. These requirements apply to all interest in real property acquired
|
||||||
|
for PROJECT purposes regardless of Federal participation in purchases.
|
||||||
|
|
||||||
|
Hatch Act (5 U.S.C., Sections 1501-1508 and 7324-7328) which limit the political
|
||||||
|
activities of employees whose principal employment activities are funded in whole or
|
||||||
|
in part with Federal funds.
|
||||||
|
|
||||||
|
Copeland Act (40 U.S.C., Section 276c and 18 U.S.C., Section 874), the Contract
|
||||||
|
Work Hours and Safety Standards Act (40 U.S.C., Sections 327-333) regarding labor
|
||||||
|
standards for federally assisted construction sub-contracts.
|
||||||
|
|
||||||
|
Flood insurance purchase requirements of Section 102(a) of the Flood Disaster
|
||||||
|
|
||||||
|
Protection Act of 1973 (P.L. 93-234) which requires recipients in a special flood
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
18.
|
||||||
|
|
||||||
|
19,
|
||||||
|
|
||||||
|
20.
|
||||||
|
|
||||||
|
21.
|
||||||
|
|
||||||
|
hazard area to participate in the program and to purchase flood insurance if the total
|
||||||
|
|
||||||
|
cost of insurable construction and acquisition is $10,000 or more.
|
||||||
|
Environmental standards which may be prescribed pursuant to the following: (a)
|
||||||
|
institution of environmental quality control measures under the National
|
||||||
|
Environmental Policy Act of 1969 (P.L. 91-190) and Executive Order (EO) 11514;
|
||||||
|
(b) notification of violating facilities pursuant to EO 11738; (c) protection of wetlands
|
||||||
|
pursuant to EO 11990; (d) evaluation of flood hazards in flood plains in accordance
|
||||||
|
with EO 11988: (e) assurance of Project’s consistency with the approved State
|
||||||
|
management program developed under the Coastal Zone Management Act of 1972
|
||||||
|
(16 U.S.C, Sections 1451 et seq.); (1) conformity of Federal actions to State (Clean
|
||||||
|
Air) Implementation Plans under Section 176 (c) of the Clean Air Act of 1955, as
|
||||||
|
amended (42 U.S.C., Section 7401 et seq.); (g) protection of underground sources of
|
||||||
|
drinking water under the Safe Drinking Water Act of 1974, as amended, (P.L. 93-
|
||||||
|
523); and (h) protection of endangered species under the Endangered Species Act of
|
||||||
|
1973, as amended, (P.L. 93-205).
|
||||||
|
|
||||||
|
Wild and Scenic Rivers Act of 1968 (16 U.S.C., Sections 1271 et seq.) related to
|
||||||
|
protecting components or potential components of the national wild and scenic rivers
|
||||||
|
system,
|
||||||
|
|
||||||
|
The SUBRECIPIENT shall assist the DMME in assuring compliance with Section
|
||||||
|
106 of the National Historic Preservation Act of 1966, as amended (16 U.S.C. 470),
|
||||||
|
EO 11593 (identification and preservation of historic properties), and the
|
||||||
|
Archaeological and Historic Preservation Act of 1974 (16 U.S.C. 469a-I et seq.).
|
||||||
|
|
||||||
|
40 CFR 122-EPA Storm Water Regulations; PL 92-500, Section 404 - Utility
|
||||||
|
Crossings of Navigable Waters — U.S. Army Corps of Engineers; Code of Virginia,
|
||||||
|
|
||||||
|
Title 10.1, Chapter 5, Article 4 - Erosion and Sediment Control Law ~ Soil and Water
|
||||||
|
|
||||||
|
2
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Conservation Commission; VR 625-02-00 — Erosion and Sediment Control
|
||||||
|
Regulations; Code of Virginia, Title 62.1, Chapter 3.1, Article 44 — State Water
|
||||||
|
Control Law; VR 680-15-02 - Virginia Water Protection Permit; Code of Virginia,
|
||||||
|
|
||||||
|
Title 62.1, Chapter 3 — Sub-aqueous Bed Permit ~ Marine Resources Commission.
|
||||||
|
|
||||||
|
Il, OBLIGATIONS OF DMME
|
||||||
|
DMME will:
|
||||||
|
|
||||||
|
1. Review and submit to the SUBRECIPIENT comments on the Construction Plan to
|
||||||
|
monitor adherence to AML Award conditions and obligations.
|
||||||
|
|
||||||
|
2. Provide administration of the PROJECT, document the costs and expenses incurred
|
||||||
|
by DMME, document the findings necessary to qualify the PROJECT as a
|
||||||
|
government financed construction project as contemplated by Va. Code § 45.1-253.2
|
||||||
|
and 4 VAC 25-130 Part 707 of VSMCRA, including those costs noted in the NEPA
|
||||||
|
document.
|
||||||
|
|
||||||
|
3. Document eligibility of the PROJECT for funding by securing an Authorization to
|
||||||
|
Proceed from the federal Office of Surface Mining,
|
||||||
|
|
||||||
|
4. Designate a PROJECT Inspector to monitor the site and to serve as contact to the
|
||||||
|
|
||||||
|
SUBRECIPIE!
|
||||||
|
|
||||||
|
Provide the SUBRECIPIENT with consultations and information that are available
|
||||||
|
and reasonably required for PROJECT purposes.
|
||||||
|
|
||||||
|
6. SAFETY INSPECTIONS OF CONSTRUCTION EQUIPMENT ON JOB SITE:
|
||||||
|
|
||||||
|
IME reserves the right to conduet safety inspections of contractor and/or sub-
|
||||||
|
contractor owned or leased equipment delivered to or present at an AML construction
|
||||||
|
site. DMME shall conduct a pre-construction safety inspection of all equipment at the
|
||||||
|
|
||||||
|
site as identified on the equipment list for the PROJECT as provided by the
|
||||||
|
|
||||||
|
13
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
contractor. If any previously unidentified equipment is delivered to the site for use,
|
||||||
|
|
||||||
|
the contractor shalt contact the Inspector/Contract Administrator to conduct a safety
|
||||||
|
inspection of that equipment. DMME may also conduct equipment safety inspections
|
||||||
|
at any time during the Contract period while the equipment is on site. The
|
||||||
|
SUBRECIPIENT will require all contractors to adhere to these stipulations.
|
||||||
|
Inspections shall be in accordance with established DMME inspection criteria and
|
||||||
|
evidenced by a safety inspection checklist (Attachment D.1). DMME requires that the
|
||||||
|
contractor perform a daily pre-shift inspection of all equipment prior to its use each
|
||||||
|
day. DMME can provide a template of the Surface Equipment Inspection Pre-
|
||||||
|
operational Exam Checklist upon request.
|
||||||
|
|
||||||
|
Upon receipt and approval of once monthly invoices, reimburse the SUBRECIPIENT
|
||||||
|
|
||||||
|
for costs incurred by the SUBRECIPIENT in compliance with the CONTRACT and
|
||||||
|
|
||||||
|
necessary for completion of the PROJECT. For the purpose of this CONTRACT,
|
||||||
|
“incurred” shall mean any invoice or request for payment paid by the
|
||||||
|
SUBRECIPIENT or waiting payment under the PROJECT. Reimbursement will be
|
||||||
|
made in accordance with the Commonwealth of Virginia’s Prompt Pay requirements
|
||||||
|
and DMME procedures. The DMME shall withhold 5% retainage on all invoices
|
||||||
|
except for project development expenditures. Separate requests for payment should be
|
||||||
|
submitted for project development and construction expenditures.
|
||||||
|
|
||||||
|
Upon receipt of proper invoicing, provide the SUBRECIPIENT with reimbursement for
|
||||||
|
|
||||||
|
the approved actual cost and up to, but not exceeding $1,645,340.00 for engineering and
|
||||||
|
|
||||||
|
construction services for the PROJECT described in this CONTRACT.
|
||||||
|
|
||||||
|
TERM OF CONTRACT
|
||||||
|
|
||||||
|
This CONTRACT shall be effective as of the 28th day of December 2020 and shall
|
||||||
|
|
||||||
|
expire thirty-six (36) months thereafter on 28th day of December 2023
|
||||||
|
|
||||||
|
“4
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
v.
|
||||||
|
|
||||||
|
Vi.
|
||||||
|
|
||||||
|
EXCESS COSTS
|
||||||
|
|
||||||
|
If the SUBRECIPIENT performs, allows or causes work to be performed or accepts
|
||||||
|
a bid which exceeds the line allocations set forth in the PROJECT budget attached hereto as
|
||||||
|
Attachment B.6, as amended and approved by DMME from time to time, which make up the
|
||||||
|
$1,645,340.00 appropriation for Engineering and Construction Services, the
|
||||||
|
SUBRECIPIENT shall bear any and all such excess costs, it being understood between the
|
||||||
|
parties that under no circumstances shall DMME be liable for the payment of and/or
|
||||||
|
reimbursement to the SUBRECIPIENT of costs in excess of those approved by the DMME
|
||||||
|
as part of the PROJECT budget but in no event in excess of the respective caps set forth for
|
||||||
|
design or construction in this section.
|
||||||
|
|
||||||
|
FINANCIAL/COMPLIANCE RECORDS AVAILABILITY
|
||||||
|
|
||||||
|
The SUBRECIPIENT agrees to retain and provide reasonable access to all books,
|
||||||
|
records, and other documents relative to this CONTRACT for five (5) years after final
|
||||||
|
payment or until otherwise notified by DMME, whichever is later. DMME, its authorized
|
||||||
|
agents, and/or State and Federal auditors shall have full access to and the right to examine any
|
||||||
|
of said materials during said period at reasonable times and upon 24 hours advance notice.
|
||||||
|
CONSTRUCTION ASSURANCES,
|
||||||
|
|
||||||
|
The SUBRECIPIENT hereby assures and certifies that they shall comply with the
|
||||||
|
laws, regulations, policies, guidelines and requirements and use of Federal funds for this
|
||||||
|
federally funded Project. Also, the SUBRECIPIENT gives assurance and certifies that:
|
||||||
|
|
||||||
|
1 The SUBRECIPIENT shall cause work on the PROJECT to be commenced within
|
||||||
|
a reasonable time after NOTIFICATION TO PROCEED from the DMME and that
|
||||||
|
the SUBRECIPIENT will execute the PROJECT to completion with reasonable
|
||||||
|
diligence. The SUBRECIPIENT will keep the DMME informed of PROJECT
|
||||||
|
|
||||||
|
progress and delays.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
VIN.
|
||||||
|
|
||||||
|
2. It is anticipated that the SUBRECIPIENT may convey the Property, including
|
||||||
|
the PROJECT, and facilities located thereon to the Industrial Development
|
||||||
|
Authority of Russell County, Virginia, a political subdivision of the
|
||||||
|
Commonwealth of Virginia, prior to the completion of the PROJECT.
|
||||||
|
Notwithstanding such a conveyance, the SUBRECIPIENT shall remain
|
||||||
|
|
||||||
|
committed to completing the PROJECT in all respects in accordance herewith.
|
||||||
|
|
||||||
|
3. During the term of this CONTRACT, the SUBRECIPIENT shall not dispose of,
|
||||||
|
modify the use of, or change the terms of the real property title, or other interest in
|
||||||
|
the Property, including the PROJECT, and facilities without permission and
|
||||||
|
instructions from the DMME. The SUBRECIPIENT shall record the federal
|
||||||
|
interest in the title of Property in accordance with DMME directives and shall
|
||||||
|
include a covenant in the title of real property acquired in whole or in part with
|
||||||
|
Federal assistance funds to assure nondiscrimination during the useful life of the
|
||||||
|
PROJECT. The SUBRECIPIENT shall adhere to 30 CFR part 879.14 and 879.15
|
||||||
|
for Property management and disposition.
|
||||||
|
|
||||||
|
EXECUTION OF CONTRACT
|
||||||
|
|
||||||
|
This CONTRACT shall be executed on behalf of the SUBRECIPIENT by such
|
||||||
|
person or persons as are authorized to act on behalf of the SUBRECIPIENT pursuant to law
|
||||||
|
and on behalf of the DMME by the Division of Mined Land Reclamation (DMLR) Director
|
||||||
|
|
||||||
|
of the Department of Mines, Minerals and Energy.
|
||||||
|
|
||||||
|
OBLIGATION TO COMPLETE
|
||||||
|
If the delivery of supplies, services, materials or equipment is not fully performed in
|
||||||
|
accordance with the terms of the CONTRACT by the time specified in the CONTRACT, the
|
||||||
|
|
||||||
|
SUBRECIPIENT agrees to complete the remaining or incomplete work at its own expense;
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Ix.
|
||||||
|
|
||||||
|
except that the accomplishment be delayed by any act, negligence, or default on the part of
|
||||||
|
the Commonwealth or OSMRE, public enemy, war, embargo, fire, explosion or Act of God
|
||||||
|
(including without limitation, adverse weather conditions) not caused by the negligence or
|
||||||
|
intentional act of the SUBRECIPIENT or its supplier(s), or by riot, sabotage, or labor trouble
|
||||||
|
that results from a cause or causes entirely beyond the control or fault of the contractor or his
|
||||||
|
supplier(s), a reasonable extension of time as the procuring public body deems appropriate
|
||||||
|
may be granted. Upon receipt of a written request and justification for an extension from the
|
||||||
|
SUBRECIPIENT, the DMME will submit the extension request to the OSMRE. OSMRE
|
||||||
|
has the sole authority to approve the amendment for an extension for the performance of the
|
||||||
|
CONTRACT or delivery of goods.
|
||||||
|
|
||||||
|
It shall also be known and understood by both parties that if the CONTRACT expires
|
||||||
|
and the delivery of supplies, services, materials or equipment has not been fully performed in
|
||||||
|
accordance with the terms of the CONTRACT, it is determined the Commonwealth is not at
|
||||||
|
fault, and grant funding for the CONTRACT has expired, the subrecipient shall, at the
|
||||||
|
SUBRECIPIENT’s sole cost and expense, complete its obligations under the CONTRACT.
|
||||||
|
INTEGRATION AND MODIFICATION
|
||||||
|
|
||||||
|
This CONTRACT constitutes the entire understanding between the
|
||||||
|
SUBRECIPIENT and DMME. No alteration, amendment or modification in the provisions
|
||||||
|
of this CONTRACT shall be effective unless it is reduced to writing, signed by the parties,
|
||||||
|
and attached hereto.
|
||||||
|
|
||||||
|
TERMINATION OF CONTRACT
|
||||||
|
|
||||||
|
Any failure by a party to perform any obligation under this CONTRACT shall
|
||||||
|
constitute a breach of the CONTRACT. Upon breach of the CONTRACT by a party, the
|
||||||
|
other party may, at its option, declare its intention to terminate the CONTRACT unless the
|
||||||
|
breach is cured by the party breaching the CONTRACT. Such declaration shall be in writing
|
||||||
|
|
||||||
|
7
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
XL
|
||||||
|
|
||||||
|
to the party in breach stating the intention to terminate, the reason(s) therefore and the action
|
||||||
|
necessary to cure the breach. Upon receipt of notice of intention to terminate, the party in
|
||||||
|
breach shall have 60 days to take the curative action and avoid termination. The DMME shall
|
||||||
|
not be obligated to pay for any services or work performed after the notice of intention to
|
||||||
|
terminate.
|
||||||
|
DEFAULT
|
||||||
|
|
||||||
|
In case of SUBRECIPIENT’s failure to deliver goods or services in accordance with
|
||||||
|
the CONTRACT terms and conditions, DMME, after due oral or written notice, may procure
|
||||||
|
them from other sources and hold the subrecipient/contractor responsible for any resulting
|
||||||
|
additional purchases and administrative cost. This remedy shall be in addition to any other
|
||||||
|
remedies, which the Commonwealth may have. The DMME may also act to forfeit
|
||||||
|
SUBRECIPIENT’s bond in accordance with regulations promulgated under 45.1-247 of the
|
||||||
|
|
||||||
|
Code.
|
||||||
|
|
||||||
|
18
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
XI NOTICE
|
||||||
|
Any notice required hereunder shall be made in writing to the applicable party at the
|
||||||
|
|
||||||
|
following addresses:
|
||||||
|
|
||||||
|
DMME SUBRECIPIE!
|
||||||
|
Lesa C. Baker Kevin Large
|
||||||
|
|
||||||
|
AML Projects Coordinator Russell County Reclamation, LLC
|
||||||
|
3405 Mountain Empire Road 2700 Lee Highway
|
||||||
|
|
||||||
|
Big Stone Gap, VA 24219 Bristol, VA 24202
|
||||||
|
|
||||||
|
Phone No. 276-523-8216 Phone No. 276-669-7851
|
||||||
|
|
||||||
|
ADDITIONAL NOTIFICATIONS
|
||||||
|
For purposes of this CONTRACT, the notice shall be deemed reccived if mailed by
|
||||||
|
certified mail, return receipt requested to the above addresses on the date of the first notice of
|
||||||
|
delivery by the post office. Failure to pick up the notice in response to the notices of delivery
|
||||||
|
shall not constitute a defense to receipt hereunder.
|
||||||
|
XIII. NON-WAIVER CLAUSE
|
||||||
|
No review, approval, acceptance of nor payment for any of the services required by
|
||||||
|
|
||||||
|
DI
|
||||||
|
|
||||||
|
IME shall be construed to operate as a waiver of any rights of or any cause of action arising
|
||||||
|
out of the performance of the CONTRACT. Notwithstanding any contrary provision
|
||||||
|
|
||||||
|
contained herein, the SUBRECIPIE.
|
||||||
|
|
||||||
|
shall be and remain liable to the D)
|
||||||
|
|
||||||
|
[ME for all costs
|
||||||
|
of any kind which are incurred by the DMME as a result of a negligent act, errors or omissions
|
||||||
|
of the SUBRECIPIENT or its Contractor in the performance of any of the services furnished.
|
||||||
|
|
||||||
|
XIV. GOVERNING LAW
|
||||||
|
|
||||||
|
This CONTRACT shall be deemed executed in Wise County, Virginia. The
|
||||||
|
execution, interpretation and enforcement of this CONTRACT shall be governed by the laws
|
||||||
|
|
||||||
|
of the Commonwealth of Virginia without regard to any conflict of laws or principles.
|
||||||
|
|
||||||
|
19
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
XV. _NON-APPROPRIATION
|
||||||
|
All contracts for products and services and all payment obligations under the 2018
|
||||||
|
AML PILOT AWARD and this CONTRACT are subject to appropriated AML funds being
|
||||||
|
available for expenditure for that purpose. The DMME shall promptly notify the
|
||||||
|
SUBRECIPIENT of any action denying such funding. In such event, any outstanding
|
||||||
|
CONTRACT shall be cancelled without further obligation to the extent the affected products
|
||||||
|
|
||||||
|
or services have not yet been duly delivered and accepted.
|
||||||
|
If any purchases are to be supported by federal funding, and such funding is not made
|
||||||
|
available, the DMME may terminate the contracts for goods or services, which are so
|
||||||
|
|
||||||
|
dependent on such federal funds without further obligation.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
XVI. ENTIRE CONTRACT
|
||||||
|
This CONTRACT incorporates and contains the entire CONTRACT and
|
||||||
|
understanding between the parties. There are no oral understandings, terms or conditions not
|
||||||
|
herein recited, and neither party has relied upon any representations, expressed or implied,
|
||||||
|
|
||||||
|
not incorporated or contained in this CONTRACT and its attachments.
|
||||||
|
|
||||||
|
IN WITNESS WHEREOF, the parties hereto have executed this CONTRACT by their duly
|
||||||
|
|
||||||
|
authorized representatives as of the day and year fist above written.
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPT. OF MINES, MINERALS & ENERGY
|
||||||
|
RUSSELL COUNTY RECLAMATION, DIVISION OF MINED LAND
|
||||||
|
|
||||||
|
LLC RECLAMATION
|
||||||
|
wv Ke 2K ov. Meal RA.
|
||||||
|
Executive Director Interim DMLR/DM Director
|
||||||
|
(Title) (Title)
|
||||||
|
|
||||||
|
P1808 A
|
||||||
|
|
||||||
|
la. Ll [20 /2- 28- 2270
|
||||||
|
(Dat (Date)
|
||||||
|
|
||||||
|
2
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Al
|
||||||
|
|
||||||
|
AQ
|
||||||
|
|
||||||
|
AB
|
||||||
|
|
||||||
|
ATTACHMENT A
|
||||||
|
|
||||||
|
Environmental Assessment
|
||||||
|
Finding of No Significant Impact (FONSI) and Authorization to Proceed (ATP)
|
||||||
|
|
||||||
|
NEPA Consultation Boundary (i.e. Project Boundary) Map
|
||||||
|
|
||||||
|
2
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Bl
|
||||||
|
|
||||||
|
B2
|
||||||
|
|
||||||
|
B3
|
||||||
|
|
||||||
|
B4
|
||||||
|
|
||||||
|
B.S
|
||||||
|
|
||||||
|
Bo
|
||||||
|
|
||||||
|
B7
|
||||||
|
|
||||||
|
ATTACHMENT B
|
||||||
|
2018 AML Pilot Guidance Document
|
||||||
|
Vetted project application
|
||||||
|
Letter to Proceed with Project Development from OSMRE
|
||||||
|
Subrecipient Approval Notice
|
||||||
|
Preliminary Budget ($1,645,340.00)
|
||||||
|
Project Budget ($1,645,340.00)
|
||||||
|
|
||||||
|
Scope of Work
|
||||||
|
|
||||||
|
23
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
cl
|
||||||
|
|
||||||
|
ATTACHMENT C
|
||||||
|
|
||||||
|
Construction Plan and Project Drawings
|
||||||
|
|
||||||
|
24
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
DA
|
||||||
|
|
||||||
|
D2
|
||||||
|
|
||||||
|
Attachment D
|
||||||
|
Equipment Safety Inspection Checklist
|
||||||
|
|
||||||
|
Applicant Violator System form (OMB 1029-0119) and Instructions
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,195 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: Project Reclaim II - Final Inspection
|
||||||
|
file: ../Project Reclaim II - Final Inspection.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Project Reclaim II - Final Inspection
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 253520
|
||||||
|
sha256sum: e10270ca8086af118ee6dcf37c230e9b81ffc02454107cde7a1e08562da798e0
|
||||||
|
sha1sum: 093f8730a5afda7d479583935f0088653067f314
|
||||||
|
---
|
||||||
|
|
||||||
|
FINAL INSPECTION
|
||||||
|
ABANDONED MINED LANDS
|
||||||
|
|
||||||
|
Project Reclaim Phase II
|
||||||
|
|
||||||
|
Project Type: AMLER Grant Year: 2018 Final Inspection
|
||||||
|
Date:
|
||||||
|
|
||||||
|
11/4/2021
|
||||||
|
|
||||||
|
Construction Start Date: 12/28/2020 Construction End Date: 10/29/2021
|
||||||
|
|
||||||
|
Contract No.:
|
||||||
|
|
||||||
|
Project No.:
|
||||||
|
|
||||||
|
Location:
|
||||||
|
|
||||||
|
County:
|
||||||
|
|
||||||
|
P091806
|
||||||
|
|
||||||
|
91806
|
||||||
|
|
||||||
|
RUSSELL Contract Expiration
|
||||||
|
Date:
|
||||||
|
|
||||||
|
12/28/2023
|
||||||
|
|
||||||
|
Project Contractor: Russell County Reclamation, LLC
|
||||||
|
|
||||||
|
Contractor's
|
||||||
|
Address:
|
||||||
|
|
||||||
|
2700 Lee Highway Bristol VA 24202
|
||||||
|
|
||||||
|
Original Contract
|
||||||
|
Amount:
|
||||||
|
|
||||||
|
$1645340.00
|
||||||
|
|
||||||
|
Total Change Orders (CO): $0.00
|
||||||
|
|
||||||
|
Total Contract Amount: $1645340.00
|
||||||
|
|
||||||
|
Total Amount Invoiced: $1645339.39
|
||||||
|
|
||||||
|
Number of people
|
||||||
|
no longer at risk:
|
||||||
|
|
||||||
|
Number of people
|
||||||
|
employed:
|
||||||
|
|
||||||
|
Total number of change orders: 0
|
||||||
|
|
||||||
|
Page 1 of 2
|
||||||
|
|
||||||
|
DT Ty FINAL INSPECTION.
|
||||||
|
© Energy ABANDONED MINED LANDS
|
||||||
|
|
||||||
|
Project Reclaim Phase II
|
||||||
|
|
||||||
|
Project Type: AMLER Grant Year: 2018 Final Inspection 11/4/2021
|
||||||
|
Date:
|
||||||
|
|
||||||
|
Construction Start Date: 12/28/2020 Construction End Date: 10/29/2021
|
||||||
|
|
||||||
|
Contract No: P091806
|
||||||
|
Project No.: 91806
|
||||||
|
|
||||||
|
Location:
|
||||||
|
|
||||||
|
County: RUSSELL Contract Expiration 12/28/2023
|
||||||
|
Date:
|
||||||
|
|
||||||
|
Project Contractor: Russell County Reclamation, LLC
|
||||||
|
|
||||||
|
Contractor's 2700 Lee Highway Bristol VA 24202
|
||||||
|
|
||||||
|
Address:
|
||||||
|
|
||||||
|
Original Contract $1645340.00
|
||||||
|
|
||||||
|
Amount:
|
||||||
|
|
||||||
|
Total Change Orders (CO): $0.00 Number of people
|
||||||
|
no longer at risk:
|
||||||
|
|
||||||
|
Total Contract Amount: $1645340.00
|
||||||
|
|
||||||
|
Total Amount Invoiced: $1645339.39 Number of people
|
||||||
|
employed
|
||||||
|
|
||||||
|
Total number of change orders: 0
|
||||||
|
|
||||||
|
Page 1 of 2
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Features Reclaimed:
|
||||||
|
|
||||||
|
This project has been constructed in accordance with the approved engineering
|
||||||
|
plans and any applicable grant requirements (True/False) True
|
||||||
|
|
||||||
|
Comments:
|
||||||
|
|
||||||
|
Features and project boundary have been added to GIS. AMLIS updates are complete. Project
|
||||||
|
is closed out. [12/29/2021, jlw]
|
||||||
|
|
||||||
|
Checklist:
|
||||||
|
|
||||||
|
Contractor Evaluation:
|
||||||
|
|
||||||
|
Permit(s) Requirements Complete:
|
||||||
|
|
||||||
|
Bond Release Recommended:
|
||||||
|
|
||||||
|
Retainage Release
|
||||||
|
Recommended:
|
||||||
|
|
||||||
|
Material(s) Certification(s):
|
||||||
|
|
||||||
|
Cost Breakdown Attachment Included (True/False):
|
||||||
|
|
||||||
|
NA
|
||||||
|
|
||||||
|
Y
|
||||||
|
|
||||||
|
Y
|
||||||
|
|
||||||
|
Y
|
||||||
|
|
||||||
|
False
|
||||||
|
|
||||||
|
eAMLIS entry Date: 12/29/2021
|
||||||
|
|
||||||
|
Total Cost $1645339.39
|
||||||
|
|
||||||
|
Problem Area Feature Reclaimed Priority Quantity Cost
|
||||||
|
|
||||||
|
VA-0821 O P3 1.00 1645339.39
|
||||||
|
|
||||||
|
Page 2 of 2
|
||||||
|
|
||||||
|
Features Reclaimed
|
||||||
|
|
||||||
|
Problem Area Feature Reclaimed Priority Quantity Cost
|
||||||
|
VA-0821 to) P3 1.00 1645339.39,
|
||||||
|
Total Cost $1645339.39
|
||||||
|
|
||||||
|
This project has been constructed in accordance with the approved engineering
|
||||||
|
plans and any applicable grant requirements (True/False) True
|
||||||
|
|
||||||
|
‘Comments:
|
||||||
|
|
||||||
|
Features and project boundary have been added to GIS. AMLIS updates are complete. Project
|
||||||
|
is closed out. [12/29/2021, jlw]
|
||||||
|
|
||||||
|
Chee!
|
||||||
|
|
||||||
|
Contractor Evaluation: = NA
|
||||||
|
|
||||||
|
Permit(s) Requirements Complete: Y
|
||||||
|
|
||||||
|
Bond Release Recommended: Y
|
||||||
|
Retainage Release Y
|
||||||
|
Recommended:
|
||||||
|
|
||||||
|
Material(s) Cer
|
||||||
|
|
||||||
|
ation(s):
|
||||||
|
|
||||||
|
Cost Breakdown Attachment Included (True/False): False
|
||||||
|
|
||||||
|
eAMLIS entry Date: 12/29/2021
|
||||||
|
|
||||||
|
Page 2 of 2
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,127 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: Project Reclaim Phase II - eligibility doc - signed
|
||||||
|
file: ../Project Reclaim Phase II - eligibility doc - signed.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Project Reclaim II - Final Inspection
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 1604887
|
||||||
|
sha256sum: 7ee557afe3fee35b321a23506b177fc7e50fdca317f2a2f08f69f61cf3948ea3
|
||||||
|
sha1sum: c5e8a1351ba0e17abfb5bd883d7982bf39c3b277
|
||||||
|
---
|
||||||
|
|
||||||
|
Divisions
|
||||||
|
ENERGY
|
||||||
|
AS AND OL
|
||||||
|
NED LAND
|
||||||
|
MINERAL MAIN
|
||||||
|
MINERAL SOURCES
|
||||||
|
vanes
|
||||||
|
ADMSTRATION
|
||||||
|
|
||||||
|
ATION
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA.
|
||||||
|
|
||||||
|
Department of Mines, Minerals and Energy
|
||||||
|
Division of Mined Land Reclamation
|
||||||
|
P.O, Drawer 900
|
||||||
|
Big Stone Gap. Virginia
|
||||||
|
(276) 523-8100" FAX
|
||||||
|
‘ww dm
|
||||||
|
|
||||||
|
0900
|
||||||
|
23-8148
|
||||||
|
|
||||||
|
June 05, 2019
|
||||||
|
|
||||||
|
PILOT PROJECT ELIGIBILITY DOCUMENTATION
|
||||||
|
PROJECT RECLAIM PHASE I!
|
||||||
|
FY18 AML PILOT GRANT
|
||||||
|
|
||||||
|
The Pilot FY2018 Project Reclaim Phase II is located is located off State Route 615, along Dumps
|
||||||
|
Creek, south of South Clinchfield in Russell County, Virginia. Project area mapping is comprised
|
||||||
|
of a section of the Carbo USGS 7.5 Minute Quadrangle. The project coordinates are 82° 10'
|
||||||
|
44.21"W and 36° 57' 38.77"N. The project area is contained within the South Clinchfield
|
||||||
|
Problem Area, VA-0821.
|
||||||
|
|
||||||
|
The 2018 AML Pilot guidance document states that sites eligible under AML Pilot include
|
||||||
|
"Previously reclaimed AML lands and polluted waters" and “land adjacent to unreclaimed or
|
||||||
|
previously reclaimed AML lands and polluted waters...”. Project Reclaim Phase Il will take place
|
||||||
|
‘on the area being remediated through the Golden Pond Gob Pile Removal Project (Project
|
||||||
|
Number 18302 FY2018).
|
||||||
|
|
||||||
|
Additionally, the proposed AML Pilot project is adjacent to the South Clinchfield Water System
|
||||||
|
project (Project Number 8613, FY86). This project installed a public water line along Gravel Lick
|
||||||
|
Rd into the community of South Clinchfield located approximately 600 feet away from the
|
||||||
|
project area. This water line passes the proposed project area within approximately 100 feet
|
||||||
|
|
||||||
|
for a distance of approximately 700 feet before diverting into the aforementioned residential
|
||||||
|
area.
|
||||||
|
|
||||||
|
There have been no permanent program activities and there is no continuing responsibility for
|
||||||
|
any individual, firm, or organization to reclaim this feature.
|
||||||
|
|
||||||
|
| have reviewed the eligibility documentation for this project and find the project meets
|
||||||
|
eligibility criteria Section Il of the Guidance for Project Eligibility under the Abandoned Mine
|
||||||
|
Land Reclamation Economic Development Pilot Program for Fiscal Year 2018.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Bul Babe Lt los [7014
|
||||||
|
|
||||||
|
Lesa Baker Date
|
||||||
|
Abandoned Mine Land Projects Coordinator
|
||||||
|
|
||||||
|
A noprove __Disapprove
|
||||||
|
Fuad, =, Cosy olshe
|
||||||
|
Randy R. Casey Date
|
||||||
|
|
||||||
|
Division Direct¢
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
LOCATION MAP
|
||||||
|
|
||||||
|
cerca manana cn
|
||||||
|
|
||||||
|
Gregan GOB on \
|
||||||
|
|
||||||
|
_
|
||||||
|
|
||||||
|
Project Reclaim
|
||||||
|
|
||||||
|
Phase IT
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Golden Pond Gob Removal Project (Project Number 18302, FY18)
|
||||||
|
|
||||||
|
Bee as |
|
||||||
|
|
||||||
|
Donia
|
||||||
|
|
||||||
|
a ‘RUSSELL COUNTY
|
||||||
|
RECLAMATION, LLC
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
South Clinchfield Water System project (Project Number 8613, FY86)
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
SITE PHOTOS
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,14 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: Project Reclaim PhaseII location
|
||||||
|
file: ../Project Reclaim PhaseII_location.jpg
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Project Reclaim II - Final Inspection
|
||||||
|
docDate: null
|
||||||
|
contentType: text/plain
|
||||||
|
contentLength: 782202
|
||||||
|
sha256sum: 3621ac05aa03ce781212e038b22a7dbef8abee628fc4382028df254538c0eef5
|
||||||
|
sha1sum: 637fc396e9c36bfe35cd0db4192307d62018b34a
|
||||||
|
---
|
||||||
|
|
||||||
|
|
@ -0,0 +1,14 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: 'Project Reclaim, Phase 2, Application'
|
||||||
|
file: '../Project Reclaim, Phase 2, Application.docx'
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Project Reclaim II - Final Inspection
|
||||||
|
docDate: null
|
||||||
|
contentType: text/plain
|
||||||
|
contentLength: 127630
|
||||||
|
sha256sum: 79225371a4e2f955290730458c8f06a96035fe7496c0def3980c07faf9cf3c83
|
||||||
|
sha1sum: be46c7467c0d171d68ccb270a232ffc04671b44c
|
||||||
|
---
|
||||||
|
|
||||||
|
|
@ -0,0 +1,117 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: Reclaim II - Project Agreement
|
||||||
|
file: ../Reclaim II - Project Agreement.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Project Reclaim II - Final Inspection
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 1000425
|
||||||
|
sha256sum: 35070fbdfbcd4914bd4a1a83f8264e29767eb6a9a84f384b389bc4619af71469
|
||||||
|
sha1sum: 13e04471ad0c9a2e802f9fd9db15a572d06db2d5
|
||||||
|
---
|
||||||
|
|
||||||
|
2019 Abandoned Mined Land Pilot Project Agreement
|
||||||
|
|
||||||
|
This Abandoned Mined Land (AML) Pilot Project Agreement (Agreement) is hereby entered into by the
|
||||||
|
Virginia Department of Mines, Minerals and Energy (DMME) and _Russell County Reclamation, LLC
|
||||||
|
(Subrecipient) for the purposes of documenting the agreement between the parties for Project
|
||||||
|
Reclaim Phase !__ (Project) based on the following terms:
|
||||||
|
|
||||||
|
WHEREAS, the Subrecipient has submitted a complete application (Application [Attachment B]) under
|
||||||
|
the Office of Surface Mining Reclamation and Enforcement’s (OSMRE) AML Pilot Program Guidance for
|
||||||
|
Project Eligibility (Attachment C); and
|
||||||
|
|
||||||
|
WHEREAS, the Application has been reviewed by the AML Pilot Advisory Committee and submitted to
|
||||||
|
OSMRE for vetting; and
|
||||||
|
|
||||||
|
WHEREAS, OSMRE is satisfied with the concept of the Project and that it meets the intent of the AML
|
||||||
|
Pilot program and has given DMME notice to move forward by the issuance of a Letter to Proceed with
|
||||||
|
project development (Attachment D); and
|
||||||
|
|
||||||
|
WHEREAS, OSMRE has determined that the applicant is approved for Subrecipient status (Attachment
|
||||||
|
E); and
|
||||||
|
|
||||||
|
WHEREAS, DMME under OSMRE’s approval has authority to reimburse the Subrecipient out of the AML
|
||||||
|
Pilot Grant for funds expended on Project Development Costs; and
|
||||||
|
|
||||||
|
WHEREAS, OSMRE’s approval of NEPA documents prepared by the Subrecipient, OSMRE’s subsequent
|
||||||
|
issuance of a Finding of No Significant Impact (FONSI) and Authorization to Proceed (ATP) with
|
||||||
|
construction, and DMME’s approval of project plans are required to finalize a project contract between
|
||||||
|
DMME and the Subrecipient;
|
||||||
|
|
||||||
|
NOW, THEREFORE, the parties hereto mutually agree as follows:
|
||||||
|
ARTICLE |. OBLIGATIONS OF SUBRECIPIENT
|
||||||
|
|
||||||
|
1. The Subrecipient agrees to be bound by the AML PILOT TERMS AND CONDITIONS (TERMS AND
|
||||||
|
CONDITIONS) in their entirety as included as Attachment A.
|
||||||
|
|
||||||
|
2. The Subrecipient agrees to be responsive within 5 business days to DMME questions
|
||||||
|
communicated appropriately and provided by email to the party noted in Article V. Notices.
|
||||||
|
|
||||||
|
3. The Subrecipient will submit invoices as directed by DMME for Project Development Costs as
|
||||||
|
defined in Article Ill.
|
||||||
|
|
||||||
|
ARTICLE II. OBLIGATIONS OF DMME
|
||||||
|
|
||||||
|
1. DMME will continue in good faith toward the development of a project contract and a final
|
||||||
|
OSMRE ATP.
|
||||||
|
|
||||||
|
2. DMME will reimburse Subrecipient for appropriate Project Development Costs within 30 days of
|
||||||
|
receipt of documented invoices.
|
||||||
|
|
||||||
|
ARTICLE Ill, DEFINITION OF “PROJECT DEVELOPMENT COSTS”
|
||||||
|
|
||||||
|
1. Project Development costs may include preparation of construction plans, preparation of
|
||||||
|
documents for National Environmental Policy Act (NEPA) and the Endangered Species Act (ESA)
|
||||||
|
compliance, as well as other architectural, engineering, or legal services needed for the
|
||||||
|
Project.
|
||||||
|
|
||||||
|
Revised 12-11-2019
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
ARTICLE IV. PENALTIES
|
||||||
|
|
||||||
|
1. Failure to follow the TERMS AND CONDITIONS or any terms of this Agreement may result in any
|
||||||
|
remedy as described in Section IV, Noncompliance of the TERMS AND CONDITIONS.
|
||||||
|
|
||||||
|
ARTICLE V. NOTICES
|
||||||
|
Any notice provided under this agreement shall be as follows:
|
||||||
|
|
||||||
|
MME
|
||||||
|
Email to Lesa Baker (lesa.baker@dmme.virgina.gov)
|
||||||
|
|
||||||
|
with copies to Clara Harris (clara.harris@dmme.virginia.gov)
|
||||||
|
|
||||||
|
Subrecipient =
|
||||||
|
Emailto _ KK LA@6E, 60 @ MATL, Comm
|
||||||
|
|
||||||
|
with copies to_JiKM @ NARBOKK Cd: com
|
||||||
|
|
||||||
|
DMME
|
||||||
|
|
||||||
|
5B,
|
||||||
|
|
||||||
|
Bradley (Butci} C. Lambert,
|
||||||
|
|
||||||
|
be <Se/ae
|
||||||
|
|
||||||
|
DMME Deputy Director Date
|
||||||
|
|
||||||
|
SUBRECIPIENT
|
||||||
|
|
||||||
|
nL ZU parget
|
||||||
|
Signature of Authorized Representative Title
|
||||||
|
|
||||||
|
Kéul LArye Wrof22
|
||||||
|
|
||||||
|
Printed Name of Authorized Date
|
||||||
|
Representative
|
||||||
|
|
||||||
|
Revised 12-11-2019
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,130 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: aiHNM0009482
|
||||||
|
file: ../aiHNM0009482.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Project Reclaim II - Final Inspection
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 36634
|
||||||
|
sha256sum: b70ce40356eac3acb2e597358d84f11f9c65755dcb85ecaadff4354edf6864d9
|
||||||
|
sha1sum: baf116d5e72a8961799c95bf25d1d4fa4db7c1a3
|
||||||
|
---
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 02/05/21
|
||||||
|
5/06 Page 1 of 1
|
||||||
|
|
||||||
|
|
||||||
|
HNM0009482
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER
|
||||||
|
|
||||||
|
Project Reclaim Phase II 91806 2018 HNM0009482
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED
|
||||||
|
|
||||||
|
0
|
||||||
|
|
||||||
|
CONTRACTOR NAME ENGINEER NAME
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
SITE CONTACT PERSON: Kevin Large
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION
|
||||||
|
|
||||||
|
01/06/21
|
||||||
|
01/13/21
|
||||||
|
01/27/21
|
||||||
|
|
||||||
|
03:30 PM
|
||||||
|
03:30 PM
|
||||||
|
03:30 PM
|
||||||
|
|
||||||
|
04:30 PM
|
||||||
|
04:30 PM
|
||||||
|
04:30 PM
|
||||||
|
|
||||||
|
WET
|
||||||
|
WET
|
||||||
|
WET
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMENTS
|
||||||
|
|
||||||
|
The contract for Project Reclaim Phase II was signed on 12/28/21 and a Notice to Proceed was issued the same day.
|
||||||
|
Work at the site was already on going from Project Reclaim Phase I. Material haulage transitioned from Phase I to Phase
|
||||||
|
II on the day the contract was signed. Material haulage continued through the month of January and will be ongoing until
|
||||||
|
completion of the project.
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNMo0009482
|
||||||
|
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
Dh DIVISION OF MINED LAND RECLAMATION
|
||||||
|
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
Virginia Depay TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
Mines Minerals and Energy
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
PROJECT NAME, PROJECT NO. GRANT YEAR | REPORT NUMBER
|
||||||
|
Project Reclaim Phase Il 91806 2018 HNM0009482
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE, PERCENT OF CONTRACT COMPLETED
|
||||||
|
0
|
||||||
|
CONTRACTOR NAME ENGINEER NAME,
|
||||||
|
|
||||||
|
‘SITE CONTACT PERSON: Kevin Large
|
||||||
|
|
||||||
|
INSPECTION DATE, ARRIVAL DEPARTURE. GROUND CONDITION
|
||||||
|
01/06/21 03:30 PM (04:30 PM WET
|
||||||
|
01/13/21 03:30 PM 04:30 PM WET
|
||||||
|
01/27/24 03:30 PM 04:30 PM WET
|
||||||
|
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
‘COMMENTS
|
||||||
|
|
||||||
|
The contract for Project Reclaim Phase Il was signed on 12/28/21 and a Notice to Proceed was issued the same day.
|
||||||
|
Work at the site was already on going from Project Reclaim Phase |. Material haulage transitioned from Phase | to Phase
|
||||||
|
Ion the day the contract was signed. Material haulage continued through the month of January and will be ongoing until
|
||||||
|
‘completion of the project.
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 02/05/21
|
||||||
|
5106 Page 1 of 1
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,126 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: aiHNM0009561
|
||||||
|
file: ../aiHNM0009561.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Project Reclaim II - Final Inspection
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 36799
|
||||||
|
sha256sum: 7ac077501e6c4d1a6ab0f2cc5a9e1d9b5bbc70f9e63cd67f7b4e9bc3d8da425c
|
||||||
|
sha1sum: 6862eca0d685a9dcd7d8d3fce5c5c597e50d9d41
|
||||||
|
---
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 04/06/21
|
||||||
|
5/06 Page 1 of 1
|
||||||
|
|
||||||
|
|
||||||
|
HNM0009561
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER
|
||||||
|
|
||||||
|
Project Reclaim Phase II 91806 2018 HNM0009561
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED
|
||||||
|
|
||||||
|
20
|
||||||
|
|
||||||
|
CONTRACTOR NAME ENGINEER NAME
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
SITE CONTACT PERSON: Kevin Large
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION
|
||||||
|
|
||||||
|
02/03/21
|
||||||
|
02/23/21
|
||||||
|
|
||||||
|
03:00 PM
|
||||||
|
03:30 PM
|
||||||
|
|
||||||
|
04:30 PM
|
||||||
|
04:30 PM
|
||||||
|
|
||||||
|
WET
|
||||||
|
WET
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMENTS
|
||||||
|
|
||||||
|
The contract for Project Reclaim Phase II was signed on 12/28/21 and a Notice to Proceed was issued the same day.
|
||||||
|
Work at the site was already on going from Project Reclaim Phase I. Material haulage transitioned from Phase I to Phase
|
||||||
|
II on the day the contract was signed. Material haulage continues daily on the project.
|
||||||
|
|
||||||
|
Invoice #1 requested payment in the amount of $266,202.90. Payment of the invoice was recommended.
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNM0009561
|
||||||
|
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
Dh DIVISION OF MINED LAND RECLAMATION
|
||||||
|
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
Virginia Depay TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
Mines Minerals and Energy
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
PROJECT NAME, PROJECT NO, GRANT YEAR | REPORT NUMBER
|
||||||
|
Project Reclaim Phase Il 91806 2018 HNM0009561
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE, PERCENT OF CONTRACT COMPLETED
|
||||||
|
20
|
||||||
|
CONTRACTOR NAME ENGINEER NAME,
|
||||||
|
|
||||||
|
‘SITE CONTACT PERSON: Kevin Large
|
||||||
|
|
||||||
|
INSPECTION DATE, ARRIVAL DEPARTURE. GROUND CONDITION
|
||||||
|
02/03/21 03:00 PM (04:30 PM WET
|
||||||
|
02/23/21 03:30 PM 04:30 PM WET
|
||||||
|
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
‘COMMENTS
|
||||||
|
|
||||||
|
The contract for Project Reclaim Phase Il was signed on 12/28/21 and a Notice to Proceed was issued the same day.
|
||||||
|
Work at the site was already on going from Project Reclaim Phase |. Material haulage transitioned from Phase I to Phase
|
||||||
|
Ion the day the contract was signed. Material haulage continues daily on the project.
|
||||||
|
|
||||||
|
Invoice #1 requested payment in the amount of $266,202.90. Payment of the invoice was recommended.
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 04/06/21
|
||||||
|
5/06 Page 1 of 1
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,178 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: aiHNM0009564
|
||||||
|
file: ../aiHNM0009564.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Project Reclaim II - Final Inspection
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 246977
|
||||||
|
sha256sum: 67fda28e57b7d82c236550c44f498cc346532b539b8e03f004560944dd581c26
|
||||||
|
sha1sum: 114c21dbe551b9cd701eecc1f7a8a6a9c504ea2f
|
||||||
|
---
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 04/08/21
|
||||||
|
5/06 Page 1 of 2
|
||||||
|
|
||||||
|
|
||||||
|
HNM0009564
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER
|
||||||
|
|
||||||
|
Project Reclaim Phase II 91806 2018 HNM0009564
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED
|
||||||
|
|
||||||
|
20
|
||||||
|
|
||||||
|
CONTRACTOR NAME ENGINEER NAME
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
SITE CONTACT PERSON: Kevin Large
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION
|
||||||
|
|
||||||
|
03/04/21
|
||||||
|
03/08/21
|
||||||
|
03/22/21
|
||||||
|
|
||||||
|
03:30 PM
|
||||||
|
03:30 PM
|
||||||
|
04:00 PM
|
||||||
|
|
||||||
|
04:30 PM
|
||||||
|
04:30 PM
|
||||||
|
04:30 PM
|
||||||
|
|
||||||
|
WET
|
||||||
|
WET
|
||||||
|
WET
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMENTS
|
||||||
|
|
||||||
|
The contract for Project Reclaim Phase II was signed on 12/28/21 and a Notice to Proceed was issued the same day.
|
||||||
|
Work at the site was already on going from Project Reclaim Phase I. Material haulage transitioned from Phase I to Phase
|
||||||
|
II on the day the contract was signed. Material haulage continues daily on the project.
|
||||||
|
|
||||||
|
Invoice #2 requested payment in the amount of $169,023.92. Payment of the invoice was recommended. Photos of the
|
||||||
|
site are shown below.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNM0009564
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
Dh DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
-ginia Depay TELEPHONE: (276) 523-8198
|
||||||
|
Mines Minerals and Energy
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
PROJECT NAME, PROJECT NO, GRANT YEAR | REPORT NUMBER
|
||||||
|
Project Reclaim Phase Il 91806 2018 HNM0009564
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE, PERCENT OF CONTRACT COMPLETED
|
||||||
|
20
|
||||||
|
CONTRACTOR NAME ENGINEER NAME,
|
||||||
|
|
||||||
|
‘SITE CONTACT PERSON: Kevin Large
|
||||||
|
|
||||||
|
INSPECTION DATE, ARRIVAL, DEPARTURE. GROUND CONDITION
|
||||||
|
03/04/21 03:30 PM (04:30 PM WET
|
||||||
|
03/08/24 03:30 PM 04:30 PM WET
|
||||||
|
03/22/24 04:00 PM 04:30 PM WET
|
||||||
|
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
COMMENTS
|
||||||
|
|
||||||
|
The contract for Project Reclaim Phase Il was signed on 12/28/21 and a Notice to Proceed was issued the same day.
|
||||||
|
Work at the site was already on going from Project Reclaim Phase |. Material haulage transitioned from Phase | to Phase
|
||||||
|
Ion the day the contract was signed. Material haulage continues daily on the project.
|
||||||
|
|
||||||
|
Invoice #2 requested payment in the amount of $169,023.92. Payment of the invoice was recommended. Photos of the
|
||||||
|
site are shown below.
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 04/08/21
|
||||||
|
5/06 Page 1 of 2
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 04/08/21
|
||||||
|
5/06 Page 2 of 2
|
||||||
|
|
||||||
|
|
||||||
|
HNM0009564
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNM0009564
|
||||||
|
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
Dh DIVISION OF MINED LAND RECLAMATION
|
||||||
|
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
Virginia Depay TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
Mines Minerals and Energy
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 04/08/21
|
||||||
|
5/06 Page 2 of 2
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,172 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: aiHNM0009659
|
||||||
|
file: ../aiHNM0009659.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Project Reclaim II - Final Inspection
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 344059
|
||||||
|
sha256sum: abba77c13314ddc337050c82d754185e7aa534591c25557380c71160b03a1562
|
||||||
|
sha1sum: b15cb7ba3d4fc1eee24547da8b5fe88f1e5baad4
|
||||||
|
---
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 06/30/21
|
||||||
|
5/06 Page 1 of 2
|
||||||
|
|
||||||
|
|
||||||
|
HNM0009659
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER
|
||||||
|
|
||||||
|
Project Reclaim Phase II 91806 2018 HNM0009659
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED
|
||||||
|
|
||||||
|
20
|
||||||
|
|
||||||
|
CONTRACTOR NAME ENGINEER NAME
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
SITE CONTACT PERSON: Kevin Large
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION
|
||||||
|
|
||||||
|
04/05/21
|
||||||
|
04/27/21
|
||||||
|
|
||||||
|
04:00 PM
|
||||||
|
04:00 PM
|
||||||
|
|
||||||
|
04:30 PM
|
||||||
|
04:30 PM
|
||||||
|
|
||||||
|
WET
|
||||||
|
WET
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMENTS
|
||||||
|
|
||||||
|
The contract for Project Reclaim Phase II was signed on 12/28/21 and a Notice to Proceed was issued the same day.
|
||||||
|
Work at the site was already on going from Project Reclaim Phase I. Material haulage transitioned from Phase I to Phase
|
||||||
|
II on the day the contract was signed. Material haulage continues daily on the project.
|
||||||
|
|
||||||
|
Application for Payment #3 requested payment in the amount of $207,215.14. Payment of the invoice was
|
||||||
|
recommended. Photos of the site are shown below.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNM0009659
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
Dh DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
-ginia Depay TELEPHONE: (276) 523-8198
|
||||||
|
Mines Minerals and Energy
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
PROJECT NAME PROJECT NO. GRANT YEAR | REPORT NUMBER
|
||||||
|
Project Reclaim Phase Il 91806 2018 HINM0009659
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE, PERCENT OF CONTRACT COMPLETED
|
||||||
|
20
|
||||||
|
CONTRACTOR NAME ENGINEER NAME
|
||||||
|
‘SITE CONTACT PERSON: Kevin Large
|
||||||
|
INSPECTION DATE ARRIVAL, DEPARTURE GROUND CONDITION
|
||||||
|
04/05/24 04:00 PM 04:30 PM ‘WET
|
||||||
|
04/27/24 04:00 PM 04:30 PM WET
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
‘COMMENTS
|
||||||
|
|
||||||
|
The contract for Project Reclaim Phase Il was signed on 12/28/21 and a Notice to Proceed was issued the same day.
|
||||||
|
Work at the site was already on going from Project Reclaim Phase |. Material haulage transitioned from Phase I to Phase
|
||||||
|
Ion the day the contract was signed. Material haulage continues daily on the project.
|
||||||
|
|
||||||
|
Application for Payment #3 requested payment in the amount of $207,215.14. Payment of the invoice was
|
||||||
|
|
||||||
|
recommended.
|
||||||
|
|
||||||
|
Photos of the site are shown below.
|
||||||
|
|
||||||
|
DMLR-AML-130S
|
||||||
|
5/06
|
||||||
|
|
||||||
|
Page 1 of 2
|
||||||
|
|
||||||
|
Printed: 06/30/21
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 06/30/21
|
||||||
|
5/06 Page 2 of 2
|
||||||
|
|
||||||
|
|
||||||
|
HNM0009659
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNM0009659
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
‘TELEPHONE: (276) 523-8198
|
||||||
|
Mines Minerals and Energy
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 06/30/21
|
||||||
|
5/06 Page 2 of 2
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,171 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: aiHNM0009662
|
||||||
|
file: ../aiHNM0009662.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Project Reclaim II - Final Inspection
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 318034
|
||||||
|
sha256sum: a34cb05f5d6de06d10e2e1ad5052bb9c72e0cc6decde720b3f2e71b8c93076dd
|
||||||
|
sha1sum: b64dc954941fbb0711e770aa24634fc56ae41833
|
||||||
|
---
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 06/30/21
|
||||||
|
5/06 Page 1 of 2
|
||||||
|
|
||||||
|
|
||||||
|
HNM0009662
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER
|
||||||
|
|
||||||
|
Project Reclaim Phase II 91806 2018 HNM0009662
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED
|
||||||
|
|
||||||
|
20
|
||||||
|
|
||||||
|
CONTRACTOR NAME ENGINEER NAME
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
SITE CONTACT PERSON: Kevin Large
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION
|
||||||
|
|
||||||
|
05/11/21
|
||||||
|
05/25/21
|
||||||
|
|
||||||
|
04:00 PM
|
||||||
|
04:00 PM
|
||||||
|
|
||||||
|
04:30 PM
|
||||||
|
04:30 PM
|
||||||
|
|
||||||
|
WET
|
||||||
|
WET
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMENTS
|
||||||
|
|
||||||
|
The contract for Project Reclaim Phase II was signed on 12/28/21 and a Notice to Proceed was issued the same day.
|
||||||
|
Work at the site was already on going from Project Reclaim Phase I. Material haulage transitioned from Phase I to Phase
|
||||||
|
II on the day the contract was signed. Material haulage continues daily on the project. Work has progressed to the outer
|
||||||
|
edge of the structure.
|
||||||
|
|
||||||
|
Application for payment #4 requested payment in the amount of $249,764.29. Payment of the invoice was recommended.
|
||||||
|
Photos of the site are shown below.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNMoo09662
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
Dh DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
-ginta Depay TELEPHONE: (276) 523-8198
|
||||||
|
Mines Minerals and Energy
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
PROJECT NAME PROJECT NO. GRANT YEAR [REPORT NUMBER
|
||||||
|
Project Reclaim Phase Il 91806 2018 HNM0009662
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE, PERCENT OF CONTRACT COMPLETED
|
||||||
|
20
|
||||||
|
CONTRACTOR NAME ENGINEER NAME
|
||||||
|
‘SITE CONTACT PERSON: Kevin Large
|
||||||
|
INSPECTION DATE. ARRIVAL, DEPARTURE GROUND CONDITION
|
||||||
|
05/11/24 04:00 PM 04:30 PM ‘WET
|
||||||
|
05/25/24 04:00 PM 04:30 PM WET
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
‘COMMENTS
|
||||||
|
|
||||||
|
The contract for Project Reclaim Phase Il was signed on 12/28/21 and a Notice to Proceed was issued the same day.
|
||||||
|
Work at the site was already on going from Project Reclaim Phase |. Material haulage transitioned from Phase | to Phase
|
||||||
|
Ion the day the contract was signed. Material haulage continues daily on the project. Work has progressed to the outer
|
||||||
|
|
||||||
|
edge of the structure.
|
||||||
|
|
||||||
|
Application for payment #4 requested payment in the amount of $249,764.29. Payment of the invoice was recommended.
|
||||||
|
|
||||||
|
Photos of the site are shown below.
|
||||||
|
|
||||||
|
DMLR-AML-130S
|
||||||
|
5/06
|
||||||
|
|
||||||
|
Page 1 of 2
|
||||||
|
|
||||||
|
Printed: 06/30/21
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 06/30/21
|
||||||
|
5/06 Page 2 of 2
|
||||||
|
|
||||||
|
|
||||||
|
HNM0009662
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNMo0009662
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
‘TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
"
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 06/30/21
|
||||||
|
5/06 Page 2 of 2
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,186 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: aiHNM0009664
|
||||||
|
file: ../aiHNM0009664.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Project Reclaim II - Final Inspection
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 275973
|
||||||
|
sha256sum: a876c62dfce152bec4e57d3e3596611b3a608ab967d39b3b25bb69be685ecf83
|
||||||
|
sha1sum: eb6994b36cb19c712035f2600537d8a5201dd5b6
|
||||||
|
---
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 06/30/21
|
||||||
|
5/06 Page 1 of 2
|
||||||
|
|
||||||
|
|
||||||
|
HNM0009664
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER
|
||||||
|
|
||||||
|
Project Reclaim Phase II 91806 2018 HNM0009664
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED
|
||||||
|
|
||||||
|
80
|
||||||
|
|
||||||
|
CONTRACTOR NAME ENGINEER NAME
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
SITE CONTACT PERSON: Kevin Large
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION
|
||||||
|
|
||||||
|
06/08/21
|
||||||
|
06/22/21
|
||||||
|
|
||||||
|
04:00 PM
|
||||||
|
04:00 PM
|
||||||
|
|
||||||
|
04:30 PM
|
||||||
|
04:30 PM
|
||||||
|
|
||||||
|
WET
|
||||||
|
WET
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMENTS
|
||||||
|
|
||||||
|
The contract for Project Reclaim Phase II was signed on 12/28/21 and a Notice to Proceed was issued the same day.
|
||||||
|
Work at the site was already on going from Project Reclaim Phase I. Material haulage transitioned from Phase I to Phase
|
||||||
|
II on the day the contract was signed. Material haulage continues daily on the project. Removal of fines is nearly
|
||||||
|
complete as well as construction of the retaining pond at the lower end of the site. Berms around the structure have been
|
||||||
|
covered with a layer of topsoil.
|
||||||
|
|
||||||
|
Application for Payment #5 requested payment in the amount of $199,344.48. Payment of the invoice was
|
||||||
|
recommended. Photos of the site are shown below.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNMo009664
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
Dh DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
-ginia Depay TELEPHONE: (276) 523-8198
|
||||||
|
Mines Minerals and Energy
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
PROJECT NAME PROJECT NO. GRANT YEAR [REPORT NUMBER
|
||||||
|
Project Reclaim Phase Il 91806 2018 HINM0009664
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE, PERCENT OF CONTRACT COMPLETED
|
||||||
|
80
|
||||||
|
CONTRACTOR NAME ENGINEER NAME
|
||||||
|
‘SITE CONTACT PERSON: Kevin Large
|
||||||
|
INSPECTION DATE ARRIVAL, DEPARTURE GROUND CONDITION
|
||||||
|
06/08/21 04:00 PM 04:30 PM ‘WET
|
||||||
|
06/22/24 04:00 PM 04:30 PM WET
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
‘COMMENTS:
|
||||||
|
|
||||||
|
The contract for Project Reclaim Phase Il was signed on 12/28/21 and a Notice to Proceed was issued the same day.
|
||||||
|
Work at the site was already on going from Project Reclaim Phase |. Material haulage transitioned from Phase | to Phase
|
||||||
|
Ion the day the contract was signed. Material haulage continues daily on the project. Removal of fines is nearly
|
||||||
|
‘complete as well as construction of the retaining pond at the lower end of the site. Berms around the structure have been
|
||||||
|
|
||||||
|
covered with a layer of topsoil.
|
||||||
|
|
||||||
|
Application for Payment #5 requested payment in the amount of $199,344.48. Payment of the invoice was
|
||||||
|
|
||||||
|
recommended.
|
||||||
|
|
||||||
|
Photos of the site are shown below.
|
||||||
|
|
||||||
|
DMLR-AML-130S
|
||||||
|
5/06
|
||||||
|
|
||||||
|
Page 1 of 2
|
||||||
|
|
||||||
|
Printed: 06/30/21
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 06/30/21
|
||||||
|
5/06 Page 2 of 2
|
||||||
|
|
||||||
|
|
||||||
|
HNM0009664
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNM0009664
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
‘TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
Mines Minerals and Energy
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
Ew ae
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 06/30/21
|
||||||
|
5/06 Page 2 of 2
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,199 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: aiHNM0009798
|
||||||
|
file: ../aiHNM0009798.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Project Reclaim II - Final Inspection
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 290637
|
||||||
|
sha256sum: acde49f109ddead42756d393304e2ce201bbceee18e46e02f076c3a96d91a221
|
||||||
|
sha1sum: bf9cb06e29b30ceaa3304ea90d69270289fd83e7
|
||||||
|
---
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 09/24/21
|
||||||
|
5/06 Page 1 of 2
|
||||||
|
|
||||||
|
|
||||||
|
HNM0009798
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER
|
||||||
|
|
||||||
|
Project Reclaim Phase II 91806 2018 HNM0009798
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED
|
||||||
|
|
||||||
|
90
|
||||||
|
|
||||||
|
CONTRACTOR NAME ENGINEER NAME
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
SITE CONTACT PERSON: Kevin Large
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION
|
||||||
|
|
||||||
|
07/13/21
|
||||||
|
07/19/21
|
||||||
|
07/27/21
|
||||||
|
|
||||||
|
03:30 PM
|
||||||
|
04:00 PM
|
||||||
|
04:00 PM
|
||||||
|
|
||||||
|
04:30 PM
|
||||||
|
04:30 PM
|
||||||
|
04:30 PM
|
||||||
|
|
||||||
|
WET
|
||||||
|
WET
|
||||||
|
WET
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMENTS
|
||||||
|
|
||||||
|
The contract for Project Reclaim Phase II was signed on 12/28/21 and a Notice to Proceed was issued the same day.
|
||||||
|
Work at the site was already on going from Project Reclaim Phase I. Material haulage transitioned from Phase I to Phase
|
||||||
|
II on the day the contract was signed. Material haulage continues daily on the project. Removal of fines is nearly
|
||||||
|
complete as well as construction of the retaining pond at the lower end of the site. Berms around the structure have been
|
||||||
|
covered with a layer of topsoil.
|
||||||
|
|
||||||
|
Application for Payment #6 requested payment in the amount of $220,130.44. Payment of the invoice was
|
||||||
|
recommended. Photos of the site are shown below.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNM0009798
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
Dh DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
-ginia Depai TELEPHONE: (276) 523-8198
|
||||||
|
Mines Minerals and Energy
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
PROJECT NAME, PROJECT NO, GRANT YEAR | REPORT NUMBER
|
||||||
|
Project Reclaim Phase Il 91806 2018 HNM0009798
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE, PERCENT OF CONTRACT COMPLETED
|
||||||
|
90
|
||||||
|
CONTRACTOR NAME ENGINEER NAME,
|
||||||
|
|
||||||
|
‘SITE CONTACT PERSON: Kevin Large
|
||||||
|
|
||||||
|
INSPECTION DATE, ARRIVAL, DEPARTURE. GROUND CONDITION
|
||||||
|
07/13/21 03:30 PM (04:30 PM WET
|
||||||
|
07/19/21 04:00 PM 04:30 PM WET
|
||||||
|
07/27/24 04:00 PM 04:30 PM WET
|
||||||
|
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
‘COMMENTS:
|
||||||
|
|
||||||
|
The contract for Project Reclaim Phase Il was signed on 12/28/21 and a Notice to Proceed was issued the same day.
|
||||||
|
Work at the site was already on going from Project Reclaim Phase |. Material haulage transitioned from Phase | to Phase
|
||||||
|
Ion the day the contract was signed. Material haulage continues daily on the project. Removal of fines is nearly
|
||||||
|
‘complete as well as construction of the retaining pond at the lower end of the site. Berms around the structure have been
|
||||||
|
covered with a layer of topsoil
|
||||||
|
|
||||||
|
Application for Payment #6 requested payment in the amount of $220,130.44. Payment of the invoice was
|
||||||
|
recommended. Photos of the site are shown below.
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 09/24/21
|
||||||
|
5/06 Page 1 of 2
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 09/24/21
|
||||||
|
5/06 Page 2 of 2
|
||||||
|
|
||||||
|
|
||||||
|
HNM0009798
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
Dh DIVISION OF MINED LAND RECLAMATION
|
||||||
|
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
Virginia Depay TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
Mines Minerals and Energy
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
DMLR-AML-130S
|
||||||
|
5/06 Page 2 of 2
|
||||||
|
|
||||||
|
HNM0009798
|
||||||
|
|
||||||
|
Printed: 09/24/21
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,132 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: aiHNM0009816
|
||||||
|
file: ../aiHNM0009816.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Project Reclaim II - Final Inspection
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 37336
|
||||||
|
sha256sum: 60fe98a5ee35b39844ae006ed3fca2bc3f531e46970fbd2c9a89d5e6ef17f15f
|
||||||
|
sha1sum: 1103c3c3326381c5cf16afbc771bc2995c9b8c09
|
||||||
|
---
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
|
||||||
|
DIVISION OF MINED LAND RECLAMATION
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 10/01/21
|
||||||
|
5/06 Page 1 of 1
|
||||||
|
|
||||||
|
|
||||||
|
HNM0009816
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER
|
||||||
|
|
||||||
|
Project Reclaim Phase II 91806 2018 HNM0009816
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED
|
||||||
|
|
||||||
|
90
|
||||||
|
|
||||||
|
CONTRACTOR NAME ENGINEER NAME
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
SITE CONTACT PERSON: Kevin Large
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION
|
||||||
|
|
||||||
|
09/14/21 02:30 PM 03:30 PM DRY
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMENTS
|
||||||
|
|
||||||
|
The contract for Project Reclaim Phase II was signed on 12/28/21 and a Notice to Proceed was issued the same day.
|
||||||
|
Work at the site was already on going from Project Reclaim Phase I. Material haulage transitioned from Phase I to Phase
|
||||||
|
II on the day the contract was signed. Work at the site is complete. Seeding of the structure will occur under the 2021
|
||||||
|
Revegetation Project. This inspection was conducted as a bid showing for the revegetation project.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNM0009816
|
||||||
|
|
||||||
|
DEPARTMENT OF MINES, MINERALS AND ENERGY
|
||||||
|
Dh DIVISION OF MINED LAND RECLAMATION
|
||||||
|
|
||||||
|
P.O. DRAWER 900, BIG STONE GAP, VA 24219
|
||||||
|
Virginia Depay TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
Mines Minerals and Energy
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
PROJECT NAME, PROJECT NO, GRANT YEAR | REPORT NUMBER
|
||||||
|
Project Reclaim Phase Il 91806 2018 HNM0009816
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE, PERCENT OF CONTRACT COMPLETED
|
||||||
|
90
|
||||||
|
CONTRACTOR NAME ENGINEER NAME,
|
||||||
|
|
||||||
|
‘SITE CONTACT PERSON: Kevin Large
|
||||||
|
|
||||||
|
INSPECTION DATE, ARRIVAL DEPARTURE. GROUND CONDITION
|
||||||
|
09/14/21 (02:30 PM 03:30 PM DRY
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
‘COMMENTS
|
||||||
|
|
||||||
|
The contract for Project Reclaim Phase Il was signed on 12/28/21 and a Notice to Proceed was issued the same day.
|
||||||
|
Work at the site was already on going from Project Reclaim Phase |. Material haulage transitioned from Phase | to Phase
|
||||||
|
Ion the day the contract was signed. Work at the site is complete. Seeding of the structure will occur under the 2021
|
||||||
|
Revegetation Project. This inspection was conducted as a bid showing for the revegetation project.
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 10/01/21
|
||||||
|
5/06 Page 1 of 1
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,192 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: aiHNM0009861
|
||||||
|
file: ../aiHNM0009861.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Project Reclaim II - Final Inspection
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 287476
|
||||||
|
sha256sum: 8fe66a599b25d697b18972357e463911ea8960633e4d4af95148025eecef6e8c
|
||||||
|
sha1sum: 0e71a130b29746fd99749e6addc2f2672bc177c5
|
||||||
|
---
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
VIRGINIA DEPARTMENT OF ENERGY
|
||||||
|
MINED LAND REPURPOSING
|
||||||
|
3405 MOUNTAIN EMPIRE ROAD, BIG STONE GAP, VA 24219
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 11/08/21
|
||||||
|
REV. 10/2021 Page 1 of 2
|
||||||
|
|
||||||
|
|
||||||
|
HNM0009861
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER
|
||||||
|
|
||||||
|
Project Reclaim Phase II 91806 2018 HNM0009861
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED
|
||||||
|
|
||||||
|
100
|
||||||
|
|
||||||
|
CONTRACTOR NAME ENGINEER NAME
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
SITE CONTACT PERSON: Kevin Large
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION
|
||||||
|
|
||||||
|
10/18/21
|
||||||
|
10/29/21
|
||||||
|
|
||||||
|
08:30 AM
|
||||||
|
03:30 PM
|
||||||
|
|
||||||
|
10:00 AM
|
||||||
|
04:30 PM
|
||||||
|
|
||||||
|
DRY
|
||||||
|
WET
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMENTS
|
||||||
|
|
||||||
|
The contract for Project Reclaim Phase II was signed on 12/28/21 and a Notice to Proceed was issued the same day.
|
||||||
|
Work at the site was already on going from Project Reclaim Phase I. Material haulage transitioned from Phase I to Phase
|
||||||
|
II on the day the contract was signed. Work at the site is complete. Seeding of the structure will occur under the 2021
|
||||||
|
Revegetation Project. Seeding of the site began on 10/19/21 and concluded on 10/29/21. With completion of the seeding
|
||||||
|
project Project Reclaim Phase II is now eligible for release. Photos of the seeded site are shown below.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
viRGINiA
|
||||||
|
|
||||||
|
Q Energy
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
VIRGINIA DEPARTMENT OF ENERGY
|
||||||
|
MINED LAND REPURPOSING
|
||||||
|
|
||||||
|
HNM0009861
|
||||||
|
|
||||||
|
3405 MOUNTAIN EMPIRE ROAD, BIG STONE GAP, VA 24219
|
||||||
|
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
PROJECT NAME, PROJECT NO, GRANT YEAR | REPORT NUMBER
|
||||||
|
Project Reclaim Phase Il 91806 2018 HNM0009861
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE, PERCENT OF CONTRACT COMPLETED
|
||||||
|
100
|
||||||
|
CONTRACTOR NAME ENGINEER NAME,
|
||||||
|
‘SITE CONTACT PERSON: Kevin Large
|
||||||
|
INSPECTION DATE, ARRIVAL DEPARTURE. GROUND CONDITION
|
||||||
|
10/18/21 08:30 AM 10:00 AM DRY
|
||||||
|
10/29/21 03:30 PM 04:30 PM WET
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
‘COMMENTS:
|
||||||
|
|
||||||
|
The contract for Project Reclaim Phase Il was signed on 12/28/21 and a Notice to Proceed was issued the same day.
|
||||||
|
Work at the site was already on going from Project Reclaim Phase |. Material haulage transitioned from Phase | to Phase
|
||||||
|
Ion the day the contract was signed. Work at the site is complete. Seeding of the structure will occur under the 2021
|
||||||
|
Revegetation Project. Seeding of the site began on 10/19/21 and concluded on 10/29/21. With completion of the seeding
|
||||||
|
project Project Reclaim Phase Il is now eligible for release. Photos of the seeded site are shown below.
|
||||||
|
|
||||||
|
DMLR-AML-130S
|
||||||
|
REV. 10/2021
|
||||||
|
|
||||||
|
Page 1 of 2
|
||||||
|
|
||||||
|
Printed: 11/08/21
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
VIRGINIA DEPARTMENT OF ENERGY
|
||||||
|
MINED LAND REPURPOSING
|
||||||
|
3405 MOUNTAIN EMPIRE ROAD, BIG STONE GAP, VA 24219
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 11/08/21
|
||||||
|
REV. 10/2021 Page 2 of 2
|
||||||
|
|
||||||
|
|
||||||
|
HNM0009861
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNMoo09861
|
||||||
|
@) E wt RO UNL VIRGINIA DEPARTMENT OF ENERGY
|
||||||
|
|
||||||
|
erg MINED LAND REPURPOSING
|
||||||
|
3405 MOUNTAIN EMPIRE ROAD, BIG STONE GAP, VA 24219
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 11/08/21
|
||||||
|
|
||||||
|
REV. 10/2021 Page 2 of 2
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,172 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: aiHNM0009870
|
||||||
|
file: ../aiHNM0009870.pdf
|
||||||
|
tags:
|
||||||
|
- Amys_Drop_Box
|
||||||
|
- Project Reclaim II - Final Inspection
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 103138
|
||||||
|
sha256sum: 380dc1351d35a3804499f1751a9b843a089184dd120a99df6dbf537e49d52c93
|
||||||
|
sha1sum: 25d6d650cb40c580ce89f8019e57153ee0e1957a
|
||||||
|
---
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
VIRGINIA DEPARTMENT OF ENERGY
|
||||||
|
MINED LAND REPURPOSING
|
||||||
|
3405 MOUNTAIN EMPIRE ROAD, BIG STONE GAP, VA 24219
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 11/16/21
|
||||||
|
REV. 10/2021 Page 1 of 2
|
||||||
|
|
||||||
|
|
||||||
|
HNM0009870
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER
|
||||||
|
|
||||||
|
Project Reclaim Phase II 91806 2018 HNM0009870
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED
|
||||||
|
|
||||||
|
100
|
||||||
|
|
||||||
|
CONTRACTOR NAME ENGINEER NAME
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
SITE CONTACT PERSON: Kevin Large
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION
|
||||||
|
|
||||||
|
11/04/21 10:00 AM 11:30 AM WET
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMENTS
|
||||||
|
|
||||||
|
This inspection was conducted as a final inspection for Project Reclaim and Project Reclaim Phase II. The inspector and
|
||||||
|
Keddy Steele were present for Virginia Energy. Cody Zirkle with OSM was also present, along with Dave Powers and
|
||||||
|
Kevin Large with the company. No problems were noted with the inspection, and it appears the site is ready for final
|
||||||
|
release. The final invoice was submitted following the inspection, payment of the invoice is recommended. A photo of the
|
||||||
|
site is shown below.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNM0009870
|
||||||
|
|
||||||
|
@) a VIRGINIA DEPARTMENT OF ENERGY
|
||||||
|
|
||||||
|
(‘<4 nergy MINED LAND REPURPOSING
|
||||||
|
3405 MOUNTAIN EMPIRE ROAD, BIG STONE GAP, VA 24219
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
PROJECT NAME, PROJECT NO, GRANT YEAR | REPORT NUMBER
|
||||||
|
Project Reclaim Phase Il 91806 2018 HNM0009870
|
||||||
|
CONTRACT INFORMATION
|
||||||
|
CONTRACT NUMBER EXPIRATION DATE, PERCENT OF CONTRACT COMPLETED
|
||||||
|
100
|
||||||
|
CONTRACTOR NAME ENGINEER NAME,
|
||||||
|
|
||||||
|
‘SITE CONTACT PERSON: Kevin Large
|
||||||
|
|
||||||
|
INSPECTION DATE, ARRIVAL, DEPARTURE. GROUND CONDITION
|
||||||
|
41/04/24 10:00 AM 14:30 AM WET
|
||||||
|
INSPECTION BY ATTACHMENTS
|
||||||
|
|
||||||
|
MCDONALD-TAYLOR, H.
|
||||||
|
|
||||||
|
[ ‘COMMENTS ]
|
||||||
|
This inspection was conducted as a final inspection for Project Reclaim and Project Reclaim Phase ll. The inspector and
|
||||||
|
Keddy Steele were present for Virginia Energy. Cody Zirkle with OSM was also present, along with Dave Powers and
|
||||||
|
Kevin Large with the company. No problems were noted with the inspection, and it appears the site is ready for final
|
||||||
|
release. The final invoice was submitted following the inspection, payment of the invoice is recommended. A photo of the
|
||||||
|
site is shown below.
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 11/16/21
|
||||||
|
REV. 10/2021 Page 1 of 2
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA
|
||||||
|
VIRGINIA DEPARTMENT OF ENERGY
|
||||||
|
MINED LAND REPURPOSING
|
||||||
|
3405 MOUNTAIN EMPIRE ROAD, BIG STONE GAP, VA 24219
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
|
||||||
|
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 11/16/21
|
||||||
|
REV. 10/2021 Page 2 of 2
|
||||||
|
|
||||||
|
|
||||||
|
HNM0009870
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMMONWEALTH OF VIRGINIA HNM0009870
|
||||||
|
@) a VIRGINIA DEPARTMENT OF ENERGY
|
||||||
|
(‘<4 nergy MINED LAND REPURPOSING
|
||||||
|
3405 MOUNTAIN EMPIRE ROAD, BIG STONE GAP, VA 24219
|
||||||
|
TELEPHONE: (276) 523-8198
|
||||||
|
ABANDONED MINE LAND INSPECTION
|
||||||
|
|
||||||
|
DMLR-AML-130S Printed: 11/16/21
|
||||||
|
|
||||||
|
REV. 10/2021 Page 2 of 2
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
566
CRS_Reports/IF11352/README.md
Normal file
566
CRS_Reports/IF11352/README.md
Normal file
|
|
@ -0,0 +1,566 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: IF11352
|
||||||
|
file: ../IF11352.pdf
|
||||||
|
tags:
|
||||||
|
- CRS_Reports
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 514152
|
||||||
|
sha256sum: 718547e672ffd23efe7ec99b48d1bfed869a29bdc9ed78ace176676a2dab2cf7
|
||||||
|
sha1sum: 7cda9aacbac9aa6540ed35d99a5396591cbdb73c
|
||||||
|
---
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
https://crsreports.congress.gov
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Updated January 7, 2022
|
||||||
|
|
||||||
|
The Abandoned Mine Reclamation Fund:
|
||||||
|
|
||||||
|
Issues and Legislation in the 117th Congress
|
||||||
|
|
||||||
|
Coal mining and production in the United States in the 20th
|
||||||
|
century contributed to the nation meeting its energy
|
||||||
|
requirements and left a legacy of unreclaimed lands. As
|
||||||
|
amended, Title IV of the Surface Mining Control and
|
||||||
|
Reclamation Act of 1977 (SMCRA) authorized federal
|
||||||
|
funding to reclaim coal mining sites that operated prior to
|
||||||
|
enactment to which no other federal or state laws applied.
|
||||||
|
Sites that remain unreclaimed may continue to pose hazards
|
||||||
|
to public health, safety, and the environment. The
|
||||||
|
Abandoned Mine Reclamation Fund, established under
|
||||||
|
Section 401 of SMCRA, provides funding to eligible states
|
||||||
|
and tribes for the reclamation of surface mining impacts
|
||||||
|
associated with historical mining of coal. Title IV of
|
||||||
|
SMCRA authorized the collection of fees on the production
|
||||||
|
of coal. On November 15, 2021, the Infrastructure
|
||||||
|
Investment and Jobs Act (IIJA; P.L. 117-58) reauthorized
|
||||||
|
the coal reclamation fees through the end of FY2034, at
|
||||||
|
reduced rates. The use of this funding is limited to the
|
||||||
|
reclamation of coal mining sites abandoned or unreclaimed
|
||||||
|
as of August 3, 1977 (date of SMCRA enactment). Title V
|
||||||
|
of SMCRA authorized the regulation of coal mining sites
|
||||||
|
operating after the law’s enactment. Coal mining sites
|
||||||
|
regulated under Title V are ineligible for grants from the
|
||||||
|
Abandoned Mine Reclamation Fund. SMCRA mandated
|
||||||
|
that coal mine operators regulated under Title V are
|
||||||
|
responsible for providing financial assurance for
|
||||||
|
completing site reclamation. The Office of Surface Mining
|
||||||
|
Reclamation and Enforcement (OSMRE) within the
|
||||||
|
Department of the Interior is the federal office responsible
|
||||||
|
for administering SMCRA in coordination with eligible
|
||||||
|
states and tribes.
|
||||||
|
|
||||||
|
Reclamation Eligibility
|
||||||
|
Title IV of SMCRA limits funding eligibility to sites where
|
||||||
|
lands and waters have been affected by coal mining sites
|
||||||
|
abandoned or unreclaimed prior to the enactment of
|
||||||
|
SMCRA and for which there is no continuing reclamation
|
||||||
|
responsibility under other federal or state laws. The scope
|
||||||
|
of reclamation broadly includes activities to address public
|
||||||
|
health and safety issues and environmental restoration of
|
||||||
|
affected lands and waters that have been degraded by coal
|
||||||
|
mining activities. Section 403 prioritizes reclamation
|
||||||
|
according to public health, safety, and environmental
|
||||||
|
hazards. For example, safety hazards may include unstable
|
||||||
|
embankments or damaged infrastructure due to land
|
||||||
|
subsidence. The geographic scope of the site may be larger
|
||||||
|
than where the coal was mined, because it includes the
|
||||||
|
affected lands and waters.
|
||||||
|
|
||||||
|
Unfunded Reclamation Costs
|
||||||
|
States and tribes report incurred and estimated future
|
||||||
|
reclamation costs to OSMRE for Abandoned Mine Land
|
||||||
|
(AML) projects. Estimates of unfunded reclamation costs
|
||||||
|
|
||||||
|
may vary by the problem types among sites and the severity
|
||||||
|
of hazards. According to OSMRE, the states and tribes have
|
||||||
|
estimated total unfunded costs for the reclamation of
|
||||||
|
eligible sites of approximately $11.5 billion to date. States
|
||||||
|
and tribes periodically update estimates of unfunded
|
||||||
|
reclamation costs as site conditions or the understandings of
|
||||||
|
these conditions may change and as new sites may be
|
||||||
|
identified.
|
||||||
|
|
||||||
|
State and Tribal Reclamation Programs
|
||||||
|
Pursuant to Section 405 of SMCRA, states and tribes must
|
||||||
|
first obtain OSMRE approval of their reclamation programs
|
||||||
|
to be eligible for grants from the Abandoned Mine
|
||||||
|
Reclamation Fund. The grants are distributed among
|
||||||
|
eligible states and tribes based on a statutory formula to
|
||||||
|
calculate their respective shares of annual coal reclamation
|
||||||
|
fee receipts based on current and historical coal production.
|
||||||
|
States with greater historical coal production generally have
|
||||||
|
more reclamation needs to address affected lands and
|
||||||
|
waters. A total of 25 coal production states and three tribes
|
||||||
|
with federally approved mine reclamation programs are
|
||||||
|
eligible for these grants.
|
||||||
|
|
||||||
|
Certification
|
||||||
|
Section 411 of SMCRA authorizes OSMRE to certify a
|
||||||
|
state or tribe once it demonstrates that it has reclaimed all
|
||||||
|
of its priority abandoned coal mining sites. Five states and
|
||||||
|
three tribes are certified: Crow Tribe, Hopi Tribe,
|
||||||
|
Louisiana, Mississippi, Montana, Navajo Nation, Texas,
|
||||||
|
and Wyoming. Since FY2008, certified states and tribes
|
||||||
|
receive state and tribal share payments from the General
|
||||||
|
Fund in lieu of the Abandoned Mine Reclamation Fund.
|
||||||
|
|
||||||
|
States with OSMRE-approved coal reclamation programs
|
||||||
|
that have not reclaimed all of their priority abandoned coal
|
||||||
|
mining sites are uncertified states. Twenty states are
|
||||||
|
uncertified: Alabama, Alaska, Arkansas, Colorado, Illinois,
|
||||||
|
Indiana, Iowa, Kansas, Kentucky, Maryland, Missouri, New
|
||||||
|
Mexico, North Dakota, Ohio, Oklahoma, Pennsylvania,
|
||||||
|
Tennessee, Utah, Virginia, and West Virginia. The
|
||||||
|
remaining states either did not have historical coal
|
||||||
|
production or have not established an OSMRE-approved
|
||||||
|
state program.
|
||||||
|
|
||||||
|
UMWA Health and Pension Benefit
|
||||||
|
Plans
|
||||||
|
In addition to employer contributions, Title IV of SMCRA
|
||||||
|
authorizes two sources of federal financial assistance for
|
||||||
|
three United Mine Workers of America (UMWA) plans that
|
||||||
|
provide health benefits for coal mine worker retirees:
|
||||||
|
interest transfers from the Abandoned Mine Reclamation
|
||||||
|
Fund and payments from the General Fund of the U.S.
|
||||||
|
Treasury, which supplement the interest transfers. None of
|
||||||
|
|
||||||
|
SX Informing the legislative debate since 1914
|
||||||
|
|
||||||
|
Congressional Research Service
|
||||||
|
|
||||||
|
Updated January 7, 2022
|
||||||
|
|
||||||
|
The Abandoned Mine Reclamation Fund:
|
||||||
|
Issues and Legislation in the 117 Congress
|
||||||
|
|
||||||
|
Coal mining and production in the United States in the 20"
|
||||||
|
century contributed to the nation meeting its energy
|
||||||
|
requirements and left a legacy of unreclaimed lands. As
|
||||||
|
amended, Title IV of the Surface Mining Control and
|
||||||
|
Reclamation Act of 1977 (SMCRA) authorized federal
|
||||||
|
funding to reclaim coal mining sites that operated prior to
|
||||||
|
‘enactment to which no other federal or state laws applied.
|
||||||
|
Sites that remain unreclaimed may continue to pose hazards
|
||||||
|
to public health, safety, and the environment. The
|
||||||
|
Abandoned Mine Reclamation Fund, established under
|
||||||
|
Section 401 of SMCRA, provides funding to eligible states
|
||||||
|
and tribes for the reclamation of surface mining impacts
|
||||||
|
associated with historical mining of coal. Title IV of
|
||||||
|
SMCRA authorized the collection of fees on the production
|
||||||
|
of coal. On November 15, 2021, the Infrastructure
|
||||||
|
Investment and Jobs Act (IIJA; P.L. 117-58) reauthorized
|
||||||
|
the coal reclamation fees through the end of FY2034, at
|
||||||
|
reduced rates. The use of this funding is limited to the
|
||||||
|
reclamation of coal mining sites abandoned or unreclaimed
|
||||||
|
as of August 3, 1977 (date of SMCRA enactment). Title V
|
||||||
|
‘of SMCRA authorized the regulation of coal mining sites,
|
||||||
|
‘operating after the law’s enactment, Coal mining sites
|
||||||
|
regulated under Title V are ineligible for grants from the
|
||||||
|
Abandoned Mine Reclamation Fund. SMCRA mandated
|
||||||
|
that coal mine operators regulated under Title V are
|
||||||
|
responsible for providing financial assurance for
|
||||||
|
completing site reclamation. The Office of Surface Mining
|
||||||
|
Reclamation and Enforcement (OSMRE) within the
|
||||||
|
Department of the Interior is the federal office responsible
|
||||||
|
for administering SMCRA in coordination with eligible
|
||||||
|
states and tribes.
|
||||||
|
|
||||||
|
Reclamation Eligibility
|
||||||
|
Title TV of SMCRA limits funding eligibility to sites where
|
||||||
|
lands and waters have been affected by coal mining sites
|
||||||
|
abandoned or unreclaimed prior to the enactment of
|
||||||
|
SMCRA and for which there is no continuing reclamation,
|
||||||
|
responsibility under other federal or state laws. The scope
|
||||||
|
of reclamation broadly includes activities to address public
|
||||||
|
health and safety issues and environmental restoration of
|
||||||
|
affected lands and waters that have been degraded by coal
|
||||||
|
‘mining activities. Section 403 prioritizes reclamation
|
||||||
|
according to public health, safety, and environmental
|
||||||
|
hazards. For example, safety hazards may include unstable
|
||||||
|
‘embankments or damaged infrastructure due to land
|
||||||
|
subsidence. The geographic scope of the site may be larger
|
||||||
|
than where the coal was mined, because it includes the
|
||||||
|
affected lands and waters.
|
||||||
|
|
||||||
|
Unfunded Reclamation Costs
|
||||||
|
|
||||||
|
States and tribes report incurred and estimated future
|
||||||
|
reclamation costs to OSMRE for Abandoned Mine Land
|
||||||
|
(AML) projects. Estimates of unfunded reclamation costs
|
||||||
|
|
||||||
|
may vary by the problem types among sites and the severity
|
||||||
|
of hazards. According to OSMRE, the states and tribes have
|
||||||
|
estimated total unfunded costs for the reclamation of
|
||||||
|
eligible sites of approximately $11.5 billion to date. States
|
||||||
|
and tribes periodically update estimates of unfunded
|
||||||
|
reclamation costs as site conditions or the understandings of
|
||||||
|
these conditions may change and as new sites may be
|
||||||
|
identified.
|
||||||
|
|
||||||
|
State and Tribal Reclamation Programs
|
||||||
|
Pursuant to Section 405 of SMCRA, states and tribes must
|
||||||
|
first obtain OSMRE approval of their reclamation programs
|
||||||
|
to be eligible for grants from the Abandoned Mine
|
||||||
|
Reclamation Fund. The grants are distributed among
|
||||||
|
eligible states and tribes based on a statutory formula to
|
||||||
|
calculate their respective shares of annual coal reclamation
|
||||||
|
fee receipts based on current and historical coal production.
|
||||||
|
States with greater historical coal production generally have
|
||||||
|
more reclamation needs to address affected lands and
|
||||||
|
waters. A total of 25 coal production states and three tribes
|
||||||
|
with federally approved mine reclamation programs are
|
||||||
|
eligible for these grants,
|
||||||
|
|
||||||
|
Certification
|
||||||
|
|
||||||
|
Section 411 of SMCRA authorizes OSMRE to certify a
|
||||||
|
state or tribe once it demonstrates that it has reclaimed all
|
||||||
|
of its priority abandoned coal mining sites. Five states and
|
||||||
|
three tribes are certified: Crow Tribe, Hopi Tribe,
|
||||||
|
Louisiana, Mississippi, Montana, Navajo Nation, Texas,
|
||||||
|
and Wyoming, Since FY2008, certified states and tribes
|
||||||
|
receive state and tribal share payments from the General
|
||||||
|
Fund in lieu of the Abandoned Mine Reclamation Fund.
|
||||||
|
|
||||||
|
States with OSMRE-approved coal reclamation programs
|
||||||
|
that have not reclaimed all of their priority abandoned coal
|
||||||
|
mining sites are uncertified states. Twenty states are
|
||||||
|
uncertified: Alabama, Alaska, Arkansas, Colorado, Illinois,
|
||||||
|
Indiana, lowa, Kansas, Kentucky, Maryland, Missouri, New
|
||||||
|
Mexico, North Dakota, Ohio, Oklahoma, Pennsylvania,
|
||||||
|
Tennessee, Utah, Virginia, and West Virginia, The
|
||||||
|
remaining states either did not have historical coal
|
||||||
|
production or have not established an OSMRE-approved
|
||||||
|
state program
|
||||||
|
|
||||||
|
UMWA Health and Pension Benefit
|
||||||
|
Plans
|
||||||
|
|
||||||
|
In addition to employer contributions, Title IV of SMCRA
|
||||||
|
authorizes two sources of federal financial assistance for
|
||||||
|
three United Mine Workers of America (UMWA) plans that
|
||||||
|
provide health benefits for coal mine worker retirees
|
||||||
|
interest transfers from the Abandoned Mine Reclamation
|
||||||
|
Fund and payments from the General Fund of the U.S.
|
||||||
|
‘Treasury, which supplement the interest transfers. None of
|
||||||
|
|
||||||
|
https://ersreports.congress.gov
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
The Abandoned Mine Reclamation Fund: Issues and Legislation in the 117th Congress
|
||||||
|
|
||||||
|
https://crsreports.congress.gov
|
||||||
|
|
||||||
|
the coal reclamation fees credited to the Abandoned Mine
|
||||||
|
Reclamation Fund fund the UMWA plans.
|
||||||
|
|
||||||
|
In the 116th Congress, the Bipartisan American Miners Act
|
||||||
|
(P.L. 116-94; Further Consolidated Appropriations Act,
|
||||||
|
2020, Division M) amended Section 402 of SMCRA to
|
||||||
|
expand the eligibility of the UMWA health plans to receive
|
||||||
|
federal funding and authorizes General Fund payments to
|
||||||
|
the UMWA pension plan. Under that act, the aggregate
|
||||||
|
amount of General Fund payments to certified states and
|
||||||
|
tribes, UMWA health plans, and the UMWA pension plan
|
||||||
|
are subject to a $750 million cap annually. Annual
|
||||||
|
payments to certified states and tribes are provided first,
|
||||||
|
then supplemental payments to UMWA health plans, and
|
||||||
|
any remaining funds amount up to $750 million annually
|
||||||
|
are to be transferred to the UMWA pension plan.
|
||||||
|
|
||||||
|
The American Miner Benefits Improvement Act of 2020
|
||||||
|
(Division Y, Consolidated Appropriations Act, 2021, P.L.
|
||||||
|
116-260) further amended Section 402(h) of SMCRA to
|
||||||
|
expand the eligibility for federal financial assistance from
|
||||||
|
the General Fund to coal mineworker retirees whose health
|
||||||
|
care benefits would be denied or reduced as a result of a
|
||||||
|
bankruptcy commenced on or after January 1, 2020.
|
||||||
|
Additionally, Congress amended Section 402(h) to increase
|
||||||
|
the annual $750 million General Fund spending cap as
|
||||||
|
necessary to meet any additional financial obligations due
|
||||||
|
to increased eligibility for these health care benefits.
|
||||||
|
|
||||||
|
Receipts and Appropriations
|
||||||
|
As authorized in Section 402 of SMCRA, the Abandoned
|
||||||
|
Mine Reclamation Fund is financed by fees collected from
|
||||||
|
operators of coal mining sites based on the volume or value
|
||||||
|
of coal produced, whichever is less. Prior to the enactment
|
||||||
|
of the 2006 amendments to SMCRA (P.L. 109-432,
|
||||||
|
Division C, Title II), OSMRE distributed grants to both
|
||||||
|
certified and uncertified states and tribes from the
|
||||||
|
Abandoned Mine Reclamation Fund subject to annual
|
||||||
|
appropriations. Annual appropriations were generally lower
|
||||||
|
than annual coal reclamation fees collected prior to the
|
||||||
|
2006 amendments, resulting in an accumulation in the
|
||||||
|
unappropriated balance of the Abandoned Mine
|
||||||
|
Reclamation Fund. The 2006 amendments to SMCRA
|
||||||
|
authorized permanent appropriations to OSMRE to
|
||||||
|
administer grants to eligible states and tribes beginning in
|
||||||
|
FY2008.
|
||||||
|
|
||||||
|
For uncertified states, OSMRE administers state share
|
||||||
|
grants, historic coal grants (based on coal production prior
|
||||||
|
to SMCRA’s enactment), and minimum program make up
|
||||||
|
funds (grants to ensure uncertified states receive at least $3
|
||||||
|
million each annually) from the Abandoned Mine
|
||||||
|
Reclamation Fund. Other appropriations from the
|
||||||
|
Abandoned Mine Reclamation Fund include interest
|
||||||
|
transfers to UMWA plans and OSMRE program funding.
|
||||||
|
OSMRE program funding is subject to annual
|
||||||
|
appropriations.
|
||||||
|
|
||||||
|
Infrastructure Investment and Jobs Act
|
||||||
|
of 2021
|
||||||
|
Enacted on November 15, 2021, the Infrastructure
|
||||||
|
Investment and Jobs Act (IIJA; P.L. 117-58) reauthorized
|
||||||
|
|
||||||
|
the coal reclamation fee under Section 402 of SMCRA and
|
||||||
|
provided $11.293 billion in emergency appropriations to the
|
||||||
|
Abandoned Mine Reclamation Fund. The IIJA extends the
|
||||||
|
authority to collect the coal fee for 13 years, until the end of
|
||||||
|
FY2034, and decreases the fee rates from prior law by 20%
|
||||||
|
for underground and surface mining, and lignite coal.
|
||||||
|
Whether the reduction in the coal fee rates would decrease
|
||||||
|
future coal receipts would depend on the quantity or value
|
||||||
|
of coal produced upon which the fees are based.
|
||||||
|
|
||||||
|
The IIJA authorizes a transfer from the General Fund of the
|
||||||
|
U.S. Treasury to provide $11.293 billion in emergency
|
||||||
|
appropriation to the Abandoned Mine Reclamation Fund.
|
||||||
|
This amount is similar in magnitude to the estimates of the
|
||||||
|
unfunded reclamation costs. None of this funding would be
|
||||||
|
sourced from coal reclamation fees. The $11.293 billion
|
||||||
|
would provide grants to eligible uncertified and certified
|
||||||
|
states and tribes, in equivalent amounts over a 15-year
|
||||||
|
period, based on relative percent of coal production prior to
|
||||||
|
1977. The IIJA includes provisions that states and tribes are
|
||||||
|
required to receive at least $20 million, to the extent that the
|
||||||
|
amount needed for reclamation projects is not less than $20
|
||||||
|
million. Provisions in the IIJA limit the use of grants from
|
||||||
|
the $11.293 billion to uncertified and certified states and
|
||||||
|
tribes for the reclamation of abandoned coal mining sites
|
||||||
|
under Section 403(a), Section 403(b), and emergency
|
||||||
|
projects under Section 410 of SMCRA. In addition to the
|
||||||
|
priorities in Section 403 of SMCRA, the IIJA authorizes
|
||||||
|
states and tribes to consider AML projects that may provide
|
||||||
|
employment to former workers of the coal industry.
|
||||||
|
|
||||||
|
The coal reclamation fee collection authorization expires at
|
||||||
|
the end of FY2034. If the authority to collect reclamation
|
||||||
|
fees is not reauthorized, SMCRA directs the remaining
|
||||||
|
balance of the Abandoned Mine Reclamation Fund to be
|
||||||
|
distributed among states and tribes receiving grants from
|
||||||
|
the Abandoned Mine Reclamation Fund until the balance is
|
||||||
|
expended. Congress included provisions in the IIJA that
|
||||||
|
would require OSMRE to evaluate grant payments to states
|
||||||
|
and tribes not later than 20 years after enactment. Upon that
|
||||||
|
evaluation, states and tribes would be required to return any
|
||||||
|
“unused funds” to the Abandoned Mine Reclamation Fund.
|
||||||
|
|
||||||
|
Other Title IV SMCRA Legislation
|
||||||
|
Other legislation introduced in the 117th Congress also
|
||||||
|
proposed to reauthorized the coal fee, but at different rates
|
||||||
|
and different time frames than the provisions enacted in the
|
||||||
|
IIJA (H.R. 1734, H.R. 2462, S. 1447, S. 1600). Versions of
|
||||||
|
the RECLAIM Act (H.R. 1733 and S. 1455) would also
|
||||||
|
authorize $1 billion from the Abandoned Mine Reclamation
|
||||||
|
Fund for AML reclamation projects that promote economic
|
||||||
|
and community development. House and Senate versions of
|
||||||
|
the RECLAIM Act would authorize $1 billion over five
|
||||||
|
years from the unappropriated balance of the Abandoned
|
||||||
|
Mine Reclamation Fund for the reclamation of abandoned
|
||||||
|
coal mining sites as a means to facilitate economic and
|
||||||
|
community development in coal production states.
|
||||||
|
|
||||||
|
Lance N. Larson, Analyst in Environmental Policy
|
||||||
|
|
||||||
|
IF11352
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
‘The Abandoned Mine Reclamation Fund: Issues and Legislation in the 117th Congress
|
||||||
|
|
||||||
|
the coal reclamation fees credited to the Abandoned Mine
|
||||||
|
Reclamation Fund fund the UMWA plans.
|
||||||
|
|
||||||
|
In the 116" Congress, the Bipartisan American Miners Act
|
||||||
|
(PLL. 116-94; Further Consolidated Appropriations Act,
|
||||||
|
2020, Division M) amended Section 402 of SMCRA to
|
||||||
|
expand the eligibility of the UMWA health plans to receive
|
||||||
|
federal funding and authorizes General Fund payments to
|
||||||
|
the UMWA pension plan. Under that act, the aggregate
|
||||||
|
amount of General Fund payments to certified states and
|
||||||
|
tribes, UMWA health plans, and the UMWA pension plan
|
||||||
|
are subject to a $750 million cap annually. Annual
|
||||||
|
payments to certified states and tribes are provided first,
|
||||||
|
then supplemental payments to UMWA health plans, and
|
||||||
|
any remaining funds amount up to $750 million annually
|
||||||
|
are to be transferred to the UMWA pension plan.
|
||||||
|
|
||||||
|
‘The American Miner Benefits Improvement Act of 2020
|
||||||
|
(Division Y, Consolidated Appropriations Act, 2021, P.L.
|
||||||
|
116-260) further amended Section 402(h) of SMCRA to
|
||||||
|
expand the eligibility for federal financial assistance from
|
||||||
|
the General Fund to coal mineworker retirees whose health.
|
||||||
|
care benefits would be denied or reduced as a result of a
|
||||||
|
bankruptcy commenced on or after January 1, 2020.
|
||||||
|
Additionally, Congress amended Section 402(h) to increase
|
||||||
|
the annual $750 million General Fund spending cap as
|
||||||
|
necessary to meet any additional financial obligations due
|
||||||
|
to increased eligibility for these health care be
|
||||||
|
|
||||||
|
Receipts and Appropriations
|
||||||
|
As authorized in Section 402 of SMCRA, the Abandoned
|
||||||
|
Mine Reclamation Fund is financed by fees collected from
|
||||||
|
‘operators of coal mining sites based on the volume or value
|
||||||
|
of coal produced, whichever is less. Prior to the enactment
|
||||||
|
of the 2006 amendments to SMCRA (P.L. 109-432,
|
||||||
|
Division C, Title 11), OSMRE distributed grants to both
|
||||||
|
certified and uncertified states and tribes from the
|
||||||
|
Abandoned Mine Reclamation Fund subject to annual
|
||||||
|
appropriations. Annual appropriations were generally lower
|
||||||
|
than annual coal reclamation fees collected prior to the
|
||||||
|
2006 amendments, resulting in an accumulation in the
|
||||||
|
tunappropriated balance of the Abandoned Mine
|
||||||
|
Reclamation Fund. The 2006 amendments to SMCRA
|
||||||
|
authorized permanent appropriations to OSMRE to
|
||||||
|
administer grants to eligible states and tribes beginning in
|
||||||
|
FY2008.
|
||||||
|
|
||||||
|
For uncertified states, OSMRE administers state share
|
||||||
|
grants, historic coal grants (based on coal production prior
|
||||||
|
to SMCRA’s enactment), and minimum program make up
|
||||||
|
funds (grants to ensure uncertified states receive at least $3
|
||||||
|
million each annually) from the Abandoned Mine
|
||||||
|
Reclamation Fund. Other appropriations from the
|
||||||
|
Abandoned Mine Reclamation Fund include interest
|
||||||
|
transfers to UMWA plans and OSMRE program funding
|
||||||
|
OSMRE program funding is subject to annual
|
||||||
|
appropriations.
|
||||||
|
|
||||||
|
Infrastructure Investment and Jobs Act
|
||||||
|
of 2021
|
||||||
|
|
||||||
|
Enacted on November 15, 2021, the Infrastructure
|
||||||
|
Investment and Jobs Act (IIJA; P.L. 117-58) reauthorized
|
||||||
|
|
||||||
|
the coal reclamation fee under Section 402 of SMCRA and
|
||||||
|
provided $1 1.293 billion in emergency appropriations to the
|
||||||
|
Abandoned Mine Reclamation Fund. The IIJA extends the
|
||||||
|
authority to collect the coal fee for 13 years, until the end of
|
||||||
|
FY2034, and decreases the fee rates from prior law by 20%
|
||||||
|
for underground and surface mining, and lignite coal.
|
||||||
|
Whether the reduction in the coal fee rates would decrease
|
||||||
|
future coal receipts would depend on the quantity or value
|
||||||
|
of coal produced upon which the fees are based.
|
||||||
|
|
||||||
|
The IIJA authorizes a transfer from the General Fund of the
|
||||||
|
USS. Treasury to provide $11.293 billion in emergency
|
||||||
|
appropriation to the Abandoned Mine Reclamation Fund.
|
||||||
|
This amount is similar in magnitude to the estimates of the
|
||||||
|
unfunded reclamation costs. None of this funding would be
|
||||||
|
sourced from coal reclamation fees. The $11.293 billion
|
||||||
|
would provide grants to eligible uncertified and certified
|
||||||
|
states and tribes, in equivalent amounts over a 15-year
|
||||||
|
period, based on relative percent of coal production prior to
|
||||||
|
1977. The ILIA includes provisions that states and tribes are
|
||||||
|
required to receive at least $20 million, to the extent that the
|
||||||
|
‘amount needed for reclamation projects is not less than $20
|
||||||
|
million. Provisions in the ILJA limit the use of grants from
|
||||||
|
the $11.293 billion to uncertified and certified states and
|
||||||
|
tribes for the reclamation of abandoned coal mining sites
|
||||||
|
under Section 403(a), Section 403(b), and emergency
|
||||||
|
projects under Section 410 of SMCRA. In addition to the
|
||||||
|
priorities in Section 403 of SMCRA, the IIJA authorizes
|
||||||
|
states and tribes to consider AML projects that may provide
|
||||||
|
‘employment to former workers of the coal industry.
|
||||||
|
|
||||||
|
The coal reclamation fee collection authorization expires at
|
||||||
|
the end of FY2034. If the authority to collect reclamation
|
||||||
|
fees is not reauthorized, SMCRA directs the remaining
|
||||||
|
balance of the Abandoned Mine Reclamation Fund to be
|
||||||
|
distributed among states and tribes receiving grants from
|
||||||
|
the Abandoned Mine Reclamation Fund until the balance is
|
||||||
|
‘expended. Congress included provisions in the IJA that
|
||||||
|
‘would require OSMRE to evaluate grant payments to states
|
||||||
|
and tribes not later than 20 years after enactment. Upon that
|
||||||
|
evaluation, states and tribes would be required to return any
|
||||||
|
“unused funds” to the Abandoned Mine Reclamation Fund.
|
||||||
|
|
||||||
|
Other Title IV SMCRA Legislation
|
||||||
|
|
||||||
|
Other legislation introduced in the 117" Congress also
|
||||||
|
proposed to reauthorized the coal fee, but at different rates
|
||||||
|
‘and different time frames than the provisions enacted in the
|
||||||
|
IVA (LR. 1734, H.R. 2462, S. 1447, S. 1600). Versions of
|
||||||
|
the RECLAIM Act (H.R. 1733 and S. 1455) would also
|
||||||
|
authorize $1 billion from the Abandoned Mine Reclamation
|
||||||
|
Fund for AML reclamation projects that promote economic
|
||||||
|
and community development. House and Senate versions of
|
||||||
|
the RECLAIM Act would authorize $1 billion over five
|
||||||
|
‘years from the unappropriated balance of the Abandoned
|
||||||
|
Mine Reclamation Fund for the reclamation of abandoned
|
||||||
|
coal mining sites as a means to facilitate economic and
|
||||||
|
‘community development in coal production states.
|
||||||
|
|
||||||
|
Lance N. Larson, Analyst in Environmental Policy
|
||||||
|
|
||||||
|
1F11352
|
||||||
|
|
||||||
|
https://ersreports.congress.gov
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
The Abandoned Mine Reclamation Fund: Issues and Legislation in the 117th Congress
|
||||||
|
|
||||||
|
https://crsreports.congress.gov | IF11352 · VERSION 3 · UPDATED
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Disclaimer
|
||||||
|
|
||||||
|
This document was prepared by the Congressional Research Service (CRS). CRS serves as nonpartisan shared staff to
|
||||||
|
congressional committees and Members of Congress. It operates solely at the behest of and under the direction of Congress.
|
||||||
|
Information in a CRS Report should not be relied upon for purposes other than public understanding of information that has
|
||||||
|
been provided by CRS to Members of Congress in connection with CRS’s institutional role. CRS Reports, as a work of the
|
||||||
|
United States Government, are not subject to copyright protection in the United States. Any CRS Report may be
|
||||||
|
reproduced and distributed in its entirety without permission from CRS. However, as a CRS Report may include
|
||||||
|
copyrighted images or material from a third party, you may need to obtain the permission of the copyright holder if you
|
||||||
|
wish to copy or otherwise use copyrighted material.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
https://crsreports.congress.gov/
|
||||||
|
‘The Abandoned Mine Reclamation Fund: Issues and Legislation in the 117th Congress
|
||||||
|
|
||||||
|
Disclaimer
|
||||||
|
|
||||||
|
This document was prepared by the Congressional Research Service (CRS). CRS serves as nonpartisan shared staff to
|
||||||
|
congressional committees and Members of Congress. It operates solely at the behest of and under the direction of Congress.
|
||||||
|
Information in a CRS Report should not be relied upon for purposes other than public understanding of information that has
|
||||||
|
‘been provided by CRS to Members of Congress in connection with CRS's institutional role, CRS Reports, as a work of the
|
||||||
|
United States Government, are not subject to copyright protection in the United States. Any CRS Report may be
|
||||||
|
reproduced and distributed in its entirety without permission from CRS. However, as a CRS Report may include
|
||||||
|
copyrighted images or material from a third party, you may need to obtain the permission of the copyright holder if you
|
||||||
|
wish to copy or otherwise use copyrighted material
|
||||||
|
|
||||||
|
https://ersreports.congress.gov | IF 11352 - VERSION 3 - UPDATED
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
2022-01-07T13:28:18-0500
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
File diff suppressed because it is too large
Load Diff
|
|
@ -0,0 +1,106 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: Average-Weekly-Wages-1
|
||||||
|
file: ../Average-Weekly-Wages-1.pdf
|
||||||
|
tags:
|
||||||
|
- Cumberland_Plateau_Planning_District_Commission
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 91169
|
||||||
|
sha256sum: d96f6920f7071f048b02ba8c0a9ddf8ecffed3810ae9a88c0b1ebd58c8675b60
|
||||||
|
sha1sum: 27c313f5ff407dbb7e67c0ecbd7af0220c1c4623
|
||||||
|
---
|
||||||
|
|
||||||
|
Jurisdiction
|
||||||
|
Average
|
||||||
|
|
||||||
|
Employment
|
||||||
|
Average Hourly
|
||||||
|
|
||||||
|
Wage
|
||||||
|
Average Weekly
|
||||||
|
|
||||||
|
Wage
|
||||||
|
Average Annual
|
||||||
|
|
||||||
|
Wage
|
||||||
|
Buchanan County 5,872 $26.55 $1,062 $55,224
|
||||||
|
Dickenson County 3,224 $25.23 $1,009 $52,468
|
||||||
|
|
||||||
|
Russell County 6,430 $21.68 $867 $45,084
|
||||||
|
Tazewell County 13,861 $19.93 $797 $41,444
|
||||||
|
|
||||||
|
CPPDC 7,347 $23.34 $934 $48,555
|
||||||
|
Virginia 3,958,628 $34.20 $1,368 $71,136
|
||||||
|
|
||||||
|
Source: Virginia Employment Commission
|
||||||
|
Quarterly Census of Employment and Wages 2022
|
||||||
|
|
||||||
|
Average Wages 2022
|
||||||
|
|
||||||
|
$0
|
||||||
|
$10,000
|
||||||
|
$20,000
|
||||||
|
$30,000
|
||||||
|
$40,000
|
||||||
|
$50,000
|
||||||
|
$60,000
|
||||||
|
$70,000
|
||||||
|
$80,000
|
||||||
|
|
||||||
|
1
|
||||||
|
Buchanan County $55,224
|
||||||
|
Dickenson County $52,468
|
||||||
|
Russell County $45,084
|
||||||
|
Tazewell County $41,444
|
||||||
|
Virginia $71,136
|
||||||
|
|
||||||
|
Average Wages 2022
|
||||||
|
|
||||||
|
Average Wages 2022
|
||||||
|
|
||||||
|
‘Average ‘Average Hourly | Average Weekly | Average Annual
|
||||||
|
Employment Wage Wage Wage
|
||||||
|
|
||||||
|
Buchanan County 5,872 $26.55 $1,062 $55,224
|
||||||
|
Dickenson County 3,224 $25.23 $1,009 $52,468
|
||||||
|
Russell County 6,430 $21.68 $867 $45,084
|
||||||
|
‘Tazewell County 13,861 $19.93 $797 $a14aa
|
||||||
|
cPPDC 7,347 $23.34 $934 $48,555
|
||||||
|
Virginia 3,958,628 $34.20 $1,368 $71,136
|
||||||
|
|
||||||
|
Source: Virginia Employment Commission
|
||||||
|
Quarterly Census of Employment and Wages 2022
|
||||||
|
|
||||||
|
Average Wages 2022
|
||||||
|
|
||||||
|
$80,000
|
||||||
|
$70,000
|
||||||
|
$60,000
|
||||||
|
$50,000
|
||||||
|
$40,000
|
||||||
|
$30,000
|
||||||
|
$20,000
|
||||||
|
$10,000
|
||||||
|
|
||||||
|
$0
|
||||||
|
|
||||||
|
1m Russell County
|
||||||
|
m= Tazewell County
|
||||||
|
= Virginia
|
||||||
|
|
||||||
|
m Buchanan County
|
||||||
|
Dickenson County
|
||||||
|
|
||||||
|
1
|
||||||
|
$55,224
|
||||||
|
$52,468
|
||||||
|
$45,084
|
||||||
|
$ai4aa
|
||||||
|
$71,136
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Sheet1
|
||||||
|
|
||||||
|
|
@ -0,0 +1,387 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: Bristol-District-Traffic
|
||||||
|
file: ../Bristol-District-Traffic.pdf
|
||||||
|
tags:
|
||||||
|
- Cumberland_Plateau_Planning_District_Commission
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 247012
|
||||||
|
sha256sum: a949e203ff80177f7c33ae74762b4104f3d04a5959c6ef5f915191877ca18f8a
|
||||||
|
sha1sum: be6e704ee5b39189c57b86a02a4d4fa4ac4f4a95
|
||||||
|
---
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
News Release
|
||||||
|
vdot.virginia.gov
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
RELEASE: IMMEDIATE
|
||||||
|
CONTACTS:
|
||||||
|
Michelle Earl, 276-696-3283
|
||||||
|
Joey Barker, 276-696-3333
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
April 26, 2024
|
||||||
|
BR-24036
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
VDOT Bristol's Weekly Traffic Alert:
|
||||||
|
April 29 - May 5, 2024
|
||||||
|
|
||||||
|
|
||||||
|
BRISTOL – In an effort to keep motorists informed, the Virginia Department of
|
||||||
|
Transportation (VDOT) provides weekly information about highway construction and
|
||||||
|
maintenance projects in southwestern Virginia. When traveling through highway work
|
||||||
|
zones, use caution and be alert to changes in traffic patterns and slow-moving or
|
||||||
|
stopped traffic.
|
||||||
|
|
||||||
|
To help motorists take the guesswork out of travel plans, call VDOT’s 511 or
|
||||||
|
visit http://www.511virginia.org for real-time traffic information.
|
||||||
|
|
||||||
|
Entries with (NEW) or (UPDATE) indicate revisions since last week’s report
|
||||||
|
|
||||||
|
|
||||||
|
INTERSTATE PROJECTS
|
||||||
|
|
||||||
|
Interstate 81 – widening (Washington County): A project to widen I-81 southbound
|
||||||
|
between exits 10 and 7 in Washington County, as well as widening approximately one
|
||||||
|
mile of northbound I-81 from exit 7 to the north, is underway. Be alert to traffic
|
||||||
|
pattern changes north and southbound. (Completion: November 2025)
|
||||||
|
|
||||||
|
Interstate 81 – truck climbing lanes (Washington County): A project is underway
|
||||||
|
to add truck climbing lanes to Interstate 81 northbound at mile marker 32.4 and
|
||||||
|
southbound at mile marker 34 in Washington County. The roadway shoulder is closed
|
||||||
|
during construction. Be alert to temporary lane closures north and southbound. Pay
|
||||||
|
close attention to work zone signs. (Completion: November 2025)
|
||||||
|
|
||||||
|
(NEW) Interstate 77 – bridge widening (Bland County): A project is underway to
|
||||||
|
widen the I-77 bridge northbound between exits 58 and 62 in Bland County. Be alert
|
||||||
|
to nighttime lane closures. Pay attention to signs and message boards.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
mailto:michelle.earl@vdot.virginia.gov
|
||||||
|
mailto:joseph.barker@vdot.virginia.gov
|
||||||
|
http://www.511virginia.org/
|
||||||
|
https://rlmzszvab.cc.rs6.net/tn.jsp?f=001-Dn-KRoLdXN86TwJ0Wasa9KGg29vBRlyLVGsXXtR_8MKsGOagv6RXVB5-bPCzuX8ghKSBh84asV9bwlHNbVpxME-BzcSUwY5hL0cxWFe2oo1kleBM-YD_OxsUtbyl4st6cRwE0cLXWRnDYfJCY6_2e9mnZehbzhO&c=1_m81YY4C2ZPt_vq_ofcYfL71BiTqPMJ0DhuLm67SIj7wy--0L5zig==&ch=7kA5jfPcLIZgAojz8fJbkOV-nZUtLEi7BsGfhfnazSuXuqat2aQbuA==
|
||||||
|
Virginia Department of Transportation vdot.virginia.gov
|
||||||
|
|
||||||
|
\VDOT News Release
|
||||||
|
|
||||||
|
RELEASE: IMMEDIATE April 26, 2024
|
||||||
|
CONTACTS: BR-24036
|
||||||
|
Michell 276-696-3283
|
||||||
|
|
||||||
|
Joey Barker, 276-696-3333
|
||||||
|
|
||||||
|
VDOT Bristol's Weekly Traffic Alert:
|
||||||
|
|
||||||
|
April 29 - May 5, 2024
|
||||||
|
|
||||||
|
BRISTOL ~ In an effort to keep motorists informed, the Virginia Department of
|
||||||
|
Transportation (VDOT) provides weekly information about highway construction and
|
||||||
|
maintenance projects in southwestern Virginia. When traveling through highway work
|
||||||
|
zones, use caution and be alert to changes in traffic patterns and slow-moving or
|
||||||
|
stopped traffic.
|
||||||
|
|
||||||
|
To help motorists take the guesswork out of travel plans, call VDOT’s 511 or
|
||||||
|
visit http://vww.5 1 I virginia.org for real-time traffic information,
|
||||||
|
|
||||||
|
Entries with (NEW) or (UPDATE) indicate revisions since last week’s report
|
||||||
|
|
||||||
|
INTERSTATE PROJECTS
|
||||||
|
|
||||||
|
Interstate 81 — widening (Washington County): A project to widen I-81 southbound
|
||||||
|
between exits 10 and 7 in Washington County, as well as widening approximately one
|
||||||
|
mile of northbound I-81 from exit 7 to the north, is underway. Be alert to traffic
|
||||||
|
pattern changes north and southbound. (Completion: November 2025)
|
||||||
|
|
||||||
|
Interstate 81 — truck climbing lanes (Washington County): A project is underway
|
||||||
|
to add truck climbing lanes to Interstate 81 northbound at mile marker 32.4 and
|
||||||
|
southbound at mile marker 34 in Washington County. The roadway shoulder is closed
|
||||||
|
during construction. Be alert to temporary lane closures north and southbound. Pay
|
||||||
|
close attention to work zone signs. (Completion: November 2025)
|
||||||
|
|
||||||
|
(NEW) Interstate 77 — bridge widening (Bland County): A project is underway to
|
||||||
|
widen the I-77 bridge northbound between exits 58 and 62 in Bland County. Be alert
|
||||||
|
to nighttime lane closures. Pay attention to signs and message boards.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
(UPDATE) Interstates 81 and 77 maintenance activities: Be alert to the following
|
||||||
|
lane closures due to interstate maintenance activities:
|
||||||
|
|
||||||
|
Interstate 81
|
||||||
|
- Daytime pothole patching north and southbound between exits 54 and 73 in
|
||||||
|
Smyth and Wythe counties.
|
||||||
|
- Daytime brush removal north and southbound between mile marker 55 and exit
|
||||||
|
67 in Wythe County.
|
||||||
|
- Nighttime bridge inspections north and southbound between exits 17 and 19 in
|
||||||
|
Washington County.
|
||||||
|
- Nighttime pothole patching northbound between mile markers 82 and 83 in
|
||||||
|
Wythe County.
|
||||||
|
- Nighttime bridge inspections north and southbound between exits 22 and 24 in
|
||||||
|
Washington County.
|
||||||
|
- Nighttime bridge deck repairs southbound near exit 45 and near mile marker 52
|
||||||
|
in Smyth County.
|
||||||
|
- Nighttime bridge deck repairs southbound near exit 29 in Washington County.
|
||||||
|
- Nighttime bridge deck repairs northbound near exit 35 in Washington County.
|
||||||
|
- Day and nighttime bridge repairs north and southbound between mile markers
|
||||||
|
36 and 38 near the Washington/Smyth County line April 28-May 3. No wide loads
|
||||||
|
over 14 feet.
|
||||||
|
- Day and nighttime bridge repairs north and southbound near exit 47 in Smyth
|
||||||
|
County April 29-May 3. No wide loads over 14 feet when the work zone is in place.
|
||||||
|
|
||||||
|
Interstate 77
|
||||||
|
- Daytime pothole patching north and southbound from exit 41 in Wythe County
|
||||||
|
to mile marker 67 in Bland County.
|
||||||
|
- Nighttime tunnel maintenance and inspection north and southbound at the Big
|
||||||
|
Walker Mountain Tunnel in Bland County. All wide loads over 12 feet must stop
|
||||||
|
before entering the tunnel.
|
||||||
|
|
||||||
|
|
||||||
|
PRIMARY HIGHWAYS AND HIGH TRAFFIC SECONDARY ROADS:
|
||||||
|
Buchanan County
|
||||||
|
Route 632 (Page Drive): A 1.5-mile section of Route 632 (Page Drive) has been
|
||||||
|
closed between the intersections of Route 626 (Chambers Road) and Ballenger Road
|
||||||
|
in Buchanan County. The section of roadway is being relocated by Buchanan
|
||||||
|
Materials as part of their coal preparation plant expansion. Pay close attention to
|
||||||
|
detour signs in the area. (Completion: August 2024)
|
||||||
|
|
||||||
|
Route 460/121 Poplar Creek Phase A: Construction of Route 460/121 Poplar Creek
|
||||||
|
Phase A is underway in Buchanan County. The Poplar Creek Phase A project created a
|
||||||
|
permanent change for Route 614 (Woods Fork). Access to the north and south ends of
|
||||||
|
|
||||||
|
(UPDATE) Interstates 81 and 77 maintenance activities: Be alert to the following
|
||||||
|
lane closures due to interstate maintenance activities:
|
||||||
|
|
||||||
|
Interstate 81
|
||||||
|
= Daytime pothole patching north and southbound between exits 54 and 73 in
|
||||||
|
Smyth and Wythe counties.
|
||||||
|
|
||||||
|
- Daytime brush removal north and southbound between mile marker 55 and exit
|
||||||
|
67 in Wythe County.
|
||||||
|
|
||||||
|
- Nighttime bridge inspections north and southbound between exits 17 and 19 in
|
||||||
|
Washington County.
|
||||||
|
|
||||||
|
- Nighttime pothole patching northbound between mile markers 82 and 83 in
|
||||||
|
Wythe County.
|
||||||
|
|
||||||
|
- "Nighttime bridge inspections north and southbound between exits 22 and 24 in
|
||||||
|
Washington County.
|
||||||
|
|
||||||
|
- Nighttime bridge deck repairs southbound near exit 45 and near mile marker $2
|
||||||
|
in Smyth County.
|
||||||
|
|
||||||
|
- Nighttime bridge deck repairs southbound near exit 29 in Washington County.
|
||||||
|
- Nighttime bridge deck repairs northbound near exit 35 in Washington County.
|
||||||
|
- Day and nighttime bridge repairs north and southbound between mile markers
|
||||||
|
36 and 38 near the Washington/Smyth County line April 28-May 3. No wide loads
|
||||||
|
over 14 feet.
|
||||||
|
|
||||||
|
- Day and nighttime bridge repairs north and southbound near exit 47 in Smyth
|
||||||
|
County April 29-May 3. No wide loads over 14 feet when the work zone is in place.
|
||||||
|
|
||||||
|
Interstate 77
|
||||||
|
- _ Daytime pothole patching north and southbound from exit 41 in Wythe County
|
||||||
|
to mile marker 67 in Bland County.
|
||||||
|
|
||||||
|
- Nighttime tunnel maintenance and inspection north and southbound at the Big
|
||||||
|
Walker Mountain Tunnel in Bland County. All wide loads over 12 feet must stop
|
||||||
|
before entering the tunnel.
|
||||||
|
|
||||||
|
PRIMARY HIGHWAYS AND HIGH TRAFFIC SECONDARY ROADS:
|
||||||
|
Buchanan County
|
||||||
|
|
||||||
|
Route 632 (Page Drive): A 1.5-mile section of Route 632 (Page Drive) has been
|
||||||
|
closed between the intersections of Route 626 (Chambers Road) and Ballenger Road
|
||||||
|
in Buchanan County. The section of roadway is being relocated by Buchanan
|
||||||
|
Materials as part of their coal preparation plant expansion. Pay close attention to
|
||||||
|
detour signs in the area. (Completion: August 2024)
|
||||||
|
|
||||||
|
Route 460/121 Poplar Creek Phase A: Construction of Route 460/121 Poplar Creek
|
||||||
|
Phase A is underway in Buchanan County. The Poplar Creek Phase A project created a
|
||||||
|
permanent change for Route 614 (Woods Fork). Access to the north and south ends of
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Route 614 is via Routes 609 (Bulls Creek Road) and Route 604 (Polar Creek Road),
|
||||||
|
respectively, which connect to Route 460 west of Grundy.
|
||||||
|
|
||||||
|
Route 460/121 Poplar Creek Phase B: Work on Route 460/121 Poplar Creek Phase
|
||||||
|
B is underway in Buchanan County. Work is taking place from near Route 604 (Poplar
|
||||||
|
Creek Road) to current Route 460 in Grundy.
|
||||||
|
|
||||||
|
|
||||||
|
Lee County
|
||||||
|
Route 23 bridge replacement: Be alert to an altered traffic pattern at the bridges over
|
||||||
|
Norfolk Southern Railroad in the Jasper area of Lee County due to the replacement of
|
||||||
|
the bridges. Two-way traffic is currently in the northbound lanes of Route 23.
|
||||||
|
(Completion: Fall 2024)
|
||||||
|
|
||||||
|
|
||||||
|
Russell County
|
||||||
|
Route 687 bridge replacement: Replacement of the bridge on Route 687 over Route
|
||||||
|
63 in the Dante area of Russell County continues. A temporary access road is in place
|
||||||
|
through the Roanoke Hill area connecting Route 63 and Route 687. (Completion:
|
||||||
|
October 2024)
|
||||||
|
|
||||||
|
|
||||||
|
Smyth County
|
||||||
|
Route 11 roundabout: A project is underway to build a roundabout on Route 11 at
|
||||||
|
the intersection of Route 660 (Railroad Drive) in Smyth County, approximately one
|
||||||
|
mile east of Oak Point Elementary School. Be alert to workers and pay close attention
|
||||||
|
to signs and message boards. (Completion: Summer 2025)
|
||||||
|
|
||||||
|
Route 622 bridge rehab: A project to rehabilitate the Route 622 bridge over Norfolk
|
||||||
|
and Western Railway in Smyth County continues. Be alert to temporary traffic signals
|
||||||
|
at Route 11 and Route 622 (Haven Ridge Road). Motorists should use caution in the
|
||||||
|
area and pay close attention to signs and message boards. (Completion: May 2024)
|
||||||
|
|
||||||
|
|
||||||
|
Tazewell County
|
||||||
|
Route 16 (W. Riverside Drive) bridge replacement over Cavitts Creek: Work to
|
||||||
|
replace the Route 16 bridge over Cavitts Creek in Tazewell continues. Motorists
|
||||||
|
should be alert to one-lane traffic being controlled by traffic signals. The travel lane
|
||||||
|
width on Route 16 at the bridge is restricted to 10 feet. (Completion: June 2024)
|
||||||
|
|
||||||
|
|
||||||
|
Washington County
|
||||||
|
Route 58 widening near Damascus: Be alert to flaggers directing traffic at
|
||||||
|
intersections through the entire Route 58 work zone due to paving operations. While
|
||||||
|
|
||||||
|
Route 614 is via Routes 609 (Bulls Creek Road) and Route 604 (Polar Creek Road),
|
||||||
|
respectively, which connect to Route 460 west of Grundy.
|
||||||
|
|
||||||
|
Route 460/121 Poplar Creek Phase B: Work on Route 460/121 Poplar Creek Phase
|
||||||
|
B is underway in Buchanan County. Work is taking place from near Route 604 (Poplar
|
||||||
|
Creek Road) to current Route 460 in Grundy.
|
||||||
|
|
||||||
|
Lee County
|
||||||
|
|
||||||
|
Route 23 bridge replacement: Be alert to an altered traffic pattern at the bridges over
|
||||||
|
Norfolk Southern Railroad in the Jasper area of Lee County due to the replacement of
|
||||||
|
the bridges. Two-way traffic is currently in the northbound lanes of Route 23.
|
||||||
|
(Completion: Fall 2024)
|
||||||
|
|
||||||
|
Russell County
|
||||||
|
Route 687 bridge replacement: Replacement of the bridge on Route 687 over Route
|
||||||
|
63 in the Dante area of Russell County continues. A temporary access road is in place
|
||||||
|
through the Roanoke Hill area connecting Route 63 and Route 687. (Completion:
|
||||||
|
October 2024)
|
||||||
|
|
||||||
|
Smyth County
|
||||||
|
Route 11 roundabout: A project is underway to build a roundabout on Route 11 at
|
||||||
|
the intersection of Route 660 (Railroad Drive) in Smyth County, approximately one
|
||||||
|
mile east of Oak Point Elementary School. Be alert to workers and pay close attention
|
||||||
|
to signs and message boards. (Completion: Summer 2025)
|
||||||
|
|
||||||
|
Route 622 bridge rehab: A project to rehabilitate the Route 622 bridge over Norfolk
|
||||||
|
and Western Railway in Smyth County continues, Be alert to temporary traffic signals
|
||||||
|
at Route 11 and Route 622 (Haven Ridge Road). Motorists should use caution in the
|
||||||
|
area and pay close attention to signs and message boards. (Completion: May 2024)
|
||||||
|
|
||||||
|
Tazewell County
|
||||||
|
Route 16 (W. Riverside Drive) bridge replacement over Cavitts Creek: Work to
|
||||||
|
replace the Route 16 bridge over Cavitts Creek in Tazewell continues. Motorists
|
||||||
|
should be alert to one-lane traffic being controlled by traffic signals. The travel lane
|
||||||
|
width on Route 16 at the bridge is restricted to 10 feet. (Completion: June 2024)
|
||||||
|
|
||||||
|
Washington County
|
||||||
|
Route 58 widening near Damascus: Be alert to flaggers directing traffic at
|
||||||
|
intersections through the entire Route 58 work zone due to paving operations. While
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Route 58 widening continues, all traffic is using the two westbound lanes through the
|
||||||
|
work zone. Pay close attention to signs, message boards and flaggers. (Completion:
|
||||||
|
May 2024)
|
||||||
|
|
||||||
|
|
||||||
|
Wise County
|
||||||
|
Alternate Route 58 median barrier construction: Work is underway to install
|
||||||
|
permanent concrete median barriers on Alternate Route 58 in the Tacoma area of Wise
|
||||||
|
County east of Stone Mountain Road. The left lane in both directions is closed. Be
|
||||||
|
alert to flaggers and message boards. (Completion: May 2024)
|
||||||
|
|
||||||
|
|
||||||
|
Wythe County
|
||||||
|
Progress Park Connector: Construction of a new 2.3-mile connector road between
|
||||||
|
Nye Road and E. Lee Trinkle Road is underway, providing a direct connection to
|
||||||
|
Wytheville’s Progress Park industrial site. A 0.3-mile portion of Lover's Lane will be
|
||||||
|
closed beginning Monday, March 18 and will remain closed for the duration of the
|
||||||
|
project. The section of Lover's Lane to be closed is located 1.6 miles from Nye Road
|
||||||
|
and 0.5 miles from Pepper's Ferry Road. Be alert to construction vehicles, work zone
|
||||||
|
signs and workers in the area. (Completion: November 2026)
|
||||||
|
|
||||||
|
Route 671 (Crigger Road) bridge: Due to an upcoming bridge replacement project,
|
||||||
|
the Route 671 (Crigger Road) bridge in Wythe County has been restricted to one 11-
|
||||||
|
foot-wide lane and a three-ton weight limit. Construction is scheduled to begin in late
|
||||||
|
2024.
|
||||||
|
|
||||||
|
|
||||||
|
(END)
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
https://rlmzszvab.cc.rs6.net/tn.jsp?f=001-Dn-KRoLdXN86TwJ0Wasa9KGg29vBRlyLVGsXXtR_8MKsGOagv6RXbYqc78FQf1ayipvfJBkyJgyWHTJwkpKtgzdwwtuuYeS4eXTTNOAPleZdpHMvKY-G2woUFX3wt15ps5yoXO_B0EteTXzdhXtTM3KxdTLAnQg759SDc-19gk=&c=1_m81YY4C2ZPt_vq_ofcYfL71BiTqPMJ0DhuLm67SIj7wy--0L5zig==&ch=7kA5jfPcLIZgAojz8fJbkOV-nZUtLEi7BsGfhfnazSuXuqat2aQbuA==
|
||||||
|
https://rlmzszvab.cc.rs6.net/tn.jsp?f=001-Dn-KRoLdXN86TwJ0Wasa9KGg29vBRlyLVGsXXtR_8MKsGOagv6RXXG3FtKGaZEcRHI5RJCZTfBJ24ngmzozoeOiJY4YyYyWD5YEJPuwRIcRuX3w6eNWtcC2NlaSyjPlg_vMkOCw4AfGblv-8b1cq7Te0qTThC6z&c=1_m81YY4C2ZPt_vq_ofcYfL71BiTqPMJ0DhuLm67SIj7wy--0L5zig==&ch=7kA5jfPcLIZgAojz8fJbkOV-nZUtLEi7BsGfhfnazSuXuqat2aQbuA==
|
||||||
|
https://rlmzszvab.cc.rs6.net/tn.jsp?f=001-Dn-KRoLdXN86TwJ0Wasa9KGg29vBRlyLVGsXXtR_8MKsGOagv6RXTvcb1Y4Wk2RbF1nIEDFcN1A-eATOcHea6rbLuXtJlUPyFdbIv_iqDgsvAJt6ESEWJbpFStmIueW-7R06hfSy2I9ZMcwDi01ijjTmKjrgiOmYQqGk-oHowM=&c=1_m81YY4C2ZPt_vq_ofcYfL71BiTqPMJ0DhuLm67SIj7wy--0L5zig==&ch=7kA5jfPcLIZgAojz8fJbkOV-nZUtLEi7BsGfhfnazSuXuqat2aQbuA==
|
||||||
|
Route 58 widening continues, all traffic is using the two westbound lanes through the
|
||||||
|
work zone. Pay close attention to signs, message boards and flaggers. (Completion:
|
||||||
|
May 2024)
|
||||||
|
|
||||||
|
Wise County
|
||||||
|
|
||||||
|
Alternate Route 58 median barrier construction: Work is underway to install
|
||||||
|
permanent concrete median barriers on Alternate Route 58 in the Tacoma area of Wise
|
||||||
|
County east of Stone Mountain Road. The left lane in both directions is closed. Be
|
||||||
|
alert to flaggers and message boards. (Completion: May 2024)
|
||||||
|
|
||||||
|
Wythe County
|
||||||
|
Progress Park Connector: Construction of a new 2.3-mile connector road between
|
||||||
|
Nye Road and E. Lee Trinkle Road is underway, providing a direct connection to
|
||||||
|
Wytheville’s Progress Park industrial site. A 0.3-mile portion of Lover’s Lane will be
|
||||||
|
closed beginning Monday, March 18 and will remain closed for the duration of the
|
||||||
|
project. The section of Lover's Lane to be closed is located 1.6 miles from Nye Road
|
||||||
|
and 0.5 miles from Pepper's Ferry Road. Be alert to construction vehicles, work zone
|
||||||
|
signs and workers in the area. (Completion: November 2026)
|
||||||
|
|
||||||
|
Route 671 (Crigger Road) bridge: Due to an upcoming bridge replacement project,
|
||||||
|
the Route 671 (Crigger Road) bridge in Wythe County has been restricted to one 11-
|
||||||
|
foot-wide lane and a three-ton weight limit, Construction is scheduled to begin in late
|
||||||
|
2024.
|
||||||
|
|
||||||
|
(END)
|
||||||
|
|
||||||
|
ty)
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
File diff suppressed because it is too large
Load Diff
|
|
@ -0,0 +1,176 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: Buchanan-County-Highway-Map
|
||||||
|
file: ../Buchanan-County-Highway-Map.pdf
|
||||||
|
tags:
|
||||||
|
- Cumberland_Plateau_Planning_District_Commission
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 2388657
|
||||||
|
sha256sum: 8b32779f47bad3727bee6a76b48649e6829f8bd8ceb5bb3875fc80af953e4ad9
|
||||||
|
sha1sum: f8d3773850385ed5fddbd7c7af8cefff20b69cba
|
||||||
|
---
|
||||||
|
|
||||||
|
INSET KEY
|
||||||
|
|
||||||
|
F sr15N
|
||||||
|
|
||||||
|
GRUNDY AREA
|
||||||
|
two times map scale
|
||||||
|
|
||||||
|
BIG ROCK AREA
|
||||||
|
four times map scala
|
||||||
|
‘0 notations on map cover for distance information
|
||||||
|
|
||||||
|
‘00 notations on map cover for distance information
|
||||||
|
|
||||||
|
b azrisw
|
||||||
|
|
||||||
|
My
|
||||||
|
|
||||||
|
=
|
||||||
|
1
|
||||||
|
|
||||||
|
SeawongreUN
|
||||||
|
‘NESTON
|
||||||
|
|
||||||
|
a
|
||||||
|
|
||||||
|
v
|
||||||
|
=
|
||||||
|
|
||||||
|
KEEN MOUNTAIN and OAKWOOD AREA
|
||||||
|
four times map scale
|
||||||
|
Se notations on map cover for distance infomation
|
||||||
|
|
||||||
|
sBRrSe WAnANED
|
||||||
|
INBSCHUN COON
|
||||||
|
|
||||||
|
eae
|
||||||
|
BIE
|
||||||
|
<<
|
||||||
|
x
|
||||||
|
<
|
||||||
|
ai
|
||||||
|
ake <
|
||||||
|
BEE,
|
||||||
|
Tora many EAGER oI
|
||||||
|
SEeOont MEE HAAN
|
||||||
|
es [a ara ‘re | neo] aval no] wav] woven] Tae
|
||||||
|
jaime [owen | punoaarace vag) vee) ran] maa] eel
|
||||||
|
lewessoere —| — ooo ass! tsa ALveaensiWAE [stm] rai] som] anal rare) — ee
|
||||||
|
[euoeosonaneo | nena] _—ere_ ot imac nel ae) taf aa em
|
||||||
|
[umrrveo [2 sa] —u_osiencen a a
|
||||||
|
Fownssce [sao wei _wrs Fora ence aa] era] aa] an ae] a
|
||||||
|
|
||||||
|
san
|
||||||
|
|
||||||
|
arin
|
||||||
|
|
||||||
|
ROAD CLASSIFICATIONS:
|
||||||
|
Divided Highway (interstate)
|
||||||
|
Hard Surface
|
||||||
|
|
||||||
|
‘All Weather Surface
|
||||||
|
|
||||||
|
Light Surface
|
||||||
|
|
||||||
|
= Unsurfaced
|
||||||
|
|
||||||
|
HIGHWAY ROUTE SIGNS
|
||||||
|
Interstate Highway
|
||||||
|
|
||||||
|
US Highway
|
||||||
|
|
||||||
|
VA Primary Highway
|
||||||
|
|
||||||
|
VA Secondary Highway
|
||||||
|
Frontage Road
|
||||||
|
|
||||||
|
Forest Highway
|
||||||
|
|
||||||
|
Fz] US Bicycle Route
|
||||||
|
|
||||||
|
@<—aoue
|
||||||
|
|
||||||
|
RAILROADS
|
||||||
|
Single Track
|
||||||
|
= TwoorMore Tracks
|
||||||
|
® Regional Metro
|
||||||
|
|
||||||
|
BOUNDARIES
|
||||||
|
State Line
|
||||||
|
|
||||||
|
County Line
|
||||||
|
|
||||||
|
Magisterial District Line
|
||||||
|
|
||||||
|
Incorporated Town or City
|
||||||
|
|
||||||
|
Park, Reservation, or Forest Boundary
|
||||||
|
|
||||||
|
CITY AND VILLAGE CENTERS
|
||||||
|
State Capital
|
||||||
|
|
||||||
|
County Seat
|
||||||
|
|
||||||
|
Town or Vilage
|
||||||
|
|
||||||
|
*
|
||||||
|
°
|
||||||
|
|
||||||
|
MISCELLANEOUS.
|
||||||
|
|
||||||
|
Place of Worship
|
||||||
|
School
|
||||||
|
|
||||||
|
Park & Ride Lot
|
||||||
|
Transmission Line
|
||||||
|
|
||||||
|
== Bridge
|
||||||
|
|
||||||
|
TEM Primary Road Distances
|
||||||
|
|
||||||
|
PORTS
|
||||||
|
ab Seaport
|
||||||
|
|
||||||
|
Ye Military Airport
|
||||||
|
|
||||||
|
2 Commercial Aiport
|
||||||
|
2% Other Airport
|
||||||
|
|
||||||
|
Request or nraion on roads shown on his map shouldbe adresses to
|
||||||
|
Bristol Distt Adminstrator, Vigra Department of Transporaon
|
||||||
|
P.O Box 1768 Bist, VA 24203
|
||||||
|
276-6615 (TTY users, cal 711)
|
||||||
|
|
||||||
|
DISTANCES SHOWIN ON MAP MAY NOT 8E OFFICIAL DISTANCES.
|
||||||
|
Distanoes shown on Primary Roads are between Primary Road
|
||||||
|
intsectons andor county ies. Distances shown on Secondary
|
||||||
|
Roais ate betwen rsetons and corte its or county ines.
|
||||||
|
Magisteal Dstt Boundary nes shown are feats such a
|
||||||
|
roads, steams ot arn he center ine of such fates.
|
||||||
|
|
||||||
|
The accuracy or caleeness of is map sol qurateed or wanted
|
||||||
|
|
||||||
|
Map depics slate intsined highway network sof anuary 1, 2001
|
||||||
|
‘Copy © 2004 by Conmonneath of Virginia.
|
||||||
|
Department of Transporation, Al Righis Reserved
|
||||||
|
|
||||||
|
BUCHANAN COUNTY, VA
|
||||||
|
|
||||||
|
\DOT
|
||||||
|
|
||||||
|
COUNTY
|
||||||
|
ROAD
|
||||||
|
MAP
|
||||||
|
|
||||||
|
BUCHANAN
|
||||||
|
COUNTY
|
||||||
|
|
||||||
|
AN INVENTORY OF STATE-MAINTAINED ROADS
|
||||||
|
BUCHANAN COUNTY, VA 13
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
File diff suppressed because it is too large
Load Diff
File diff suppressed because it is too large
Load Diff
|
|
@ -0,0 +1,702 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: CPC-CProp-Application
|
||||||
|
file: ../CPC-CProp-Application.pdf
|
||||||
|
tags:
|
||||||
|
- Cumberland_Plateau_Planning_District_Commission
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 286941
|
||||||
|
sha256sum: 53d675d734545f26362a8148228d8408866d9585d3aa63c756a6aa795ecfce1b
|
||||||
|
sha1sum: 43c12d6c366d4ab832ab09d3cdeb9f5b21f3504d
|
||||||
|
---
|
||||||
|
|
||||||
|
CUMBERLAND PLATEAU
|
||||||
|
COMPANY
|
||||||
|
|
||||||
|
Cumberland Plateau Regional
|
||||||
|
Opportunity Program (CProp)
|
||||||
|
|
||||||
|
GRANT APPLICATION
|
||||||
|
|
||||||
|
CUMBERLAND PLATEAU
|
||||||
|
COMPANY
|
||||||
|
|
||||||
|
Cumberland Plateau Regional
|
||||||
|
Opportunity Program (CProp)
|
||||||
|
|
||||||
|
GRANT APPLICATION
|
||||||
|
|
||||||
|
Cumberland Plateau
|
||||||
|
|
||||||
|
—e
|
||||||
|
BRU ADBAND
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
2
|
||||||
|
|
||||||
|
PROGRAM DESIGN
|
||||||
|
CUMBERLAND PLATEAU REGIONAL OPPORTUNITY PROGRAM (CProp)
|
||||||
|
|
||||||
|
PURPOSE
|
||||||
|
|
||||||
|
The Cumberland Plateau Regional Opportunity Program (CProp) is established to
|
||||||
|
reinvest program income revenues from the CPC Broadband project in economic development
|
||||||
|
efforts in the four counties and twelve towns of the Cumberland Plateau Planning District
|
||||||
|
(CPPDC). These program income revenues are generated from the regional broadband
|
||||||
|
infrastructure system that was funded by the U.S. Economic Development Administration, the
|
||||||
|
Virginia Tobacco Commission, U.S. National Telecommunications and Information
|
||||||
|
Administration and the Virginia Coalfield Economic Development Authority and is operated and
|
||||||
|
maintained by the Cumberland Plateau Company in partnership with the Sunset Group,
|
||||||
|
specifically Point Broadband.
|
||||||
|
|
||||||
|
ELIGIBLE APPLICANTS AND ACTIVITIES
|
||||||
|
|
||||||
|
The only eligible applicants for CProp funds are the local governing bodies of the
|
||||||
|
Cumberland Plateau Planning District Commission – Buchanan, Dickenson, Russell and
|
||||||
|
Tazewell Counties and the Towns of Grundy, Clinchco, Clintwood, Haysi, Cleveland, Honaker,
|
||||||
|
Lebanon, Bluefield, Cedar Bluff, Pocahontas, Richlands and Tazewell.
|
||||||
|
|
||||||
|
The CProp is meant to be a flexible grant source for these local governments to support
|
||||||
|
various public economic and community development activities that help to diversify the District
|
||||||
|
economy. Preference will be given to activities that are linked to the Cumberland Plateau
|
||||||
|
Planning District Commission’s Comprehensive Economic Development Strategy (latest update)
|
||||||
|
and to other regional, state and federal economic development plans, initiatives and programs.
|
||||||
|
Eligible activities include, but are not limited to, the following:
|
||||||
|
|
||||||
|
• Industrial Site/Park Development Projects in support of manufacturing jobs,
|
||||||
|
including, but not limited to, infrastructure activities such as water, sewer,
|
||||||
|
telecommunications, electricity, natural gas, access roads, rails sidings, etc.
|
||||||
|
|
||||||
|
• Broadband and Wireless Infrastructure Expansion and Upgrade projects that
|
||||||
|
support business development and expansion as well as deployment in residential
|
||||||
|
communities.
|
||||||
|
|
||||||
|
• Downtown Revitalization Projects, including, but not limited to, activities such as
|
||||||
|
streetscapes, signage, building renovations, water and sewer and other public
|
||||||
|
infrastructure improvements, etc. that support or enhance small business
|
||||||
|
development. CProp funds cannot be used for renovations to public buildings
|
||||||
|
and facilities that do not have an economic development impact.
|
||||||
|
|
||||||
|
PROGRAM DESIGN
|
||||||
|
CUMBERLAND PLATEAU REGIONAL OPPORTUNITY PROGRAM (CProp)
|
||||||
|
|
||||||
|
PURPOSE
|
||||||
|
|
||||||
|
The Cumberland Plateau Regional Opportunity Program (CProp) is established to
|
||||||
|
reinvest program income revenues from the CPC Broadband project in economic development
|
||||||
|
efforts in the four counties and twelve towns of the Cumberland Plateau Planning District
|
||||||
|
(CPPDC). These program income revenues are generated from the regional broadband
|
||||||
|
infrastructure system that was funded by the U.S. Economic Development Administration, the
|
||||||
|
Virginia Tobacco Commission, U.S. National Telecommunications and Information
|
||||||
|
‘Administration and the Virginia Coalfield Economic Development Authority and is operated and
|
||||||
|
maintained by the Cumberland Plateau Company in partnership with the Sunset Group,
|
||||||
|
specifically Point Broadband.
|
||||||
|
|
||||||
|
ELIGIBLE APPLICANTS AND ACTIVITIES
|
||||||
|
|
||||||
|
The only eligible applicants for CProp funds are the local governing bodies of the
|
||||||
|
Cumberland Plateau Planning District Commission — Buchanan, Dickenson, Russell and
|
||||||
|
Tazewell Counties and the Towns of Grundy, Clinchco, Clintwood, Haysi, Cleveland, Honaker,
|
||||||
|
Lebanon, Bluefield, Cedar Bluff, Pocahontas, Richlands and Tazewell.
|
||||||
|
|
||||||
|
The CProp is meant to be a flexible grant source for these local governments to support
|
||||||
|
various public economic and community development activities that help to diversify the District
|
||||||
|
economy. Preference will be given to activities that are linked to the Cumberland Plateau
|
||||||
|
Planning District Commission’s Comprehensive Economic Development Strategy (latest update)
|
||||||
|
and to other regional, state and federal economic development plans, initiatives and programs.
|
||||||
|
Eligible activities include, but are not limited to, the following:
|
||||||
|
|
||||||
|
© Industrial Site/Park Development Projects in support of manufacturing jobs,
|
||||||
|
including, but not limited to, infrastructure activities such as water, sewer,
|
||||||
|
telecommunications, electricity, natural gas, access roads, rails sidings, ete.
|
||||||
|
|
||||||
|
* Broadband and Wireless Infrastructure Expansion and Upgrade projects that
|
||||||
|
support business development and expansion as well as deployment in residential
|
||||||
|
communities.
|
||||||
|
|
||||||
|
* Downtown Revitalization Projects, including, but not limited to, activities such as
|
||||||
|
streetscapes, signage, building renovations, water and sewer and other public
|
||||||
|
infrastructure improvements, etc. that support or enhance small business
|
||||||
|
development. CProp funds cannot be used for renovations to public buildings
|
||||||
|
and facilities that do not have an economic development impact.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
3
|
||||||
|
|
||||||
|
• Asset-based Development Projects, such as trails, trailheads, welcome centers,
|
||||||
|
museums, and other tourism-related activities that support new business
|
||||||
|
development related to the regional cultural heritage and outdoor recreation
|
||||||
|
initiatives such as Southwest Virginia Outdoors, The Crooked Road, ‘Round the
|
||||||
|
Mountain, the Clinch River Valley Initiative and the Spearhead Trails.
|
||||||
|
|
||||||
|
• Other activities that support economic diversification in the region as determined
|
||||||
|
by the Cumberland Plateau Company Board and in keeping with the District
|
||||||
|
CEDS and the guidelines of the U.S. Economic Development Administration.
|
||||||
|
|
||||||
|
APPLICATION PROCESS
|
||||||
|
|
||||||
|
Applications for CProp funds will be received each quarter of the fiscal year on the
|
||||||
|
following dates: January 15, April 15, July 15 and October 15. Upon receipt of applications, the
|
||||||
|
Cumberland Plateau Company Executive Board (Board) will review and make awards as
|
||||||
|
appropriate within the CProp guidelines as approved by EDA at the regular Executive Board
|
||||||
|
Meeting the following month. Only one (1) application from a locality can be received in a year
|
||||||
|
unless the Board directs otherwise.
|
||||||
|
|
||||||
|
APPLICATION GUIDELINES
|
||||||
|
|
||||||
|
CProp funds, as available, are to be used for economic and community development and
|
||||||
|
economic enhancement activities in the four counties of the Cumberland Plateau Planning
|
||||||
|
District. Higher priority will be given to projects that support job creation. However, projects
|
||||||
|
that have lower job creation numbers but enhance overall economic development efforts, such as
|
||||||
|
asset-based or downtown projects, will be eligible for funding.
|
||||||
|
|
||||||
|
A maximum of $200,000 will be available for any one project in any given year, unless
|
||||||
|
the Board directs otherwise. It is anticipated that larger funding awards may be made for projects
|
||||||
|
with large numbers of jobs created.
|
||||||
|
|
||||||
|
* Asset-based Development Projects, such as trails, trailheads, welcome centers,
|
||||||
|
museums, and other tourism-related activities that support new business
|
||||||
|
development related to the regional cultural heritage and outdoor recreation
|
||||||
|
initiatives such as Southwest Virginia Outdoors, The Crooked Road, ‘Round the
|
||||||
|
Mountain, the Clinch River Valley Initiative and the Spearhead Trails.
|
||||||
|
|
||||||
|
© Other activities that support economic diversification in the region as determined
|
||||||
|
by the Cumberland Plateau Company Board and in keeping with the District
|
||||||
|
CEDS and the guidelines of the U.S. Economic Development Administration.
|
||||||
|
|
||||||
|
APPLICATION PROCESS
|
||||||
|
|
||||||
|
Applications for CProp funds will be received each quarter of the fiscal year on the
|
||||||
|
following dates: January 15, April 15, July 15 and October 15. Upon receipt of applications, the
|
||||||
|
Cumberland Plateau Company Executive Board (Board) will review and make awards as
|
||||||
|
appropriate within the CProp guidelines as approved by EDA at the regular Executive Board
|
||||||
|
Meeting the following month. Only one (1) application from a locality can be received in a year
|
||||||
|
unless the Board directs otherwise.
|
||||||
|
|
||||||
|
APPLICATION GUIDELINES
|
||||||
|
|
||||||
|
CProp funds, as available, are to be used for economic and community development and
|
||||||
|
economic enhancement activities in the four counties of the Cumberland Plateau Planning
|
||||||
|
District. Higher priority will be given to projects that support job creation. However, projects
|
||||||
|
that have lower job creation numbers but enhance overall economic development efforts, such as
|
||||||
|
asset-based or downtown projects, will be eligible for funding.
|
||||||
|
|
||||||
|
A maximum of $200,000 will be available for any one project in any given year, unless
|
||||||
|
the Board directs otherwise. It is anticipated that larger funding awards may be made for projects
|
||||||
|
with large numbers of jobs created.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
4
|
||||||
|
|
||||||
|
SECTION 1: APPLICANT INFORMATION
|
||||||
|
|
||||||
|
Local Government:____________________________________________________________
|
||||||
|
|
||||||
|
Address:______________________________________________________________________
|
||||||
|
|
||||||
|
City:________________________________ State:__________________ ZIP:_____________
|
||||||
|
|
||||||
|
Contact Person:________________________________________________________________
|
||||||
|
|
||||||
|
Telephone:_______________________________ Fax:_________________________________
|
||||||
|
|
||||||
|
E-mail:__________________________________ Website:_____________________________
|
||||||
|
|
||||||
|
Federal Tax ID Number:________________________________________________________
|
||||||
|
|
||||||
|
DUNS Number (if available):_____________________________________________________
|
||||||
|
|
||||||
|
Brief Description of Project:____________________________________________________
|
||||||
|
|
||||||
|
______________________________________________________________________________
|
||||||
|
|
||||||
|
______________________________________________________________________________
|
||||||
|
|
||||||
|
Estimated Date of Project Completion:
|
||||||
|
(Project Completion should occur within 2 years of grant award.)
|
||||||
|
|
||||||
|
Physical address of project location:_______________________________________________
|
||||||
|
|
||||||
|
SECTION 2: PROGRAM SPECIFIC INFORMATION
|
||||||
|
|
||||||
|
If applicable, which Goal in the most recent Cumberland Plateau Planning District
|
||||||
|
Commission Comprehensive Economic Development Strategy Update does this project
|
||||||
|
address?(CEDS Update can be found at this link: (www.cppdc.org/Reports).
|
||||||
|
|
||||||
|
If this project is not aligned with the CEDS, does it address another local, regional, state or
|
||||||
|
federal economic development plan, initiative or program? <20> Yes <20> No If “Yes”, please
|
||||||
|
identify and provide supporting information:________________
|
||||||
|
______________________________________________________________________________
|
||||||
|
|
||||||
|
http://www.cppdc.org/Reports
|
||||||
|
SECTION 1: APPLICANT INFORMATION
|
||||||
|
|
||||||
|
Local Government:
|
||||||
|
|
||||||
|
Address:
|
||||||
|
State: ZIP:
|
||||||
|
Contact Person:
|
||||||
|
Telephone: Fax:
|
||||||
|
E-mail: Website:
|
||||||
|
|
||||||
|
Federal Tax ID Number:
|
||||||
|
|
||||||
|
DUNS Number (if available):
|
||||||
|
|
||||||
|
Brief Description of Project:
|
||||||
|
|
||||||
|
Estimated Date of Project Completion:
|
||||||
|
(Project Completion should occur within 2 years of grant award.)
|
||||||
|
|
||||||
|
Physical address of project location:
|
||||||
|
|
||||||
|
SECTION 2: PROGRAM SPECIFIC INFORMATION
|
||||||
|
|
||||||
|
If applicable, which Goal in the most recent Cumberland Plateau Planning District
|
||||||
|
Commission Comprehensive Economic Development Strategy Update does this project
|
||||||
|
address?(CEDS Update can be found at tl (www.eppde.org/Reports).
|
||||||
|
|
||||||
|
If this project is not aligned with the CEDS, does it address another local, regional, state or
|
||||||
|
federal economic development plan, initiative or program?[_lYes [_|No__ If “Yes”, please
|
||||||
|
identify and provide supporting information:
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
5
|
||||||
|
|
||||||
|
If no, how does the project support job creation and economic diversification in the
|
||||||
|
region?______________________________
|
||||||
|
______________________________________________________________________________
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
SECTION 3: PROJECT INFORMATION
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Please describe the project, including as applicable, a discussion of the project history,
|
||||||
|
proposed use of funds, other funding sources, benefits to the community, projected private
|
||||||
|
investment levels, projected local tax revenues and type and number of jobs
|
||||||
|
created/retained.
|
||||||
|
______________________________________________________________________________
|
||||||
|
______________________________________________________________________________
|
||||||
|
______________________________________________________________________________
|
||||||
|
______________________________________________________________________________
|
||||||
|
______________________________________________________________________________
|
||||||
|
______________________________________________________________________________
|
||||||
|
______________________________________________________________________________
|
||||||
|
______________________________________________________________________________
|
||||||
|
______________________________________________________________________________
|
||||||
|
______________________________________________________________________________
|
||||||
|
______________________________________________________________________________
|
||||||
|
______________________________________________________________________________
|
||||||
|
______________________________________________________________________________
|
||||||
|
______________________________________________________________________________
|
||||||
|
______________________________________________________________________________
|
||||||
|
______________________________________________________________________________
|
||||||
|
______________________________________________________________________________
|
||||||
|
______________________________________________________________________________
|
||||||
|
______________________________________________________________________________
|
||||||
|
______________________________________________________________________________
|
||||||
|
______________________________________________________________________________
|
||||||
|
______________________________________________________________________________
|
||||||
|
______________________________________________________________________________
|
||||||
|
______________________________________________________________________________
|
||||||
|
______________________________________________________________________________
|
||||||
|
______________________________________________________________________________
|
||||||
|
______________________________________________________________________________
|
||||||
|
______________________________________________________________________________
|
||||||
|
______________________________________________________________________________
|
||||||
|
______________________________________________________________________________
|
||||||
|
______________________________________________________________________________
|
||||||
|
______________________________________________________________________________
|
||||||
|
______________________________________________________________________________
|
||||||
|
______________________________________________________________________________
|
||||||
|
|
||||||
|
If no, how does the project support job creation and economic diversification in the
|
||||||
|
region?
|
||||||
|
|
||||||
|
SECTION 3: PROJECT INFORMATION
|
||||||
|
|
||||||
|
Please describe the project, including as applicable, a discussion of the project history,
|
||||||
|
proposed use of funds, other funding sources, benefits to the community, projected private
|
||||||
|
investment levels, projected local tax revenues and type and number of jobs
|
||||||
|
created/retained.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
6
|
||||||
|
|
||||||
|
SECTION 4: FUNDING REQUEST INFORMATION
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Estimated Total Project Cost: $__________________________________________________
|
||||||
|
|
||||||
|
Estimated CProp Funds Requested: $
|
||||||
|
|
||||||
|
Please list the estimated project costs and funding sources below.
|
||||||
|
|
||||||
|
|
||||||
|
Cost Category Applicant CProp Source: Source: Source: Total
|
||||||
|
Land Acquistion $ $ $ $ $ $
|
||||||
|
Site Development $ $ $ $ $ $
|
||||||
|
Building Cost $ $ $ $ $ $
|
||||||
|
Utilities/Roads $ $ $ $ $ $
|
||||||
|
Engineering/Arch. $ $ $ $ $ $
|
||||||
|
Legal/closing fees $ $ $ $ $ $
|
||||||
|
Other: $ $ $ $ $ $
|
||||||
|
Other: $ $ $ $ $ $
|
||||||
|
Total $ $ $ $ $ $
|
||||||
|
|
||||||
|
|
||||||
|
Funding status: (Provide status of all funding sources listed above and attach commitment
|
||||||
|
letters as appropriate.)
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Project Engineer/Architect:______________________________________________________
|
||||||
|
|
||||||
|
Has a copy of a project activities map or plat of the project site and proposed
|
||||||
|
improvements been attached to this application? <20> Yes <20> No <20> Not applicable to project.
|
||||||
|
If “No”, please explain why not:
|
||||||
|
______________________________________________________________________________
|
||||||
|
|
||||||
|
Has a copy of a resolution from the appropriate county/town supporting the project been
|
||||||
|
attached to this application? <20> Yes <20> No If “No”, please explain why
|
||||||
|
not:_____________________________________________________
|
||||||
|
______________________________________________________________________________
|
||||||
|
|
||||||
|
|
||||||
|
SECTION 5: EMPLOYMENT IMPACT
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Current Number of Employees at Project Location; if applicable:
|
||||||
|
|
||||||
|
______ Full-Time ______ Part-Time Average Full-Time Wage: $______________________
|
||||||
|
|
||||||
|
|
||||||
|
Projected Number of Employees at Project Location:
|
||||||
|
|
||||||
|
Within 1 Year: _________ Full-Time _________ Part-Time
|
||||||
|
|
||||||
|
SECTION 4: FUNDING REQUEST INFORMATION
|
||||||
|
|
||||||
|
Estimated Total Project Cost: $
|
||||||
|
|
||||||
|
Estimated CProp Funds Requested: $
|
||||||
|
|
||||||
|
Please list the estimated project costs and funding sources below.
|
||||||
|
|
||||||
|
‘Gost Category ‘Applicant CProp Source Source Source: Total
|
||||||
|
|
||||||
|
‘Land Acquistion
|
||||||
|
|
||||||
|
Site Development
|
||||||
|
|
||||||
|
‘Building Cost
|
||||||
|
|
||||||
|
Utilities/Roads
|
||||||
|
|
||||||
|
‘Engineoring/Arch,
|
||||||
|
|
||||||
|
Legallelosing fees
|
||||||
|
|
||||||
|
‘Other:
|
||||||
|
|
||||||
|
‘Other:
|
||||||
|
|
||||||
|
Total
|
||||||
|
|
||||||
|
Funding status: (Provide status of all funding sources listed above and attach commitment
|
||||||
|
letters as appropriate.)
|
||||||
|
|
||||||
|
Project Engineer/Architect:
|
||||||
|
|
||||||
|
Has a copy of a project activities map or plat of the project site and proposed
|
||||||
|
improvements been attached to this application? 1Yes [No LE Not applicable to project.
|
||||||
|
If “No”, please explain why not:
|
||||||
|
|
||||||
|
Has a copy of a resolution from the appropriate county/town supporting the project been
|
||||||
|
|
||||||
|
attached to this application? [] Yes [] No If “No”, please explain why
|
||||||
|
not:
|
||||||
|
|
||||||
|
SECTION 5: EMPLOYMENT IMPACT
|
||||||
|
|
||||||
|
Current Number of Employees at Project Location; if applicable:
|
||||||
|
|
||||||
|
Full-Time Part-Time Average Full-Time Wage: $.
|
||||||
|
|
||||||
|
Projected Number of Employees at Project Location:
|
||||||
|
|
||||||
|
Within | Year: Full-Time Part-Time
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
7
|
||||||
|
|
||||||
|
Average Full-Time Wage: $_______________________________________________________
|
||||||
|
|
||||||
|
|
||||||
|
Within 2 Years: _________ Full-Time _________ Part-Time
|
||||||
|
Average Full-Time Wage: $_______________________________________________________
|
||||||
|
|
||||||
|
Within 3 Years: _________ Full-Time _________ Part-Time
|
||||||
|
Average Full-Time Wage: $_______________________________________________________
|
||||||
|
|
||||||
|
Is it expected that employment at the project location will be drawn from residents of two
|
||||||
|
or more counties within the Cumberland Plateau? <20> Yes <20> No <20> Not applicable to project.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
SECTION 6: SIGNATURE PAGE
|
||||||
|
|
||||||
|
|
||||||
|
By signing below, the Applicant hereby acknowledges and agrees to the following:
|
||||||
|
|
||||||
|
• Eligibility for financial assistance from CPC is determined by the information presented in this application
|
||||||
|
and in the required attachments. Any changes in the proposed project from the facts presented herein could
|
||||||
|
disqualify the project. Therefore, CPC immediately must be advised in writing of any material changes in
|
||||||
|
the information contained in this application.
|
||||||
|
|
||||||
|
|
||||||
|
• The Applicant understands that neither the submission of this application, nor any other communications
|
||||||
|
|
||||||
|
(oral or written), creates any legally binding obligations upon CPC. There is no guarantee of approval.
|
||||||
|
|
||||||
|
|
||||||
|
• CPC may require supplemental information from time to time. Any such submitted supplemental
|
||||||
|
information shall become a part of this application.
|
||||||
|
|
||||||
|
|
||||||
|
• This application shall form a part of any grant agreement between the parties.
|
||||||
|
|
||||||
|
|
||||||
|
• Only complete signed applications will be considered.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
The undersigned hereby certifies that all information contained above and all information
|
||||||
|
contained in attachments which make up this application are true and correct to the best of
|
||||||
|
his/her knowledge and belief, and are submitted for the purpose of obtaining grant
|
||||||
|
assistance from the Cumberland Plateau Company’s CProp fund.
|
||||||
|
|
||||||
|
Applicant Name:_______________________________________________________________
|
||||||
|
|
||||||
|
By:____________________________________________________________________(SEAL)
|
||||||
|
Print Name:___________________________________________________________________
|
||||||
|
Title:_________________________________________________________________________
|
||||||
|
Date:_________________________________________________________________________
|
||||||
|
|
||||||
|
|
||||||
|
Average Full-Time Wage: S
|
||||||
|
|
||||||
|
Within 2 Years: Full-Time Part-Time
|
||||||
|
Average Full-Time Wage: S
|
||||||
|
|
||||||
|
Within 3 Years: Full-Time Part-Time
|
||||||
|
Average Full-Time Wage: S
|
||||||
|
|
||||||
|
Is it expected that employment at the project location will be drawn from residents of two
|
||||||
|
or more counties within the Cumberland Plateau?[_]Yes [No [_]Not applicable to project.
|
||||||
|
|
||||||
|
SECTION
|
||||||
|
|
||||||
|
: SIGNATURE PAGE
|
||||||
|
|
||||||
|
By signing below, the Applicant hereby acknowledges and agrees to the following:
|
||||||
|
|
||||||
|
Eligibility for financial assistance from CPC is determined by the information presented in this application
|
||||||
|
and in the required attachments. Any changes in the proposed project from the facts presented herein could
|
||||||
|
disqualify the project. Therefore, CPC immediately must be advised in writing of any material changes in
|
||||||
|
the information contained in this application,
|
||||||
|
|
||||||
|
‘* The Applicant understands that neither the submission of this application, nor any other communications
|
||||||
|
(oral or written), creates any legally binding obligations upon CPC. There is no guarantee of approval.
|
||||||
|
|
||||||
|
* CPC may require supplemental information fiom time to time. Any such submitted supplemental
|
||||||
|
information shall become a part of this application,
|
||||||
|
|
||||||
|
‘* This application shall form a part of any grant agreement between the parties.
|
||||||
|
|
||||||
|
© Only complete signed applications will be considered,
|
||||||
|
|
||||||
|
‘The undersigned hereby certifies that all information contained above and all information
|
||||||
|
contained in attachments which make up this application are true and correct to the best of
|
||||||
|
his/her knowledge and belief, and are submitted for the purpose of obtaining grant
|
||||||
|
assistance from the Cumberland Plateau Company’s CProp fund.
|
||||||
|
|
||||||
|
Applicant Name:
|
||||||
|
|
||||||
|
By: (SEAL)
|
||||||
|
Print Name:
|
||||||
|
|
||||||
|
Title:
|
||||||
|
|
||||||
|
Date:
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
City:
|
||||||
|
State:
|
||||||
|
ZIP:
|
||||||
|
Contact Person:
|
||||||
|
Telephone:
|
||||||
|
Fax:
|
||||||
|
Email:
|
||||||
|
Website:
|
||||||
|
Federal Tax ID Number:
|
||||||
|
DUNS Number if available:
|
||||||
|
Brief Description of Project 1:
|
||||||
|
Brief Description of Project 2:
|
||||||
|
Estimated Date of Project Completion:
|
||||||
|
identify and provide supporting information 1:
|
||||||
|
identify and provide supporting information 2:
|
||||||
|
identify and provide supporting information 3:
|
||||||
|
region 1:
|
||||||
|
createdretained 1:
|
||||||
|
createdretained 2:
|
||||||
|
createdretained 3:
|
||||||
|
createdretained 4:
|
||||||
|
createdretained 5:
|
||||||
|
createdretained 6:
|
||||||
|
createdretained 7:
|
||||||
|
createdretained 8:
|
||||||
|
createdretained 9:
|
||||||
|
createdretained 10:
|
||||||
|
createdretained 11:
|
||||||
|
createdretained 12:
|
||||||
|
createdretained 13:
|
||||||
|
createdretained 14:
|
||||||
|
createdretained 15:
|
||||||
|
createdretained 16:
|
||||||
|
createdretained 17:
|
||||||
|
createdretained 18:
|
||||||
|
createdretained 19:
|
||||||
|
createdretained 20:
|
||||||
|
createdretained 21:
|
||||||
|
createdretained 22:
|
||||||
|
createdretained 23:
|
||||||
|
createdretained 24:
|
||||||
|
createdretained 25:
|
||||||
|
createdretained 26:
|
||||||
|
createdretained 27:
|
||||||
|
createdretained 28:
|
||||||
|
createdretained 29:
|
||||||
|
createdretained 30:
|
||||||
|
createdretained 31:
|
||||||
|
createdretained 32:
|
||||||
|
createdretained 33:
|
||||||
|
createdretained 34:
|
||||||
|
Estimated Total Project Cost:
|
||||||
|
Estimated CProp Funds Requested:
|
||||||
|
letters as appropriate 1:
|
||||||
|
letters as appropriate 2:
|
||||||
|
letters as appropriate 3:
|
||||||
|
Project EngineerArchitect:
|
||||||
|
If No please explain why not 1:
|
||||||
|
If No please explain why not 2:
|
||||||
|
Current Number of Employees at Project Location if applicable:
|
||||||
|
FullTime:
|
||||||
|
Average FullTime Wage:
|
||||||
|
Within 1 Year:
|
||||||
|
FullTime_2:
|
||||||
|
Average FullTime Wage_2:
|
||||||
|
Within 2 Years:
|
||||||
|
FullTime_3:
|
||||||
|
Average FullTime Wage_3:
|
||||||
|
Within 3 Years:
|
||||||
|
FullTime_4:
|
||||||
|
Average FullTime Wage_4:
|
||||||
|
Applicant Name:
|
||||||
|
By:
|
||||||
|
Print Name:
|
||||||
|
Title:
|
||||||
|
Date:
|
||||||
|
fill_25:
|
||||||
|
fill_19:
|
||||||
|
fill_20:
|
||||||
|
fill_21:
|
||||||
|
fill_22:
|
||||||
|
fill_23:
|
||||||
|
fill_1:
|
||||||
|
fill_2:
|
||||||
|
fill_3:
|
||||||
|
fill_4:
|
||||||
|
fill_5:
|
||||||
|
fill_6:
|
||||||
|
fill_7:
|
||||||
|
fill_8:
|
||||||
|
fill_9:
|
||||||
|
fill_18:
|
||||||
|
fill_10:
|
||||||
|
fill_11:
|
||||||
|
fill_12:
|
||||||
|
fill_13:
|
||||||
|
fill_14:
|
||||||
|
fill_15:
|
||||||
|
fill_16:
|
||||||
|
fill_17:
|
||||||
|
fill_24:
|
||||||
|
fill_26:
|
||||||
|
fill_27:
|
||||||
|
fill_28:
|
||||||
|
fill_29:
|
||||||
|
fill_30:
|
||||||
|
fill_31:
|
||||||
|
fill_32:
|
||||||
|
fill_34:
|
||||||
|
fill_35:
|
||||||
|
fill_36:
|
||||||
|
fill_37:
|
||||||
|
fill_38:
|
||||||
|
fill_39:
|
||||||
|
fill_40:
|
||||||
|
fill_41:
|
||||||
|
fill_42:
|
||||||
|
fill_43:
|
||||||
|
fill_44:
|
||||||
|
fill_45:
|
||||||
|
fill_46:
|
||||||
|
fill_47:
|
||||||
|
fill_48:
|
||||||
|
fill_49:
|
||||||
|
fill_50:
|
||||||
|
fill_51:
|
||||||
|
fill_52:
|
||||||
|
fill_53:
|
||||||
|
fill_54:
|
||||||
|
Check Box1: Off
|
||||||
|
Check Box2: Off
|
||||||
|
Check Box3: Off
|
||||||
|
Address:
|
||||||
|
Name:
|
||||||
|
Check Box4: Off
|
||||||
|
Check Box5: Off
|
||||||
|
Check Box6: Off
|
||||||
|
Check Box7: Off
|
||||||
|
Check Box8: Off
|
||||||
|
Check Box9: Off
|
||||||
|
Check Box10: Off
|
||||||
|
Physical address of project location:
|
||||||
|
not:
|
||||||
|
region 2:
|
||||||
|
|
||||||
|
|
||||||
File diff suppressed because it is too large
Load Diff
|
|
@ -0,0 +1,143 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: CPPDC-Public-Parcipitation-Plan
|
||||||
|
file: ../CPPDC-Public-Parcipitation-Plan.pdf
|
||||||
|
tags:
|
||||||
|
- Cumberland_Plateau_Planning_District_Commission
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 120002
|
||||||
|
sha256sum: cc325eb5dd26d10bec2eee4c33ef18cfb73baef8504a006e1f7a88ae0b86d87c
|
||||||
|
sha1sum: cc2ca8bd0e0e211e7ed15c7680f834419d4c0d2a
|
||||||
|
---
|
||||||
|
|
||||||
|
Cumberland Plateau Planning District Commission
|
||||||
|
|
||||||
|
Public Participation Plan
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
This document is intended to guide the public participation procedure for the Cumberland
|
||||||
|
Plateau Planning District Commission in relation to the Rural Regional Long Range Transportation
|
||||||
|
Plan.
|
||||||
|
|
||||||
|
The Rural Regional Long Range Transportation Plan covers all aspects of transportation planning
|
||||||
|
for roadways, bike and pedestrian, air, rail, and travel demand over the long term. The proposed
|
||||||
|
projects in the plan is limited by the funds expected to be available over the next 20 years.
|
||||||
|
|
||||||
|
The purpose of this plan is to provide the opportunity for interested parties to be engaged in the
|
||||||
|
transportation planning process. Local officials, the general public, low income, minority and
|
||||||
|
disabled communities are encouraged to participate in the process.
|
||||||
|
|
||||||
|
INVOLVEMENT OPPORTUNITIES
|
||||||
|
|
||||||
|
The Cumberland Plateau PDC will:
|
||||||
|
|
||||||
|
|
||||||
|
• Hold a meeting to gather data and input at the beginning of the planning process or when
|
||||||
|
updating the Rural Long Range Transportation Plan.
|
||||||
|
|
||||||
|
• Hold all meetings at convenient, accessible times and locations.
|
||||||
|
• Use maps, charts, graphs and other tools to visually convey information presented.
|
||||||
|
• Advertise meetings for public input and listening sessions at least 14 days prior, by posting
|
||||||
|
|
||||||
|
in newspaper and on website.
|
||||||
|
• Provide comment cards and an email for public input.
|
||||||
|
• Provide accommodations for the disabled if needed.
|
||||||
|
|
||||||
|
|
||||||
|
Communications and Information
|
||||||
|
|
||||||
|
|
||||||
|
• All meeting dates and documents will be available on the PDC website.
|
||||||
|
• All draft and final plans will be available for viewing at the PDC office.
|
||||||
|
• Flyers will be available at local libraries and posted on community bulletin boards as
|
||||||
|
|
||||||
|
necessary.
|
||||||
|
|
||||||
|
Response
|
||||||
|
|
||||||
|
|
||||||
|
• The draft plan will be posted to the Cumberland Plateau PDC website and a 30 day
|
||||||
|
comment period will be offered.
|
||||||
|
|
||||||
|
• Copies of the draft document will be available at local libraries for review.
|
||||||
|
|
||||||
|
Cumberland Plateau Planning District Commission
|
||||||
|
|
||||||
|
Public Participation Plan
|
||||||
|
|
||||||
|
This document is intended to guide the public participation procedure for the Cumberland
|
||||||
|
|
||||||
|
Plateau Planning District Commission in relation to the Rural Regional Long Range Transportation
|
||||||
|
Plan.
|
||||||
|
|
||||||
|
The Rural Regional Long Range Transportation Plan covers all aspects of transportation planning
|
||||||
|
for roadways, bike and pedestrian, air, rail, and travel demand over the long term. The proposed
|
||||||
|
projects in the plan is limited by the funds expected to be available over the next 20 years.
|
||||||
|
|
||||||
|
The purpose of this plan is to provide the opportunity for interested parties to be engaged in the
|
||||||
|
transportation planning process. Local officials, the general public, low income, minority and
|
||||||
|
disabled communities are encouraged to participate in the process.
|
||||||
|
|
||||||
|
INVOLVEMENT OPPORTUNITIES
|
||||||
|
|
||||||
|
The Cumberland Plateau PDC will:
|
||||||
|
|
||||||
|
* Hold a meeting to gather data and input at the beginning of the planning process or when
|
||||||
|
updating the Rural Long Range Transportation Plan.
|
||||||
|
|
||||||
|
* Hold all meetings at convenient, accessible times and locations.
|
||||||
|
|
||||||
|
© Use maps, charts, graphs and other tools to visually convey information presented.
|
||||||
|
|
||||||
|
* Advertise meetings for public input and listening sessions at least 14 days prior, by posting
|
||||||
|
in newspaper and on website.
|
||||||
|
|
||||||
|
* Provide comment cards and an email for public input.
|
||||||
|
|
||||||
|
* Provide accommodations for the disabled if needed.
|
||||||
|
|
||||||
|
Communications and Information
|
||||||
|
|
||||||
|
© Allmeeting dates and documents will be available on the PDC website.
|
||||||
|
|
||||||
|
© All draft and final plans will be available for viewing at the PDC office.
|
||||||
|
|
||||||
|
Flyers will be available at local libraries and posted on community bulletin boards as
|
||||||
|
necessary.
|
||||||
|
|
||||||
|
Response
|
||||||
|
|
||||||
|
* The draft plan will be posted to the Cumberland Plateau PDC website and a 30 day
|
||||||
|
comment period will be offered.
|
||||||
|
* Copies of the draft document will be available at local libraries for review.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
• Staff will hold public meetings throughout the region to discuss the document and gather
|
||||||
|
feedback.
|
||||||
|
|
||||||
|
• All comments will be reviewed by staff and will receive a response before action on the
|
||||||
|
plan.
|
||||||
|
|
||||||
|
• Once all phases of the plan are complete, a final draft will be presented to member
|
||||||
|
localities for a majority vote. Upon adoption, the plan will be updated every five years for
|
||||||
|
inclusion in the Six Year Improvement Plan.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Staff will hold public meetings throughout the region to discuss the document and gather
|
||||||
|
feedback.
|
||||||
|
|
||||||
|
All comments will be reviewed by staff and will receive a response before action on the
|
||||||
|
plan.
|
||||||
|
|
||||||
|
Once all phases of the plan are complete, a final draft will be presented to member
|
||||||
|
localities for a majority vote. Upon adoption, the plan will be updated every five years for
|
||||||
|
inclusion in the Six Year Improvement Plan.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
@ -0,0 +1,403 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: Castlewood-CDP
|
||||||
|
file: ../Castlewood-CDP.pdf
|
||||||
|
tags:
|
||||||
|
- Cumberland_Plateau_Planning_District_Commission
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 118865
|
||||||
|
sha256sum: 28ec381b327d18088ba3aae6a7d18d35db7099dad3d92d11213d8028b077fa1a
|
||||||
|
sha1sum: 78178b9ad122a76d965f322e4e0dea7933bb1478
|
||||||
|
---
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Profile for Castlewood CDP, Virginia
|
||||||
|
Located in Russell County
|
||||||
|
People & Housing Employment & Income
|
||||||
|
|
||||||
|
Population Estimate (2021) 1,238 Labor Force (persons working in
|
||||||
|
the area) (2021) 441
|
||||||
|
|
||||||
|
H.S. Diploma or More - % of
|
||||||
|
Adults 25+ (2021) 84.2% Unemployment Rate (2021) 0.7
|
||||||
|
|
||||||
|
Bachelor's Deg. or More - % of
|
||||||
|
Adults 25+ (2021) 11.2% Median Household Income
|
||||||
|
|
||||||
|
(2021) $41,875
|
||||||
|
|
||||||
|
Households (2021) 579 Median Family Income (2021)
|
||||||
|
Total Housing Units (2021) 724 Poverty Rate (2021) 33.4
|
||||||
|
Percent of Total Units Vacant for
|
||||||
|
Seasonal or Recreational Use
|
||||||
|
(2021)
|
||||||
|
|
||||||
|
0.0% Mean Travel Time to Work
|
||||||
|
(minutes) (2021) 27.2
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Population by Age, 2021
|
||||||
|
|
||||||
|
Castlewood
|
||||||
|
CDP, Virginia
|
||||||
|
|
||||||
|
Pct. of
|
||||||
|
Total Virginia Pct. of
|
||||||
|
|
||||||
|
Total
|
||||||
|
Total 1,238 100% 8,582,479 100%
|
||||||
|
Preschool (0 to 4) 53 4.3% 501,494 5.8%
|
||||||
|
School Age (5 to 17) 153 12.4% 1,391,258 16.2%
|
||||||
|
College Age (18 to 24) 41 3.3% 807,206 9.4%
|
||||||
|
Young Adult (25 to 44) 279 22.5% 2,311,690 26.9%
|
||||||
|
Adult (45 to 64) 361 29.2% 2,242,231 26.1%
|
||||||
|
Older Adult (65 plus) 351 28.4% 1,328,600 15.5%
|
||||||
|
Median Age* 53.4 38.5
|
||||||
|
Source: U.S. Census Bureau, American Community Survey, latest 5-Year Estimates
|
||||||
|
*Median Age is averaged for combined areas
|
||||||
|
Population by Race and Hispanic Origin, 2021
|
||||||
|
|
||||||
|
Castlewood
|
||||||
|
CDP, Virginia
|
||||||
|
|
||||||
|
Pct. of
|
||||||
|
Total Virginia Pct. of
|
||||||
|
|
||||||
|
Total
|
||||||
|
Total 1,238 100% 8,582,479 100%
|
||||||
|
American Ind. or Alaskan Native Alone 0 0.0% 24,007 0.3%
|
||||||
|
Asian Alone 0 0.0% 578,210 6.7%
|
||||||
|
Black Alone 0 0.0% 1,631,941 19.0%
|
||||||
|
Native Hawaiian and Other Pac. Isl. Alone 0 0.0% 5,313 0.1%
|
||||||
|
White Alone 1,237 99.9% 5,574,307 64.9%
|
||||||
|
Two or More Race Groups 1 0.1% 503,340 5.9%
|
||||||
|
Hispanic or Latino
|
||||||
|
|
||||||
|
Profile for Castlewood CDP,
|
||||||
|
|
||||||
|
Located in Russell County
|
||||||
|
|
||||||
|
People & Housing
|
||||||
|
Population Estimate (2021) 1,238
|
||||||
|
HS. Diploma or More - % of .
|
||||||
|
Adults 25+ (2021) 84.2%
|
||||||
|
Bachelor's Deg. or More -% of 1 99
|
||||||
|
Adults 25+ (2021) a“
|
||||||
|
Households (2021) 579
|
||||||
|
Total Housing Units (2021) 724
|
||||||
|
Percent of Total Units Vacant for
|
||||||
|
Seasonal or Recreational Use 0.0%
|
||||||
|
|
||||||
|
(2021)
|
||||||
|
|
||||||
|
Population by Age, 2021
|
||||||
|
|
||||||
|
Total
|
||||||
|
Preschool (0 to 4)
|
||||||
|
School Age (5 to 17)
|
||||||
|
College Age (18 to 24)
|
||||||
|
Young Adult (25 to 44)
|
||||||
|
Adult (45 to 64)
|
||||||
|
Older Adult (65 plus)
|
||||||
|
Median Age*
|
||||||
|
|
||||||
|
Virginia
|
||||||
|
|
||||||
|
Employment & Income
|
||||||
|
Labor Force (persons working in
|
||||||
|
the area) (2021)
|
||||||
|
|
||||||
|
Unemployment Rate (2021)
|
||||||
|
Median Household Income
|
||||||
|
(2021)
|
||||||
|
Median Family Income (2021)
|
||||||
|
Poverty Rate (2021)
|
||||||
|
Mean Travel Time to Work
|
||||||
|
(minutes) (2021)
|
||||||
|
Castlewood Pet. of Virginia
|
||||||
|
CDP, Virginia Total
|
||||||
|
1,238 100% — 8,582,479
|
||||||
|
53 43% 501,494
|
||||||
|
153 12.4% 1,391,258
|
||||||
|
4 3.3% 807,206
|
||||||
|
279 22.5% 2,311,690
|
||||||
|
361 29.2% 2,242,231
|
||||||
|
351 28.4% — 1,328,600
|
||||||
|
53.4 38.5
|
||||||
|
|
||||||
|
441
|
||||||
|
0.7
|
||||||
|
|
||||||
|
$41,875
|
||||||
|
|
||||||
|
33.4
|
||||||
|
|
||||||
|
27.2
|
||||||
|
|
||||||
|
Pet. of
|
||||||
|
Total
|
||||||
|
100%
|
||||||
|
5.8%
|
||||||
|
16.2%
|
||||||
|
9.4%
|
||||||
|
26.9%
|
||||||
|
26.1%
|
||||||
|
15.5%
|
||||||
|
|
||||||
|
Source: U.S. Census Bureau, American Community Survey, latest 5-Year Estimates
|
||||||
|
|
||||||
|
*Median Age is averaged for combined areas
|
||||||
|
Population by Race and Hispanic Origin, 2021
|
||||||
|
|
||||||
|
Total
|
||||||
|
American Ind. or Alaskan Native Alone
|
||||||
|
Asian Alone
|
||||||
|
Black Alone
|
||||||
|
Native Hawaiian and Other Pac. Isl. Alone
|
||||||
|
White Alone
|
||||||
|
Two or More Race Groups
|
||||||
|
|
||||||
|
Hispanic or Latino
|
||||||
|
|
||||||
|
Castlewood Pet. of Virginia
|
||||||
|
CDP, Virginia Total
|
||||||
|
|
||||||
|
1,238 100% — 8,582,479
|
||||||
|
0 0.0% — 24,007
|
||||||
|
|
||||||
|
0 0.0% — 578,210
|
||||||
|
0 0.0% 1,631,941
|
||||||
|
0 0.0% — 5,313
|
||||||
|
1,237 99.9% 5,574,307
|
||||||
|
1 0.1% 503,340
|
||||||
|
|
||||||
|
Pet. of
|
||||||
|
Total
|
||||||
|
100%
|
||||||
|
0.3%
|
||||||
|
6.7%
|
||||||
|
19.0%
|
||||||
|
0.1%
|
||||||
|
64.9%
|
||||||
|
5.9%
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Total Hispanic or Latino 0 0.0% 840,248 9.8%
|
||||||
|
Mexican 0 0.0% 190,142 2.2%
|
||||||
|
Cuban 0 0.0% 22,602 0.3%
|
||||||
|
Puerto Rican 0 0.0% 108,327 1.3%
|
||||||
|
Other 0 0.0% 519,177 6.0%
|
||||||
|
Source: U.S. Census Bureau, American Community Survey, latest 5-Year Estimates
|
||||||
|
Educational Attainment, 2021
|
||||||
|
|
||||||
|
Castlewood
|
||||||
|
CDP, Virginia
|
||||||
|
|
||||||
|
Pct. of
|
||||||
|
Total Virginia Pct. of
|
||||||
|
|
||||||
|
Total
|
||||||
|
Total Population 25 and Older 991 100.0% 5,882,521 100.0%
|
||||||
|
Less Than 9th Grade 104 10.5% 217,549 3.7%
|
||||||
|
9th to 12th, No Diploma 53 5.3% 322,050 5.5%
|
||||||
|
High School Graduate (incl. equiv.) 422 42.6% 1,402,487 23.8%
|
||||||
|
Some College, No Degree 200 20.2% 1,102,111 18.7%
|
||||||
|
Associate Degree 101 10.2% 465,927 7.9%
|
||||||
|
Bachelor's Degree 76 7.7% 1,338,831 22.8%
|
||||||
|
Graduate or Professional Degree 35 3.5% 1,033,566 17.6%
|
||||||
|
Source: U.S. Census Bureau, American Community Survey, latest 5-Year Estimates
|
||||||
|
Households, 2021
|
||||||
|
|
||||||
|
Castlewood
|
||||||
|
CDP, Virginia
|
||||||
|
|
||||||
|
Pct. of
|
||||||
|
Total
|
||||||
|
|
||||||
|
Virginia
|
||||||
|
Households
|
||||||
|
|
||||||
|
Pct. of
|
||||||
|
Total
|
||||||
|
|
||||||
|
Total Households 579 100.0% 3,248,528 100.0%
|
||||||
|
Family Households 330 57.0% 2,134,654 65.7%
|
||||||
|
Married with Children 27 4.7% 647,307 19.9%
|
||||||
|
Married without Children 194 33.5% 970,074 29.9%
|
||||||
|
Single Parents 44 7.6% 256,084 7.9%
|
||||||
|
Other 65 11.2% 261,189 8.0%
|
||||||
|
Non-family Households 249 43.0% 1,113,874 34.3%
|
||||||
|
Living Alone 222 38.3% 899,255 27.7%
|
||||||
|
Average Household Size 2.0 2.5
|
||||||
|
Average Family Household Size 2.8 3.2
|
||||||
|
Source: U.S. Census Bureau, American Community Survey, latest 5-Year Estimates
|
||||||
|
Housing units, 2021
|
||||||
|
|
||||||
|
Castlewood
|
||||||
|
CDP, Virginia
|
||||||
|
|
||||||
|
Pct. of
|
||||||
|
Total Virginia Units Pct. of
|
||||||
|
|
||||||
|
Total
|
||||||
|
Total Housing Units 724 100.0% 3,596,100 100.0%
|
||||||
|
Owner Occupied 359 49.6% 2,164,967 60.2%
|
||||||
|
Renter Occupied 220 30.4% 1,083,561 30.1%
|
||||||
|
Vacant For Seasonal or Recreational Use 0 0.0% 78,915 2.2%
|
||||||
|
1-Unit (Attached or Detached) 494 68.2% 2,393,445 66.6%
|
||||||
|
2 - 9 Units 7 1.0% 287,952 8.0%
|
||||||
|
10 - 19 Units 0 0.0% 177,165 4.9%
|
||||||
|
|
||||||
|
Total Hispanic or Latino 0 0.0% — 840,248 9.8%
|
||||||
|
Mexican 0 0.0% 190,142 2.2%
|
||||||
|
Cuban 0 0.0% — 22,602 0.3%
|
||||||
|
Puerto Rican 0 0.0% 108,327 1.3%
|
||||||
|
Other 0 0.0% 519,177 6.0%
|
||||||
|
|
||||||
|
Source: U.S. Census Bureau, American Community Survey, latest 5-Year Estimates
|
||||||
|
Educational Attainment, 2021
|
||||||
|
|
||||||
|
Castlewood Pet. of Virginia Pet. of
|
||||||
|
CDP, Virginia Total Total
|
||||||
|
Total Population 25 and Older 991 100.0% 5,882,521 100.0%
|
||||||
|
Less Than 9th Grade 104 10.5% 217,549 3.1%
|
||||||
|
9th to 12th, No Diploma 53 5.3% 322,050 5.5%
|
||||||
|
High School Graduate (incl. equiv.) 422 42.6% 1,402,487 23.8%
|
||||||
|
Some College, No Degree 200 20.2% 1,102,111 18.7%
|
||||||
|
Associate Degree 101 10.2% 465,927 7.9%
|
||||||
|
Bachelor's Degree 76 7.7% 1,338,831 22.8%
|
||||||
|
Graduate or Professional Degree 35 3.5% 1,033,566 17.6%
|
||||||
|
Source: U.S. Census Bureau, American Community Survey, latest 5-Year Estimates
|
||||||
|
Households, 2021
|
||||||
|
Castlewood Pet. of Virginia Pet. of
|
||||||
|
CDP, Virginia Total Households Total
|
||||||
|
Total Households 579 100.0% 3,248,528 100.0%
|
||||||
|
Family Households 330 57.0% 2,134,654 65.7%
|
||||||
|
Married with Children 27 47% 647,307 19.9%
|
||||||
|
Married without Children 194 33.5% 970,074 29.9%
|
||||||
|
Single Parents 44 7.6% 256,084 7.9%
|
||||||
|
Other 65 11.2% 261,189 8.0%
|
||||||
|
Non-family Households 249 43.0% 1,113,874 34.3%
|
||||||
|
Living Alone 222 38.3% 899,255 27.7%
|
||||||
|
Average Household Size 2.0 25
|
||||||
|
Average Family Household Size 28 3.2
|
||||||
|
Source: U.S. Census Bureau, American Community Survey, latest 5-Year Estimates
|
||||||
|
Housing units, 2021
|
||||||
|
Castlewood Pet. of Pet. of
|
||||||
|
|
||||||
|
Virginia Units
|
||||||
|
|
||||||
|
CDP, Virginia Total Total
|
||||||
|
|
||||||
|
Total Housing Units 724 100.0% 3,596,100 100.0%
|
||||||
|
Owner Occupied 359 49.6% 2,164,967 60.2%
|
||||||
|
Renter Occupied 220 30.4% — 1,083,561 30.1%
|
||||||
|
Vacant For Seasonal or Recreational Use 0 0.0% — 78,915 2.2%
|
||||||
|
1-Unit (Attached or Detached) 494 68.2% — 2,393,445 66.6%
|
||||||
|
2-9 Units 7 1.0% 287,952 8.0%
|
||||||
|
|
||||||
|
10 - 19 Units 0 0.0% — 177,165 49%
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
20 or more Units 0 0.0% 261,335 7.3%
|
||||||
|
Built prior to 1940 38 5.2% 258,472 7.2%
|
||||||
|
Source: U.S. Census Bureau, American Community Survey, latest 5-Year Estimates
|
||||||
|
Labor Force Averages, 2021
|
||||||
|
|
||||||
|
Castlewood CDP,
|
||||||
|
Virginia Virginia
|
||||||
|
|
||||||
|
Total Labor Force 441 4,422,588
|
||||||
|
Employed 438 4,219,781
|
||||||
|
Unemployed 3 202,807
|
||||||
|
Unemployment Rate 0.7 4.6
|
||||||
|
Source: U.S. Census Bureau, American Community Survey, latest 5-Year Estimates
|
||||||
|
Commuting to Work, 2021
|
||||||
|
|
||||||
|
Castlewood
|
||||||
|
CDP, Virginia
|
||||||
|
|
||||||
|
Pct. of
|
||||||
|
Total Virginia Pct. of
|
||||||
|
|
||||||
|
Total
|
||||||
|
Workers 16 years and over 411 100.0% 4,268,079 100.0%
|
||||||
|
Car, truck, or van -- drove alone 394 95.9% 3,104,957 72.7%
|
||||||
|
Car, truck, or van -- carpooled 10 2.4% 361,359 8.5%
|
||||||
|
Public transportation (excluding taxicab) 0 0.0% 146,755 3.4%
|
||||||
|
Walked 7 1.7% 95,270 2.2%
|
||||||
|
Other means 0 0.0% 72,515 1.7%
|
||||||
|
Worked at home 0 0.0% 487,223 11.4%
|
||||||
|
Mean travel time to work (minutes) 27 25
|
||||||
|
Source: U.S. Census Bureau, American Community Survey, latest 5-Year Estimates
|
||||||
|
Resident Occupations, 2021
|
||||||
|
|
||||||
|
Castlewood
|
||||||
|
CDP, Virginia
|
||||||
|
|
||||||
|
Pct. of
|
||||||
|
Total Virginia Pct. of
|
||||||
|
|
||||||
|
Total
|
||||||
|
Employed civilian pop. 16 years and over 438 100.0% 4,219,781 100.0%
|
||||||
|
Management, professional, and related 72 16.4% 1,954,214 46.3%
|
||||||
|
Service 33 7.5% 682,362 16.2%
|
||||||
|
Sales and office 170 38.8% 807,573 19.1%
|
||||||
|
Farming, fishing, and forestry 0 0.0% 14,146 0.3%
|
||||||
|
Construction, extraction, and maintenance 74 16.9% 316,525 7.5%
|
||||||
|
Production, transportation, and material
|
||||||
|
moving 89 20.3% 444,961 10.5%
|
||||||
|
|
||||||
|
Source: U.S. Census Bureau, American Community Survey, latest 5-Year Estimates
|
||||||
|
|
||||||
|
20 or more Units 0 0.0% — 261,335 73%
|
||||||
|
Built prior to 1940 38 5.2% 258,472 1%
|
||||||
|
Source: U.S. Census Bureau, American Community Survey, latest 5-Year Estimates
|
||||||
|
Labor Force Averages, 2021
|
||||||
|
Castlewood CDP,
|
||||||
|
|
||||||
|
Virginia Virginia
|
||||||
|
Total Labor Force 441 4,422,588
|
||||||
|
Employed 438 4,219,781
|
||||||
|
Unemployed 3 202,807
|
||||||
|
Unemployment Rate 07 46
|
||||||
|
|
||||||
|
Source: U.S. Census Bureau, American Community Survey, latest 5-Year Estimates
|
||||||
|
‘Commuting to Work, 2021
|
||||||
|
|
||||||
|
Castlewood Pet. of Virginia Pet. of
|
||||||
|
CDP, Virginia Total Total
|
||||||
|
Workers 16 years and over 4 100.0% 4.268079 100.0%
|
||||||
|
Car, truck, or van -- drove alone 394 95.9% 3,104,957 72.7%
|
||||||
|
Car, truck, or van -- carpooled 10 2.4% 361,359 8.5%
|
||||||
|
Public transportation (excluding taxicab) 0 0.0% 146,755 3.4%
|
||||||
|
Walked 7 1.7% 95,270 2.2%
|
||||||
|
Other means 0 0.0% 72,515 1.7%
|
||||||
|
Worked at home 0 0.0% 487,223 11.4%
|
||||||
|
Mean travel time to work (minutes) 27 25
|
||||||
|
Source: U.S. Census Bureau, American Community Survey, latest 5-Year Estimates
|
||||||
|
Resident Occupations, 2021
|
||||||
|
Castlewood Pet. of Virginia Pet. of
|
||||||
|
CDP, Virginia Total Total
|
||||||
|
Employed civilian pop. 16 years and over 438 100.0% 4.219.781 100.0%
|
||||||
|
Management, professional, and related 72 16.4% 1,954,214 46.3%
|
||||||
|
Service 33 7.5% 682,362 16.2%
|
||||||
|
Sales and office 170 38.8% 807,573 19.1%
|
||||||
|
Farming, fishing, and forestry 0 0.0% — 14,146 0.3%
|
||||||
|
Construction, extraction, and maintenance 74 16.9% 316,525 7.5%
|
||||||
|
Production, transportation, and material gg 203% 444,961 10.5%
|
||||||
|
moving
|
||||||
|
|
||||||
|
Source: U.S. Census Bureau, American Community Survey, latest 5-Year Estimates
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Profile for Castlewood CDP, Virginia
|
||||||
|
|
||||||
|
|
@ -0,0 +1,463 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: Claypool-Hill-CDP
|
||||||
|
file: ../Claypool-Hill-CDP.pdf
|
||||||
|
tags:
|
||||||
|
- Cumberland_Plateau_Planning_District_Commission
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 118433
|
||||||
|
sha256sum: 86eee10f97901f7f31ac26ed4a4c9cd88c2a804feb87531e7c8e011ad77eef24
|
||||||
|
sha1sum: a85d28ec83ad33c26952a3639dd185b6a9d5bc94
|
||||||
|
---
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Profile for Claypool Hill CDP, Virginia
|
||||||
|
Located in Tazewell County
|
||||||
|
People & Housing Employment & Income
|
||||||
|
|
||||||
|
Population Estimate (2021) 1,169 Labor Force (persons working in
|
||||||
|
the area) (2021) 411
|
||||||
|
|
||||||
|
H.S. Diploma or More - % of
|
||||||
|
Adults 25+ (2021) 80.0% Unemployment Rate (2021) 9.2
|
||||||
|
|
||||||
|
Bachelor's Deg. or More - % of
|
||||||
|
Adults 25+ (2021) 16.2% Median Household Income
|
||||||
|
|
||||||
|
(2021) $39,485
|
||||||
|
|
||||||
|
Households (2021) 525 Median Family Income (2021) $42,433
|
||||||
|
Total Housing Units (2021) 681 Poverty Rate (2021) 12.9
|
||||||
|
Percent of Total Units Vacant for
|
||||||
|
Seasonal or Recreational Use
|
||||||
|
(2021)
|
||||||
|
|
||||||
|
3.1% Mean Travel Time to Work
|
||||||
|
(minutes) (2021) 21.2
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Population by Age, 2021
|
||||||
|
|
||||||
|
Claypool Hill
|
||||||
|
CDP, Virginia
|
||||||
|
|
||||||
|
Pct. of
|
||||||
|
Total Virginia Pct. of
|
||||||
|
|
||||||
|
Total
|
||||||
|
Total 1,169 100% 8,582,479 100%
|
||||||
|
Preschool (0 to 4) 111 9.5% 501,494 5.8%
|
||||||
|
School Age (5 to 17) 144 12.3% 1,391,258 16.2%
|
||||||
|
College Age (18 to 24) 63 5.4% 807,206 9.4%
|
||||||
|
Young Adult (25 to 44) 330 28.2% 2,311,690 26.9%
|
||||||
|
Adult (45 to 64) 139 11.9% 2,242,231 26.1%
|
||||||
|
Older Adult (65 plus) 382 32.7% 1,328,600 15.5%
|
||||||
|
Median Age* 37.1 38.5
|
||||||
|
Source: U.S. Census Bureau, American Community Survey, latest 5-Year Estimates
|
||||||
|
*Median Age is averaged for combined areas
|
||||||
|
Population by Race and Hispanic Origin, 2021
|
||||||
|
|
||||||
|
Claypool Hill
|
||||||
|
CDP, Virginia
|
||||||
|
|
||||||
|
Pct. of
|
||||||
|
Total Virginia Pct. of
|
||||||
|
|
||||||
|
Total
|
||||||
|
Total 1,169 100% 8,582,479 100%
|
||||||
|
American Ind. or Alaskan Native Alone 0 0.0% 24,007 0.3%
|
||||||
|
Asian Alone 0 0.0% 578,210 6.7%
|
||||||
|
Black Alone 19 1.6% 1,631,941 19.0%
|
||||||
|
Native Hawaiian and Other Pac. Isl. Alone 0 0.0% 5,313 0.1%
|
||||||
|
White Alone 1,093 93.5% 5,574,307 64.9%
|
||||||
|
Two or More Race Groups 0 0.0% 503,340 5.9%
|
||||||
|
Hispanic or Latino
|
||||||
|
|
||||||
|
Profile for Claypool Hill CDP, Virginia
|
||||||
|
|
||||||
|
Located in Tazewell County
|
||||||
|
|
||||||
|
People & Housing
|
||||||
|
|
||||||
|
Population Estimate (2021) 1,169
|
||||||
|
|
||||||
|
HLS. Diploma or More - % of ,
|
||||||
|
|
||||||
|
Adults 25+ (2021) 80.0%
|
||||||
|
: -%
|
||||||
|
|
||||||
|
Bachelor's Deg. or More =% of 16 99%
|
||||||
|
|
||||||
|
‘Adults 25+ (2021)
|
||||||
|
|
||||||
|
Households (2021) 525
|
||||||
|
|
||||||
|
Total Housing Units 2021) 681
|
||||||
|
|
||||||
|
Percent of Total Units Vacant for
|
||||||
|
|
||||||
|
Seasonal or Recreational Use 3.1%
|
||||||
|
|
||||||
|
(2021)
|
||||||
|
|
||||||
|
Population by Age, 2021
|
||||||
|
|
||||||
|
Total
|
||||||
|
Preschool (0 to 4)
|
||||||
|
School Age (5 to 17)
|
||||||
|
College Age (18 to 24)
|
||||||
|
Young Adult (25 to 44)
|
||||||
|
Adult (45 to 64)
|
||||||
|
Older Adult (65 plus)
|
||||||
|
Median Age*
|
||||||
|
|
||||||
|
Employment & Income
|
||||||
|
Labor Force (persons working in
|
||||||
|
the area) (2021)
|
||||||
|
|
||||||
|
Unemployment Rate (2021)
|
||||||
|
|
||||||
|
Median Houschold Income
|
||||||
|
|
||||||
|
(2021)
|
||||||
|
|
||||||
|
Median Family Income (2021)
|
||||||
|
|
||||||
|
Poverty Rate (2021)
|
||||||
|
|
||||||
|
Mean Travel Time to Work
|
||||||
|
|
||||||
|
(minutes) (2021)
|
||||||
|
Claypool Hill Pet. of, -
|
||||||
|
CDP. Virginia Total Virginia
|
||||||
|
1,169 100% — 8,582,479
|
||||||
|
M1 9.5% 501,494
|
||||||
|
144 12.3% 1,391,258
|
||||||
|
63 5.4% 807,206
|
||||||
|
330 28.2% 2,311,690
|
||||||
|
139 11.9% 2,242,231
|
||||||
|
382 32.7% — 1,328,600
|
||||||
|
37.1 38.5
|
||||||
|
|
||||||
|
411
|
||||||
|
9.2
|
||||||
|
|
||||||
|
$39,485
|
||||||
|
|
||||||
|
$42,433
|
||||||
|
12.9
|
||||||
|
|
||||||
|
21.2
|
||||||
|
|
||||||
|
Pet. of
|
||||||
|
Total
|
||||||
|
100%
|
||||||
|
5.8%
|
||||||
|
16.2%
|
||||||
|
9.4%
|
||||||
|
26.9%
|
||||||
|
26.1%
|
||||||
|
15.5%
|
||||||
|
|
||||||
|
Source: U.S. Census Bureau, American Community Survey, latest 5-Year Estimates
|
||||||
|
|
||||||
|
*Median Age is averaged for combined areas
|
||||||
|
Population by Race and Hispanic Origin, 2021
|
||||||
|
|
||||||
|
Total
|
||||||
|
American Ind. or Alaskan Native Alone
|
||||||
|
Asian Alone
|
||||||
|
Black Alone
|
||||||
|
Native Hawaiian and Other Pac. Isl. Alone
|
||||||
|
White Alone
|
||||||
|
Two or More Race Groups
|
||||||
|
|
||||||
|
Hispanic or Latino
|
||||||
|
|
||||||
|
Claypool Hill Pet. of
|
||||||
|
|
||||||
|
CDP, Virginia Total Vit8inia
|
||||||
|
1,169 100% — 8,582,479
|
||||||
|
0 0.0% 24,007
|
||||||
|
|
||||||
|
0 0.0% 578,210
|
||||||
|
19 1.6% 1,631,941
|
||||||
|
0 0.0% 5,313
|
||||||
|
1,093 93.5% 5,574,307
|
||||||
|
0 0.0% — 503,340
|
||||||
|
|
||||||
|
Pet. of
|
||||||
|
Total
|
||||||
|
100%
|
||||||
|
0.3%
|
||||||
|
6.7%
|
||||||
|
19.0%
|
||||||
|
0.1%
|
||||||
|
64.9%
|
||||||
|
5.9%
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Total Hispanic or Latino 57 4.9% 840,248 9.8%
|
||||||
|
Mexican 0 0.0% 190,142 2.2%
|
||||||
|
Cuban 0 0.0% 22,602 0.3%
|
||||||
|
Puerto Rican 0 0.0% 108,327 1.3%
|
||||||
|
Other 57 4.9% 519,177 6.0%
|
||||||
|
Source: U.S. Census Bureau, American Community Survey, latest 5-Year Estimates
|
||||||
|
Educational Attainment, 2021
|
||||||
|
|
||||||
|
Claypool Hill
|
||||||
|
CDP, Virginia
|
||||||
|
|
||||||
|
Pct. of
|
||||||
|
Total Virginia Pct. of
|
||||||
|
|
||||||
|
Total
|
||||||
|
Total Population 25 and Older 851 100.0% 5,882,521 100.0%
|
||||||
|
Less Than 9th Grade 77 9.0% 217,549 3.7%
|
||||||
|
9th to 12th, No Diploma 93 10.9% 322,050 5.5%
|
||||||
|
High School Graduate (incl. equiv.) 297 34.9% 1,402,487 23.8%
|
||||||
|
Some College, No Degree 192 22.6% 1,102,111 18.7%
|
||||||
|
Associate Degree 54 6.3% 465,927 7.9%
|
||||||
|
Bachelor's Degree 60 7.1% 1,338,831 22.8%
|
||||||
|
Graduate or Professional Degree 78 9.2% 1,033,566 17.6%
|
||||||
|
Source: U.S. Census Bureau, American Community Survey, latest 5-Year Estimates
|
||||||
|
Households, 2021
|
||||||
|
|
||||||
|
Claypool Hill
|
||||||
|
CDP, Virginia
|
||||||
|
|
||||||
|
Pct. of
|
||||||
|
Total
|
||||||
|
|
||||||
|
Virginia
|
||||||
|
Households
|
||||||
|
|
||||||
|
Pct. of
|
||||||
|
Total
|
||||||
|
|
||||||
|
Total Households 525 100.0% 3,248,528 100.0%
|
||||||
|
Family Households 321 61.1% 2,134,654 65.7%
|
||||||
|
Married with Children 58 11.0% 647,307 19.9%
|
||||||
|
Married without Children 210 40.0% 970,074 29.9%
|
||||||
|
Single Parents 35 6.7% 256,084 7.9%
|
||||||
|
Other 18 3.4% 261,189 8.0%
|
||||||
|
Non-family Households 204 38.9% 1,113,874 34.3%
|
||||||
|
Living Alone 198 37.7% 899,255 27.7%
|
||||||
|
Average Household Size 2.2 2.5
|
||||||
|
Average Family Household Size 2.9 3.2
|
||||||
|
Source: U.S. Census Bureau, American Community Survey, latest 5-Year Estimates
|
||||||
|
Housing units, 2021
|
||||||
|
|
||||||
|
Claypool Hill
|
||||||
|
CDP, Virginia
|
||||||
|
|
||||||
|
Pct. of
|
||||||
|
Total Virginia Units Pct. of
|
||||||
|
|
||||||
|
Total
|
||||||
|
Total Housing Units 681 100.0% 3,596,100 100.0%
|
||||||
|
Owner Occupied 388 57.0% 2,164,967 60.2%
|
||||||
|
Renter Occupied 137 20.1% 1,083,561 30.1%
|
||||||
|
Vacant For Seasonal or Recreational Use 21 3.1% 78,915 2.2%
|
||||||
|
1-Unit (Attached or Detached) 418 61.4% 2,393,445 66.6%
|
||||||
|
2 - 9 Units 0 0.0% 287,952 8.0%
|
||||||
|
10 - 19 Units 0 0.0% 177,165 4.9%
|
||||||
|
|
||||||
|
Total Hispanic or Latino 37 49% — 840,248
|
||||||
|
Mexican 0 0.0% — 190,142
|
||||||
|
Cuban 0 0.0% 22,602
|
||||||
|
Puerto Rican 0 0.0% — 108,327
|
||||||
|
Other 37 49% 519,177
|
||||||
|
|
||||||
|
Source: U.S. Census Bureau, American Community Survey, latest 5-Year Estimates
|
||||||
|
|
||||||
|
Educational Attainment, 2021
|
||||||
|
|
||||||
|
Claypool Hill Pet. of -_
|
||||||
|
CDP. Virginia Total Virginia
|
||||||
|
|
||||||
|
Total Population 25 and Older 851 100.0% 5,882,521
|
||||||
|
Less Than 9th Grade 1 9.0% 217,549
|
||||||
|
9th to 12th, No Diploma 93 10.9% 322,050
|
||||||
|
High School Graduate (incl. equiv.) 297 34.9% 1,402,487
|
||||||
|
Some College, No Degree 192 22.6% 1,102,111
|
||||||
|
Associate Degree 54 6.3% 465,927
|
||||||
|
Bachelor's Degree 60 TA% 1,338,831
|
||||||
|
Graduate or Professional Degree 8 9.2% 1,033,566
|
||||||
|
|
||||||
|
Source: U.S, Census Bureau, American Community Survey, latest 5-Year Estimates
|
||||||
|
|
||||||
|
Households, 2021
|
||||||
|
|
||||||
|
Claypool Hill Pot. of Virginia
|
||||||
|
CDP, Virginia Total Households
|
||||||
|
|
||||||
|
Total Households 525 100.0% 3,248,528
|
||||||
|
Family Households 321 61.1% 2,134,654
|
||||||
|
Married with Children 58 11.0% 647,307
|
||||||
|
Married without Children 210 40.0% 970,074
|
||||||
|
Single Parents 35 6.7% 256,084
|
||||||
|
Other 18 3.4% — 261,189
|
||||||
|
Non-family Households 204 38.9% 1,113,874
|
||||||
|
Living Alone 198 37.7% 899,255
|
||||||
|
|
||||||
|
Average Household Size 22 25
|
||||||
|
|
||||||
|
Average Family Houschold Size 29 32
|
||||||
|
|
||||||
|
Source: U.S. Census Bureau, American Community Survey, latest 5-Year Estimates
|
||||||
|
|
||||||
|
Housing units, 2021
|
||||||
|
|
||||||
|
Claypool Hill Pot of
|
||||||
|
CDP. Virginia Total Vitsinia Units
|
||||||
|
|
||||||
|
Total Housing Units 681 100.0% 3,596,100
|
||||||
|
Owner Occupied 388 57.0% 2,164,967
|
||||||
|
Renter Occupied 137 20.1% 1,083,561
|
||||||
|
Vacant For Seasonal or Recreational Use 21 3.1% 78,915
|
||||||
|
1-Unit (Attached or Detached) 418 61.4% 2,393,445
|
||||||
|
2-9 Units 0 0.0% (287,952
|
||||||
|
10 - 19 Units 0 0.0% 177,165
|
||||||
|
|
||||||
|
9.8%
|
||||||
|
2.2%
|
||||||
|
0.3%
|
||||||
|
1.3%
|
||||||
|
6.0%
|
||||||
|
|
||||||
|
Pet. of
|
||||||
|
Total
|
||||||
|
100.0%
|
||||||
|
3.7%
|
||||||
|
5.5%
|
||||||
|
23.8%
|
||||||
|
18.7%
|
||||||
|
7.9%
|
||||||
|
22.8%
|
||||||
|
17.6%
|
||||||
|
|
||||||
|
Pet. of
|
||||||
|
Total
|
||||||
|
100.0%
|
||||||
|
65.7%
|
||||||
|
19.9%
|
||||||
|
29.9%
|
||||||
|
7.9%
|
||||||
|
8.0%
|
||||||
|
34.3%
|
||||||
|
27.1%
|
||||||
|
|
||||||
|
Pet. of
|
||||||
|
Total
|
||||||
|
100.0%
|
||||||
|
60.2%
|
||||||
|
30.1%
|
||||||
|
2.2%
|
||||||
|
66.6%
|
||||||
|
8.0%
|
||||||
|
49%
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
20 or more Units 0 0.0% 261,335 7.3%
|
||||||
|
Built prior to 1940 7 1.0% 258,472 7.2%
|
||||||
|
Source: U.S. Census Bureau, American Community Survey, latest 5-Year Estimates
|
||||||
|
Labor Force Averages, 2021
|
||||||
|
|
||||||
|
Claypool Hill CDP,
|
||||||
|
Virginia Virginia
|
||||||
|
|
||||||
|
Total Labor Force 411 4,422,588
|
||||||
|
Employed 373 4,219,781
|
||||||
|
Unemployed 38 202,807
|
||||||
|
Unemployment Rate 9.2 4.6
|
||||||
|
Source: U.S. Census Bureau, American Community Survey, latest 5-Year Estimates
|
||||||
|
Commuting to Work, 2021
|
||||||
|
|
||||||
|
Claypool Hill
|
||||||
|
CDP, Virginia
|
||||||
|
|
||||||
|
Pct. of
|
||||||
|
Total Virginia Pct. of
|
||||||
|
|
||||||
|
Total
|
||||||
|
Workers 16 years and over 373 100.0% 4,268,079 100.0%
|
||||||
|
Car, truck, or van -- drove alone 365 97.9% 3,104,957 72.7%
|
||||||
|
Car, truck, or van -- carpooled 0 0.0% 361,359 8.5%
|
||||||
|
Public transportation (excluding taxicab) 0 0.0% 146,755 3.4%
|
||||||
|
Walked 0 0.0% 95,270 2.2%
|
||||||
|
Other means 0 0.0% 72,515 1.7%
|
||||||
|
Worked at home 8 2.1% 487,223 11.4%
|
||||||
|
Mean travel time to work (minutes) 21 25
|
||||||
|
Source: U.S. Census Bureau, American Community Survey, latest 5-Year Estimates
|
||||||
|
Resident Occupations, 2021
|
||||||
|
|
||||||
|
Claypool Hill
|
||||||
|
CDP, Virginia
|
||||||
|
|
||||||
|
Pct. of
|
||||||
|
Total Virginia Pct. of
|
||||||
|
|
||||||
|
Total
|
||||||
|
Employed civilian pop. 16 years and over 373 100.0% 4,219,781 100.0%
|
||||||
|
Management, professional, and related 128 34.3% 1,954,214 46.3%
|
||||||
|
Service 6 1.6% 682,362 16.2%
|
||||||
|
Sales and office 190 50.9% 807,573 19.1%
|
||||||
|
Farming, fishing, and forestry 0 0.0% 14,146 0.3%
|
||||||
|
Construction, extraction, and maintenance 0 0.0% 316,525 7.5%
|
||||||
|
Production, transportation, and material
|
||||||
|
moving 49 13.1% 444,961 10.5%
|
||||||
|
|
||||||
|
Source: U.S. Census Bureau, American Community Survey, latest 5-Year Estimates
|
||||||
|
|
||||||
|
20 or more Units 0 0.0% — 261,335 73%
|
||||||
|
Built prior to 1940 7 1.0% 258,472 1%
|
||||||
|
Source: U.S. Census Bureau, American Community Survey, latest 5-Year Estimates
|
||||||
|
Labor Force Averages, 2021
|
||||||
|
Claypool Hill CDP,
|
||||||
|
|
||||||
|
Virginia Virginia
|
||||||
|
Total Labor Force 411 4,422,588
|
||||||
|
Employed 373 4,219,781
|
||||||
|
Unemployed 38 202,807
|
||||||
|
Unemployment Rate 92 46
|
||||||
|
|
||||||
|
Source: U.S. Census Bureau, American Community Survey, latest 5-Year Estimates
|
||||||
|
‘Commuting to Work, 2021
|
||||||
|
|
||||||
|
Claypool Hill Pet. of Virginia Pet. of
|
||||||
|
CDP, Virginia Total Total
|
||||||
|
Workers 16 years and over 373 100.0% 4.268079 100.0%
|
||||||
|
Car, truck, or van -- drove alone 365 97.9% 3,104,957 72.7%
|
||||||
|
Car, truck, or van -- carpooled 0 0.0% 361,359 8.5%
|
||||||
|
Public transportation (excluding taxicab) 0 0.0% 146,755 3.4%
|
||||||
|
Walked 0 0.0% 95,270 2.2%
|
||||||
|
Other means 0 0.0% 72,515 1.7%
|
||||||
|
Worked at home 8 2.1% 487,223 11.4%
|
||||||
|
Mean travel time to work (minutes) 21 25
|
||||||
|
Source: U.S. Census Bureau, American Community Survey, latest 5-Year Estimates
|
||||||
|
Resident Occupations, 2021
|
||||||
|
Claypool Hill Pet. of Visginig Pet. of
|
||||||
|
CDP, Virginia Total Total
|
||||||
|
Employed civilian pop. 16 years and over 373 100.0% 4.219.781 100.0%
|
||||||
|
Management, professional, and related 128 34.3% 1,954,214 46.3%
|
||||||
|
Service 6 1.6% 682,362 16.2%
|
||||||
|
Sales and office 190 50.9% 807,573 19.1%
|
||||||
|
Farming, fishing, and forestry 0) 0.0% 14,146 0.3%
|
||||||
|
Construction, extraction, and maintenance 0 0.0% 316,525 7.5%
|
||||||
|
Production, transportation, and material 4g 13.1% 444,961 10.5%
|
||||||
|
moving
|
||||||
|
|
||||||
|
Source: U.S. Census Bureau, American Community Survey, latest 5-Year Estimates
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Profile for Claypool Hill CDP, Virginia
|
||||||
|
|
||||||
|
|
@ -0,0 +1,89 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: Coal-Production
|
||||||
|
file: ../Coal-Production.pdf
|
||||||
|
tags:
|
||||||
|
- Cumberland_Plateau_Planning_District_Commission
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 50876
|
||||||
|
sha256sum: 6b6cf3ebaf171650b6b0255e581d053c532e5587f92dd63e7d458e499c0c6ce7
|
||||||
|
sha1sum: 3c9e7da399fa49b4a7dfd4e75aa8c017b35190fb
|
||||||
|
---
|
||||||
|
|
||||||
|
Year Buchanan Dickenson Russell Tazewell PDC Total
|
||||||
|
1990 20,938,340 6,686,984 926,249 3,716,869 32,268,442
|
||||||
|
1991 17,479,189 5,857,352 1,114,282 3,921,886 28,372,709
|
||||||
|
1992 17,962,757 6,360,976 1,094,510 3,534,018 28,952,261
|
||||||
|
1993 13,958,036 5,516,515 1,552,558 2,862,372 23,889,481
|
||||||
|
1994 13,594,006 4,303,346 1,467,694 2,481,842 21,846,888
|
||||||
|
1995 13,791,629 2,704,253 1,728,600 2,156,220 20,380,702
|
||||||
|
1996 14,783,931 2,988,258 1,345,502 1,839,618 20,957,309
|
||||||
|
1997 14,224,401 3,699,032 696,401 1,699,083 20,318,917
|
||||||
|
1998 12,467,167 4,021,151 705,429 1,806,652 19,000,399
|
||||||
|
1999 10,655,918 4,168,329 394,430 2,069,730 17,288,407
|
||||||
|
2000 11,154,684 4,259,431 156,525 1,469,825 17,040,465
|
||||||
|
2001 11,589,519 3,230,718 665,065 1,626,539 17,111,841
|
||||||
|
2002 10,048,222 2,779,463 556,557 1,435,455 14,819,697
|
||||||
|
2003 10,812,659 2,735,067 555,534 1,293,990 15,397,250
|
||||||
|
2004 10,347,697 2,564,014 489,984 1,335,068 14,736,763
|
||||||
|
2005 7,756,474 2,566,576 952,366 1,237,844 12,513,260
|
||||||
|
2006 10,180,930 2,582,717 980,663 1,349,704 15,094,014
|
||||||
|
2007 7,777,265 2,139,842 1,072,568 1,165,052 12,154,727
|
||||||
|
2008 8,438,897 2,070,185 1,133,535 744,959 12,387,576
|
||||||
|
2009 6,799,719 1,384,909 1,031,003 836,322 10,051,953
|
||||||
|
2010 8,744,056 1,058,819 726,205 943,236 11,472,316
|
||||||
|
2011 9,315,749 1,331,667 881,376 1,118,585 12,647,377
|
||||||
|
2012 7,183,857 3,412,332 725,511 1,410,408 12,732,108
|
||||||
|
2013 7,695,116 3,542,761 397,957 1,248,095 12,883,929
|
||||||
|
2014 7,224,000 3,466,000 280,000 1,325,000 12,295,000
|
||||||
|
2015 7,100,586 3,585,016 348,866 728,966 11,763,434
|
||||||
|
2016 7,429,542 3,500,698 179,268 250,145 11,359,653
|
||||||
|
2017 7,930,728 3,357,738 302,371 144,179 11,735,016
|
||||||
|
2018 7,333,837 3,341,052 207,964 214,540 11,097,393
|
||||||
|
2019 6,606,136 3,661,700 45,748 233,001 10,546,585
|
||||||
|
|
||||||
|
Source: Department of Mines Minerals and Energy
|
||||||
|
|
||||||
|
1990 - 2019 Coal Production (Tons)
|
||||||
|
|
||||||
|
1990 - 2019 Coal Production (Tons)
|
||||||
|
|
||||||
|
Year Buchanan | Dickenson Russell Tazewell PDC Total
|
||||||
|
1990 20,938,340 | 6,686,984 926,249 3,716,869 | 32,268,442
|
||||||
|
1991 17,479,189 | 5,857,352 | 1,114,282 | 3,921,886 | 28,372,709
|
||||||
|
1992 17,962,757 | 6,360,976 | 1,094,510 | 3,534,018 | 28,952,261
|
||||||
|
1993 13,958,036 | 5,516,515 | 1,552,558 | 2,862,372 | 23,889,481
|
||||||
|
1994 13,594,006 | 4,303,346 | 1,467,694 | 2,481,842 | 21,846,888
|
||||||
|
1995 13,791,629 | 2,704,253 | 1,728,600 | 2,156,220 | 20,380,702
|
||||||
|
1996 14,783,931 | 2,988,258 | 1,345,502 | 1,839,618 | 20,957,309
|
||||||
|
1997 14,224,401 | 3,699,032 696,401 1,699,083 | 20,318,917
|
||||||
|
1998 12,467,167 | 4,021,151 705,429 1,806,652 | 19,000,399
|
||||||
|
1999 10,655,918 | 4,168,329 394,430 2,069,730 | 17,288,407
|
||||||
|
2000 11,154,684 | 4,259,431 156,525 1,469,825 | 17,040,465
|
||||||
|
2001 11,589,519 | 3,230,718 665,065 1,626,539 | 17,111,841
|
||||||
|
2002 10,048,222 | 2,779,463 556,557 1,435,455 | 14,819,697
|
||||||
|
2003 10,812,659 | 2,735,067 555,534 1,293,990 | 15,397,250
|
||||||
|
2004 10,347,697 | 2,564,014 489,984 1,335,068 | 14,736,763
|
||||||
|
2005 7,756,474 | 2,566,576 952,366 1,237,844 | 12,513,260
|
||||||
|
2006 10,180,930 | 2,582,717 980,663 1,349,704 | 15,094,014
|
||||||
|
2007 7,777,265 | 2,139,842 | 1,072,568 | 1,165,052 | 12,154,727
|
||||||
|
2008 8,438,897 | 2,070,185 | 1,133,535 744,959 12,387,576
|
||||||
|
2009 6,799,719 | 1,384,909 | 1,031,003 836,322 10,051,953
|
||||||
|
2010 8,744,056 | 1,058,819 726,205 943,236 11,472,316
|
||||||
|
2011 9,315,749 | 1,331,667 881,376 1,118,585 | 12,647,377
|
||||||
|
2012 7,183,857 | 3,412,332 725,511 1,410,408 | 12,732,108
|
||||||
|
2013 7,695,116 | 3,542,761 397,957 1,248,095 | 12,883,929
|
||||||
|
2014 7,224,000 | 3,466,000 280,000 1,325,000 | 12,295,000
|
||||||
|
2015 7,100,586 | 3,585,016 348,866 728,966 11,763,434
|
||||||
|
2016 7,429,542 | 3,500,698 179,268 250,145 11,359,653
|
||||||
|
2017 7,930,728 | 3,357,738 302,371 144,179 11,735,016
|
||||||
|
2018 7,333,837 | 3,341,052 207,964 214,540 11,097,393
|
||||||
|
2019 6,606,136 | 3,661,700 45,748 233,001 10,546,585
|
||||||
|
|
||||||
|
Source: Department of Mines Minerals and Energy
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
ALL Years
|
||||||
|
|
||||||
File diff suppressed because it is too large
Load Diff
|
|
@ -0,0 +1,200 @@
|
||||||
|
---
|
||||||
|
type: document
|
||||||
|
title: Combined-Notice
|
||||||
|
file: ../Combined-Notice.pdf
|
||||||
|
tags:
|
||||||
|
- Cumberland_Plateau_Planning_District_Commission
|
||||||
|
docDate: null
|
||||||
|
contentType: application/pdf
|
||||||
|
contentLength: 132419
|
||||||
|
sha256sum: fbcedb271252350cb8fb56ba9b3bc091c52729e8f6f6f94fa22b785001504eed
|
||||||
|
sha1sum: 47b1591e66cd7e729e1b635f4bd57ff2dd1f9530
|
||||||
|
---
|
||||||
|
|
||||||
|
COMBINED NOTICE OF FINDING OF NO SIGNIFICANT IMPACT
|
||||||
|
AND INTENT TO REQUEST RELEASE OF FUNDS
|
||||||
|
|
||||||
|
|
||||||
|
February 14, 2023
|
||||||
|
|
||||||
|
|
||||||
|
Virginia Coalfield Coalition (VCC)
|
||||||
|
|
||||||
|
|
||||||
|
PO Box 548, 224 Clydesway Drive
|
||||||
|
|
||||||
|
|
||||||
|
Lebanon, Virginia, 24266
|
||||||
|
|
||||||
|
|
||||||
|
Prepared by Cumberland Plateau Planning District Commission -- (276)-889-1778
|
||||||
|
|
||||||
|
|
||||||
|
This Notice shall satisfy the above-cited two separate but related procedural notification requirements.
|
||||||
|
|
||||||
|
|
||||||
|
REQUEST FOR RELEASE OF FUNDS
|
||||||
|
|
||||||
|
On or about March 17, 2023 the Virginia Coalfield Coalition will submit a request to the Virginia Department of
|
||||||
|
Housing and Community Development (DHCD) for the release of Appalachian Regional Commission ARC
|
||||||
|
POWER+ funds as amended under the Appalachian Redevelopment Act of 1965 to undertake a project known as
|
||||||
|
the Buchanan-Tazewell Wireless Communication Job Growth Corridor for the purpose of constructing and
|
||||||
|
activating six (6) new cellular towers along US Route 460 between the communities of Red Ash and Vansant.
|
||||||
|
|
||||||
|
|
||||||
|
FINDING OF NO SIGNIFICANT IMPACT
|
||||||
|
|
||||||
|
The Virginia Coalfield Coalition has determined that the project will have no significant impact on the human
|
||||||
|
environment. Therefore, an Environmental Impact Statement under the National Environmental Policy Act of
|
||||||
|
1969 (NEPA) is not required. Additional project information is contained in the Environmental Review Record
|
||||||
|
(ERR) on file at the offices of the Cumberland Plateau Planning District Commission, located at 224 Clydesway
|
||||||
|
Drive, Lebanon, VA 24266, between 8:00 AM and 4:00 PM and may be examined or copied on weekdays at the
|
||||||
|
times listed. A digital copy of the Environmental Review record is also available upon request by calling the
|
||||||
|
number listed in this notice’s heading or by emailing CPerkins@cppdc.org.
|
||||||
|
|
||||||
|
|
||||||
|
PUBLIC COMMENTS
|
||||||
|
|
||||||
|
Any individual, group, or agency disagreeing with this determination or wishing to comment on the project may
|
||||||
|
submit written comments to the Cumberland Plateau Planning District Commission—PO Box 548, 224
|
||||||
|
Clydesway Drive, Lebanon, VA 24266. All comments received by March 16, 2023 will be considered by the
|
||||||
|
Virginia Coalfield Coalition prior to authorizing submission of a request for release of funds. Commentors should
|
||||||
|
specify which part of this Notice they are addressing.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
COMBINED NOTICE OF FINDING OF NO SIGNIFICANT IMPACT
|
||||||
|
AND INTENT TO REQUEST RELEASE OF FUNDS.
|
||||||
|
|
||||||
|
February 14, 2023
|
||||||
|
Virginia Coalfield Coalition (VCC)
|
||||||
|
PO Box 548, 224 Clydesway Drive
|
||||||
|
Lebanon, Virginia, 24266
|
||||||
|
Prepared by Cumberland Plateau Planning District Commission -- (276)-889-1778
|
||||||
|
This Notice shall satisfy the above-cited two separate but related procedural notification requirements.
|
||||||
|
|
||||||
|
REQUEST FOR RELEASE OF FUNDS
|
||||||
|
|
||||||
|
On or about March 17, 2023 the Virginia Coalfield Coalition will submit a request to the Virginia Department of
|
||||||
|
Housing and Community Development (DHCD) for the release of Appalachian Regional Commission ARC
|
||||||
|
POWER+ funds as amended under the Appalachian Redevelopment Act of 1965 to undertake a project known as
|
||||||
|
the Buchanan-Tazewell Wireless Communication Job Growth Corridor for the purpose of constructing and
|
||||||
|
activating six (6) new cellular towers along US Route 460 between the communities of Red Ash and Vansant.
|
||||||
|
|
||||||
|
FINDING OF NO SIGNIFICANT IMPACT.
|
||||||
|
|
||||||
|
The Virginia Coalfield Coalition has determined that the project will have no significant impact on the human
|
||||||
|
environment, Therefore, an Environmental Impact Statement under the National Environmental Policy Act of
|
||||||
|
1969 (NEPA) is not required. Additional project information is contained in the Environmental Review Record
|
||||||
|
(ERR) on file at the offices of the Cumberland Plateau Planning District Commission, located at 224 Clydesway
|
||||||
|
Drive, Lebanon, VA 24266, between 8:00 AM and 4:00 PM and may be examined or copied on weekdays at the
|
||||||
|
times listed. A digital copy of the Environmental Review record is also available upon request by calling the
|
||||||
|
number listed in this notice’s heading or by emailing CPerkins@cppdc.org.
|
||||||
|
|
||||||
|
PUBLIC COMMENTS
|
||||||
|
|
||||||
|
‘Any individual, group, or agency disagreeing with this determination or wishing to comment on the project may
|
||||||
|
submit written comments to the Cumberland Plateau Planning District Commission—PO Box 548, 224
|
||||||
|
Clydesway Drive, Lebanon, VA 24266. All comments received by March 16, 2023 will be considered by the
|
||||||
|
Virginia Coalfield Coalition prior to authorizing submission of a request for release of funds. Commentors should
|
||||||
|
specify which part of this Notice they are addressing.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
RELEASE OF FUNDS
|
||||||
|
|
||||||
|
The Virginia Coalfield Coalition certifies to DHCD that Scotty Wampler in his capacity as Co-Executive Director
|
||||||
|
consents to accept the jurisdiction of the Federal Courts if an action is brought to enforce responsibilities in
|
||||||
|
relation to the environmental review process and that these responsibilities have been satisfied. DHCD’s approval
|
||||||
|
of the certification satisfies its responsibilities under NEPA and related laws and authorities, and allows the
|
||||||
|
Virginia Coalfield Coalition to use Program funds.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
OBJECTIONS TO RELEASE OF FUNDS
|
||||||
|
|
||||||
|
DHCD will consider objections to its release of funds and the Virginia Coalfield Coalition’s certification received
|
||||||
|
by April 1, 2023 or a period of fifteen days from its receipt of the request (whichever is later) only if they are on
|
||||||
|
one of the following bases: (a) the certification was not executed by the Certifying Officer or other officer of the
|
||||||
|
Virginia Coalfield Coalition approved by DHCD; (b) the Virginia Coalfield Coalition has omitted a step or failed
|
||||||
|
to make a decision or finding required by HUD regulations at 24 CFR Part 58; (c) the grant recipient or other
|
||||||
|
participants in the project have committed funds or incurred costs not authorized by 24 CFR Part 58 before
|
||||||
|
approval of a release of funds by DHCD; or (d) another Federal agency acting pursuant to 40 CFR Part 1504 has
|
||||||
|
submitted a written finding that the project is unsatisfactory from the standpoint of environmental quality.
|
||||||
|
Objections must be prepared and submitted in accordance with the required procedures (24 CFR Part 58) and
|
||||||
|
shall be addressed to DHCD at:
|
||||||
|
|
||||||
|
|
||||||
|
Director
|
||||||
|
Virginia Department of Housing & Community Development
|
||||||
|
Attn: Program Administration and Assistance Office
|
||||||
|
Main Street Centre
|
||||||
|
|
||||||
|
600 E. Main St., Suite 300
|
||||||
|
Richmond, Virginia 23219-2430
|
||||||
|
|
||||||
|
(804) 371-7061 [TTP 371-7089 / FAX 371-7093]
|
||||||
|
|
||||||
|
Potential objectors should contact DHCD to verify the actual last day of the objection period.
|
||||||
|
|
||||||
|
|
||||||
|
Scotty Wampler, Co-Executive Director
|
||||||
|
Virginia Coalfield Coalition
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
RELEASE OF FUNDS
|
||||||
|
|
||||||
|
The Virginia Coalfield Coalition certifies to DHCD that Scotty Wampler in his capacity as Co-Executive Director
|
||||||
|
consents to accept the jurisdiction of the Federal Courts if an action is brought to enforce responsibilities in
|
||||||
|
relation to the environmental review process and that these responsibilities have been satisfied. DHCD’s approval
|
||||||
|
of the certification satisfies its responsibilities under NEPA and related laws and authorities, and allows the
|
||||||
|
Virginia Coalfield Coalition to use Program funds.
|
||||||
|
|
||||||
|
OBJECTIONS TO RELEASE OF FUNDS
|
||||||
|
|
||||||
|
DHCD will consider objections to its release of funds and the Virginia Coalfield Coalition’s certification received
|
||||||
|
by April 1, 2023 or a period of fifteen days from its receipt of the request (whichever is later) only if they are on
|
||||||
|
one of the following bases: (a) the certification was not executed by the Certifying Officer or other officer of the
|
||||||
|
Virginia Coalfield Coalition approved by DHCD; (b) the Virginia Coalfield Coalition has omitted a step or failed
|
||||||
|
to make a decision or finding required by HUD regulations at 24 CFR Part 58; (c) the grant recipient or other
|
||||||
|
participants in the project have committed funds or incurred costs not authorized by 24 CFR Part 58 before
|
||||||
|
approval of a release of funds by DHCD; or (d) another Federal agency acting pursuant to 40 CFR Part 1504 has
|
||||||
|
submitted a written finding that the project is unsatisfactory from the standpoint of environmental quality.
|
||||||
|
Objections must be prepared and submitted in accordance with the required procedures (24 CFR Part 58) and
|
||||||
|
shall be addressed to DHCD at:
|
||||||
|
|
||||||
|
Director
|
||||||
|
|
||||||
|
Virginia Department of Housing & Community Development
|
||||||
|
Attn: Program Administration and Assistance Office
|
||||||
|
|
||||||
|
Main Street Centre
|
||||||
|
|
||||||
|
600 E. Main St., Suite 300
|
||||||
|
|
||||||
|
Richmond, Virginia 23219-2430
|
||||||
|
|
||||||
|
(804) 371-7061 [TTP 371-7089 / FAX 371-7093]
|
||||||
|
|
||||||
|
Potential objectors should contact DHCD to verify the actual last day of the objection period.
|
||||||
|
|
||||||
|
Scotty Wampler, Co-Executive Director
|
||||||
|
Vii Coalfield Coalition
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
Some files were not shown because too many files have changed in this diff Show More
Loading…
Reference in New Issue
Block a user